GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.2713
ANSWERED ON 16.03.2026
STRENGTHENING OF POWER INFRASTRUCTURE IN J AND K
2713 SHRI SAT PAUL SHARMA:
Will the Minister of POWER be pleased to state:
(a) whether Government has identified the reasons for frequent power cuts in the Jammu and
Kashmir region during the winter months;
(b) the steps taken by Government to mitigate the power cuts; and
(c) the measures taken by Government to strengthen power infrastructure and ensure
uninterrupted electricity supply in the region?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a): Electricity being a concurrent subject, supply and distribution of electricity to consumers is
within the purview of the respective State Government/ distribution utility. As reported by UT of
J&K, power cuts are primarily driven by system constraints at the transmission and distribution
levels, alongside unrestricted energy consumption in unmetered areas.
(b) & (c): Government of India (GoI) has supplemented the efforts of the States/UT including
Jammu and Kashmir through schemes like Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY),
Integrated Power Development Scheme (IPDS) and Pradhan Mantri Sahaj Bijli Har Ghar Yojana
(SAUBHAGYA), to help them achieve the objective of providing quality and reliable power supply.
These schemes stand closed as on 31.03.2022. Under these schemes, projects worth Rs. 2,909 crore
were executed for strengthening of power distribution infrastructure in the UT of J&K. Further, the
Government of India, in November 2016, had approved Prime Minister Development Package
(PMDP) for augmentation of infrastructure for distribution systems including capital cities, tourist
destinations along with Advance Technology interventions for erstwhile state of J&K (including
Ladakh). Under PMDP, projects worth Rs. 2780 Cr have been executed. Under the above schemes
and project, the major executed works include creation and augmentation of substations, Distribution
Transformers, High Tension (HT) Lines, Low Tension (LT) Lines, feeder separation etc.
Further, the Government of India, in July 2021, launched the Revamped Distribution Sector
Scheme (RDSS) with the objective of improving the quality and reliability of power supply to
consumers through a financially sustainable and operationally efficient Distribution Sector in the
country.Under RDSS, Projects worth Rs. 5,034 crores for loss reduction works and Rs. 1,064 crores
for smart metering works have been sanctioned for the UT of J&K. The sanctioned works include
execution of new and upgradation of existing substations and Distribution Transformers (DTs), HT
& LT lines, agricultural feeder segregation, household electrification, etc.
Ministry of Power also allocates additional power from the Central Generating Stations
(CGSs) during winter months every year with a view to facilitate electric supply in J&K. In the
winter of current FY 2025-26, Ministry of Power had allocated the following additional power from
the CGSs:
(i) 120 MW unallocated power from Patratu Thermal Power Plant (Unit#1) as specific
allocation from 05.11.2025 (Commercial Operation Date) to 28.02.2026.
(ii) 292.99 MW power from NTPC Kahalgaon Super Thermal Power Station (Stage-I) from
01.10.2025 to 28.02.2026.
.
**********