REDEVELOPMENT OF ERNAKULAM TOWN AND JUNCTION RAILWAY
STATIONS
569. SHRI HIBI EDEN:
Will the Minister of RAILWAYS be pleased to state:
(a) the expected date of completion of the redevelopment works of Town
Railway Station and Junction Railway Station, station-wise;
(b) whether provisions have been made to meet the needs of special groups
including lactating women, differently-abled individuals, transgenders,
women, concerning facilities, security and mandatory arrangements
and if so, the details thereof;
(c) whether there are strategies to address obstacles and ensure the
timely completion of the redevelopment projects in Ernakulam Town
and Junction Railway Stations with specified quality and if so, the
details thereof;
(d) whether a comprehensive overview is available for the new facilities
planned for Ernakulam Town and Junction, such as the proposed Sky
Walks and Multilevel Car Parking; and
(e) if so, the details thereof and if not, the reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): Ministry of Railways has identified Ernakulam Town and
Ernakulam Junction Railway Station for redevelopment under Amrit Bharat
Station Scheme. The progress at Ernakulam Town and Ernakulam Junction
stations is given below:
At Ernakulam Junction station, the structural works of east terminal
building, west terminal building, multi-level car parking and service
§ Page 1 of 6building have been taken up. The structural works of P-way depot and P-
way office has been completed and finishing works taken up.
At Ernakulam Town railway station, the structural work of west terminal
building- segment 1, multi level car parking, residential tower and
foundation for the foot over bridge have been completed. The finishing work
of multi level car parking, west terminal building (segment I) and super
structure work of foot over bridge was taken up. However, due to slow
progress of the work, the contract was terminated and retendering process
has been taken up.
The redevelopment plans of Ernakulam Town and Ernakulam Junction
railway station have provisions for feeding room, Child Help line, health
facilitation, security arrangements, toilets etc.
There is provision of Multi-Level Car Parking at Ernakulam Junction and
Ernakulam Town and Skywalk arrangement from Ernakulam Junction
station to Ernakulam South Metro station. Skywalk is planned from
Ernakulam Town station to Ernakulam North Road Over Bridge from where
access is available to bus stop and Town Hall Metro Station. East Terminal
of Ernakulam Junction station is very close to Manorama Bus stand. Above
arrangements are considered adequate and effective for passengers
coming to Railway station by Metro/Bus/Road Vehicle.
Amrit Bharat Station Scheme envisages development of stations on a
continuous basis with a long-term approach. It involves preparation of
master plans and their implementation in phases to improve the stations of
Indian Railways. The master planning, keeping in view the necessity of
each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Page 2 of 6 Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1340 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 35 stations including Ernakulam
Junction and Ernakulam Town railway stations are located in Kerala. The
names of stations identified for development under Amrit Bharat Station
Scheme in Kerala are as following:
State No. of Names of Stations
Stations
Kerala 35 Alappuzha , Angadippuram, Angamali For Kaladi,
Chalakudi, Changanassery, Chengannur,
Chirayinkeezh, Ernakulam, Ernakulam Town,
Ettumanur, Ferok, Guruvayur , Kannur, Kasargod,
Page 3 of 6Kayankulam Jn, Kollam Jn, Kozhikode, Kuttippuram,
Mavelikara, Neyyattinkara , Nilambur Road,
Ottappalam, Parappanangadi, Payyanur, Punalur,
Shoranur Jn., Thalassery, Thiruvananthapuram
Central, Thrisur, Tirur, Tiruvalla, Tripunithura,
Vadakara, Varkala Shivagiri, Wadakancheri
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Kerala have been taken up at a good pace. The detail of stations where
development works are completed in Kerala is as given below:
State No. of Name of Stations
Stations
Kerala 16 Angamaly for Kaladi, Chalakudi, Changanassery,
Chirayinkeezh, Ferok, Guruvayur, Kuttippuram,
Mavelikara, Nilambur Road, Parappanangadi, Shoranur
Jn., Thalassery, Tirur, Tripunithura, Vadakara,
Wadakancheri
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Kasargod Station: The works of improvements of station building,
new entrance porch, improvements of booking office and concourse,
improvement of platform surface of platform no. 2 & 3, improvements
of circulating area and parking, improvement of waiting hall, toilets,
platform shelters, lifts, installation of coach indication board and
improvement of amenities for Divyangjan have been completed. The
Page 4 of 6works of extension of platform no. 1, 6 m wide foot over bridge,
escalator and parking at second entry have been taken up.
Angadippuram station: The works of improvement of station building,
new entrance porch, concourse and booking office, platform shelter,
improvement of platform surfacing of platform no. 1 & 2, waiting hall,
toilet, improvement of circulating area and parking, approach road,
installation of coach indication board, train indication board, signages
and lifts have been completed. The work of provision of 6 m wide foot
over bridge has been taken up.
Payyanur station: The works of raising platform no. 2 & 3, provision of
platform shelter, improvement of concourse, booking office, waiting
hall, circulating area at second entry, parking, installation of coach
indication board and train indication board have been completed. The
works of improvement of station building, circulating area at main
entry, amenities for Divyangjan, 6 m wide foot over bridge and lifts
have been taken up.
Kollam station: The works of service building, multi level car parking
and parcel building have been completed. The works of 12 m wide
foot over bridge, air concourse, north terminal building, south
terminal building and platform upgradation have been taken up.
Indian Railways has a well established mechanism to monitor
implementation of projects including their reviews, inspection, check for
time and cost overruns, quality of works and audits. Monitoring of projects
is done at various levels including through dedicated portal of Indian
Railways named Indian Railway Project Sanction and Management (IRPSM).
Works are carried out adhering to the standards and specifications laid
down in various codes and manuals. Inspections/audits/checks are carried
Page 5 of 6out from time to time by various agencies/officials/multi-disciplinary teams
as per laid down instructions and actions for correction are taken
immediately. The issues faced by the executing units are accordingly
addressed. This is a continuous and ongoing process.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Development / Upgradation of stations is complex in nature involving
safety of passengers & trains and requires various statutory clearances
such as fire clearance, heritage, tree cutting, airport clearance etc. The
progress also gets affected due to brownfield related challenges such as
shifting of utilities (involving water/sewage lines, optical fibre cables, gas
pipe lines, power/signal cables, etc.), infringements, operation of trains
without hindering passenger movement, speed restrictions due to works
carried out in close proximity of tracks and high voltage power lines, etc.
and these factors affect the completion time.
*****
Page 6 of 6