GOVERNMENT OF INDIA
MINISTRY OF POWER
LOK SABHA
UNSTARRED QUESTION NO.814
ANSWERED ON 23.07.2026
STRENGTHENING ELECTRICITY TRANSMISSION AND DISTRIBUTION
INFRASTRUCTURE
814. DR. KIRSAN NAMDEO:
Will the Minister of POWER
be pleased to state:
(a) whether the Government has undertaken or proposes to undertake projects
for strengthening the electricity transmission and distribution infrastructure,
including construction of new substations and upgradation of power lines in the
Gadchiroli-Chimur Parliamentary Constituency, considering the growing
industrial, mining and rural electrification requirements;
(b) if so, the details of such projects including their estimated cost, the timeline
for completion and the present status thereof; and
(c) the steps taken to ensure uninterrupted and quality power supply to remote
and tribal villages in the constituency particularly in naxal-affected areas?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) to (c): (i) As reported by the State Government of Maharashtra, 10 year
Long-Term Plan (2026-27 to 2035–36) includes projects for strengthening the
Intra-State transmission System (InSTS) infrastructure in the Gadchiroli–Chimur
Parliamentary Constituency. The proposed projects particularly in Sironcha,
Hedri, Illur (Ashti), Etapalli, Allapalli, and Konsari areas, ensure uninterrupted and
quality power supply to remote and tribal villages.
The details of under implementation InSTS projects are enclosed in
Annexure.
……….2.- 2 -
(ii) System Strengthening works under Maharashtra Power Distribution
Enhancement Program (MPDEP) funded by Asian Development Bank (ADB) with
an estimated cost of ₹ 76.47 crore and the 66 kV Level Elimination Scheme
(special scheme) with an estimated cost of ₹ 11.28 crore are also under
implementation in the Gadchiroli–Chimur Parliamentary Constituency.
(iii) Presently, under Inter State Transmission System (ISTS), High Voltage
Direct Current (HVDC) project for evacuation of RE from Khavda Area to Nagpur,
at an anticipated cost of ₹24,819 crore with Schedule Commercial Operation Date
(SCOD) as May 2029, is under implementation. The project shall facilitate the
drawl of Power for meeting the load requirement of Maharashtra, including nearby
Chimur / Gadchiroli area.
(iv) Under Revamped Distribution Sector Scheme (RDSS), Projects with
estimated cost of ₹527.81 sanctioned for Gadchiroli-Chimur Parliamentary
Constituency are under implementation.
*************ANNEXURE
ANNEXURE REFERRED IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION
NO. 814 ANSWERED IN THE LOK SABHA ON 23.07.2026
*************
The details of the under implementation InSTS projects in Gadchiroli–Chimur
Parliamentary Constituency are as under:-
Sr. Name of Projects Estimated SCOD
No cost
(₹ in Crore.)
1 Establishment of new substation 132 kV 76.69 March-2028
Sironcha S/s.
2 2nd Ckt stringing on 132 kV Ashti-Allapalli 13.05 March-2027
line along with end bays.
3 Establishment of new substation 132/ 92.65 March-2028
33kV Deori, District- Gondia.
4 2nd Ckt stringing on 132 kV Mul 10.39 March-2028
Sindewahi (30kM) (RE).
5 2nd Ckt stringing on 132 kV Bramhapuri 7.0 March-2028
Sindewahi (53kM) (RE).
6 ICT Addition at 220 kV Nagbhid S/S 11.5 March-2029
(1x100) MVA 220/132kV.
****************