GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4136
TO BE ANSWERED ON 12.08.2026
RESULTS OF INCREASED CAPITAL EXPENDITURE ON RAILWAYS
4136. SMT. PRATIMA MONDAL:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has significantly increased capital expenditure
on Railways during the last decade and if so, the details thereof;
(b) the details of the measurable improvements Government has achieved
in punctuality, average train speeds, congestion reduction and
passenger experience rather than infrastructure creation alone;
(c) the details of the time-bound roadmap has been adopted to extend
Kavach across the high-density rail network and the manner in which
the Government prioritising vulnerable sections that continue to
operate without automatic train protection; and
(d) the manner in which the Government is balancing investments in future
high-speed projects with the urgent modernisation of the existing
railway network in view at the Government has announced seven new
high-speed rail corridors while several conventional routes continue to
face capacity constraints, overcrowding and speed restrictions?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) : The Government has significantly enhanced capital investment
in Indian Railways, with Gross Budgetary Support increasing more than
9.5 times from ₹29,055 crore in 2013-14 to ₹2,78,030 crore in 2026-27.
This sustained increase in investment has enabled the Railways to
undertake large-scale capacity augmentation, modernization and
§ Page 1 of 25infrastructure development across Indian Railways. This enhanced capital
expenditure has resulted in:
Capacity augmentation through New Lines, Doubling/Tripling,
Electrification and Signalling upgrades, contributing to improved
punctuality and operational efficiency;
Development of logistics infrastructure to improve freight handling and
logistics efficiency; and thereby increase in Revenue Earnings.
Redevelopment and modernization of railway stations with improved
passenger amenities and accessibility ensuring passenger experience
through modern stations, improved safety, enhanced amenities, cleaner
facilities, and introduction of upgraded rolling stock and digital
passenger services.
Capacity enhancement and Infrastructure augmentation
Capacity enhancement of railway network has been taken up by Indian
Railways in a big way during the last 12 years. The details of
commissioning/laying of new track across Indian Railways are given
below:-
Period New track Average commissioning
Commissioned of new tracks
2009-14 7,599 Km 4.2 Km/day
2014-26 36,429 Km 8.32 Km/day (nearly 2 times)
As on 01.04.2026, across Indian Railways, 514 Railway infrastructure
projects (169 New Line, 29 Gauge Conversion and 316 Doubling) of total
length 40,000 Km, costing approx. Rs. 8.31 lakh crore are sanctioned. The
summary is as under:-
Page 2 of 25Category No. of Total Length Length Total
Projects NL/GC/DL Commissioned Expenditure
(km) till Mar'26 upto Mar'26
(Km) (Rs. in Crore)
New lines 169 16,634 3,361 1,57,572
Gauge 29 3,987 3,045 24,227
conversion
Doubling 316 19,379 6,177 1,23,454
TOTAL 514 40,000 12,583 3,05,253
Ministry of Railways had taken up the construction of two Dedicated
Freight Corridors (DFC) viz. Eastern Dedicated Freight Corridor (EDFC) from
Ludhiana to Sonnagar (1337 Km) and the Western Dedicated Freight
Corridor (WDFC) from Jawaharlal Nehru Port Terminal (JNPT) to Dadri
(1506 Km). The work on both EDFC and WDFC has been completed and
commissioned.
On average, about 443 trains are operated per day on DFCs. The Dedicated
Freight Corridors have demonstrated robust operational performance.
Freight volumes have steadily increased, with higher average speeds,
faster turnarounds, and enhanced reliability. DFC has contributed to
creating additional paths on the conventional network by diverting freight
traffic to EDFC and WDFC. As a result, Railways have been able to run
additional goods and coaching services over its network.
The Dedicated Freight Corridor project is expected to strengthen the
competitiveness of rail transport by enabling cost-effective, efficient and
sustainable freight movement across the country. It is envisaged to
facilitate a gradual modal shift of long-haul bulk commodities, container
traffic and industrial freight from road to rail, thereby reducing overall
logistics costs, improving supply chain efficiency and supporting economic
growth.
Page 3 of 25Track Modernisation
Strengthening, upgradation, modernisation and improvement of existing
track infrastructure is a continuous and ongoing process over Indian
Railways and It also tells the same story of scaled-up ambition: annual
outlay on track renewal and upgradation has grown from Rs 4,979 crore in
2013-14 to Rs 26,231 crore in 2025-26. The following measures are being
taken by Indian Railways to upgrade railway tracks:
i. Modern track structure consisting of 60 kg, 90 Ultimate Tensile
Strength (UTS) rails, Wider and heavier Pre-stressed Concrete Sleepers
(PSC) with elastic fastening, fan-shaped layout turnout on PSC
sleepers and H-beam Sleepers on girder bridges are being used while
carrying out primary track renewals.
ii. The Thick Web Switches and Weldable CMS Crossings are being used
in turnout renewal works.
iii. Supply of 260 m long rail panels have been increased to avoid welding
of joints, thereby improving safety.
iv. Thick Web Switch Expansion Joints are being used in place of earlier
Conventional/Improved SEJs.
v. Adoption of better welding technology for rails i.e. Flash Butt Welding.
vi. Adoption of mechanized system for track maintenance using high
output plain tampers and points & crossing tampers for improved
maintainability & reliability of track.
vii. Deployment of state-of-the-art modern machines including Rail
Grinding Machines to further improve asset reliability.
viii. Mechanisation of track laying activities through use of track machines
like PQRS, TRT, T-28 etc.
ix. Interlocking of Level Crossing (LC) Gates for enhancing safety at LC
gates.
x. Use of advanced Phased Array technology of testing of rail and welds.
Page 4 of 25xi. Deployment of Integrated Track Monitoring Systems (ITMS) and
Oscillation Monitoring System (OMS) for comprehensive health
assessment to ascertain optimal maintenance requirements.
xii. Adoption of portable Track Measuring Trolley for continuous recording
of track parameters in yards.
xiii. Using web enabled Track Management System (TMS) for integration
and data analytics of the track inspection records received through
various sources to enable precise maintenance inputs.
As a result of above measures, there has been significant increase in
speed potential of the tracks. The details of speed potential of railway
tracks during 2014 vis-a-vis 2026 are as under:
Sectional Speed 2014 2026
(kmph) Track Km % Track Km %
130 & above 5,036 6.3 24,173 22.5
110 - 130 26,409 33.3 62,482 58.1
< 110 47,897 60.4 20,897 19.4
Total 79,342 100 1,07,552 100
Modernisation of Rolling stock
A Paradigm Shift can be seen in Safety and Passenger Experience also
through the upgraded rolling stock and advanced safety technology. The
work of replacement of earlier ICF coaches with safer and more modern
LHB coaches has been taken up in a phased manner. Technologically
superior LHB coaches have better riding, improved aesthetics and features
like Lightweight design, Anti climbing features, Air suspension (Secondary)
with failure indication system, stainless steel shell and disc brake system
etc.
Page 5 of 25Production of LHB coaches during 2014-26 vis-à-vis 2004-14 is as under:
Period LHB coaches manufactured
2004-14 2,337 nos.
2014-26 49,366 nos. (more than 21 times)
Vande Bharat services (Chair Car):
Indian Railways, with a view to improve travel experience of the
passengers, have introduced indigenously designed and manufactured
Vande Bharat trains with modern coaches, advanced safety features and
passenger amenities. These Vande Bharat Chair Car Trains have following
features:
Jerk Free Semi-Permanent couplers.
Fitted with KAVACH.
Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
Emergency Alarm Push buttons and Talk Back Units on all Coaches.
Improved fire safety – Aerosol based fire detection and suppression
system in electrical cabinets and lavatories.
Higher acceleration with design/operating speed of 180/160 KMPH.
Driver-Guard communication with voice recording facility & Crash
hardened memory.
Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful bacteria
from conditioned air to improve the hygiene standards inside the
passenger area.
Better Ride Comfort.
CCTVs in all Coaches.
For Divyangjan passengers special lavatory in the driving coaches on
each end.
Page 6 of 25 Coach condition monitoring System (CCMS) display with remote
monitoring.
Vande Bharat services (Sleeper):
For long distance travel the Sleeper variant of Vande Bharat Express has
been indigenously designed and developed. Two such trains have already
been manufactured. After extensive trials, these trains have been
introduced on Indian Railways. To improve travel experience of the
passengers and set new benchmarks in terms of safe and comfortable
journey, these train sets have been provided with modern coaches having
advanced safety features and passenger amenities like:
Jerk-Free Semi permanent couplers and Anti Climbers.
Fitted with KAVACH.
Higher acceleration with design/operating speed of 180/160 KMPH.
Crashworthy Design of Car body complying with EN standards.
Fire barrier doors at the end of each coach for compliance of Fire
Safety standards.
Aerosol based fire detection and suppression system in electrical
cabinets and lavatories.
Regenerative braking system for energy efficiency.
Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful bacteria
from conditioned air to improve the hygiene standards inside the
passenger area.
Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
CCTVs in all coaches.
Emergency talk-back unit for communication between Passenger and
Train Manager/Loco Pilot in case of emergency.
Page 7 of 25 For Divyangjan passengers special lavatory in the driving coaches on
each end.
Centralized Coach Monitoring System for better condition monitoring
of passenger amenities such as Air conditioning, Saloon Lighting etc.
Ergonomically designed ladder for ease of climbing on to upper
berths.
Amrit Bharat service:
To provide affordable means of transportation to the low and middle
income families, Indian Railways have introduced Amrit Bharat services
that are fully non-AC modern trains. The present composition of Amrit
Bharat consists of 11 General Class coaches, 8 Sleeper Class coaches, 01
Pantry Car and 02 Luggage cum Divyangjan coaches.
High Speed and enhanced Safety standards are the hallmarks of these
trains with following enhanced features and amenities:
Better aesthetics of seat and berths with enhanced look & feel on the
lines of Vande Bharat Sleeper.
Jerk Free Semi-Automatic Couplers.
Improved Crashworthiness in coaches by provision of crash tube.
Provision of CCTV system in all coaches.
Improved designs of toilets.
Improved design of Ladder for ease of climbing on to the berth.
Improved LED Light fitting & Charging Sockets.
Provision of EP assisted braking system.
Aerosol based fire suppression system in toilets and electrical
cubicles.
USB Type-A and Type-C mobile charging sockets.
Page 8 of 25 Emergency Talk Back system for two-way communication between
Passenger and Guard/Train Manager.
Non-AC pantry with enhanced heating capacity.
Fully sealed gangways with quick release mechanism for easy
attachment and detachment.
Namo Bharat Rapid Rail services:
Namo Bharat Rapid Rail has been introduced to enhance the travelling
experience of suburban and regional commuters for inter-city short
distance movement by harnessing the features of Vande Bharat Trains.
The prominent features of Namo Bharat Rapid Rail are as follows:
Centrally controlled Double Leaf Automatic Sliding Doors.
CCTVs for safety and passenger surveillance.
Modular interior with Cushioned Seats and Sealed Flexible Gangway.
Emergency Talk Back System.
Continuous LED lighting with Energy Efficient lighting system.
FRP Modular Toilets with vacuum evacuation.
Fully Air-Conditioned trains with AC Driver cab.
Safety
Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Page 9 of 25Number of Consequential Train Accidents has reduced as shown in the table
below:-
Year Consequential Accidents
2014-15 135
2025-26 16 (88% lesser)
2026-27 ( upto June 2026) 2
Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2025-26 0.01 ( 91% lesser)
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers run
Page 10 of 25The various safety measures taken to enhance safety in train operations are
as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities
Year
(Rs. in Cr.)
2013-14 39,200
2022-23 87,336
2023-24 1,01,662
2024-25 1,14,022
2025-26 1,17,693
2026-27 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,671 stations up to
30.06.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,395
Level Crossing Gates up to 30.06.2026 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,671
stations up to 30.06.2026.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol, preparation
of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
Page 11 of 258. Retro-reflective sigma boards are provided on the mast which is located
two OHE masts prior to the signals in electrified territories to alert the
crew about the signal ahead when visibility is low due to foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while
carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
Page 12 of 2519. Web based online monitoring system of track assets viz. Track database
and decision support system has been adopted to decide rationalized
maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system in
newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in a
phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein work
Page 13 of 25of integrated maintenance/ repair/replacement of assets is planned up
to 52 weeks in advance on rolling basis and executed as per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-26 Vs.
SN Item
2013-14 2025-26 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.63 Lakh Km More than
rails 2.8 times
(60 Kg) (Km)
2. Longer Rail Panels 9,917 Km 87,219 Km Nearly 9
(260m) (Km) times
3. Electronic 837 3,691 Stations More than 4
Interlocking (Stations) Stations times
4. Fog Pass Safety As on As on 31.03.26: 352 times
Devices (Nos.) 31.03.14: 31,693 Nos.
90 Nos.
5. Thick Web Switches Nil 35,971 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 57,583 Km 1.78 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2.25 Crore More than
Flaw detection) 2.8 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2025-26: 93 %
3,699 Nos. 272 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2025-26: 92%
2,548 Nos. 208 Nos. reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 36,429 Km Almost 2.5
(Track Km) times
2. Flyovers 4,148 Nos. 14,362 Nos. More than 3
(RoBs)/Underpasses times
(RUBs) (Nos.)
3. Unmanned Level As on As on 31.03.26: Removed
crossings 31.03.14: Nil
(Nos.) on BG 8,948 (All eliminated by
Page 14 of 2531.01.19)
4. Manufacture of LHB 2,337 Nos. 49,366 More than
Coaches (Nos.) 21 times
KAVACH
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which requires
safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do so
and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running on
Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1,465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse
railway network. This is a significant milestone in safety for Indian
Page 15 of 25Railways. Within a short period, IR has developed, tested and started
deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location Accuracy,
Improved Information of Signal Aspects in bigger yards, Station to
Station Kavach interface on OFC and Direct Interface to existing
Electronic Interlocking System. With these improvements, Kavach
Ver.4.0. is planned for large scale deployment over Indian Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 2,633 Route Kilometres as on 31.07.26,
covering the high density Delhi- Mumbai and Delhi-Howrah routes as
below:
SN Section Progress
(Route Km)
(1) Delhi-Mumbai route: 1,423 Rkm
i Tilak Bridge - Junction cabin – Palwal – Mathura – 1,327
Kota-Nagda-Ratlam–Vadodara-Virar section
ii Vadodara – Ahmedabad section 96
(2) Delhi – Howrah route: 1,210 Rkm
i. Chipyana - Tundla - Kanpur - Subedarganj section 563
ii. Kanpur – Lucknow section 71
iii. Mirzapur - DDU (Excluding) section 64
iii. DDU(FOC)-BhabuaRoad section 50
iv. Sasaram - Phesar section 43
v. Gaya -Sarmatarn- Nimiaghat section 159
vi. Chota Ambana - Bardhaman – Howrah section 260
10. In addition, track side Kavach implementation work has been taken
up on 21,794 RKM covering all GQ,GD,HDN and identified sections of
Indian Railways.
11. The total Progress of key items of Kavach on Indian Railway sections
are as under:-
Page 16 of 25SN Item Progress
i Laying of Optical Fibre Cable 11,547 Km
ii Installation of Telecom Towers 1,721 Nos.
iii Station Data Centre 1,009 station
iv Installation of Track side equipment 7,726 RKm
v Provision of Kavach in Loco 6,290 Nos.
12. In addition, work for installation of Kavach in 7,190 Locomotives and
1,200 EMU/MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to
all concerned officials. By now more than 94,000 technicians,
operators and engineers have been trained on Kavach technology.
This includes about 57,000 Loco Pilots & Assistant Loco Pilots.
Courses have been designed in collaboration with IRISET.
14. The funds utilized on Kavach works so far up to Jun'26 is Rs. 3,875
Crores. The allocation of funds during the year 2026-27 is Rs. 2066.24
Crores. Kavach work is going at good pace in the entire country.
Requisite funds are made available as per the progress of works.
Road over Bridge (ROB)/Road under Bridge (RUB):
Sanctioning of works of Road over Bridge (ROB)/Road under Bridge
(RUB) in lieu of Level crossings (LCs) is another dynamic process of Indian
Railway. Such works are prioritised and taken up on the basis of their
impact on safety in train operations, mobility of trains & impact for road
users and feasibility etc.
Page 17 of 25No. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 vis a vis 2014-26 (Upto May’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos.
As on 01.06.2026, 4,993 Nos. ROBs/ RUBs works are sanctioned at a
cost of approx. ₹ 1,17,492 Cr on Indian Railways which are at various
stages of planning and execution.
Improvement in Punctuality and Train speed
Adding tracks and ROB/RUB is only one half of the story; real-time
operational efficiency is required to keep trains moving safely and
punctually. The following steps are being taken to improve the average
speed:
● Segregation of wagons to optimize the maximum permissible
speeds of rakes.
● Induction of 100 kmph speed potential wagons.
● Indian Railway’s Terminals capacity enhancements to reduce
bottlenecks at exit points of DFC.
● more holding lines on EDFC & WDFC.
● Centralized traffic control (CTC) system over DFC.
● Introduction of Kavach.
All possible efforts are made to run trains on time. However, on Indian
Railways, several factors affect punctuality which includes foggy
weather, path constraints/congestion, asset maintenance and other
issues, alarm chain pulling, agitations, cattle run over and other
unforeseen circumstances.
Page 18 of 25The steps taken to improve punctuality of train services include:
● Regular, continuous and real-time monitoring of punctuality of trains
using technological tools and IT systems.
● Use of an integrated digital platform for monitoring of train operations
comprising Integrated Coaching Management System (ICMS) and
Control Office Application (COA) which are integrated with National
Train Enquiry System (NTES).
● Progressive advancement for automatic uptake of timings by the train
movement itself, is being achieved through GPS devices fitted
locomotives {Real-Time Train Information System (RTIS) and Remote
Monitoring and Management of Locomotives and Trains (REMMLOT)}
and Data loggers integrated with the station signaling system.
● To improve punctuality, IR also undertakes rationalisation of time
tables. One such exercise, in a scientific manner, was undertaken with
the assistance of IIT- Mumbai using their traffic simulator. The
exercise also aimed at provisioning of fixed Integrated Maintenance
blocks on all sections to minimise detention and improve punctuality.
● Further, with a view to minimise and mitigate the effect of fog and to
assist the Loco Pilots run the train during foggy weather conditions the
following steps have been taken by Indian Railways:
(i) GPS based FOG SAFE DEVICE – A Global Positioning System
(GPS) based portable 'Fog Safe Device' (FSD) is being provided to
Loco Pilots, which displays upcoming critical landmarks such as
approaching signal, level crossing gates, permanent speed
restrictions etc. in advance during poor visibility conditions like fog.
This device is used for safe train operation especially during winter
season and to help reduce stress on Loco Pilots while running in
poor visibility conditions. As on 31.05.2026, there are 33,624 Fog
Safe devices available over Indian Railways.
Page 19 of 25(ii) Modified Semi-Automatic Stop Signal (MASS) System: MASS has
been introduced on the Automatic Signalling territory during
abnormal conditions like Fog & Bad Weather impairing visibility. The
system helps minimise delay in train operation during foggy weather
conditions.
Train operation during fog and poor visibility conditions is an
essential component of the training curriculum and the same has
already been incorporated in the Transportation Module and
Technical Module of the prescribed training syllabus for Loco Pilots
(LPs) and Assistant Loco Pilots (ALPs).
Modernisation of Signalling infrastructure:
Indian Railway is continuously modernising current infrastructure of its
Siganlling system as under:
1. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals in place of old mechanical signalling. It has been
provided at 6671 stations as on 30.06.2026, out of which Electronic
Interlocking have been provided at 3954 stations.
2. Complete Track Circuiting of stations to enhance safety for verification
of track occupancy by electrical means has been provided at 6671
stations upto30.06.2026.
3. Axle counters for automatic clearance of Block Section, BPAC (Block
Proving Axle Counter) are provided to ensure complete arrival of train
without manual intervention before granting line clear to receive next
train and to reduce human element. These systems have been provided
on 6085 Block Sections up to 30.06.2026.
4. Automatic Block Signalling (ABS) that enhances line capacity within
existing track infrastructure has been provided at 7464 Route Km upto
30.06.2026.
Page 20 of 255. Modified Semi-Automatic Stop Signal (MASS) System has been
introduced on the Automatic Siganlling territory during abnormal
conditions like Fog & Bad Weather conditions impairing visibility. The
system helps to minimise delay in train operation during foggy weather
conditions.
6. Signalling assets maintenance are planned & under taken during Rolling
Block introduced in Indian Railways (Open Lines) General Rules vide
Gazette notification dated 30.11.2023, wherein work of integrated
maintenance/repair/replacement of assets is planned in advance on
rolling basis and executed.
Due to these initiatives, Indian railways, during 2025-26 recorded an overall
punctuality of more than 77%. The average punctuality of trains on Indian
Railways during 2023-24, 2024-25 and 2025-26 is as under:
Year Mail/Express
2023-24 73.62%
2024-25 77.12%
2025-26 77.43%
High Speed Projects
Railway is also making a fine balance between modernization and up
gradation of present assets with high speed vision. The next chapter is
already under construction. While upgrading existing mainline routes,
Indian Railways simultaneously laid the foundation for high-speed rail.
Presently, the Mumbai-Amdavad High Speed Rail (MAHSR) Project (508 km)
is under execution. The Project is passing through the States of Gujarat,
Maharashtra and Union Territory of Dadra & Nagar Haveli with 12 stations
Page 21 of 25planned at Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch,
Vadodara, Anand, Amdavad and Sabarmati.
Entire land (1389.5 Ha.) for MAHSR project has been acquired. All Statutory
Clearances have been obtained. All 1651 utilities have been shifted. The
delay in land acquisition in the State of Maharashtra has impacted the
project till 2021. The land acquisition picked up in 2022 in Maharashtra.
The progress of various major items so far is as under:
Item Progress
Piers 452 kms.
Girder 356 kms.
Track Bed 209 kms.
OHE Masts 190 kms.
The progress of stations is given below:-
S.No. Station Status
1 Sabarmati Foundation & structural works completed. Finishing
work have been taken up.
2 Amdavad Structural works completed. Finishing works and
track works have been taken up.
3 Anand/Nadiad
4 Vadodara Foundation & structural works completed. Finishing
work have been taken up.
5 Bharuch Structural works completed and finishing works
have been taken up. At Surat, Bilimora and Bharuch
6 Surat
Track works have also been taken up.
7 Bilimora
8 Vapi
9 Boisar Foundation works have been taken up and in
advanced stage. Structural works have been taken
10 Virar
up.
11 Thane
12 BKC This is an underground station. Foundation works
(Mumbai) almost completed and Base Slab has been taken up.
Page 22 of 25The progress on the River Bridges is as under:-
S. No. River Name Status
1 Sabarmati River (480m) Sub-Structure work completed,
Superstructure work has been taken
up.
2 Meshwa River (120m) Bridge construction completed. Track
works completed and OHE works have
3 Vatrak River (280m)
been taken up at Mohar River. Track
4 Mohar (Shedhi) River
works in progress at Vatrak River.
(160m)
5 Mahi River (720m) Foundation completed. Pier works and
Girder launching have been taken up.
6 Vishwamitri River (80m)
Bridge construction completed.
7 Dhadhar River (120m)
8 Narmada River (1366m) 21 out of 25 wells completed; 6 out of
24 spans launched
9 Kim River (120m) Bridge construction completed.
10 Tapi River (720m) 09 out of 13 Pier Cap completed.
11 Mindhola River (240m)
12 Purna River (360m)
13 Ambika River (200m)
14 Venganiya River (200m)
15 Kaveri River (120m)
Bridge construction completed. Track
16 Kharera River (120m)
and Electrical works have been taken
17 Auranga River (320m)
up.
18 Par River (320m)
19 Kolak River (160m)
20 Daman Ganga River
(360m)
21 Darotha River (80m)
22 Jagani River (360m) Substructure works have been
completed.
23 VaitarnaRiver (2320m) 17 Pile Cap and 15 Pier (out of 58)
completed.
24 Ulhas River Branch Temporary Access Bridge (TAB)
(120m) completed to start the foundation work.
25 Desai Khadi River Geo-technical Investigation (GTI) has
Bridge (400m) been completed and Design work has
been taken up.
Page 23 of 25The work of the under-sea tunnel (approximately 21 km) has commenced,
out of which 4.8 km of tunnel between Ghansoli and Shilphata in
Maharashtra has been completed.
On the Surat–Vapi section (97 km) entire civil works including river bridge
construction, have been completed and 86% of the track bed has been laid.
To strengthen national transport infrastructure, provide a fillip to regional
connectivity, economic growth, tourism, investment and employment
generation, and encourage modal shift from road and air transport to rail,
the Government has announced the development of the following seven
new High-Speed Rail (HSR) corridors in the Union Budget 2026-27:-
(i) Mumbai–Pune
(ii) Pune–Hyderabad
(iii) Hyderabad–Bengaluru
(iv) Hyderabad–Chennai
(v) Chennai–Bengaluru
(vi) Delhi–Varanasi
(vii) Varanasi–Siliguri
Post Budget announcement, the cost updation, alignment finalization &
land survey etc. have been taken up in Detailed Project Report (DPR). The
details of the stations/cities covered, investment, route length etc. can be
firmed up only after DPR is finalised.
However, being highly capital intensive, the decision to sanction any HSR
Corridor/Project depends on many factors such as outcome of DPR, techno
economic feasibility studies and availability of resources such as financing
options etc.
Page 24 of 25Taken together, the 9.5 times rise in capital expenditure since 2013-14 has
not been spent in isolation on any one goal. It has bought more track, freed
capacity through dedicated freight corridors, increased freight loading and
revenue, nudged punctuality steadily upward, embedded automatic safety
protection and a transformed passenger experience thereby increasing
freight loading 1670 MT and becoming second largest freight carrier in the
world.
*****