GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 607
TO BE ANSWERED ON 22.07.2026
RAILWAY INFRASTRUCTURE EXPANSION IN MADHYA PRADESH
607. SHRI GANESH SINGH:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of railway infrastructure projects including new lines,
doubling, tripling, station redevelopment, electrification and capacity
enhancement works being implemented in Madhya Pradesh out of the
record capital expenditure provided to Indian Railways in recent years;
(b) the details of the amount of railway investment allocated to Madhya
Pradesh and the major projects sanctioned or under execution in the
State during the Financial Year 2026–27;
(c) the details of the progress made in railway capacity augmentation,
freight infrastructure, station redevelopment, electrification and
passenger amenities in the Satna–Maihar–Katni corridor, along with the
expected benefits for passengers, industries and mineral
transportation; and
(d) the details of the growth recorded in freight loading and passenger
traffic in Madhya Pradesh including the contribution of the State
towards Indian Railways achieving the historic milestone of over
hundred crore tonnes freight loading during the last decade?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) : Budget allocation in the recent years has increased significantly.
Budget allocation for Infrastructure projects and safety works, falling
fully/partly in the State of Madhya Pradesh is as under:
Period Outlay
2009-14 ₹632 crore/year
2026-27 ₹15,188 crore (nearly 24 times)
§ Page 1 of 11Track Construction:
The details of constructing new track falling fully/partly in the State of
Madhya Pradesh is as under:
Period New Track Average Commissioning of new
Commissioned tracks
2009-14 145 Km 29 Km/year
2014-26 2,893 Km 241 Km/year (More than 8 times)
Project Sanctioned:
As on 01.04.2026, 32 projects (10 New Lines, 02 Gauge Conversion and 20
Doubling), of total length of 5,584 Km, costing ₹1,26,939 crore falling
fully/partly in Madhya Pradesh are sanctioned. The summary is as under:
Category No. of Total Length Expenditure
projects Length Commissioned upto March-26
(in Km) Upto March- 26 (₹ in Cr.)
(Km)
New Lines 10 1,936 621 19,435
Gauge 02 809 457 7,771
Conversion
Doubling / 20 2,839 1,037 18,876
Multitracking
Total 32 5,584 2,115 46,082
Recently completed projects:
Details of some of the recently completed projects falling fully/partly in the
State of Madhya Pradesh are as under:
S.No. Name of Project Cost
(₹ in Crores)
1 Anuppur - Katni 3rd Line (166 Km) 2,311
2 Pendra Road - Anuppur 3rd Line (50 Km) 394
3 Bhopal-Bina 3rd Line (145 Km) 1,075
Page 2 of 11S.No. Name of Project Cost
(₹ in Crores)
4 Bina-Kota Doubling (283 Km) 2,477
5 Jabalpur-Gondia Gauge Conversion (300 Km) 2,005
6 Chhindwara-Nagpur Gauge Conversion (150 Km) 1,512
7 Chhindwara-Mandla Fort Gauge Conversion (182 1,268
Km)
8 Itarsi-Budhni 3rd Line (25 Km) 286
9 Barkhera-Bhopal 3rd Line (41 Km) 473
10 Nimach-Chittaurgarh Doubling (56 Km) 560
11 Budhni-Barkhera 3rd Line (27 Km) 1,703
12 Indore-Dewas-Ujjain Doubling (79 Km) 757
13 Guna- Etawah New Line (348 Km) 683
14 Ramna-Singrauli Doubling (160 Km) 2,436
15 Karaila Road- Shaktinagar Doubling (32 Km) 763
16 Katni-Bina 3rd Line (260 Km) 3,138
17 Nimach-Ratlam Doubling (133 Km) 1,475
Ongoing projects:
Some of the projects falling fully/partly in the State of Madhya Pradesh
which have been taken up are as under:
S. Project Cost
No. (₹ in Crores)
1 Katni- Grade separator / Bypass (35 Km) 2,300
2 Katni- Singrauli Doubling (257 Km) 4,377
3 Lalitpur- Khajuraho New Line (541 Km) 8,914
4 Ramganjmandi-Bhopal New Line (277 Km) 5,073
5 Indore-Budni New Line (198 Km) 7,474
6 Nimach-Badi Sadri New Line (48 Km) 896
7 Gwalior-Sheopurkalan Gauge Conversion (284 3,947
Km)
8 Itarsi- Nagpur 3rd Line (280 Km) 2,607
9 Jhansi-Bina 3rd Line (153 Km) 2,002
Page 3 of 11S. Project Cost
No. (₹ in Crores)
10 Mathura-Jhansi 3rd Line (274 Km) 5,961
11 Jhansi- Manikpur & Khirar-Bhimsen Doubling 4,330
(431 Km)
12 Satna-Rewa Doubling (50 Km) 616
13 Manmad - Indore New Line (360 Km) 18,529
14 Bhusawal-Khandwa 3rd & 4th Line (131 Km) 3,285
15 Dahod-Indore New Line (205 Km) 9,746
16 Chhota Udepur-Dhar New Line (147 Km) 1,994
17 Ratlam-Nagda 3rd and 4th Line (41 Km) 964
18 Vadodara-Ratlam 3rd and 4th Line (259 Km) 8,885
19 Ratlam-Akola Gauge Conversion (525 Km) 18,811
20 Bina-Itarsi 4th Line (237 km) 4,329
21 Itarsi-Nagpur 4th Line (297 Km) 5,010
22 Gondia-Jabalpur Doubling (231 Km) 5,236
23 Nagda-Mathura 3rd & 4th Line (568 Km) 16,403
Completion of Railway project/s depends on various factors which include
the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
To further improve the connectivity in Katni-Maihar-Satna section, Final
Location Survey (FLS) for 3rd line between Katni- Maihar - Satna - Manikpur
Page 4 of 11(176 km) has been sanctioned. Field survey has been completed and
Detailed Project Report (DPR) has been prepared.
After preparation of DPR, sanctioning of project requires consultation with
various stake-holders including State Governments and necessary
approvals viz. appraisal of NITI Aayog, Ministry of Finance etc. As
sanctioning of projects is a continuous and dynamic process, exact
timelines depend upon appraisal and approval by various stakeholders.
Station Development
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve and upgrade the stations of Indian Railways. The
master planning, keeping in view the necessity of each station, includes:
• Improvement of access to station and circulating areas
• Integration of station with both sides of city
• Improvement of station building
• Improvement of waiting halls, toilets, sitting arrangement, water
booths
• Provision of wider foot over bridge/subway to commensurate with
passenger traffic
• Provision of lifts/escalators/ramps
• Improvement of platform surface/ provision of platform shelter
• Provision of kiosks for local products through schemes like ‘One
Station One Product’
• Parking development
• Amenities for Divyangjans
• Better passenger information systems
Page 5 of 11• Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 80 stations, including Katni Jn., Katni Murwara, Katni
South, Maihar, Satna station are located in Madhya Pradesh. The names of
stations identified for development under Amrit Bharat Station Scheme in
Madhya Pradesh are as following:
State No. of Name of Stations
Stations
Madhya 80 Akodia, Amla, Anuppur, Ashoknagar, Balaghat,
Pradesh
Banapura, Bargawan, Beohari, Berchha, Betul,
Bhind, Bhopal, Bijuri, Bina, Biyavra Rajgarh,
Chhindwara, Dabra, Damoh, Datia, Dewas,
Gadarwara, Ganjbasoda, Ghoradongri, Guna,
Gwalior, Harda, Harpalpur, Indore Jn, Itarsi Jn,
Jabalpur, Junnor Deo, Kareli, Katni Jn, Katni
Murwara, Katni South, Khachrod, Khajuraho Jn,
Khandwa, Khirkiya, Laxmi Bai Nagar, Maihar,
Maksi Jn, Mandla Fort, Mandsor, MCS Chhatarpur,
Meghnagar, Morena, Multai, Nagda Jn, Nainpur
Jn, Narmadapuram, Narsinghpur, Nepanagar,
Nimuch, Orchha, Pandhurna, Pipariya, Ratlam,
Rewa, Ruthiyai, Sanchi, Sant Hirdaram Nagar,
Satna, Saugor, Sehore, Seoni, Shahdol, Shajapur,
Shamgarh, Sheopur Kalan, Shivpuri, Shridham,
Shujalpur, Sihora Road, Singrauli, Tikamgarh,
Page 6 of 11State No. of Name of Stations
Stations
Ujjain, Umaria, Vidisha, Vikramgarh Alot
Development works at railway stations under Amrit Bharat Station
Scheme in Madhya Pradesh have been taken up at a good pace. Details
of stations completed in Madhya Pradesh are as under:
State No. of stations Name of stations
Madhya 19 Ashoknagar, Balaghat, Beohari, Bhind,
Pradesh Chhindwara, Harpalpur, Junnor Deo, Katni
South, MCS Chhatarpur, Nainpur Junction,
Narmadapuram, Orchha, Sanchi, Seoni,
Shajapur, Shivpuri, Shridham, Tikamgarh,
Vidisha
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Katni Junction station: The works of improvement of station building,
entry and exit porches, waiting halls, improvement of platform
surface, platform shelter, signage, amenities for Divyangjan and new
toilet block have been completed. The works of 12 m wide foot over
bridge, lifts and escalators have been taken up.
Katni Murwara station: The works of improvement of station building,
entry and exit porches, waiting halls, new toilet block, improvement
of platform surface, platform shelter, signage and amenities of
Divyangjan have been completed. The works of 12 m wide foot over
bridge, lifts and escalators have been taken up.
Page 7 of 11 Maihar station: The works of improvement of station building, entry
and exit porches, raising and surfacing of platforms no. 1, 2 & 3,
improvement of platform shelter at platform no. 1, 2 & 3, improvement
of circulating area, waiting hall, amenities of Divyangjan, new toilet
blocks and signage have been completed. The works of 12 m wide
foot over bridge, lifts and escalators have been taken up.
Satna station: The works of departure station building (front side),
arrival station building (front side), departure/arrival station building
(rear side) and Pay & Use toilets have been taken up.
Sihora Road station: The works of improvement of station building,
platform raising and surfacing of platform no. 1 & 2, new toilet blocks,
improvement of waiting hall, improvement of circulating area &
parking, provision of 12 m wide foot over bridge, improvement of
circulating area and parking at second entry and improvement of
amenities for Divyangjan have been completed. The works of lifts and
escalators have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Development / Upgradation of railway stations is a complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as tree cutting, heritage, fire clearance, airport clearance
etc. These stations are in operation since long, so brownfield work
challenges are being faced, such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipelines, power/signal
Page 8 of 11cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in close
proximity of the tracks and near to high voltage power lines, etc. and these
factors affect the progress of work and completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Madhya Pradesh is covered under the jurisdiction of seven railway
zones, namely, Central Railway, East Central Railway, North Central
Railway, South Central Railway, South East Central Railway, Western
Railway and West Central Railway. For these zones, an allocation of ₹ 5,285
crore has been made for the financial year 2026-27, out of which an
expenditure (up to June, 2026) of ₹ 2,318 crore has been incurred so far.
ROBs/RUBs
Sanctioning of works of Road over Bridge (ROB)/Road under Bridge (RUB) in
lieu of Level crossings (LCs) is a continuous and dynamic process of Indian
Railway.
Such works are prioritised and taken up on the basis of their impact on
safety in train operations, mobility of trains & impact for road users and
feasibility etc. No. of ROBs/ RUBs constructed on Indian Railways during
the period 2004-14 vis a vis 2014-26 (Upto May’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 14,451 Nos. (1,361 Nos. in the State of Madhya
(Upto May’26) Pradesh)
As on 01.06.2026, 4993 Nos. ROBs/ RUBs works are sanctioned at a cost of
approx. ₹ 1,17,492 Cr on Indian Railways including 313 Nos. ROBs/ RUBs
Page 9 of 11works at a cost of approx. ₹ 8,018 Cr in the state of Madhya Pradesh which
are at various stages of planning and execution.
Completion & commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of LC, fixing of approach alignment, approval of General
Arrangement Drawing (GAD), land acquisition, removal of encroachment,
shifting of infringing utilities, statutory clearances from various
authorities, law and order situation in the area of project / work sites,
duration of working season in a year for the particular project / area due to
climatic conditions etc. All these factors affect the completion time of the
projects / works.
Further, Railways have taken following measures to expedite the progress
of work:
1. Joint survey with concerned State Govt./Road Owning Authority is
done before finalizing the General Arrangement Drawing (GAD) to
ensure smooth execution.
2. Periodic meetings of Railway & State Government officials are done
to resolve various issues related to ROB/RUB works.
3. Standardization of superstructure and substructure drawings for
various combinations of span, skewness and width of road on the
Railway portion has been done to avoid delays during the design
approval. This has been issued in the form of a compendium, which
can be directly adopted for Road Over Bridge across Railway lines for
expeditious planning.
Railway Electrification
Electrification of railway network on Indian Railways has been taken up in
mission mode. So far, about 99.6% of Broad Gauge (BG) network has been
Page 10 of 11electrified. The electrification in remaining network has been taken up.
Electrification carried out during 2014-26 and before 2014 is as under:
Period Route Kilometer
Before 2014 (about 60 years) 21,801
2014-26 48,072
In Madhya Pradesh, entire existing BG network has been electrified.
Further, all new line / multi-tracking projects are being sanctioned and
constructed with electrification.
Freight Loading and Passenger Traffic (Including Madhya Pradesh)
Year Revenue Freight Loading No. of Passenger
(In Million Tonnes) (in Crores)
2024-25 ~1,617 ~729
2025-26 ~1,670 ~760
*****
Page 11 of 11