GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2062
ANSWERED ON 30TH JULY, 2026
STATUS OF VADODARA–MUMBAI EXPRESSWAY
2062. DR. HEMANT VISHNU SAVARA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the current status of the Vadodara-Mumbai Expressway,
particularly the stretches falling in Palghar district, Maharashtra;
(b) the details of the sanctioned length, project cost, physical
progress, and expenditure incurred on this Expressway, section-wise
particularly in the Palghar district section;
(c) whether any land acquisition, environmental clearance or other
implementation issues have delayed the project, if so, the details
thereof; and
(d) the expected timeline for completion and opening of the Palghar
district stretches of the Vadodara-Mumbai Expressway, section-wise?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a), (b) & (d) The current status of the Vadodara-Mumbai
Expressway (VME) is annexed.
(c) Yes Sir. The projects have been delayed due to land acquisition,
environmental clearance, utility shifting etc. The details are as under:1). Vadodara Mumbai Expressway (VME) Package-15:
Utility Shifting Issues: Delay in providing shutdown by
Maharashtra State Electricity Transmission Company
Limited (MSETCL) for 220 kV from Ch. 34+440 to 35+500,
Village Pundas, Taluka Bhiwandi Length affected: 60 Mtr.
2) Vadodara Mumbai Expressway (VME) Package-16:
(i) Land Acquisition (LA) Issues: Acquisition of 0.83
hectare in village Balyani, Taluka, Kalyan district is under
progress. Length affected: 50 Mtr.
(ii) Utility Shifting Issues: Delay in Shifting of 1 no of 100
KV, 7 Nos. of 400kV EHV lines of MSETCL due to extended
time taken by MSETCL in approval of designs, drawings and
delay in providing shutdown for 1 no of 100 KV EHV line for
length affected. 0.7Km.
3) Vadodara Mumbai Expressway (VME) Package-17:
LA Issues: Land for construction of interchange at Morbe is
to be provided by Maharashtra State Road Development
Corporation (MSRDC). State Government of Maharashtra
has not yet handed over the required land.ANNEXURE REFERRED TO IN REPLY TO PART (a), (b) & (d) OF LOK
SABHA UNSTARRED QUESTION NO. 2062 ANSWERED ON 30TH JULY,
2026 ASKED BY DR. HEMANT VISHNU SAVARA REGARDING ‘STATUS
OF VADODARA–MUMBAI EXPRESSWAY’.
Status of package-wise Vadodara -Mumbai Expressway projects
SanctionProject CPhysicaExpenditure
Sr.
Name of Project ed Lengt ost l Progre (in Cr.) Status
No.
h (km) (in Cr.) ss (%)
23.74 4374.64 100% 2,647.76 Work Com
Vadodara to Padra Km
pleted.
1 . 355+000 to Km. 378+
Open to Tr
740 (VME, Pkg-1)
affic
32.00 3280.29 100% 1,951.31 Work Com
Padra to Sanpa Km. 32
pleted.
2 3+000 to Km. 355+000
Open to Tr
(VME, Pkg-2)
affic
31.00 2473.59 100% 1,636.12 Work Com
Sanpa to Manubar Km.
pleted.
3 292+000 to Km. 323+0
Open to Tr
00 (VME, Pkg-3)
affic
13.00 2236.27 100% 1,552.29 Work Com
Manubar to Ankleshwa
pleted.
4 r Km. 279+000 to Km.
Open to Tr
292+000 (VME, Pkg-4)
affic
24.57 2929.20 96% 1,526.96 work is bei
ng redone
due to poo
r quality, c
Ankleshwar to Kim K
ompletion
5 m. 254+430 to Km. 27
certificate
9+000 (VME, Pkg-5)
has not be
en issued.
Open to T
raffic
37.43 4301.73 100% 2,992.46 Work Com
Ena to Kim Km. 217+5
pleted.
6 00 to Km. 254+430 (V
Open to Tr
ME, Pkg.6)
affic
27.00 3455.87 100% 2,457.26 Work Com
Gandeva to Ena Km. 1
pleted.
7 90+000 to Km. 217+50
Open to Tr
0 (VME, Pkg.7)
affic
8 Jujuwa to Gandeva K 36.00 3820.20 4.85% 198.02 Contract tm. 154+600 to Km. 19 erminated
0+000 (VME, Pkg-8) on accoun
t of poor p
erformanc
e of Contra
ctor. Bids i
nvited for
completio
n of balanc
e work and
likely date
of complet
ion is 30.0
6.2028.
26.00 2587.04 21.75 % 227.07 Contract t
erminated
on accoun
t of poor p
erformanc
e of Contra
Karvad to Jujuwa ctor. Bids i
9 Km. 128+000 to Km. 1 nvited for
54+630 (VME, Pkg-9) completio
n of balanc
e work and
likely date
of complet
ion is 30.0
6.2028.
24.6 2652.24 36.23% 1097.29 Intention t
o Terminat
e notice is
sued to Co
ncessionai
re on acco
unt of poor
performan
Talasari to Karvad Km
ce. Lender
10 . 103+400 to Km. 128+
s have exe
000 (VME, Pkg-10)
rcised thei
r right of s
ubstitution
of Concess
ionaire. Li
kely date o
f completi
on is 30.06.2028
Vadodara Mumbai Exp 26.40 1730.21 100 % 901.76 Completed
ressway (Phase II - Pk / CC issued
11 g XI) [Km. 77.000 to K w.e.f. 20.0
m. 103.400] (Ganjad - 1.2026.
Talsari)
Vadodara Mumbai Exp 26.30 2110.93 99.85 % 979.41 31.07.2026
ressway (Phase II - Pk
g XII) [Km. 50.700 to K PCC is und
m. 77.000] (Masvan - G er conside
anjad) ration of th
12 e Authority
for entire l
ength of 2
6.300 Km
w.e.f. 31.0
1.2026.
Vadodara Mumbai Exp 27.12 4298.89 98.00 % 2014.39 31.08.2026
ressway (Phase II - Pk (One side
g XIII) [Km. 26.582 to of the Maj
Km. 50.700 of Main Ali or bridge a
gnment] & [Km. 0.000 t Ch. 35+8
to Km. 3.000 of Spur A 48 shall be
lignment] (Shirsad - M completed
13 asvan) )
31.10.2026
. PCC Issu
ed for leng
th of 24.36
8 km w.e.f.
15.07.2025
.
Vadodara Mumbai Exp 17.20 2016.05 98.00% 634.55 31.08.2026
ressway (Phase II - Pk PCC is und
g XIV) [Km. 3.000 to K er conside
m. 20.200 of Spur] (Shi ration of th
rsad - Akloli) e Authority
14
for entire l
ength 17.2
00 Km w.e
.f. 15.04.20
26.
Vadodara Mumbai Exp 18.00 2603.18 94.50 % 622.23 31.10.2026
ressway (Phase II - Pk (Balance l
15 g XV) [Km. 20.200 to K ength & B
m. 43.000 of Spur] (Akl hoirgaon I
oli - Amne) ntechangeshall be co
mpleted; T
hus, entire
project sh
all be com
pleted). PC
C issued w
.e.f. 15.01.
2026 for 1
7.440 km o
ut of 18.00
0 km of Pr
oject Leng
th.
Vadodara Mumbai Exp 7.00 889.88 95.00 % 800.88 30.09.2026
ressway (Phase II - Pk
16 g XV A) [Km. 20.200 to
Km. 43.000 of Spur] (A
kloli - Amne)
Vadodara Mumbai Exp 24.60 3918.77 95.00 % 982.89 31.10.2026
ressway (Phase II - Pk
g XVI) [Km. 43.000 to PCC issue
17 Km. 69.800 of Spur] (A d w.e.f. 23.
mne - Bhoj) 09.2025 fo
r 19.884 K
m.
Vadodara Mumbai Exp 9.98 1972.94 90.12 % 889.56 31.10.2026
ressway (Phase II - Pk
18 g XVII) [Km. 69.800 to
Km. 79.783 of Spur] (B
hoj - Morbe)
Total 432 51652 24112
*****