See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF PORTS, SHIPPING AND WATERWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3332
ANSWERED ON 07.08.2026
STRENGTHENING OF INFRASTRUCTURE IN MUMBAI PORT
3332. SHRI BALYA MAMA SURESH GOPINATH MHATRE:
Will the Minister of PORTS, SHIPPING AND WATERWAYS be pleased to state:
प(cid:419)न, पोत प(cid:464)रवहन और जलमाग (cid:91) म(cid:287)ं ी
(a) the details of various projects undertaken in the Mumbai Port Authority in the last two
years to strengthen the port infrastructure and to further the green port initiative of the
country; and
(b) the details of the cost of projects undertaken, year-wise ?
ANSWER
MINISTER OF PORTS, SHIPPING AND WATERWAYS
(SHRI SARBANANDA SONOWAL)
(a) & (b) The details of the projects undertaken by the Mumbai Port Authority (MbPA)
during the last two years to strengthen port infrastructure are enclosed at Annexure-I.
The green port initiatives undertaken by the MbPA are given below:
(i) Renewable energy: A total of 1.4 MW rooftop solar capacity is operational. In addition,
a 3 MW rooftop solar project on Indira Dock sheds is under implementation under the
RESCO model. At present, about 57% of the Port's electricity requirement is met through
renewable energy.
(ii) Alternative marine fuels: Biofuel blending has been piloted in collaboration with
BPCL. Green Tugs are being inducted under the Green Tug Transition Programme
(GTTP). Development of an LNG import and handling facility at Jawahar Dweep is under
progress to facilitate cleaner marine fuel handling.(iv) Afforestation & ecology: Bamboo plantation and other plantation drives are being
undertaken. Development of a Mangrove Park at Sewri has also been taken up to
enhance green cover and support the coastal ecosystem.
(v) Cleaner domestic fuel: Conversion from LPG to PNG is being undertaken across
port residential and common-user connections.Annexure-1
The details of the projects undertaken during last two years
Sr. Description of project undertaken in 2025-26 Total Cost of
No. Project
1. Development, Operation and Maintenance of Mumbai Rs.192 Cr.
International Cruise Terminal (MICT) at Indira Dock on DBFOT
(PPP) Basis.
2. Modernization of existing Mumbai International Cruise Terminal Rs.303 Cr.
(MICT) at Indira Dock, Mumbai on EPC mode.
3. Providing Shore Protection at Jawahar Dweep. Rs. 80.4 Cr.
4. Viksit Bharat Mumbai Marina(EPC part) Rs. 470 Cr.
Description of project undertaken in 2024-25
5.
Construction of Third Chemical Berth at Pirpau, MbPA. Rs.161.00 Cr.
6. SCADA and PLC automation system at Marine Oil Terminal at
Rs.25.84 Cr.
Mumbai Port
7. Augmentation of Firefighting facilities at Pir Pau Terminal of
Rs.52.69 Cr.
Mumbai Port
*****