GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAJYA SABHA
STARRED QUESTION NO. 226
ANSWERED ON 13.03.2026
TRAIN DELAY INDEX FOR INDIAN RAILWAYS
*226# DR. RADHA MOHAN DAS AGRAWAL:
Will the Minister of RAILWAYS be pleased to state:
(a) the Train Delay Index for Indian Railways passenger trains compared to those in the United States
(US), Russia, China, United Kingdom and Japan; and
(b) the comparative Train Delay Index across different zones of the country and the action being taken
by Government to ensure punctuality of trains?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) and (b): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) AND (b) OF STARRED QUESTION
NO.226 BY DR. RADHA MOHAN DAS AGRAWAL ANSWERED IN RAJYA SABHA ON
13.03.2026 REGARDING TRAIN DELAY INDEX FOR INDIAN RAILWAYS
(a) and (b) The punctuality of train services is measured on terminating basis and expressed in terms
of the percentage of trains arriving at the destination station within specified time limit after the
scheduled arrival time of the train.
Monitoring of Punctuality:
Punctuality is accorded high priority on Indian Railways (IR). IR makes all possible efforts to run
trains on time. To ensure regular, continuous and real-time monitoring of punctuality of trains,
technological tools and IT systems have been put in place.
IR is using an integrated digital platform for monitoring of train operations comprising Integrated
Coaching Management System (ICMS) and Control Office Application (COA) which are integrated
with National Train Enquiry System (NTES).
Progressive advancement for automatic uptake of timings by the train movement itself, is being
achieved through GPS devices fitted locomotives {Real-Time Train Information System (RTIS)
and Remote Monitoring and Management of Locomotives and Trains (REMMLOT)} and Data
loggers integrated with the station signaling system.
Data loggers ensure real time and realistic reporting of arrival / departure of passenger trains at
stations.
IR has been replacing conventional coaches (ICF coaches) by modern light weight LHB coaches
having state-of-the art technology. The Production units of Indian Railways are producing only
LHB coaches from April 2018 onwards. The production of LHB coaches has continually increased
during the years and more than 50,000 LHB coaches have been turned out. IR has also been
proliferating Vande Bharat, Namo Bharat Rapid Rail and Amrit Bharat trains, quick acceleration
and deceleration.
To improve punctuality, IR also undertakes rationalisation of time tables. One such exercise, in a
scientific manner, was undertaken with the assistance of IIT- Mumbai using their traffic simulator.
The exercise also aimed at provisioning of fixed Integrated Maintenance blocks on all sections to
minimise detention and improve punctuality.
New generation High capacity Locomotives are being utilised for Right powering of trains.
Further, with a view to minimise and mitigate the effect of fog and to assist the Loco Pilots run the
train during foggy weather conditions the following steps have been taken by Indian Railways:
(a) GPS based FOG SAFE DEVICE – A Global Positioning System (GPS) based portable 'Fog
Safe Device' (FSD) is being provided to Loco Pilots, which displays upcoming critical
landmarks such as approaching signal, level crossing gates, permanent speed restrictions etc. in
advance during poor visibility conditions like fog. This device is used for safe train operation
§especially during winter season and to help reduce stress on Loco Pilots while running in poor
visibility conditions. As on 31.01.2026, there are 29848 Fog Safe devices available over Indian
Railways.
(b) Modified Semi-Automatic Stop Signal (MASS) System: MASS has been introduced on the
Automatic Signalling territory during abnormal conditions like Fog & Bad Weather impairing
visibility. The system helps minimise delay in train operation during foggy weather conditions.
Train operation during fog and poor visibility conditions is an essential component of the training
curriculum and the same has already been incorporated in the Transportation Module and Technical
Module of the prescribed training syllabus for Loco Pilots (LPs) and Assistant Loco Pilots (ALPs).
Results/outcomes:
Due to these initiatives, Indian railways, during 2025-26 (upto February,2026) recorded an overall
punctuality of more than 77%.
No. of Divsions Punctuality percentage
24 Punctuality of more than 90%
19 Punctuality between 80% and 90%
All Divisions of Indian Railways 77%
The Challenges:
Several factors, both internal and external, affect punctual running of trains which include foggy
weather, path constraints, asset maintenance, alarm chain pulling, agitations, cattle run over and other
unforeseen circumstances. The major challenges that affect running of trains include:
1. Mixed Traffic - Different types of trains with different speeds run on the same track. Vande
Bharat, Mail/ Express, Passenger trains, Suburban, Freight trains, Military consignments,
Engineering machines, etc. having different speed utilise the same track. This leads to requirement
of precedence for passenger carrying trains over freight and other trains affecting the through
running of trains.
Indian Railways has been taking many measures including infrastructure projects such as Eastern
Dedicated Freight Corridor (EDFC) and Western Dedicated Freight Corridor (WDFC) to create
dedicated freight paths to give exclusive access to freight trains.
2. Heavy Traffic load - Indian railways run approximately 25,000 trains per day including suburban
and freight trains. The major routes like Delhi - Howrah, Mumbai - Kolkata, etc are highly
congested affecting punctual running of trains.
§Capacity increase of existing network :
Increase of capacity of existing rail network has been taken up in a big way during the last 11 years.
The details of new tracks commissioned are as under:-
Period New track Commissioned Average commissioning of new tracks
2009-14 7,599 Km 4.2 Km/day
2014-25 34,428 Km 8.6 Km/day (more than 2 times)
Further, as on 01.04.2025, across Indian Railways, 431 Railway infrastructure projects (154 New Line,
33 Gauge Conversion and 244 Doubling) of total length 35,966 Km, costing approx. ₹ 6.75 lakh crore
are sanctioned. The summary is as under:-
Category No of Projects Total Length Length Total Exp upto
NL/GC/DL Commissioned till Mar’25
(km) Mar’25 (Km) (₹ in Cr)
New Lines 154 16,142 3,036 1,45,318
Gauge Conversion 33 4,180 2,997 22,753
Doubling / 244 15,644 6,736 1,22,858
Multitracking
Total 431 35,966 12,769 2,90,929
Zone-wise/year-wise details of all Railway projects are made available in public domain on Indian
Railway’s website.
With these capacity augmentation works, the punctuality of the trains will improve.
*****
§