Parliament Question: Requirement of ROBs and RUBs

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document presents the Ministry of Road Transport and Highways' response to Lok Sabha Starred Question No. 176, answered on December 11, 2025, regarding the "Requirement of ROBs and RUBs." The response details the government's policy and actions related to Road Over Bridges (ROBs) and Road Under Bridges (RUBs) on National Highways (NHs). A statement is laid on the Table of the House along with an Annexure detailing state/UT-wise ROBs and RUBs approved in the last three years and the current year. **Key Points / Main Content** * **Government Policy:** * The government's policy mandates replacing railway level crossings along National Highways (NHs) with Road-over-Bridges (ROBs) or Road-under-Bridges (RUBs). * The aim is to minimize road user time delay and remove bottlenecks for smooth and safe traffic operation. * The Setu Bharatam Scheme was launched in 2016 to ensure the replacement of all level crossings on National Highways with ROBs/RUBs. * **Approval of New ROBs and RUBs:** * The number of new ROBs and RUBs approved for smooth traffic operation and prevention of accidents on National Highways (NHs) during the last three years and the current year state/UT-wise is at Annexure. * **Construction and Assessment:** * Construction of ROBs/RUBs on NHs is undertaken either on a standalone basis or as part of an improvement/upgradation project depending on feasibility and site requirements. * Feasibility studies include an assessment of the wastage of fuel, pollution, and economic loss to local trade caused by traffic congestion along NHs, including railway level crossings, if any. * **Functionality of ROBs/RUBs:** * ROBs/RUBs are permanent grade-separated structures that, once constructed, provide smooth and seamless traffic operation, including the movement of emergency services such as ambulances and fire brigades. **Impact Analysis** **Stakeholder: Road Users** * **Impact**: Reduced time delay and improved traffic flow. Enhanced safety at railway crossings. * **Action Required**: None specified. **Stakeholder: State/UT Governments** * **Impact**: Involved in the construction and planning of ROBs/RUBs within their jurisdiction. The annexure indicates the amount of projects approved for their region. * **Action Required**: Need to collaborate with the central government on the implementation of ROB/RUB projects. **Stakeholder: Emergency Services (Ambulance, Fire Brigade)** * **Impact**: Improved and timely movement through smoother traffic flow. * **Action Required**: None specified. **Stakeholder: Local Trade** * **Impact**: Reduced economic losses due to traffic congestion. * **Action Required**: None specified.

Key Entities Referenced

Ministry of Road Transport and Highways: The primary ministry responsible for the policy regarding Road Over Bridges and Road Under Bridges on National Highways. National Highways (NHs): Roads under the jurisdiction of the central government, specifically related to the construction of ROBs and RUBs. Road Over Bridges (ROBs) and Road Under Bridges (RUBs): The core subject of the policy, which addresses the construction and replacement of railway level crossings with ROBs and RUBs on National Highways. Setu Bharatam Scheme: A scheme launched in 2016 to replace all level crossings on National Highways by constructing ROBs and RUBs. Lok Sabha: The lower house of the Parliament of India where the question related to the requirement of ROBs and RUBs was raised.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA STARRED QUESTION NO. 176 ANSWERED ON 11TH DECEMBER, 2025 REQUIREMENT OF ROBS AND RUBS *176. SHRI NARAYANDAS AHIRWAR: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सडक परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) whether lack of an adequate number of Road Over Bridges (ROBs) and Road Under Bridges (RUBs) on several major National Highways (NHs) and busy railway crossings in the country is causing the public to face serious traffic jams, wastage of time and accidents, if so, the reaction of the Government thereto; (b) the number of new ROBs and RUBs approved for smooth traffic operation and prevention of accidents on National Highways and railway crossings, during the last three years and the current year, State-wise; (c) whether the Government has conducted any assessment of the wastage of fuel, pollution and economic loss to local trade caused by traffic congestion at these crossings, if so, the details thereof; and (d) the steps being taken by the Government to provide a permanent solution to these problems and to ensure timely movement of emergency services such as ambulance and fire brigade? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) to (d) A Statement is laid on the Table of the House.__________________________________________________________________________ STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF LOK SABHA STARRED QUESTION NO. 176 TO BE ANSWERED ON 11/12/2025 ASKED BY SHRI NARAYANDAS AHIRWAR REGARDING ‘REQUIREMENT OF ROBS AND RUBS’ ___________________________________________________________________________ (a) Policy of the Government mandates replacement of railway level crossings along National Highways (NHs) with Road-over-Bridges (RoBs) or Road-under-Bridges (RuBs) to minimise road user time delay and to remove bottlenecks for smooth and safe traffic operation. Further, Setu Bharatam Scheme has been launched in the year 2016 to ensure replacement of all level crossings on National Highways by construction of ROBs/RUBs. (b) The number of new RoBs and RuBs approved for smooth traffic operation and prevention of accidents on National Highways (NHs) during the last three years and the current year state/UT-wise is at Annexure. (c) Construction of RoBs/RuBs on NHs are taken up either on standalone basis or as part of improvement/upgradation project of a section of NH depending upon feasibility & site requirements. Feasibility study of the project includes assessment of the wastage of fuel, pollution and economic loss to local trade caused by traffic congestion along NHs including railway level crossings, if any. (d) RoBs/RuBs are permanent grade-separated structures and once constructed, provide smooth and seamless traffic operation including movement of emergency services such as ambulance and fire brigade.Annexure ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA STARRED QUESTION NO. 176 TO BE ANSWERED ON 11/12/2025 ASKED BY SHRI NARAYANDAS AHIRWAR REGARDING ‘REQUIREMENT OF ROBS AND RUBS’ ____________________________________________________________________ Number of new RoBs Number of new RuBs approved/sanctioned approved/sanctioned Name of r a ) 6 5 4 3 r a ) 6 5 4 3 State/UT e Y 52 - 42 - 32 - 22 - e Y 52 - 42 - 32 - 22 - t n 2 0 2 0 2 0 2 0 t n 2 0 2 0 2 0 2 0 e 2 2 2 2 e 2 2 2 2 r r Y Y Y Y r r Y Y Y Y u F F F F u F F F F C ( C ( Andhra 0 4 2 14 0 0 0 1 Pradesh Arunachal 0 0 0 0 0 0 0 0 Pradesh Assam 0 4 0 1 0 0 0 0 Bihar 0 8 6 3 0 0 0 0 Chhattisgarh 0 0 0 1 0 0 0 0 Delhi 0 0 0 0 0 0 0 0 Goa 0 2 0 0 0 0 0 0 Gujarat 3 11 0 15 0 1 0 0 Haryana 0 0 2 6 0 2 0 0 Himachal 0 0 0 3 0 0 0 1Number of new RoBs Number of new RuBs approved/sanctioned approved/sanctioned Name of r a ) 6 5 4 3 r a ) 6 5 4 3 State/UT e Y 52 - 42 - 32 - 22 - e Y 52 - 42 - 32 - 22 - t n 2 0 2 0 2 0 2 0 t n 2 0 2 0 2 0 2 0 e 2 2 2 2 e 2 2 2 2 r r Y Y Y Y r r Y Y Y Y u F F F F u F F F F C ( C ( Pradesh Jammu and 0 0 1 4 0 0 0 2 Kashmir Jharkhand 2 0 8 8 0 0 2 1 Karnataka 0 8 4 15 0 1 0 2 Kerala 0 0 2 3 0 0 0 0 Madhya 3 7 6 15 0 1 1 1 Pradesh Maharashtra 6 8 5 8 2 0 0 3 Manipur 0 0 0 0 0 0 0 0 Meghalaya 0 0 0 0 0 0 0 0 Mizoram 0 0 0 0 0 0 0 0 Nagaland 0 0 0 0 0 0 0 0 Sikkim 0 0 0 0 0 0 0 0 Odisha 5 2 2 5 0 0 0 1 Puducherry 0 0 0 0 0 0 0 0Number of new RoBs Number of new RuBs approved/sanctioned approved/sanctioned Name of r a ) 6 5 4 3 r a ) 6 5 4 3 State/UT e Y 52 - 42 - 32 - 22 - e Y 52 - 42 - 32 - 22 - t n 2 0 2 0 2 0 2 0 t n 2 0 2 0 2 0 2 0 e 2 2 2 2 e 2 2 2 2 r r Y Y Y Y r r Y Y Y Y u F F F F u F F F F C ( C ( Punjab 1 2 4 9 0 0 0 0 Rajasthan 1 2 1 7 0 0 0 4 Tamil Nadu 2 6 0 3 0 0 0 0 Telangana 0 1 0 7 0 1 0 0 Tripura 0 0 2 0 0 0 0 0 Uttar Pradesh 5 16 23 37 0 2 4 4 Uttarakhand 0 0 3 1 0 0 0 0 West Bengal 0 5 0 9 0 1 0 0 *****