Executive Summary & Key Takeaways

This document addresses a parliamentary query regarding rail connectivity to Khatu Shyam Ji Temple in Ringas, Rajasthan. The Ministry of Railways outlines the following: * **Increased Connectivity:** A new 17 km rail line project directly connecting Ringas to Khatu Shyam Ji has been sanctioned at a cost of Rs. 254 crore, with Rs. 43 crore allocated for the fiscal year 2025-26. Land acquisition is underway. * **Existing Services:** Ringas is currently served by 8 pairs of Mail/Express train services to Delhi, with 3 pairs operating daily. Between 2024-25 and June 2025, 4.98 lakh and 1.25 lakh reserved passengers, respectively, traveled between Ringas and the Delhi area. Average occupancy on these trains has exceeded 100%. * **Alwar Route:** A proposed rail route from Delhi to Alwar via Sohana, Nuh, Firozpur Jhirka (104.11 km), initially included in the budget subject to approvals, was surveyed and a Detailed Project Report (DPR) was created. However, the project was not pursued due to low traffic projections and the existing connectivity between Delhi and Alwar via Rewari. * **Kota-Jaipur-Ringas Route:** Currently, 29 pairs of train services connect Kota to Jaipur. Kota is connected to Ringas by 3 pairs of regular trains, supplemented by 3 pairs of special trains to accommodate pilgrim traffic. The introduction of new train services is an ongoing process, contingent upon traffic justification, operational feasibility, and resource availability.

Key Entities Referenced

Khatu Shyam Temple: A Hindu temple located in Ringas, Rajasthan, and a major pilgrimage site addressed in the policy regarding rail connectivity. Ringas, Rajasthan: A town in Rajasthan serving as a rail head for Khatu Shyam Temple. It is a focal point for railway connectivity discussions. SHRI RAMVIR SINGH BIDHURI: Member of Parliament who raised questions regarding rail connectivity to Khatu Shyam Temple. SHRI ASHWINI VAISHNAW: Minister of Railways, Information Broadcasting and Electronics Information Technology, who provided the answer to the questions raised in the Lok Sabha. Delhi: The national capital of India. The policy discusses increasing rail connectivity from Delhi to Ringas. Alwar, Rajasthan: A city in Rajasthan. A previously approved train route from Alwar via Nuh-Ferozpur Jhirka is mentioned. Kota, Rajasthan: A city in Rajasthan connected to Jaipur and Ringas, with discussions about a potential new train route. Indian Railways: The national railway system of India, responsible for implementing and managing train services and infrastructure projects discussed in the document.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2900 TO BE ANSWERED ON 06.08.2025 TRAIN CONNECTIVITY TO KHATU SHYAM TEMPLE †2900. SHRI RAMVIR SINGH BIDHURI Will the Minister of RAILWAYS be pleased to state: (a) whether the Government proposes to increase rail connectivity to Khatu Shyam ji Temple, Ringas for pilgrims visiting from Delhi, if so, the details thereof; (b) whether it is a fact that people are forced to travel on steps and doors of trains' coaches as there are three daily trains available for Ringas from Delhi and these are fully reserved/occupied in advance; (c) whether a train route from Alwar via Nuh-Ferozpur Jhirka which was approved into the budget of 2013-14 has not been started so far; (d) if so, the time by when this route is likely to be functional; and (e) whether the Government proposes to launch a new train route between Kota- Jaipur via Rewari-Narnaul-Ringas route benefitting pilgrims of Khatu Shyam ji, if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (e) To provide direct connectivity to Khatu Shayam Ji, Ringas- Khatu Shyam Ji (17 km) new line project has been sanctioned at a cost of Rs. 254 crore. An outlay of Rs. 43 crore has been allocated for the year of 2025-26. Land acquisition has been taken up. Ringas, which serves as the rail head for Khatu Shyam Ji temple, is presently connected to Delhi by 08 pairs of Mail/Express train services. Of these, 03 pairs of services are operating as daily services. On Indian Railways, demand pattern of reserved accommodation is not uniform throughout the year and it varies over lean and peak periods. Moreover, trains running on popular and convenient timings with lesserstoppage and running time are generally well patronized. However, in other trains accommodation is generally available. During the period of 2024-25 and 2025-26(Upto June-2025) a total of 4.98 lakh & 1.25 lakh reserved passengers respectively have travelled between Ringas and Delhi Area. Moreover, during the period of 2024-25 and 2025-26(Upto Jun-2025) overall average occupancy of trains running between Ringas and Delhi Area has been more than 100%. The new railway line project from Delhi to Alwar via Sohana, Nuh, Firzpur, Jhirka (104.11 Km) was included in the Budget subject to requisite approvals. Accordingly, a survey was conducted and Detailed Project Report(DPR) was made. Due to low traffic projections, the project could not be taken forward. Moreover, Delhi to Alwar is already connected via Rewari. Presently, 29 pairs of train services connect Kota to Jaipur. Kota is also connected to Ringas by 03 Pairs of regular train services. Further, 03 pairs of special trains are also being operated which cater to the needs of the Kota-Jaipur-Ringas sector. Besides, introduction of new train services is an ongoing process on Indian Railways subject to traffic justification, operational feasibility, resource availability, etc. ******