GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 786
ANSWERED ON 23rd JULY, 2026
TOLL COLLECTION DESPITE DILAPIDATED CONDITION OF NHs
†786. SHRI PATEL UMESHBHAI BABUBHAI:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government is aware that, despite the condition of roads
on several National Highways (NHs) being severely deteriorated, toll is
being collected at the full prescribed rates and if so, the number of toll
plazas currently operational where the quality of roads does not conform
to the prescribed standards;
(b) whether the Government has any provision to suspend or discontinue
toll collection where the condition of the road falls below the prescribed
standards, if so, the details thereof and the number of cases during the
last five years in which toll collection has been suspended or
discontinued and if not, the reasons therefor;
(c) the total number of toll plazas in the country and the number of toll
plazas where toll collection has continued even after the project cost
has been recovered or the prescribed toll collection period has expired,
State-wise;
(d) whether the Government has conducted any independent financial
audit of such projects, if so, the details and the findings thereon; and
(e) the maintenance obligations of concessionaires/contractors during
the toll collection period and the number of penal actions and toll
contract terminations executed due to poor maintenance during the last
five years and if such action has been negligible, the reasons therefor?
1ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) & (b) The collection of user fee commences only upon issuance of the
Completion Certificate/ Provisional Completion Certificate and the safety
report certifying that the concerned section of the National Highway is
fit for operation. User fee at Fee Plazas on National Highways (NHs) is
levied and collected only after the publication of the respective user fee
notification in the Gazette of India, in accordance with the provisions of
the National Highways Fee (Determination of Rates and Collection)
Rules, 2008 and the terms and conditions stipulated in the respective
Concession Agreements.
Further, as per the provisions of the NH Fee Rules, 2008, the applicable
user fee is reduced during the period of upgradation of National Highway
projects, and no annual revision of the user fee is carried out until
completion of the upgradation works, as under:
(i) Reduction of applicable user fee to 30% on stretches where
two-lane highways with paved shoulders but below four lane
configuration being upgraded to four lane or more lanes
configuration.
(ii) Reduction of applicable user fee to 75% on stretches where
upgradation of four lane highways being upgraded to six lane or
above configuration.
To ensure that National Highways sections remain traffic-worthy at all
times, regular site inspections, periodical reviews, and site visits are
carried out. In addition, periodic NSV surveys, FWD tests, drone
surveys, etc. are undertaken for assessing and monitoring the
condition of pavement and other Highway Assets with respect to the
desired service levels specified in the respective Contract Agreements
(CA). Based on the results of these surveys/ inspections, necessary
repair and maintenance works, if required are carried out by the Field
2Units through the respective Contractors/ Concessionaires as per the
provisions of the Contract Agreement.
(c) As of June, 2026, a total of 1,235 Fee Plazas are operational on
National Highways in the country.
Collection of user fee at fee plazas on National Highways is not related
to the recovery of project development cost. As per the provisions of
National Highways Fee Rules, 2008, in case of concessionaire operated
fee plaza, the fee notified as per concession agreement is collected by
the concessionaire till the end of the concession period, and after the
concession period is over, the fee Plaza is handed over to the
Government and thereafter the fee is collected by the Central
Government or the executing authority as per the fee specified under the
provisions of NH Fee Rules, 2008. In respect of fee plaza under public
funded project, the fee leviable shall continue to be collected for such
section of the National Highway. The revenue collected by the Central
Government from user fee collection is deposited in Consolidated Fund
of India (CFI) and the funds provided through budgetary allocation are
utilised for further maintenance, development and augmentation of
National Highways.
(d) The extant National Highways Fee (Determination of Rates and
Collection) Rules, 2008 was formulated to ensure transparency, with a
uniform methodology for calculating user fees across the country.
Regular audit of user fee plazas are conducted by the Comptroller &
Auditor General including user fee plazas operated by concessionaire.
(e) The maintenance of National Highways is carried out as per
requirement and it is ensured that no stretch of National Highways
remains unattended.
Further, the Concessionaire/ Contractor is responsible for the Operation
and Maintenance of the National Highway during the Concession/
Contract period as per the provisions of their respective Concession/
Contract Agreement. The maintenance activities are undertaken as per
3stipulated timeline given in Schedule-K, Schedule-E, Schedule-F &
Annexure-E of the Concession/ Contract Agreement in case of BOT/ HAM,
EPC, ToT/ InVIT & PBMC Projects respectively. In cases of failure to
repair or rectify any defect or deficiency within the stipulated period,
action is taken against the defaulting Concessionaire/Contractor, on a
case-to-case basis, in accordance with the provisions of the respective
Concession/Contract Agreement.
The details of the penal actions and toll contract terminations executed
due to poor maintenance during the last five years are at Annexure.
4ANNEXURE
ANNEXURE REFERRED TO IN REPLY TO PART (e) OF LOK SABHA
UNSTARRED QUESTION NO. 786 FOR ANSWER ON 23RD JULY,
2026 ASKED BY SHRI PATEL UMESHBHAI BABUBHAI REGARDING TOLL
COLLECTION DESPITE DILAPIDATED CONDITION OF NHs.
-----------------------------------------------------------------------------------------------------------------------
Details of the penal actions and toll contract terminations executed due
to poor maintenance during the last five years:
Name of Project/ Concessionaire/
Penalty (Rs. in Lakh)
Fee Plaza Contractor
M/s Ganeshgaria
3.44
Construction Pvt. Ltd.
M/s Ganeshgaria
1.00
Construction Pvt. Ltd.
Newli at Km.54+100 on
NH-752B
M/s Banco
1.00
Construction Pvt. Ltd.
M/s Banco
14.70
Construction Pvt. Ltd.
Joharia Shaikh at M/s Vanshika
1.00
Km.165+350 on NH-146 Construction
8 Lane Mukarba Chowk M/s NXT-INFRA MCP
to Panipat Section from Highways Private 176.55
Ch 15+500 to 86+000 Limited
Tolling rights of the
concessionaire was
Palanpur-Radhanpur-
suspended for Bhildi
Samakhiyali section of M/s PRS Tolls Limited
Fee plaza from
NH-27 (TOT Bundle- 5A1)
23.06.2026 to
14.07.2026
Palanpur -Radhanpur- Tolling rights of the
M/s DP Jain TOT Toll
Samakhiyali section of concessionaire was
5NH-27 (TOT Bundle- 5A2) Roads Private Limited suspended for Varahi
and Bhalgam Fee plazas
from 22.06.2026 to
16.07.2026.
BOT project was
terminated including
Jetpur- Gondal- Rajkot
M/s WGEL tolling rights at Bharudi
BOT project
and Pithadiya Toll
plazas on 31.03.2022
*****
6