Official Gazette Notification Text
Official TranscriptGOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3194 ANSWERED ON 06TH AUGUST 2026 ROAD AND INFRASTRUCTURE PROJECTS IN MATHURAPUR 3194. SHRI BAPI HALDAR: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of road, bridge and other connectivity projects sanctioned by the Government in...
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3194 ANSWERED ON 06TH AUGUST 2026 ROAD AND INFRASTRUCTURE PROJECTS IN MATHURAPUR
3194. SHRI BAPI HALDAR:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the details of road, bridge and other connectivity projects sanctioned by the Government in Mathurapur Lok Sabha Constituency during the last five years, indicating the project-wise estimated cost, executing agency and present status thereof;
(b) the details of funds sanctioned, released and utilized for such projects during the said period;
(c) whether the Government has identified any pending or delayed road infrastructure projects in the said constituency affecting connectivity particularly in the coastal and Sundarbans region and if so, the reasons therefor and the corrective measures taken thereon;
and
(d) whether the Government proposes to sanction additional road and bridge projects to improve all-weather connectivity and support socio-economic development in Mathurapur Lok Sabha Constituency and if so, the details and timeline thereof? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)
(a) to (c) Project-wise details of road, bridge and other connectivity projects on National Highway sanctioned by the the Government through the Ministry of Road Transport and Highways and passingthrough the Mathurapur Lok Sabha Constituency during the last five years, indicating the sanctioned cost, executing agency, present status and expenditure incurred are annexed.
(d) The Government through Ministry of Road Transport and Highways is primarily responsible for development and maintenance of National Highways (NHs). Development and maintenance of NHs is a continuous process; works on NHs are accordingly taken up depending upon requirement of connectivity, traffic density and synergy with PM Gati Shakti National Master Plan to keep the NHs in traffic worthy conditions.ANNEXURE ANNEXURE REFERRED TO IN REPLY OF PARTS (a) to (c) TO LOK SABHA UNSTARRED QUESTION NO. 3194 FOR ANSWER ON 06TH AUGUST 2026 ASKED BY SHRI BAPI HALDAR REGARDING ROAD AND INFRASTRUCTURE PROJECTS IN MATHURAPUR Sche Sancti Expen Pres dule Reason Sl. Lengt oned c Date o Appoi Executi NH diture ent S Com for del No Project Name h (Kmost( Rs f Sanc nted D ng Age no. (Rs in tatus pleti ay(If a . ) . in Cr tion ate ncy Crore) on D ny) ore) ate Stage Strengthening from km 34.000 to k m 56.000, km 64.000 to km 80.000 and km
94.500 to km 98.000 Stone including re-construc Concer tion of 600 m in sele n Infras Com 05.0 cted stretches and r41.50 22.12. 06.05. tructur No Del 1 12 57.38 45.69 plete 5.20 ectification of 22 ide 0 2021 2022 e Devel ay d 23 ntified black spots o opment n NH-117 and IMS fro Pvt. Lt m km 22.76 to km 13 d.
7.684 in the district o f South 24 Parganas, West Bengal on EPC mode - reg.
Stage Strengthening from km 98.00 to km
111.710, including re .construction of 500 m in selected stretch es including rectifica Com 31.1 M R Co
13.71 28.12. 05.05. No Del 2 12 tion of one identified 17.07 14.22 plete 0.20 nstruct 0 2021 2022 ay black spot at Sima B d 22 ion andh (WB. 02.564) on NH.117 in the district of South 24 Parganas , West Bengal on EPC mode . regRoad Safety works b y providing “Thrie” m etal beam crash barri er on NH.117 (New N H.12) from km 22.76 Km to km 34.00 km, km 56.00 to km 64.0 Com 15.0 Vaisno 0 and km 80.00 to k 19.07. 16.01. No Del 3 12 .. 1.44 1.18 plete 4.20 Constr m 94.50 under NH Di 2022 2023 ay d 23 uction vision.I in the district of South 24 Parganas during the year 2022.
23 under Road Safety Annual Plan 2022.23 on item rate mode us ing SBD.
Construction of 3(thr ee) nos. new single c ell type box culvert (
2.0 m X 3.0m) at chai nages 54+150 km, 54 +750 km, & 55+150 k m of NH.12(old NH.1 Com 13.1 A T Ma
17) including improv 29.11. 16.04. No Del 4 12 -- 1.64 1.65 plete 0.20 ndal & ement of flaring porti 2024 2025 ay d 25 Sons on on either side of e ach culvert during th e year 2024.2025 und er N.H. Division No. 1 , in the district of So uth 24 parganas, We st Bengal.
Rehabilitation & Rest oration of 3 (three) n os. bridge at chainag es 95.296 km (Jora P ole Bridge), 99.200 k m (Kalnagini Bridge) Chatter & km 79.065 (Karanj Com 30.1
08.05. 01.09. jee Con No Del 5 12 ali Bridge) of NH.117 0.153 1.23 1.06 plete 1.20 2025 2025 structi ay (New NH.12) under R d 25 on econstruction/Repair/ Rehabilitation of Brid ge/ Culverts under An nual Plan of works u nder NH(O) on SBD m ode.Work of Widening & Strengthening work ( existing 2 lane carria geway to 2 lane with paved shou lder configuration) fr om km. 114.975 to k m. 137.684 of NH.117 Tend
22.70 03.10. No Del 6 12 [New NH.12] (excludi 237.08 0.00 er st - - - 9 2025 ay ng two major bridges age of approx. 1.40 km le ngth from km 118.84 8 to km 119.506 & k m 127.926 to km 128 .668) in the district o f South 24 Parganas, West Bengal.
*****