Executive Summary:
On July 13, 2025, a freight train carrying petroleum products caught fire near Thiruvallur, Tamil Nadu, causing damage to railway infrastructure estimated at approximately ₹1.69 crore. An inquiry committee was formed by Southern Railway to investigate the incident. Restoration efforts were completed, with all lines operational by July 14, 2025. Indian Railways emphasizes safety with continuous improvements and preventive measures.
Key Points / Main Content:
Incident Details:
* A fire involving a crude oil tanker on a freight train occurred near Thiruvallur on July 13, 2025, at 05:10 hours.
* 18 wagons were damaged in the incident.
* Damage included tracks, sleepers, rails, turnout switch, electrical equipment, and signaling equipment.
Inquiry and Safety Measures:
* Southern Railway constituted an inquiry committee to investigate the cause of the fire.
* Safety is the highest priority, with a significant reduction in train accidents from 135 in 2014-15 to 31 in 2024-25 and further to 3 in 2025-26 (up to June 2025).
* Accidents Per Million Train Kilometer (APMTKM) reduced from 0.11 in 2014-15 to 0.03 in 2024-25.
Safety Enhancements:
* Increased expenditure on safety-related activities.
* Provision of Electrical/Electronic Interlocking Systems at 6,635 stations.
* Interlocking of Level Crossing Gates at 11,096 locations.
* Complete Track Circuiting at 6,640 stations.
* Deployment of Kavach system on 1548 RKm and progressing on Delhi-Mumbai and Delhi-Howrah corridors.
* Equipping all locomotives with Vigilance Control Devices (VCD).
* Use of modern track structure and mechanization of track laying.
* Ultrasonic Flaw Detection (USFD) testing of rails.
* Monitoring of track geometry by OMS and TRC.
* Preventive maintenance of railway assets and replacement of conventional coaches with LHB coaches.
* Elimination of all unmanned level crossings (UMLCs) on Broad Gauge (BG) routes by January 2019.
* Provision of Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars and Fire and Smoke detection system in newly manufactured coaches
Service Disruption Mitigation:
* Arranged special buses at Arakkonam Junction (AJJ) and Katpadi (KPD) to transport stranded passengers.
* Provided catering services, including water bottles and snacks.
* Operated seven EMU trains via the AJJ-JCGL route.
* Help desks established at key stations for passenger assistance.
* Additional counters operated for refunds, with approximately ₹1.5 crore refunded in PRS counters and ₹80,000 to unreserved passengers.
Track Safety and Security:
* Regular inspections and monitoring of track components.
* Coordination with State Governments and law enforcement agencies (GRP/District Police) for crime prevention and maintaining law and order.
* Regular State Level Security Committee of Railways (SLSCR) meetings.
* Frequent patrolling of vulnerable sections.
* Sensitization of people living near railway tracks.
Carriage of Dangerous Goods:
* Comprehensive safety measures for the conveyance of dangerous goods as per the Railways Act, 1989.
Compensation:
* Compensation for death/injury is decided by the Railway Claims Tribunal (RCT).
* No claims for compensation from train passengers are expected, as no injuries or loss of property occurred directly due to the incident.
Impact Analysis:
Railway Passengers:
* Impact: Disruption of train services due to the fire incident, leading to cancellations, diversions, and short terminations.
* Action Required: Utilize alternative transportation arrangements provided by the Railways, seek refunds for cancelled or diverted journeys, and stay informed through help desks at railway stations.
Indian Railways (Southern Railway):
* Impact: Damage to railway infrastructure, financial losses, and the need to conduct an inquiry and restore services.
* Action Required: Conduct a thorough investigation to determine the cause of the fire, implement measures to prevent similar incidents, restore full train operations, and provide compensation as per RCT decisions.
Railway Staff (Engineers, Maintenance Crew, Security Personnel):
* Impact: Increased workload due to restoration efforts, heightened vigilance for track safety and security.
* Action Required: Conduct regular inspections, maintenance, and renewals of track, adhere to safety guidelines, and coordinate with law enforcement agencies to prevent sabotage.
State Government and Law Enforcement Agencies (GRP/District Police):
* Impact: Responsibility for maintaining law and order and assisting in crime prevention on Indian Railways.
* Action Required: Coordinate with RPF, conduct regular patrols, and investigate potential sabotage incidents.
Residents Near Railway Tracks:
* Impact: Increased awareness of safety responsibilities and the need to report suspicious activities.
* Action Required: Remain vigilant, report any suspicious activity near railway tracks, and avoid placing foreign materials on the tracks.
Key Entities Referenced
Thiruvallur, Tamil Nadu: Location of the train accident involving a crude oil tanker on a freight train.
Southern Railway: The railway zone under which the accident occurred and which conducted the inquiry.
Chennai-Arakkonam route: The train route disrupted due to the fire incident.
SHRI ASHWINI VAISHNAW: Minister of Railways, Information Broadcasting and Electronics Information Technology.
Kavach: A highly technology intensive system adopted as a National ATP system in July 2020 to reduce accidents.
Railway Protection Force (RPF): Supplements the efforts of GRPDistrict Police to provide better protection and security of passenger area and passengers.
Indian Railways Act, 1989: The act under which compensation for death/injury of railway passengers in train accidents is decided.
LHB design coaches: Replacement of conventional ICF design coaches with LHB design coaches is being done.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1625
TO BE ANSWERED ON 30.07.2025
TRAIN ACCIDENT NEAR THIRUVALLUR, TAMIL NADU
1625. SHRI K SUDHAKARAN:
SHRI RAJA A:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the fire incident involving a crude oil tanker on a
freight train near Thiruvallur, Tamil Nadu, on July 13, 2025,
including the cause of the fire and the extent of damage to
railway infrastructure;
(b) whether any enquiry has been ordered, if so, the details thereof;
(c) whether the Government has investigated reports of a crack in
the railway track near the incident site and if so, the measures
taken/being taken to address potential sabotage or track safety
issues;
(d) whether safety audit of these tracks under Southern Railway
was ever done, if so, the details thereof;
(e) whether Railways would order for safety audit and preventive
maintenance of all tracks including signal and communication
system in Railway, if so, the details thereof;
(f) the details of the steps taken to mitigate the disruption caused
to train services, including the cancellation, diversion and
short-termination of trains on the Chennai–Arakkonam route;
(g) the safety measures being implemented to prevent similar
incidents on freight trains carrying hazardous materials; and(h) the timeline for restoring full train operations on the affected
route and any compensation planned for affected passengers?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (h): On 13-07-2025 at 05.10 hours, a freight train carrying
petroleum products caught fire at kilometer 42/10A-16A near
Thiruvallur station over Chennai Division of Southern Railway. In the
incident, 18 wagons of the train suffered damage. At the location of
the incident, there was damage to the tracks (sleepers, rails, turnout
switch), electrical equipment (overhead equipment mast, catenary
and contact wires) and signaling equipment (point machine, bond
wires). The cost of damage to the railway infrastructure due to the
incident has been estimated to be roughly ₹1.69 crore. An inquiry
committee has been constituted by Southern Railway to inquire into
the incident.
Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there
has been a steep decline in the number of accidents. Consequential
Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 as
shown in the graph below.It may be noted that the Consequential Train Accidents during the
period 2004-14 was 1711 (average 171 per annum), which has
declined to 31 in 2024-25 and further to 3 in 2025-26 (upto June,
2025).
Another important index showing improved safety in train operations
is Accidents Per Million Train Kilometer (APMTKM) which has reduced
from 0.11 in 2014-15 to 0.03 in 2024-25, indicating an improvement of
approx. 73% during the said period.
The number of consequential train accidents during the last five years
are depicted in the Graph below.
234
s
t
n
e
d
ic
c 165
A
n
ia
135
r
T
la
it
n
e
u
q
e
s
n
o 55
C 48
f o 35 40 31
.o 22
N
3
2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26
06 10 15 20 21 22 23 24 25 (up to
Covid yearCovid year Jun'25)
The various safety measures taken to enhance safety in train
operations are as under:-
i. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-Expenditure on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 RE 2024- BE 2025-
(Act.) (Act.) (Act.) 25 26
Maintenance of 9,172 18,115 20,322 21,800 23,316
Permanent Way
& Works
Maintenance of 14,796 27,086 30,864 31,540 30,666
Motive Power
and Rolling Stock
Maintenance of 5,406 9,828 10,772 12,112 12,880
Machines
Road Safety LCs 1,986 5,347 6,662 8,184 7,706
and ROBs/ RUBs
Track Renewals 4,985 16,326 17,850 22,669 22,800
Bridge Works 390 1,050 1,907 2,130 2,169
Signal & 905 2,456 3,751 6,006 6,800
Telecom Works
Workshops Incl. 1,823 7,119 9,523 9,581 10,134
PUs and Misc.
expenditure on
Safety
Total 39,463 87,327 1,01,651 1,14,022 1,16,470
ii. Electrical/Electronic Interlocking Systems with centralized
operation of points and signals have been provided at 6,635
stations up to 30.06.2025 to reduce accident due to human failure.
iii. Interlocking of Level Crossing (LC) Gates has been provided at
11,096 level Crossing Gates up to 30.06.2025 for enhancing safety
at LC gates.
iv. Complete Track Circuiting of stations to enhance safety by
verification of track occupancy by electrical means has been
provided at 6,640 stations up to 30.06.2025.
v. Kavach is a highly technology intensive system, which requires
safety certification of highest order. Kavach was adopted as aNational ATP system in July 2020. Kavach is provided progressively
in phased manner. Kavach has already been deployed on 1548 RKm
on South Central Railway and North Central Railway. Presently, the
work is in progress on Delhi-Mumbai and Delhi-Howrah corridors
(approximately 3000 RKm). Track side works on these routes have
been completed on about 2200 RKm as on 30.06.2025. Regular
trials are being done on these sections.
vi. Detailed instructions on issues related with safety of Signalling,
e.g. mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
vii. System of disconnection and reconnection for S&T equipment as
per protocol has been re-emphasized.
viii. All locomotives are equipped with Vigilance Control Devices (VCD)
to improve alertness of Loco Pilots.
ix. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories
to alert the crew about the signal ahead when visibility is low due
to foggy weather.
x. A GPS based Fog Safety Device (FSD) is provided to loco pilots in
fog affected areas which enables loco pilots to know the distance
of the approaching landmarks like signals, level crossing gates,
etc.
xi. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC)
Normal/Wide base sleepers with elastic fastening, fan shaped
layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on
girder bridges is used while carrying out primary track renewals.xii. Mechanisation of track laying activity through use of track
machines like PQRS, TRT, T-28 etc. to reduce human errors.
xiii. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
xiv. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws
and timely removal of defective rails.
xv. Laying of longer rails, minimizing the use of Alumino Thermic
Welding and adoption of better welding technology for rails i.e.,
Flash Butt Welding.
xvi. Monitoring of track geometry by OMS (Oscillation Monitoring
System) and TRC (Track Recording Cars).
xvii. Patrolling of railway tracks to look out for weld/rail fractures.
xviii. The use of Thick Web Switches and Weldable CMS Crossing in
turnout renewal works.
xix. Inspections at regular intervals are carried out to monitor and
educate staff for observance of safe practices.
xx. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
xxi. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
xxii. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.xxiii. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
xxiv. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route
have been eliminated by January 2019.
xxv. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken
up based upon the conditions assessed during these inspections.
xxvi. Indian Railways has displayed Statutory “Fire Notices” for
widespread passenger information in all coaches. Fire posters are
provided in every coach so as to educate and alert passengers
regarding various Do’s and Don’ts to prevent fire. These include
messages regarding not carrying any inflammable material,
explosives, prohibition of smoking inside the coaches, penalties
etc.
xxvii. Production Units are providing Fire detection and suppression
system in newly manufactured Power Cars and Pantry Cars, Fire
and Smoke detection system in newly manufactured coaches.
Progressive fitment of the same in existing coaches is also
underway by Zonal Railways in a phased manner.
xxviii. Regular counselling and training of staff is undertaken.
xxix. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed
as per plan.
Safety-related Works: The details of the Safety related works related
to better maintenance practices, Technological improvements, betterinfrastructure and rolling stock etc. undertaken by Railways are
tabulated below:-
2014-15 to
2004-05 to 2014-25 Vs.
S.N. Item 2024-25
2013-14 2004-14
(till March 25)
Technological improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than
rails (60 Kg) (Km) 2 times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than
Interlocking (Stations) Stations 4 times
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better maintenance practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013- In 2024-25: 90 %
14: 3699 370 Nos. reduction
Nos.
4. Rail fractures (Nos.) In 2013- In 2024-25: More than
14: 2548 289 Nos. 88%
Nos. reduction
Better infrastructure and Rolling stock
1. New Track KM added 14,985 34,428 Km More than
(Track km) Nos. 2 times
2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than
Underpasses (RUBs) 3 times
(Nos.)
3. Unmanned Level As on As on 31.03.24: Removed
crossings 31.03.14: Nil
(nos.) on BG 8948 (All eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 timesIntra-railway safety audits were conducted in the section comprising
the location of the incident in February 2024 and before that in
December 2017. In both these audits, no specific deficiencies were
reported regarding track and signal and communication system at the
location where the incident took place. These audits are over and
above the regular inspections that have been conducted as prescribed
in Indian Railways manuals.
In the wake of the incident, Southern Railway made all round efforts
to minimize effects on its services. As a result, 94.6 percent of
scheduled services were maintained. This was made possible by
suitably diverting inter-zonal and long distance trains by providing
alternate stoppages for the benefit of travelling passengers. In
addition, Southern Railway efficiently planned and utilised the
available lie-over rakes of long distance trains to run the highly
patronized services towards Mangalore and Alappuzha which
otherwise would have got cancelled due to the want of rakes. Special
trains operated towards Coimbatore from Chennai Central for stranded
passengers as there were no regular services from Chennai Central
towards Coimbatore. The following steps were taken to mitigate the
disruption caused to train services, including the cancellation,
diversion and short-termination of trains on the Chennai- Arakkonam
route:
i. Arrangement of Special Buses- At Arakkonam Junction (AJJ), a
total of 20 buses were arranged to bridge stranded passengers from
Train Nos. 17654, 16022, 12674, and 12672. Through these
arrangements, approximately 750 passengers, including EMU
passengers, were safely transhipped from AJJ to Avadi (AVD),
Ambattur (ABU), and Chennai, ensuring minimal inconvenienceduring the disruption. At Katpadi (KPD), 23 State Government buses
were deployed to facilitate the movement of passengers from
multiple affected trains, including Train Nos. 12686, 12696, 12608,
22641, 22698, 12680, 12028, 12698, 12295, 22305, 18189, and
22638. These arrangements enabled around 1,500 passengers to be
transported from KPD to Chennai, with drop-off points organized at
Koyambedu Bus Stand for onward connectivity.
ii. Catering services: Around 1500 numbers of water bottles and
snacks were distributed to the passengers of the short-terminated
trains at AJJ and KPD.
iii. EMU Services: In addition to bus bridging services, seven EMU
trains were operated via the AJJ-CJ-CGL route as an alternative
diversionary measure. This arrangement benefited over 3,000
passengers, providing safe and convenient travel options despite
the operational challenges.
iv. Connection through Vande Bharat Express: Train No.20644 Vande
Bharat Express (CBE to MAS) was operated via diverted route of
CGL, AJJ so as to connect the trains which started from AJJ
(Partially cancelled between MAS &AJJ) viz, Trivandrum mail (MAS
-TVC)Train No.12623 and Shatabdi Express (MAS-SBC) Train
No.12027.
v. Help desks: To manage passenger needs and disseminate
information, help desks were established at Control Room and
across important stations viz., MAS, MS, KPD, JTJ, TRT, AJJ, CGL
and GDR.
vi. Additional counters: Additional counters were operated at MAS, MS
with increased number of staff for managing the excessive crowd
approaching for refunds, as 17 trains were cancelled, 34 trainswere diverted and 4 trains originated from AJJ/KPD instead of MAS.
A total refund to the tune of Rs.1.5 cr was made in PRS counters.
Apart from these, full refunds of around Rs.80,000/- were made to
unreserved passengers.
Immediate steps were taken by Southern Railway to contain the
damage from the incident and work towards restoration. Restoration
of traffic was completed on 13.07.2025. While the Down slow line was
restored at 21:25 hrs on 13.07.2025 and the Up slow line were
restored at 00:47 hrs on 14.07.2025. Down and Up fast lines were
restored at 23:50 hrs on 14.07.2025.
To ensure safety of track, inspection, maintenance and renewal of
track is accorded the utmost priority in Indian Railways. There are
well-laid down inspection and monitoring schedules and guidelines
stipulated in Indian Railways manuals for the same. These are
adhered to strictly and records are maintained. These records are
permanent and are crosschecked by designated authorities. To ensure
safety of track, multiple inspection schedules have been prescribed
for all components of track structure at various levels. Findings in
inspections are followed up and necessary action taken well within
time for upkeep, maintenance and renewal before any defect can
occur. Inspections, monitoring and rectification as above are integral
part of the duty and responsibility of permanent way engineers of
Indian Railways.
'Police' and 'Public Order' are State subjects under the Seventh
Schedule to the Constitution of India and, as such, State Governments
are responsible for prevention, detection, registration and
investigation of crime and maintaining law and order etc. on IndianRailways through their law enforcement agencies viz. Government
Railway Police (GRP)/District Police. However, Railway Protection
Force (RPF) supplements the efforts of GRP/District Police to provide
better protection and security of passenger area and passengers and
for matters connected therewith and in order to prevent incident of
sabotage over Indian Railways, following steps are being taken by
Indian Railways:-
i. Regular State Level Security Committee of Railways (SLSCR)
meetings are being conducted, which have been constituted in
each State under the chairmanship of Director
Generals/Commissioners of Police of respective States/Union
territory with representatives of RPF, GRP and Intelligence units.
Further, close liaison is made by RPF with the State Police/GRP
authorities at all levels to control crime, registration of cases, their
investigation and maintenance of Law & Order in Railway premises
as well as on running trains with focus on sabotage incidents and
sharing of intelligence. Effective steps are being undertaken to
prevent such incidents.
ii. Besides Central & State Intelligence agencies, Intelligence Units of
RPF i.e. Crime Intelligence Branch (CM) & Special Intelligence
Branch (SIB) have been sensitized and instructed to collect
intelligence and take necessary action in coordination with Police
authorities for detection and prevention of sabotage attempts.
iii. Frequent patrolling of identified black spots and vulnerable
sections are being done by Railwaymen, RPF, GRP & Civil Police
iv. Regular drives are conducted to remove material lying near the
railway tracks, which can potentially be used by miscreants for
putting obstructive those materials on the track.v. The people living near railway tracks are being sensitized about the
consequences of putting foreign material on tracks, removing rail
components etc. and are requested to keep watch and report any
suspected activity immediately.
vi. Special teams are formed to patrol high risk areas, vulnerable
sections and sharing of intelligence to mitigate threats effectively.
Carriage of goods by Indian Railways is done under the provisions of
the Railways Act, 1989. In exercise of the powers conferred by
Sections 67 and 87 of the Act, conditions for conveyance of
dangerous goods over Indian Railways have been notified by the
Government. These include comprehensive safety measures for
carriage of dangerous goods and are to be compulsorily followed for
ensuring safety in transporting such goods over Indian Railways.
Compensation for death/injury of railway passengers in train
accidents and untoward incidents as defined under Section 124 and
Section 124-A (read with Section 123) of the Indian Railways Act,
1989, is decided by Railway Claims Tribunal (RCT) on the basis of a
claim application filed by the victims/their dependents before RCT
and it disposes of the cases after following the due judicial process.
Railway Administration pays compensation when a decree is
awarded by Hon’ble RCT in favor of the claimant and Railways decide
to implement the decree. Immediately upon the occurrence of the
incident, Indian Railways controlled the movement of trains such
that no passenger suffered any injury or loss of property directly due
to the incident. Therefore no claim for compensation from train
passengers can arise under the Act.
*****