SECOND AIRPORT FOR BENGALURU
774. SHRI P C MOHAN
Will the Minister of CIVIL AVIATION
be pleased to state:-
(a) the current status of the proposal for a second airport for Bengaluru,
including the sites under consideration on Kanakapura Road and Kunigal Road
and the extent of land identified at each site;
(b) the status and expected completion date of the feasibility study being
conducted for the said project;
(c) the expected timeline for according final approval to the project and
commencement of construction thereof;
(d) whether any expansion is planned at the existing Kempegowda International
Airport, Bengaluru and if so, the details thereof including the status of Terminal
2 Phase 2;
(e) the present annual and average daily passenger handling capacity of the
existing airport along with the actual current average daily passenger footfall;
and
(f) the steps being taken to ensure that the existing airport keeps pace with the
growing air traffic in Bengaluru till the new airport becomes operational?
ANSWER
Minister of State in the Ministry of CIVIL AVIATION
(Shri Murlidhar Mohol)
(a) to (f): Airports Authority of India (AAI) has conducted Pre-feasibility
Studies of three sites for development of a second airport in Bengaluru, on the
request of Government of Karnataka (GoK). The Pre-feasibility study report has
been sent to GoK. Government of India (GoI) has not received any proposal
thereafter under Greenfield Airports Policy either from GoK or any airport
developer for development of a second Greenfield Airport near Bengaluru.
The current annual and average daily Passenger Handling Capacity of
Bengaluru airport is 51.5 million and 141 thousand respectively. The average
daily passenger footfall in FY 26-27 till June, 2026 is approximately 123.8thousand. The terminal capacity at Bengaluru airport is expected to reach 80
Million Passenger per Annum (MPPA) by 2030. This is inclusive of Terminal 2
Phase 2 to increase its capacity from existing 25 MPPA to 45 MPPA.
Concession agreements executed by the Concessioning Authorities and
Concessionaires typically specify capacity expansion triggers, where airport
expansion needs to be initiated once traffic exceeds certain limit of installed
capacity. Further, airport operators prepare master plans and development plans
relating to their expansion projects.
******