(a) the number of railway stations redeveloped under the Amrit Bharat
Station Scheme (ABSS) in Uttar Pradesh including the Baghpat Lok
Sabha Constituency during the last three years and the current year
along with the current status of ongoing works at various stations, year-
wise;
(b) the steps taken/being taken by the Government to provide better
passenger amenities, universal accessibility, multi-modal integration,
green infrastructure, digital facilities, advanced waiting rooms and
improved traffic circulation;
(c) the expected impact of these initiatives on passenger experience,
regional connectivity and local economic development; and
(d) the details of the funds sanctioned and the tentative timelines for the
re-development of railway stations falling under the said Lok Sabha
Constituency of Uttar Pradesh under the ABSS during the last three
years and the current year, year-wise?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) Development works at railway stations of Baghpat Lok Sabha
Constituency in Uttar Pradesh are being carried out at a good pace,
including the redevelopment of Modinagar stations under the Amrit Bharat
Station Scheme. Significant progress has been achieved in improving
§ Page 1 of 9passenger amenities at the stations of Baghpat Lok Sabha Constituency,
the details are as under:
At Modinagar station, the development works have been completed which
includes, improvement to the station building, improvement of circulating
area, new 12 m wide foot over bridge, lifts, platform shelter, improvement
of platform surface, installation of furniture in the new waiting hall &
executive lounge, toilet, and amenities for Divyangjan.
At Khekra station the work of platform raising, cover over foot over bridge
and water booth have been completed.
At Baghpat Road station the work of improvement of platform surface,
cover over foot over bridge, water booth and overhead water tank have
been completed.
At Alawalpur Idrispur station the work of platform raising from rail level to
high level, and platform shelter have been completed.
At Baraut Station the work of cover on foot over bridge and water booth
have been completed.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
This scheme involves preparation of master plans and their implementation
in phases to improve the stations of Indian Railways. The master planning,
keeping in view the necessity of each station, includes:
Page 2 of 9● Improvement of access to station and circulating areas
● Integration of station with both sides of city
● Improvement of station building
● Improvement of waiting halls, toilets, sitting arrangement, water
booths
● Provision of wider foot over bridge/subway to commensurate with
passenger traffic
● Provision of lifts/escalators/ramps
● Improvement of platform surface/ provision of platform shelter
● Provision of kiosks for local products through schemes like ‘One
Station One Product’
● Parking development
● Amenities for Divyangjans
● Better passenger information systems
● Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term. Development of stations into city centres
envisages enhanced economic activities at and around the stations apart
from improved travel experience.
So far, 1,340 stations have been identified for development under this
scheme, out of which 157 stations, including Modinagar station of Baghpat
Lok Sabha Constituency, are located in Uttar Pradesh.
Page 3 of 9The names of stations identified for development under Amrit Bharat
Station Scheme in Uttar Pradesh are as following:
No. of Name of Stations
State
Stations
Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn,
Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand
Nagar Jn., Aonla, Ayodhya Dham Junction,
Azamgarh, Babatpur, Bachhrawan, Badaun,
Badshahnagar, Badshahpur, Baheri, Bahraich,
Balamau Jn., Ballia, Balrampur, Banaras,
Banda, Barabanki Jn, Bareilly, Bareilly City,
Barhni, Basti, Belthara Road, Bhadohi,
Bharatkund, Bhatni, Bhuteshwar, Bijnor,
Bulandsahar, Chandauli Majhwar, Chandausi,
Chilbila, Chitrakut dham karwi, Chopan,
Chunar Jn., Daliganj, Darshannagar, Deoria
Sadar, Dhampur, Dildarnagar, Etawah Jn.,
Farrukhabad, Fatehabad, Fatehpur, Fatehpur
Sikri, Firozabad, Gajraula, Garhmuktesar,
Gauriganj, Ghatampur, Ghaziabad, Ghazipur
City, Gola Gokarnath, Gomtinagar, Gonda,
Gorakhpur, Govardhan, Govindpuri,
Gursahaiganj, Haidergarh, Hapur, Hardoi,
Hathras City, Idgah Agra Jn, Izzatnagar,
Janghai Jn, Jaunpur City, Jaunpur Jn, Kannauj,
Kanpur Anwarganj, Kanpur Bridge Left Bank,
Kanpur Central, Kaptanganj Jn, Kasganj Jn,
Kashi, Khalilabad, Khorason road, Khurja Jn.,
Page 4 of 9No. of Name of Stations
State
Stations
Kosi Kalan, Kunda Harnamganj, Lakhimpur,
Lalganj, Lalitpur Jn, Lambhua, Lohta, Lucknow
(Charbagh) NR, Lucknow city, Lucknow Jn.
(NER), Maa Belha Devi Pratapgarh Junction,
Maghar, Maharaja Bijli Pasi, Mahoba Jn,
Mailani Jn, Mainpuri Jn, Malhaur, Manak
Nagar, Manikpur Jn, Mariahu, Mathura Jn, Mau
Jn, Meerut City Jn, Mirzapur, Modinagar,
Mohanlalganj, Moradabad Jn, Muzaffarnagar,
Nagina, Najibabad Jn, Orai, Panki Dham,
Phaphamau Jn, Phulpur, Pilibhit Jn, Pokhrayan,
Prayag Jn, Prayagraj Jn, Pt. Deen Dayal
Upadhyay Jn , Rae Bareli Jn, Raja Ki Mandi,
Ramghat Halt, Rampur Jn, Renukoot,
Saharanpur Jn., Salempur, Seohara, Shahganj
Jn, Shahjahanpur, Shamli, Shikohabad Jn.,
Shivpur, Siddharth nagar, Sitapur Jn.,
Sonbhadra, Sri Krishna Nagar, Sultanpur Jn,
Suraimanpur, Swaminarayan Chappia, Takia,
Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao
Jn, Utraitia Jn, Varanasi Cantt., Varanasi City,
Vindhyachal, Virangana Lakshmibai Jhansi,
Vyasnagar, Zafarabad
Completed Stations:
Development works at railway stations under Amrit Bharat Station
Scheme in Uttar Pradesh have been taken up at a good pace. Details of
Page 5 of 9the stations completed including Modinagar station of Baghpat Lok Sabha
Constituency, in Uttar Pradesh are as under:
State No. of Name of stations
stations
Uttar 38 Aishbagh Junction, Ayodhya Dham Junction,
Pradesh Bachhrawan, Baheri, Balrampur, Bareilly City, Bijnor,
Chunar Junction, Daliganj, Dhampur, Fatehabad,
Fatehpur, Gauriganj, Gola Gokarnath, Gomtinagar,
Govardhan, Govindpuri, Hathras City, Idgah Agra
Junction, Izzatnagar, Khalilabad, Mailani Junction,
Modinagar, Mohanlalganj, Orai, Panki Dham,
Phaphamau Junction, Pokhrayan, Prayag Junction,
Ramghat Halt, Saharanpur Junction, Salempur,
Shamli, Siddharth Nagar, Suraimanpur,
Swaminarayan Chappia, Ujhani, Vindhyachal
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Hapur station: The works of improvement of station building, new
platform shelter, improvement of platform surface, improvement of
circulating area and approach road have been completed. The work of
12 m wide foot over bridge has been taken up.
Kanpur Central station: The structural works of new station building,
commercial building, electrical substation at city side and
Cantonment side have been completed. The finishing works of new
station building, commercial building, electrical substation at city and
Cantonment side, structural work of air concourse, new platform
Page 6 of 9shelters, improvement of platform surface and underground parking
have been taken up.
Lucknow (Charbagh) NR station: The structural work of new station
building at second entry has been completed. The finishing work of
new station building, concourse,10 m wide foot over bridge,
development of circulating area at second entry and improvement of
circulating area at main entry have been taken up.
Nagina station: The works of new station building, improvement of
platform surface, new platform shelter, improvement of circulating
area, parking and new 12 m wide foot over bridge have been
completed. The work of installation of lift has been taken up.
Prayagraj Junction station, The structural work of station building at
Civil lines side, Railway Mail Service building, parcel building, two
arrival blocks, 2 electric substations and improvement of surface
parking have been completed. The finishing works of station building,
Railway Mail Service building, parcel building and electrical
substation, basement parking at city side, air concourse and new
platform shelter have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of passenger amenities
like waiting room, Coach Indication Board, Train Indication Board,
circulating area, parking, approach road etc., is a continuous and ongoing
process and works in this regard are undertaken as per requirement,
subject to inter-se priority and availability of funds. Development /
redevelopment / upgradation / modernisation of a station is carried out
based on category of station/condition/traffic handled etc.
Page 7 of 9Indian Railways is committed to make its railway stations accessible
for Persons with Disabilities (Divyangjans) and passengers with reduced
mobility as part of “Sugamya Bharat Mission” or ‘Accessible India
Campaign’ of Government of India. In compliance of the Rights of
Persons with Disabilities Act, 2016, “Guidelines on accessibility of
Indian Railway stations and facilities at stations for differently abled
persons (Divyangjans) and passengers with reduced mobility” have
been circulated and notified in the Gazette of India. The guidelines
include provisions of facilities for Divyangjans and passengers with
reduced mobility such as entrance ramps, accessible parking, low
height ticket counter/help booths, toilets, drinking water booth, sub-
ways/ foot over bridges with ramps/lifts, standard signages including
Braille signages and tactile pathways for visual impairment, etc.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time. Therefore, no time frame
can be indicated at this stage.
Development / Upgradation / Modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Uttar Pradesh is covered under the jurisdiction of five railway zones,
Page 8 of 9namely, East Central Railway, North Central Railway, Northern Railway,
North Eastern Railway and West Central Railway. For these zones, an
allocation of ₹ 15,988 crore has been made over the last three financial
years and current financial year, out of which an expenditure (up to June,
2026) of ₹ 12,126 crore has been incurred so far.
*****
Page 9 of 9