**Executive Summary**
This document details the status of railway projects in Telangana as of December 3, 2025, including budgetary allocations, station upgrades under the Amrit Bharat Station Scheme, and the Railway Manufacturing Unit at Kazipet. A total of 20 projects costing ₹35,045 crore have been sanctioned, with an expenditure of ₹11,549 crore incurred up to March 2025. The commissioning target for the Siddipet – Siricilla line is FY 2025-26.
**Key Points / Main Content**
* **Railway Projects and Coverage:**
* Railway infrastructure projects in Telangana fall under East Coast Railway (ECoR), South Central Railway (SCR), and South Western Railway (SWR) zones.
* Details of railway projects, including cost, expenditure, and outlay, are publicly available.
* **Project Statistics (as of 01.04.2025):**
* 20 projects (6 New Lines, 14 Doubling) sanctioned for ₹35,045 crore, covering 2,165 km.
* 547 km length has been commissioned.
* **Financial Outlay (Infrastructure Projects in Telangana):**
* 2023-24: Rs. 4,418 Cr.
* 2024-25: Rs. 5,336 Cr.
* 2025-26: Rs. 5,337 Cr.
* **New Track Commissioning (Telangana):**
* 2009-14: 87 km
* 2014-25: 774 km (More than 8 times compared to 2009-14)
* **Recently Completed Projects (Partial List):**
* Peddapalli- Nizamabad new line (178 Km): ₹926 Cr
* Jaggayyapeta- Janpahadnew line (48 Km): ₹737 Cr
* Akkanapet – Medak new line (17 Km): ₹205 Cr
* Bhadrachalam Road-Sattupalli new line (56 Km): ₹990 Cr
* Raghavapuram-Mandamari Doubling (24 Km): ₹165 Cr
* Raichur-Guntakal Doubling (81 Km): ₹388 Cr
* Secunderabad- Mehboobnagar Doubling (85 Km): ₹1,266 Cr
* Multi- Modal Transport System (MMTS) Phase-II, Hyderabad (103 Km): ₹1,156 Cr
* Byepass line at Peddapalli (2 Km): ₹37 Cr
* **Recently Undertaken Projects (Partial List):**
* Manoharabad-Kothapalli new line (151 km): ₹2,781 Cr
* Malkangiri-Pandurangapuram new line (174 Km): ₹3,592 Cr
* Kazipet -Vijaywada - 3rd line (220 km): ₹3,315 Cr
* Kazipet -Ballarshah - 3rd line (202 km): ₹3,183 Cr
* Guntur- Bibinagar Doubling(239 km): ₹2,853 Cr
* Mudkhed - Medchal - Dhone Doubling (417 km): ₹4,686 Cr
* Bhadrachalam Road – Dornakal Doubling(55 km): ₹770 Cr
* Motumari-Vishnupuram doubling and RoR at Motumari (100 km): ₹1,596 Cr
* Nashkal (Pindial)-Hasanparthi Road bypass (25 Km): ₹465 Cr
* Secunderabad (Sanathnagar)- Wadi 3rd and 4th line (173 Km): ₹5,012 Cr
* DornakalRail over Rail (RoR) Flyover (11 Km): ₹327 Cr
* **Land Acquisition:**
* Total land required: 2,343 Ha; Land acquired: 1,580 Ha (67%); Balance to be acquired: 764 Ha (33%).
* Projects delayed due to land acquisition (examples): Guntur-Bibinagar Doubling, Mudkhed - Medchal&Mahbubnagar - DhoneDoubling, Kazipet-Vijaywada 3rd line, Manoharabad – Kothapalli New Line.
* Government of Telangana needs to provide land free of cost for Manoharabad - Kothapalli new line.
* **Cost-Sharing Projects:**
* 4 projects sanctioned with cost-sharing; Telangana government's share is Rs. 2,181 Cr.
* Telangana has deposited Rs. 894 Cr against the required Rs. 1,708 Cr, leading to a shortfall of Rs. 814 Cr.
* **Project Completion Factors:**
* Completion depends on land acquisition, forest clearance, shifting utilities, statutory clearances, and geological conditions.
* **Station Re-development (Amrit Bharat Station Scheme):**
* 1337 stations identified for development, including 40 in Telangana.
* Master plans involve phased implementation for improvements.
* Phase-I works completed at Begumpet, Karimnagar, and Warangal stations.
* Telangana is covered under South Central Railway with an allocation of ₹863 crore for FY 2025-26, out of which ₹664.27 crore has been spent (up to October 2025).
* **Railway Manufacturing Unit at Kazipet:**
* Planned unit with a cost of Rs.521.36 crore for manufacturing and maintaining rolling stocks.
* Significant progress in civil and electrical infrastructure; machinery and plants delivered.
**Impact Analysis**
**Stakeholder:** Ministry of Railways
* **Impact:** Responsible for overall execution and monitoring of railway projects in Telangana.
* **Action Required:** Ensure timely release of funds, address land acquisition issues, and monitor progress of various projects.
**Stakeholder:** Government of Telangana
* **Impact:** Required to provide land for projects, share costs for certain projects, and coordinate with the Ministry of Railways.
* **Action Required:** Expedite land acquisition, deposit the remaining funds for cost-sharing projects, and ensure coordination for smooth project execution.
**Stakeholder:** Citizens of Telangana
* **Impact:** Benefit from improved railway infrastructure, enhanced connectivity, and upgraded station facilities.
* **Action Required:** Provide feedback on railway services and infrastructure to relevant authorities.
**Stakeholder:** Railway Passengers
* **Impact:** Improved facilities in the stations, faster commute times as projects get commissioned.
* **Action Required:** Understand the different processes involved in completion of railway projects, cooperate with construction and development projects for ease of progress.
Key Entities Referenced
Telangana: Indian state where the listed railway projects are located.
Amrit Bharat Station Scheme: A railway station redevelopment scheme launched by the Ministry of Railways. The document details which stations in Telangana are covered under the scheme.
Ministry of Railways: The ministry responsible for the railway projects and the Amrit Bharat Station Scheme mentioned in the document.
South Central Railway (SCR): One of the railway zones that covers railway infrastructure projects in Telangana.
Railway Manufacturing Unit at Kazipet: A railway manufacturing unit planned in Kazipet, Telangana, discussed in the document.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO.534
TO BE ANSWERED ON 03.12.2025
RAILWAY PROJECTS IN TELANGANA
534. SHRI ARVIND DHARMAPURI:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the total budgetary allocation for railway projects in
Telangana for the fiscal years 2023-24 and 2024-25;
(b) the details of the number of railway stations in Telangana identified
for upgradation under the Amrit Bharat Station Scheme, the total funds
allocated for their redevelopment along with their present status; and
(c) the current status/total central investment/the revised timeline for the
completion of the Railway Manufacturing Unit at Kazipet?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c) Railway Infrastructure Projects falling fully/partly in the State of
Telangana are covered under East Coast Railway (ECoR), South Central
Railway (SCR) and South Western Railway (SWR) Zones of Indian
Railways. Zonal Railway wise details of Railway projects including cost,
expenditure and outlay are made available in public domain.As on 01.04.2025, 20 projects (6 New Lines and 14 Doubling), of total length
of 2,165 Km, costing ₹35,045 crore falling fully/partly in the State of
Telangana have been sanctioned, out of which, 547 km length has been
commissioned and an expenditure of ₹11,549 crore has been incurred upto
March, 2025. The summary is as under:-
Category No. of Total Length Total Exp.
projects Length Commissioned upto
(in Km) till March, 2025 March,
(in Km) 2025
(Rs. in Cr.)
New Lines 6 840 245 4,611
Doubling/Multi-tracking 14 1,326 303 6,939
Total 20 2,165 547 11,549
The details of outlay for infrastructure projects falling fully/partly in the State
of Telangana is as under:-
Period Outlay
2023-24 Rs. 4,418 Cr.
2024-25 Rs. 5,336 Cr.
2025-26 Rs. 5,337 Cr.
The details of commissioning/laying of new track falling fully/partly in the
State of Telangana during 2009-14 and 2014-25 is as under:
Period New Track Average Commissioning of new
Commissioned tracks
2009-14 87 km -
2014-25 774 km More than 8 times
Details of some of the recently completed projects falling fully/partly in the
State of Telangana are as under:S. Cost
Project
No. (Rs. in Cr.)
1 Peddapalli- Nizamabad new line (178 Km) 926
2 Jaggayyapeta- Janpahadnew line (48 Km) 737
3 Akkanapet – Medak new line (17 Km) 205
4 Bhadrachalam Road-Sattupalli new line (56 990
Km)
5 Raghavapuram-Mandamari Doubling (24 Km) 165
6 Raichur-Guntakal Doubling (81 Km) 388
7 Secunderabad- Mehboobnagar Doubling (85 1,266
Km)
8 Multi- Modal Transport System (MMTS)
1,156
Phase-II, Hyderabad (103 Km)
9 Byepass line at Peddapalli (2 Km) 37
Some of the projects falling fully/partly in the State of Telangana
which have been taken up recently are as under:
S.N Name of Project Cost
(Cr)
1 Manoharabad-Kothapalli new line (151 km) 2,781
2 Malkangiri-Pandurangapuram new line (174 Km) 3,592
3 Kazipet -Vijaywada - 3rd line (220 km) 3,315
4 Kazipet -Ballarshah - 3rd line (202 km) 3,183
5 Guntur- Bibinagar Doubling(239 km) 2,853
6 Mudkhed - Medchal - Dhone Doubling (417 km) 4,686
7 Bhadrachalam Road – Dornakal Doubling(55 km) 770
8 Motumari-Vishnupuram doubling and RoR at Motumari 1,596
(100 km)
9 Nashkal (Pindial)-Hasanparthi Road bypass (25 Km) 465
10 Secunderabad (Sanathnagar)- Wadi 3rd and 4th line
5,012
(173 Km)
11 DornakalRail over Rail (RoR) Flyover (11 Km) 327In last 3 years i.e. (2022-23, 2023-24, 2024-25) and current Financial Year
i.e.2025-26, 57 surveys (18 New Line and 39 Doubling) covering a length of
5,672 km have been sanctioned falling fully/partly in the State of Telangana .
Execution of important infrastructure projects falling fully/partly in the State
of Telangana is held up due to delay in land acquisition. Status of land
acquisition in Telangana is as under:
Total Land required 2,343 Ha
Land Acquired 1,580 Ha (67%)
Balance Land to be acquired 764 Ha (33%)
Details of some major projects which are delayed due to land acquisition are
as under:-
SN Name of the project Total Land Balance Amount
land acquired Land to Paid to
required (in Ha) be State
(in Ha) acquired ( in Cr.)
(in Ha)
1. Guntur- 31 0 31 40
BibinagarDoubling
2. Mudkhed - 70 0 70 30
Medchal&Mahbubnagar
– DhoneDoubling
3. Kazipet-Vijaywada 3rd 135 118 17 159
line
4. Manoharabad – 1146 1050 96 -
Kothapalli New Line
Government of Telangana has to provide land free of cost for Manoharabad –
Kothapalli new line. From Manoharabad to Siddipet, 76 km has already been
commissioned. Siddipet – Siricilla (31km ) section out of 151 km is pending
since January 2025 is targeted for commissioning in FY 2025-26. However,for Forest land diversion in 2.1 km near Siricilla, Rs 10.10 Cr was demanded
in Jan-25 but money required has not yet been deposited by Telangana Govt.
till date. Commissioning of Siddipet – Siricilla (31km) is held up due to this
account.
04 projects in Telangana have been sanction on cost sharing basis at a cost
of Rs 4,704 Cr Share of Telangana Government in these projects is Rs.2,181
Cr. Telangana had to deposit Rs 1,708 Cr to Ministry of Railways for these
cost sharing projects. However they have deposited only Rs 894 Cr. Thus
there is a shortfall of Rs 814 Cr which is adversely affecting progress of
works.
Sanction of any railway project depends upon many parameters/factors
which include the following:
Anticipated traffic projections and remunerativeness of the proposed
route
First and last mile connectivity provided by the project
Connection of missing links and providing additional route
Augmentation of congested/saturated lines
Demands raised by State Governments/Central Ministries/Public
representatives,
Railway’s own operational requirements
Socio-economic considerations
Overall availability of funds
Completion of Railway project/s depends on various factors which
include the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
Station Re-development
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider foot over bridge/air concourse
commensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like
‘One Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at
each station.
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,phasing and feasibility and creation of city centre at the station
in the long term.
So far, 1337 stations, including 40 stations located in the state of
Telangana have been identified for development under Amrit Bharat
Station Scheme. The name of stations identified for development
under Amrit Bharat Station Scheme in the state of Telanganaare as
following:
State No. of Name of Stations
Stations
Telangana 40 Adilabad, Basar, Begumpet, Bhadrachalam
Road, Gadwal, Hafizpeta, Hi-tech city,
Huppuguda, Hyderabad, Jadcherla,
Jangaon, Kacheguda, Kamareddi,
Karimnagar, KazipetJn, Khammam,
Lingampalli, Madhira, Mahbubabad,
Mahbubnagar, Malakpet, MalkajgiriJn,
Manchiryal, Medak, Medchal, Miryalaguda,
Nalgonda, NizamabadJn, PeddapalliJn,
Ramagundam, Secunderabad, Shadnagar,
Sri BalaBrahmeswaraJogulamba, Tandur,
Umdanagar, Vikarabad, Warangal, Yadadri,
Yakutpura, Zahirabad
Development works at railway stations under Amrit Bharat Station
Scheme in the state of Telangana have been taken up at a good
pace. Till now, phase-I works of 3 stations (Begumpet, Karimnagar
and Warangal) in the state of Telangana have been completed
under this scheme.The works at other stations have also beentaken up at good pace and progress of some of the stations is
as given below:
Basar station: The works of improvement of platform
surfacing and platform wall have been completed. The works
of improvement of circulating area, platform shelter and
waiting hall have been taken up.
Khammam station: The works of platform shelter, general
waiting hall, retiring room and improvement to AC lounge
have been completed. The works of Foot Over Bridge, lifts,
escalator, station building and circulating area have been
taken up.
Sri Bala Brahmeswara Jogulamba station: The works of
platform raising, platform extension, improvement of station
building, circulating area, platform shelters and Divyangjan
facilities have been completed. The finishing works have
been taken up.
Hafizpeta station: The works of station building, booking
office, waiting hall, and toilet have been completed. The
works of platform shelter, platform surfacing, circulating
area, signages, lift, escalator, 12 m Foot Over Bridge and
Divyangjan facilities have been taken up.
Kazipet Junction station: The works of platform shelters,
improvement of existing general waiting hall, toilet, lift and
escalator have been completed. The works of improvement
of station building, AC waiting hall, circulating area, parking
area and Foot OverBridge have been taken up.
Further development / redevelopment / upgradation /
modernisation of stations on Indian Railways is a continuous and
ongoing process and works in this regard are undertaken as perrequirement, subject to inter-se priority and availability of funds.
The priority for development / redevelopment / upgradation /
modernisation of stations is accorded to higher category of
station over lower category of station while sanctioning and
executing the works.
Development / Upgradation of railway stations is complex in
nature involving safety of passengers & trains and requires
various statutory clearances such as fire clearance, heritage,
tree cutting, air-port clearance etc. The progress also gets
affected due to brownfield related challenges such as shifting of
utilities (involving water/sewage lines, optical fibre cables, gas
pipe lines, power/signal cables, etc.), infringements, operation of
trains without hindering passenger movement, speed restrictions
due to works carried out in close proximity of tracks and high
voltage power lines, etc. and these factors affect the completion
time. Therefore, no time frame can be indicated at this stage.
Development / upgradation / modernisation of stations including
under Amrit Bharat Station Scheme is generally funded under
Plan Head-53 ‘Customer Amenities’. The details of allocation and
expenditure under Plan Head-53 are maintained Zonal Railway-
wise and not work-wise, or station-wise or state-wise. The state
of Telangana is covered under the jurisdiction of South Central
Railway and for this zone, an allocation of ₹ 863crore has been
made for the financial year 2025-26, out of which an expenditure
(up to October, 2025) of ₹ 664.27 crore has been incurred so far.
Manufacturing unit at Kazipet
Indian Railways has planned to develop a Railway Manufacturing
Unit at Kazipet, Telangana at a cost of Rs.521.36 crore whichwill be capable of manufacturing and maintaining a variety of
modern Rolling Stocks. Significant progress has been made, with
the civil and electrical infrastructure nearing completion and the
majority of the machinery and plants delivered.
****