See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2946
TO BE ANSWERED ON 05.08.2026
ROBS AND SUBWAYS IN WEST BENGAL
2946. DR. SHARMILA SARKAR:
Will the Minister of RAILWAYS be pleased to state:
(a) the total number of new Rail Over Bridges (ROBs) and Subways
sanctioned in West Bengal in FY 2025-2026;
(b) the details of the number of locations of ROBs/Subways in Purba
Bardhaman, a district of the said State;
(c) the number of Amrit Bharat Station Scheme (ABSS) sanctioned and
completed till date since the launch of the said scheme in December
2022, State/UT, Station and year-wise; and
(d) whether the stations are being upgraded under the said scheme in West
Bengal especially in Purba Bardhaman District and if so, the details
thereof and if not, the reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): Sanctioning of works of Road over Bridge (ROB)/Road under Bridge
(RUB) in lieu of Level crossings (LCs) is a continuous and dynamic process
of Indian Railway. Such works are prioritised and taken up on the basis of
their impact on safety in train operations, mobility of trains & impact for
road users and feasibility etc.
No. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 viz-a-viz 2014-26 (Upto May’26) is as under:
§ Page 1 of 8Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos. (547 Nos. in
the State of West Bengal)
As on 01.06.2026, 4,993 Nos. ROB / RUB works are sanctioned at a
cost of approx.₹ 1,17,492 Cr on Indian Railways including 363 Nos. ROB /
RUB works at a cost of approx. ₹ 8,060 Cr in the State of West Bengal
which are at various stages of planning and execution. Out of these, 66
Nos. ROB / RUB works are sanctioned at a cost of approx. ₹ 1387 Cr in
Purba Bardhaman district which are at various stages of planning and
execution.
As on date, there are 04 Nos. ROBs and 44 Nos. RUBs in Purba
Bardhaman district.
Completion & commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of LC, fixing of approach alignment, approval of General
Arrangement Drawing (GAD), land acquisition, removal of encroachment,
shifting of infringing utilities, statutory clearances from various
authorities, law and order situation in the area of project / work sites,
duration of working season in a year for the particular project / area due to
climatic conditions etc. All these factors affect the completion time of the
projects / works.
Further, Railways have taken following measures to expedite the
progress of work:
Page 2 of 8i. Joint survey with concerned State Govt./Road Owning Authority is
done before finalizing the General Arrangement Drawing (GAD) to
ensure smooth execution.
ii. Periodic meetings of Railway & State Government officials are done
to resolve various issues related to ROB/RUB works.
iii. Standardization of superstructure and substructure drawings for
various combinations of span, skewness and width of road on the
Railway portion has been done to avoid delays during the design
approval. This has been issued in the form of a compendium, which
can be directly adopted for Road Over Bridge across Railway lines for
expeditious planning.
Amrit Bharat Station Scheme:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations of Indian Railways.
The master planning, keeping in view the necessity of each station,
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Page 3 of 8 Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 102 stations including Ambika Kalna,
Barddhaman and Katwa Junction station of Purba Bardhaman district
are located in West Bengal. The names of stations identified for
development under Amrit Bharat Station Scheme in West Bengal are as
following:
State No. of Name of Stations
Stations
West Bengal 102 Adra, Alipurduar Jn., Aluabari Road, Ambika
Kalna, Anara, Andal Jn., Andul, Asansol Jn.,
Azimganj, Bagnan, Bally, Balurghat, Bandel
Jn., Bangaon Jn., Bankura, Barabhum,
Barasat, Barddhaman, Barrackpore, Belda,
Berhampore Court, Bethuadahari, Bhaluka
Page 4 of 8State No. of Name of Stations
Stations
Road, Binnaguri, Bishnupur, Bolpur
Shantiniketan, Burnpur, Canning, Chandan
Nagar, Chandpara, Chandrakona Road,
Dalgaon, Dalkhola, Dankuni, Dhulian Ganga,
Dhupguri, Digha, Dinhata, Dum Dum Jn.,
Falakata, Garbeta, Gede, Haldia, Haldibari,
Harishchandrapur, Hasimara, Hijli, Howrah
Jn, Jalpaiguri, Jalpaiguri Road, Jangipur
Road, Jhalida, Jhargram, Joychandi Pahar
Jn, Kaliyaganj, Kalyani, Kalyani Ghoshpara,
Kamakhyaguri, Katwa Jn, Khagraghat
Road, Kharagpur Jn, Kolkata, Krishnanagar
City Jn, Kumedpur Jn, Madhukunda,
Madhyamgram, Malda Court, Malda Town,
Mecheda, Medinipur (Midnapore), Nabadwip
Dham, Naihati Jn, New Alipurduar, New
Cooch Behar, New Farakka Jn, New
Jalpaiguri Jn, New Mal Jn, Ondagram,
Panagarh, Pandabeswar, Panskura Jn,
Purulia Jn, Rampurhat Jn, Ranaghat,
Sainthia Jn, Salboni, Samsi, Santragachi,
Sealdah, Shalimar, Shantipur, Sheoraphuli
Jn., Shrirampur, Siliguri Jn., Sitarampur,
Siuri, Sonarpur Jn., Suisa, Tamluk,
Tarakeswar, Tulin, Uluberia
Page 5 of 8Completed Stations of West Bengal under Amrit Bharat Station Scheme:
Development works at railway stations under Amrit Bharat Station
Scheme in West Bengal have been taken up at a good pace. Details of
stations completed in West Bengal are as under:
State No. of Name of stations
stations
West Anara, Barabhum, Digha, Garbeta, Haldia,
Bengal Haldibari, Jalpaiguri Road, Joychandi Pahar
13
Junction, Kalyani Ghoshpara, Kamakhyaguri,
Panagarh, Siuri, Tamluk
The activities for development at other stations of West Bengal have
also been taken up at good pace and progress of some of the stations
is as given below:
Stations of Purba Bardhaman district in West Bengal:
Ambika Kalna station:The structural works of new station building
at second entry, improvement of platform surface and platform
shelters have been completed. The works of new station building
at main entry, new toilet block, 12 m wide foot over bridge and
finishing works of station building at second entry have been
taken up.
Barddhaman station: The works of new station building at second
entry, entrance porch, waiting hall, booking counter, toilet,
improvement of platform surface and platform shelters have been
Page 6 of 8completed. The works of 6 m wide foot over bridge and
improvement of circulating area have been taken up.
Katwa Junction station: The works of improvement of platform
surface and platform shelters have been completed. The works of
improvement of station building, entrance porch, improvement of
waiting hall, toilet and booking counter have been taken up.
Other stations of West Bengal:
Asansol Junction station: The structural work of new station
building block no. 4 of South Wing, building block no. 1, 2 and 3 of
North Wing have been completed. The structural work of new station
building block no. 3 of South Wing, extension of 6 m wide foot over
bridge and air concourse have been taken up.
• New Jalpaiguri Junction station: The works of new station
building at second entry, Rail Mail Service office building and
structural work of new departure station building up to fourth floor
have been completed. The structural works of new arrival station
building at main entry, structural work of fifth and sixth floor of new
departure station building, podium parking, elevated road and air
concourse have been taken up.
Aluabari Road station: The works of extension of platform no. 2,
improvement of platform surface at platform no. 1 and 2, circulating
area, parking, approach road and boundary wall have been
completed. The works of 12 m wide foot over bridge, new station
building block and improvement of platform shelter have been taken
up.
Page 7 of 8 Berhampore Court station: The works of platform shelters at
platform no. 1& 2/3 and improvement of platform surface at platform
no. 2/3 have been completed. The works of platform shelter at
platform no. 4/5, improvement of platform surface at platform no. 1,
booking counter and 6 m wide foot over bridge have been taken up.
New Farakka Junction station: The works of improvement of
station building, waiting halls, toilet, entrance porch, signages and
installation of Train Indication Board have been completed. The
works of improvement of circulating area and parking have been
taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways, is a continuous and ongoing process and
works in this regard are undertaken as per requirement, subject to
inter-se priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on
category of station/condition/traffic handled etc.
*****
Page 8 of 8