Home India Ministry of Housing and Urban Affairs Parliament Question: Smart Cities Mission in West Bengal...
Date: 2026-07-30 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Smart Cities Mission in West Bengal

Issued by Ministry of Housing and Urban Affairs · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF HOUSING AND URBAN AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 1893 TO BE ANSWERED ON JULY 30, 2026 SMART CITIES MISSION IN WEST BENGAL NO. 1893 SHRI ADHIKARI DEEPAK DEV: SHRI SAUMITRA KHAN: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) the present status of Smart Cities Mission (SCM) in West Bengal, project-wise; (b) the details of the funds sanctioned, allocated and utilised under various projects of SCM in West Bengal during the last five years, year, city and item-wise; (c) whether the Government has achieved its targets under SCM in West Bengal, if so, the details thereof and if not, the reasons therefor; and (d) whether the Government has reviewed the quality of work carried out under various projects under SCM in cities of West Bengal, if so, the details thereof and if not, the reasons therefor? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (SHRI TOKHAN SAHU) (a) to (c): In the State of West Bengal, New Town Kolkata (NTK) city was selected under Smart Cities Mission (SCM). NTKcity has been able to claim its entire Central Financial Assistance of ₹490 Crore, out of which ₹487 Crore (99%) has been utilized. As reported by the State as on 31.03.2026, total 226 projects worth ₹1,460 Cr were taken up under the Mission, out of which 225 projects (99%) worth ₹1,435 Cr have been completed. The status of projects taken by the city is at Annexure. …2/--2- (d): Ministry of Housing and Urban Affairs (MoHUA) has a multi-level review structure to expedite the progress of projects under the SCM. At the National level, implementation is monitored by an Apex Committee headed by Secretary, MoHUA. At the State level, Mission implementation is monitored by the State level High Powered Steering Committee (HPSC) chaired by the Chief Secretary. At the City level, there is provision for establishing Smart City Advisory Forum (SCAF) for all 100 cities to advise and enable collaboration among various stakeholders. *****Annexure Annexure referred to in reply for part (a) to (c) of Lok Sabha Unstarred Question No. 1893 for answer on 30th July, 2026 regarding Smart Cities Mission in West Bengal. The status of projects taken by the New Town Kolkata in West Bengal: (Amount in ₹ Cr) Total S. Project Name Projects Cost No. (in ₹ Cr) Completed Projects Implementation and Operation of Electronic Health Record, HER of Birth Death Module of 1 0.04 NKDA using Blockchain Technology Installation of Solar Panels with LED lights on top of a 1.7 km stretch of Link Canal, both 2 0.59 sides 3.4 kms 3 Greening of Metro Pillars by IoT enabled vertical Garden 2.12 Construction of Cycle Track and Barrier Free Fothpath along the service road of MAR-1111 4 1.78 from 1st Rotary infront of Axis Mall in AA-I, New Town,Kolkata Provinding Smart Street light arrangement on the service road of MAR-1111 at the Axis 5 0.46 Mall side at New Town,AA-1C in New Town,Kolkata Illumination of Solar Street Lighting at the pathway of Green Verge at AA-1A,1B,1C of AA- 6 0.75 1,New Town,Kolkata Construction of the Community Centre at AA-1C, plot no. CC 2 3, premises no. 31-1111 7 45.18 under Smart City Mission Installation of Smart energy efficient digitally enabled listing near New Town Plaza Clock 8 0.31 tower, within ABD Installation of Smart energy efficient digitally enabled listing near New Town Plaza Clock 9 tower, within ABD [ Part-II - Providing Smart street light solution on LORAWAN Network at 0.16 New Town kolkata under W.B HIDCO ] 10 Smart Library at Nazrul Tirtha in Newtown, Kolkata [Part I - Furnishing Work] 2.88 Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 11 use of Digital Technology within ABD [ PartI - Landscaping work of kolkata gate, Smart 0.23 Plaza in AA-i under New Town Kolkata] Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 12 use of Digital Technology within ABD [ Part II - Landscaping work of kolkata gate Entry Plaza 0.05 in AA-I under New Town Kolkata] Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 13 use of Digital Technology within ABD [ Part III - Aboriculture Work at Smart Plaza for 0.05 kolkata Narkelbagan under NKDA, New Town, Kolkata] Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 14 use of Digital Technology within ABD [ Part IV - Kolkata gate landscape work for entry 0.01 plaza, only for seat planter at Narkelbagan under NKDA, New Town, Kolkata] Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 15 use of Digital Technology within ABD [ Part V - Aboriculture Work at Entry Plaza for kolkata 0.02 Narkelbagan under NKDA, New Town, Kolkata] Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 16 use of Digital Technology within ABD Drawing ALPANA applying Thermoplastic Paint with 0.29 Reflectorising Glazz Beads on Bituminous Surface at Kolkata Gate in AA I Kolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 17 use of Digital Technology within ABD [ Part X - Providing illumination work at 2222 MAR 0.05 side of Entry Plaza near kolkata gate at AA_ICKolkata Gate Smart Plaza Developing Landscape Gardening with Smart Street Furniture and 18 use of Digital Technology within ABD [ Part XI - Providing illumination work at 2222 MAR 0.03 Side of Entry Plaza near kolkata gate at AA-IC, Installation of Smart Components in the Parking Plaza near TATA Cancer Hospital at Action 19 0.14 Area-ID, New Town, Kolkata Consumption of DI Pipe from PHED Resource Division for ‘Utilization of effluent water from 20 1.21 STP at AA-IIB & IIC for Gardening under New Town Kolkata Construction of Cycle Track and barrier free footpath along service road of MAR Street no. 21 1.95 1111 from 1st Rotary to 3rd Rotary in front of Pride Hotel in AA-I, New Town, Kolkata Procurement of IT equipments for Smart Library at Nazrul Tirtha Complex, New Town, 22 0.14 Kolkata Implementation of Municipal administration and governance system within the e-district 23 eco system comprising Municipal Transaction Processing System, Citizen Interface System, 1.16 Municipal Monitoring and Evaluation System and Municipal MIS CCTV Surveillance wwith video Analytics for different locations of New Town Business Club, 24 0.42 New Town, Kolkata 25 Construction of Smart Cycle Stand Adjacent to DLF Subway, AA-IA, New Town, Kolkata 0.34 Cycle Track along with development of 2nd Rotary in front of NOVOTEL HOTEL in AA-I, New 26 2.03 Town, Kolkata 27 Smart Bus Shelter at three locations of New Town Kolkata 0.89 Installation of Smart Energy Efficient LoraWan based lighting application at different area 28 4.93 of New town, AA-IA, IB, IC NKDA 29 Solar Stud Light and Road Stud for Safe Cycling 0.16 30 Improvement of Citizen Communication through Cloud Connected Systems 3.88 Construction of Water Conservation Measure within Eco-Park with Quality and Level 31 5.44 Monitoring System 32 Construction of the Community Centre at AA-IIB, Plot No. 1947 12 along Street no. 652 31.25 Design, Construction of Public Convenience Building Near Axis Mall at AA-IC, New Town, 33 0.43 Kolkata 34 Development of 8 Activity Zones within Green Corridor of AA-I 1.69 Development of Integrated Vehicular and Pedestrian Safety Measures using Smart 35 67.86 Techniques -3rd Intersection of Biswa Bangla Sarani , New Town 36 Rejuvenation of Bamboo Fencing at Road Divider Near Tank - 3, AA-I, New Town 0.22 37 Smart Sensory Park in Action Area II under NKDA 8.43 Prefabricated Single Tank Based Modular Biogas Digester in connection with Solid Waste 38 2.61 Management at New Town 39 Construction of Containerized Toilet at Different Locations of New Town, Kolkata 0.96 Construction of Containerized Cafe at Green Verge Adjacent to Ecospace Roundabout, AA 40 0.09 II, New Town, Kolkata 41 Co Working Space Community Living and Working 94.58 Construction of Barrier Free Pedestrian Friendly Foothpath with Street No. 175, 550 m 42 0.40 length in AA-IC at New Town, Kolkata 43 Construction of Solid Waste Management Museum neat 1st Rotary of New Town, Kolkata 0.61 44 Installation of Intelligent CCTV Solution at Rabindra Tirtha 0.32 Selection of agency to design, procure, install, operate and maintain Public Bicycle Sharing 45 3.15 System in New Town, Kolkata 46 CCTV Surveillance System for New Town Kolkata Part - I 14.46 47 IT Infrastructure for new Administrative Building of NKDA 7.83 Construction of Cattle Barrier and CCTV Surveillance in front of NCB, Narcotic Control 48 0.10 Bureau Office Building within AA - I, NKDA 49 Construction of Smart Workspace at PLot No. 67 1, AA-IIE, New Town Kolkata 31.01 50 Illumination of Solar Street Light at the pathway of Green Verge at AA-ID AA-II, New Town 1.78 51 Cycle Track along the Service Road of MAR in different locations from Jatragachi Bridge to 2.52Noapara in New Town, Kolkata LEngth -2450.00 Electrical and ELV work including Air Conditioner and Elevator for Smart Workspace at Plot 52 1.39 no 67 1, AA-IIE, New Town, Kolkata Integration of CCTV Surveillance for Supervision and Monitoring of Subway Akansha More, 53 0.08 New Town, Kolkata Supply, Installation, Annual Operation and Maintenance Support for " Toilet Feedback 54 0.20 Monitoring System" for New Town, Kolkata 55 Installation of Outdoor Gym Equipment at Eco Urban Village, AA-II B, New Town, Kolkata 0.36 56 Roof-Top Solar, Vertical Green Wall and Rainwater Recharge Proposal at NKGSCCL Building 0.81 57 Construction of Day Care Centre at Block AD AA IA, New Town, Kolkata 0.61 58 Integrated Command and Control Centre 24.69 59 Technology Enabled Smart Street Signage, AA-I, New Town, Kolkata 11.20 Construction of Barrier Free Pedestrian friendly Footpath in AA-IA under NKDA, New Town, 60 10.77 Kolkata Construction of Barrier Free Pedestrian friendly Footpath in AA-IB under NKDA, New Town, 61 7.95 Kolkata Construction of Barrier Free Pedestrian friendly Footpath in AA-IC under NKDA, New Town, 62 12.05 Kolkata Construction of Barrier Free Pedestrian friendly Footpath in AA-ID under NKDA, New Town, 63 11.18 Kolkata 64 Landscape Redevelopment of Neem Banani Park 5.51 Utilization of effluent water from STP at AA-II B II C for gardening under New Town, Kolkata 65 2.47 project Bagjola Canal-Top Grid Interactive Solar Photovoltaic Power Plant in New Town, Kolkata, 66 15.60 West Bengal Supply, Installation, Testing, Commissioning 5 years Maintenance for Network Backbone 67 through OFC for CCTV Surveillance System under New Town Kolkata Green Smart City 5.89 Projects Providing equipment and accessories with all ancillaries and auxiliaries for SCADA including 68 automation by SCADA system of Raw Water Intake Pumping Station at Rani Debendrabala 2.77 Ghat and Central SCADA arrangement at WTP campus Providing SCADA automation arrangement for 20 MGD WTP including Clear Water Pump 69 House, Sub-Station, Filter House, Chemical House and Mission Bazar for Surface based W S 2.78 scheme under NTK Project Providing equipment and accessories with all ancillaries and auxiliaries of SCADA 70 arrangement at OHR sites for Surface based Water Supply at OHR Zone - 1 to 8 of AA-1 2.28 under NTK Project Providing SCADA arrangement with equipment and all ancillaries and auxiliaries at BS-I for 71 0.37 Surface based Water Supply under NTK Project "Bulk Electro Magnetic Flow Meter, GPRS RTU and Control Valve for Bulk Consumer Line 72 6.36 size-80 100 mm dia " Supply, Delivery, Installation and Commissioning of Domestic Type Ultrasonic Water Meter 73 EEC MID or OMIL marked and Float Valve for Small Consumer Water Supply Management, 6.86 Action Area - I, New Town, Kolkata Supply, Delivery, Installation and Commissioning of Bulk Electro Magnetic Flow Meter, 74 GPRS RTU and control Valve for Bulk Consumer Water Supply Management, Action Area - 4.07 II, New Town, Kolkata Supply, Delivery, Installation and Commissioning of Domestic Type Ultrasonic Water Meter 75 EEC MID or OMIL marked and Float Valve for Small Consumer Water Supply Management, 0.69 Action Area - II, New Town, Kolkata 76 Shifting of 03 nos. 33 KV3X300 SQMM Cable Near Axis Mall, Street No. 184 0.05 77 Setting up and Running of 24 7 Toll Free Citizen Helpline for New Town Kolkata 0.49 78 Proposed Smart Building Solution for WBHIDCO Bhawan in New Town, Kolkata 0.97Arrangement of Garden Water by Solar Power Pumping Sets at Different areas in AA-I and 79 0.35 II under New Town, Kolkata 80 Installation of IOT Enabled Biopod, Aqua - II at premises of NKGSCCL 0.01 Construction of Captive Drainage Pumping Station DPS with Smart Pumping Arrangement 81 1.23 at Balaka Abasan under NTK Project Construction of Alaap Banquet Hall and Citizen Interaction Area at Swapnobhor Senior 82 3.60 Citizen Park, Block BF, AA-IB, New Town, Kolkata 83 Installation of Directional Signages in Mangaldeep Subway in New Town, Kolkata 0.08 84 Installation of IOT enabled enabled Public Message Boards in New Town, Kolkata 0.54 Providing LT power connections to the junction Box used for 82 Nos. CCTV surveillance 85 0.35 system for different locations, New Town, Kolkata under WBHIDCO 86 Construction of Cycle Docking Stations 21 nos. at various locations of New Town, Kolkata 2.66 Construction of 28 nos. Kiosks at Mangaldeep Subway and 02 Nos. Kiosks each at DLF Eco 87 0.52 Park Subway Proposed Landscape Development and Construction of Micro Garden at New Town, 88 1.94 Kolkata Landscape Development of activity park opposite Neem Banani at AA-II B, New Town, 89 2.43 Kolkata Implementation of Public WiFi Hotspot Zone at different locations of New Town, Kolkata 90 using HIDCO Backbone Network System Ph-I incluidng 05 Five years Operation and 2.67 Management Shifting of drainage pipeline from Public Convenience Building Site under New Town 91 0.02 Kolkata W/S Division – I, PHE Strengthening and renovation of the existing street by using shredder waste plastic with 92 bituminous mix and preparation of two Number Rams on the service road abutting to Mela 0.34 Ground AA-I, New Town, Kolkata Construction of Smart Bus Shelter in front of New Town Mela Ground Retrofitting of the 93 existing one in front of Swapnobhor in connection with Smart Street at AA-I of New Town, 0.15 Kolkata Setting up Integrated Interactive Tele presence System between VC Rooms of Smart City, 94 0.64 NKDA and HIDCO - Capability of External Voip Connectivity like Zoom, Skype 95 Installation of Grow Light to Enhance Flower Growth in New Town, Kolkata 0.41 96 Hosting of Blockchain Based Application at Vivek Tirtha 0.15 97 Bee Corridor at Eco Park, New Town, Kolkata 0.10 Supply, Installation and maintenance of Facial based attendance System for NKDA and 98 0.14 HIDCO Supply and installation of 4, Four Mosquito traps at 4, four locations in New Town, Kolkata 99 0.11 and their Operation and Maintenance for three years 100 Supply, Installation, Commissioning and testing of IOT enabled Solar Benches 0.05 101 Providing Power Connection to the newly installed EV Chargers at AA-II, New Town 0.52 Supply, delivery, installation, commissioning and testing, maintenance for 2 years of Solar 102 Road Studs of given specifications, to be installed on the parking lane and service lane of 0.57 Biswa Bangla Sarani, in front of Senior Citizen Park. Design, supply, fabrication, erection, commissioning, testing and maintenance of 5 five 103 solar trees at the Smart Street beside 'Mela Ground' and 'Swapna Bhore' in New Town, 0.24 Kolkata 104 Drone Technology for Managing Covid 19 3.88 105 Construction of Graded Cycle Tracks, Cycle Sheds, Signal and Signage Group-2 0.63 106 Setting up of Community Radio in Nazrul Tirtha Complex in New Town 1.37 107 Construction of Graded Cycle Tracks, Cycle Sheds, Signal and Signage Group 3 7 3.10 108 API integration for IGMS System 24X7 New Town Helpline at NKDA with the ICCC 0.01 Modification of Power Distribution Work for Street Light under the Barrier Free Footpath 109 0.73 at AA-1AModification of Power Distribution Work for Street Light under the Barrier Free Footpath 110 0.58 at AA-1B Modification of Power Distribution Work for Street Light under the Barrier Free Footpath 111 0.49 at AA-1C Modification of Power Distribution Work for Street Light under the Barrier Free Footpath 112 0.98 at AA-1D 113 Construction of Graded Cycle Tracks, Cycle Sheds, Signal and Signage Group 6 0.88 114 Radar Speed Sign Devices for Controlling of over speeding vehicles at New Town 1.00 115 Construction of Covid Memorial at CC 4 1 in AA-1 of New Town, Kolkata 2.16 Strategy for Inward Investment in Bengal Silicon Valley, Fintech Hub and Other Central 116 1.58 Business District CBD Plots of New Town 117 Multi Storied Car Parking Complex at Plot No - CBD 117 118 in New Town Kolkata 177.86 118 Urban Primary Health Centre UPHC in IIC BKL 22 1, New Town 4.74 Urban Recreation Park and Landscape Development New Town, Kolkata (Near City Centre - 119 2.02 II) 120 Development of 24 hours Grid Power at 421 nos. Signage in AA-1, New Town 0.38 121 Chatbot Integration in 24/7 Helpline 0.06 Community Health Card for Citizen on Blockchain Technology, including 03 (Three) Years 122 0.60 Operation & Maintenance Real Time Passenger Information Display System (RPIDS) for Public Bus Stops in New Town, 123 2.88 Kolkata (Including 2 years AMC) Promotion of visibility of Eco Park as bird refuge through photographic documentation etc. 124 0.23 in Eco Park, New Town, Kolkata Smart Home Tag Platform with Integration of Solid Waste Management System using NFC 125 0.43 Technology Additional OFC Infrastructure required for the Implementation of Public Wi-fi Hotspot Zone 126 at Four public spaces located at different locations of New Town, Kolkata using HIDCO's 0.44 Backbone Network System including 5 years O&M Rectification of Old ANPR, Speed Detection & RLVD (Red Light Violation Detection) System 127 (04 Location) and Integration with existing system under New Town Kolkata Green City 0.24 (Including 5 Yrs O&M) 128 New Town Streetscape for Street Nos 165 & 166, in AA-1B, New Town, Kolkata 2.70 Construction of IOT Enabled Smart Fencing on MAR from Mahisbatan Box Bridge to Kolkata 129 10.12 Gate (Approx. 17.4 Km) 130 CCTV based Mask detecting system in CB Community Market of NKDA 0.05 131 Plastic Free Market at CB Block Community Market, Action Area-1C, New Town, Kolkata 0.23 132 Construction of 15 No. Smart Bus Shelter, New Town, Kolkata 1.34 Construction of Community Hall cum Market at CE Block & AC Block of AA-I of New Town, 133 5.01 Kolkata Roof Covering of Bio-Methanation plant with Zinc Aluminium steel sheet over steel 134 0.49 structural framework including rooftop SPV Power plant at AA-IC, New Town, Kolkata Providing chain fencing around 06 (Six) nos. Activity Zone cum Playgrounds within green 135 1.81 corridors including illumination works with LED lights at different blocks Design, Development, Testing and Maintenance of NFT based Property identification & 136 0.55 integration with Record of Title (Mutation) Installation of Plaque for various component of Smart Street in Action Area - I, New Town, 137 0.09 Kolkata (03 Years O&M) Installation of Vertical LED Panel dual side Display Board to render community based 138 0.51 messages at New Town, Kolkata Proposed Transformation of Street no. 0106 & Surroundings to a pedestrian friendly Urban 139 1.16 Space at New Town, Kolkata Cycle Docking Station Backlit Signage Board for all the cycle docking stations constructed in 140 0.44 New Town, KolkataConstruction of Pedestrian Underpass across the MAR, in front of City Centre - II, New 141 7.92 Town, Kolkata Centre for Career Development & Excellence on Sustainability for WBHIDCO at Nazrul 142 1.14 Tirtha, New Town , Kolkata Providing IOT Enabled Vertical Garden on the surface of 03 (Three) nos. R.C.C Piers of East- 143 West Metro Corridor inside the Smart Plaza near Biswa Bangla Gate ay 3rd Rotary of New 0.67 Town , Kolkata including 03 Years O&M 144 Design Development and Maintenance of Website of Zero Shop 0.02 145 Conversion of Conventional to LED Street Light at New Town under NKDA 0.78 Construction of Apur Sansar Park at Plot No. BC/54/1/ of Street No. 131, Action Area - I, 146 1.78 New Town, Kolkata Fabrication, Supply & Erection of Street Signage at AA - II of New Town Kolkata under 147 2.31 Smart City 148 Consultancy and Management Work for Affordable Housing in New Town, Kolkata 1.54 149 Affordable Housing at AA-IIC, New Town, Kolkata SCM part 249.67 150 250m. Outdoor Cycle Velodrome beside football stadium in AA - IIE, at New Town. Kolkata 9.77 Supply Installation and Operation of Sensor Based Waste Bin Management System in New 151 0.29 Town Kolkata Providing Electrical Illumination Work at Smart Plaza at BF Block near Biswa Bangla Gate 152 0.20 New Town, Kolkata under NKDA 153 Development of underpass near Nawabpur 4.84 Implementation of Wi-Fi Hotspot at Smart Plaza and near LED Board of Eden Court at New 154 Town, Rajarhat connecting with the existing HIDCO's Wi-Fi Network System in New Town, 0.49 Kolkata Design and set up of a 3D Holographic Experience at Apur Sansar Park, AA-IB, New Town, 155 0.60 Kolkata Supply and Installation of AIR Conditioner with VRF System for 1st & 2nd Floor Banquet 156 Halls & Split System for all the Guest Rooms, Lounges at Mezzanine Floor Level & Office 0.50 room of Community Centre II, Action Area II, New Town, Kolkata Supply, Fabrication & Erection of 03 Nos. Vehicle Driven Stainless Steel Water Tanker of 157 0.18 Capacity 3000 L each Mounted on Wheeled MS Base Frame Installation of Bicycle Signals along internal roads with Cycle Track in Action Area I, New 158 0.97 Town, Kolkata 159 Installation of Bicycle Signals along MAR 1111& 2222 in Action Area I, New Town 0.81 Supply, Fabrication and Installation of Road Signage with LED light facility with Stainless 160 Steel Pole (SS Grade - 304) fixed in ground with Cement Concrete Base as per design and 0.27 drawing all complete for Cycle Tracks in Action Area - I Design, supply, installation, testing, commissioning & comprehensive maintenance of grid 161 connected roof top Solar PV Power Plant with illumination at the surrounding area at New 0.20 Town Police Station , New Town , Kolkata Supply, installation, testing, commissioning & five years comprehensive maintenance of 162 1.02 200 KWP 3 Phase roof top Solar Power Plant at NKDA Admin Building Supply, installation, testing, commissioning & five years comprehensive maintenance of 11 163 0.04 KWP 3 Phase roof top Solar Power Plant at NKDA Cattle & Dog Pound Construction of 15 nos. waste transfer stations at suitable locations of New Town, Kolkata 164 2.38 to facilitate daily waste collection and disposal under the SWM Programme of NKDA Construction of Outfall Structures along with Replacement of Draw Shutters and Ancillary 165 0.34 works along Bagjola Canal Supply and Installation of VRF air conditioner system for 1st and 2nd floor Banquet Halls & 166 Split Air Conditioner System for four nos. guest room , office room & lounges at mezzanine 0.50 floor level of Community Centre - I, AA-IC, New Town, Kolkata Development work for public convenience building site (Near Axis Mall) within AA-I and 167 0.04 other ancillary works under New Town Kolkata W/S Division - ISupply & Delivery, Installation & Commissioning of SMART Improvement of Water Supply 168 2.94 system in different OHR in AA - I& II under New Town Kolkata W/S Division Supply,, Installation, Testing, Commissioning and 03 years maintenance of automatic 169 2.73 vehicle speed detection camera & e-challan system at 12 locations of New Town , Kolkata Supply, Installation, Testing, Commissioning and 3 Years Maintenance for IP Based CCTV 170 Surveillance system (Phase - II), under New Town Kolkata Development Authority Areas 14.74 and integration with existing system already installed 171 Preparation of Project Report on 'On-street Parking Management in New Town Kolkata' 1.94 172 Construction of 3 Nos Working Pod (COCOON) in New Town, Kolkata 0.95 Construction of Daily Market in Action Area - IIIE under New Town Kolkata Development 173 2.91 Authority, New Town, Kolkata Construction of NKDA Market opposite to Eco Space, Plot No., IIF/26/1, Action Area - IIF, 174 New Town, Kolkata to rehabilitate the street hawkers operating around the place at Eco 2.63 Space of New Town, Kolkata Construction of NKDA Market beside T.C.S at Plot No. IIF/26/3 at Action Area IIF, New 175 Town, Kolkata to rehabilitate the street hawkers operating around T.C.S of New Town, 1.85 Kolkata Construction of NKDA Market opposite to Unitec Gate no. 2, Plot No. DH/6/50, Premises 176 no. 04-0368, Action Area - ID, New Town, Kolkata to rehabilitate the street hawkers 3.23 operating around the place at Unitec Gate No. 2 of New Town, Kolkata Extension Hawkers Plaza opposite to Unitech Infospace at New Town, Kolkata to 177 rehabilitate the street hawkers operating around the place at Unitech Infospace of New 1.44 Town, Kolkata Construction of NKDA Market in-between the car parking lot and D.C.P office at Street No. 178 45 of Action Area - I, New Town, Kolkata to rehabilitate the street hawkers operating 3.74 around DLF - I/Coal India Bhaban and nearby places of New Town, Kolkata Construction of Market Complex at Baliguri R.R Plot beside MAR 3333 outside the 179 2.56 periphery canal in Action Area - III B, New Town, Kolkata 180 Solar Dome at Eco Tourism Park, New Town, Kolkata 53.20 Surveying, Planning, Designing, Supply, Construction, Erection and Commissioning of 20 181 MGD Surface Water Based W.T.P (2nd Unit) including 3 Months Trial Run followed by 5 41.40 years operation & maintenance Construction of Utility Building in Action Area - IIE opposite to City Centre - II in New Town 182 6.87 Kolkata 183 Construction of Sewage Treatment Plant in Action Area IIID, New Town, Kolkata 37.88 Daily collection of solid waste including garbage, transportation, stacking and spreading 184 the waste at specified disposal ground, from different areas of New Town, Kolkata as will 5.64 be assigned by NKDA Mechanized and manual sweeping of internal roads within Action Area - I, New Town, 185 6.24 Kolkata Mechanized and manual sweeping of MAR 3333 including internal roads within Action 186 6.16 Area - III, New Town, Kolkata 187 Mechanized and manual sweeping of internal roads within Action Area II, New Town 6.24 Supply, installation & operation of in-situ Solid Waste Composting Plant for conversion of 188 0.26 organic waste generated from NKDA Community Market to compost (01 M.T/Day) Mechanized and manual sweeping & cleaning of MAR - 1111 including service road at New 189 6.94 Town kolkata under NKDA Mechanized and manual sweeping and cleaning of the Biswa Bangla Sarani (Left side-up & 190 down) including service road from Box Bridge to VIP road crossing (Haldirams) at New 6.63 Town Kolkata under NKDA Daily collection of solid waste (Dry Waste & Wet Waste), transportation, stacking and 191 spreading the waste at specified yard/disposal ground from Action Area I, II & III of New 18.62 TownConstruction of 2nd Bridge over Keshtopur Canal including approach viaduct and ancillary 192 Road Work for Connecting Link Road at Salt Lake End and on the other End Street Np. 2222 55.12 at New Town Design & Build One No 4.5 M Wide Cross Over Bridge over Bagjola Canal adjacent to Biswa 193 2.87 Bangla Convention Centre at New Town Kolkata Supplying, Delivery at site & laying of rising main of 350 mm dia MS pipe for Tank No-7&8 194 from existing W/S rising main at AA-ID and other ancillary works under New Town Kolkata 2.02 W/S Division Construction of Drainage Pumping Station near Ghuni Canal at Chainage 4808.00 Mts. And 195 allied Works opposite to City Centre - 2 near IOC Petrol Pump at Action Area IIE New Town 1.57 Kolkata Phase II Construction of Electrical Sub-station building at WTP Site at Action Area - I in New Town 196 1.29 Kolkata under New Town Kolkata Water Supply Division No. I, P.H.E Construction of Electrical Sub-station building at Boosting Station - III in New Town Kolkata 197 1.24 under New Town Kolkata Water Supply Division No. I, P.H.E Annual Repair and Maintenance of Streets in different locations by hot mix Plant in Action 198 0.47 Area IB under NKDA, New Town, Kolkata Profile correction of Bituminous Road by laying Bituminous Macadam in stretches with 199 SDBC works with paver finisher at street no. 269, 306 &324 at AA-ID, under NKDA, New 0.59 Town, Kolkata Profile correction of Bituminous Road by laying Bituminous Macadam in stretches with 200 SDBC works with paver finisher at street no. 326 & 299 at AA-ID, under NKDA, New Town, 0.59 Kolkata Construction of First phase (B+G+IV) of Administrative Building of New Town Kolkata 201 Development Authority at No. DG/13, Premises No. 04-3333, Action Area I D, New Town, 74.77 Kolkata 202 Development of 24 Hour Grid Power for 373 nos camera in New Town 0.43 CCTV Surveillance at different Community Markets & Public Bicycle Sharing Stations at 203 0.17 New Town, Kolkata Engagement of System Integrator (SI) for Fastag Based Vehicle Parking Solutions in New 204 0.28 Town Kolkata 205 Additional work of Smart Sensory Park in Action Area II New Town, Kolkata 2.58 Procurement of Furniture at the integrated Urban Primary Health Centre with Polyclinic at 206 0.63 Plot No, BLK/22, New Town, Kolkata 207 Happy Street 9.43 208 Empanelment of agency for citizen centric activities in New Town Kolkata 0.02 209 Development of Futsal Ground with Citizens' Corner in AA - II, New Town 2.26 Development of Land at Plot No. AA-IIE/57/D, Action Area - IIE allotted for SWM Work 210 including Roof Covering over steel structural framework under New Town Kolkata 1.14 Development Authority 211 Development and Modification of Graded Cycle Track in AA-I New Town Kolkata 0.95 API integration of technology enabled smart street signage at 421 locations in AA-I of New 212 0.25 Town, Kolkata Construction of a cycle docking station (Dimension: 20 m X 2.5 m) at a specified location of 213 0.11 New Town, Kolkata 214 Procurement of Manhole Cleaning Robotic Arm 2.75 Construction of Toilet Block with separate arrangement for ladies and gents for various 215 0.26 playgrounds/activity zones (09 nos.) at Action Area – I, New Town, Kolkata 216 Provision of Cycle Track along the Footpath in Action Area IA, IB, ID at New Town, Kolkata 2.75 Provision of Cycle Track and barrier free Footpath along the street no 568, 374 and 335 in 217 3.05 Action Area II New Town Kolkata Preparation of Architectural 3D physical models (03 nos.) exhibiting best practices 218 0.09 benefitting the citizen of New Town through various projects executed by NKDASupply, Delivery and installation of zero B UV chill 60-80-120 LPH water purifier (21 nos.) 219 0.22 for various bus stops of New Town Development of playgrounds (08 nos - 500 sq m each) Children’s Pay area within Green 220 0.77 Corridor of AA – I, New Town, Kolkata Construction of Smart Bus Shelter at northern site as per existing model on both sides of 221 0.10 MAR 3333 near coco petrol pump at Action Area IIIC, Construction of Smart Bus Shelter at southern site as per existing model on both sides of 222 0.10 MAR 3333 near coco petrol pump at Action Area IIIC Design, Development and cloud hosting of One City One App for New Town Kolkata with 3- 223 0.07 year maintenance 224 Children Park at AC block St. No. 37 along with Toilet block 0.55 Development of football playground in AC Block (Plot no. AC/44, Premises No. 25 – 0043) 225 0.45 AA-I, New Town, Kolkata Under Implementation Construction of School Building at Plot No - DF/183, 184, 185 in Action Area - ID, New 1 25.1 Town, Kolkata (As reported by the State on 31.03.2026.)

Continue your research