Home India Ministry of Railways Parliament Question: Trains Manufactured under Make in India...
Date: 2025-12-10 Category: Not Applicable State: Union Government Country: India

Parliament Question: Trains Manufactured under Make in India Initiative

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document presents the Ministry of Railways' response to questions regarding trains manufactured under the 'Make in India' initiative. It provides details on the Vande Bharat, Amrit Bharat, and Namo Bharat Rapid Rail trains, including their features and current operational status. It also discusses the completion of the railway electrification project between Udaipur and Ahmedabad and the ongoing considerations for introducing new train services to and from Udaipur. The date of the response is December 10, 2025. **Key Points / Main Content** * **Vande Bharat Trains:** * 164 services are operational on the Indian Railway network. * Features include KAVACH, jerk-free couplers, automatic plug doors, emergency alarm buttons, improved fire safety, higher acceleration, driver-guard communication, UV-C based disinfection, better ride comfort, CCTVs, special lavatories for Divyangjan, and coach condition monitoring system. * **Amrit Bharat Express:** * Fully non-AC modern train with 30 services in operation. * Composition: 11 General Class coaches, 8 Sleeper Class coaches, 1 Pantry car, and 2 Luggage cum Divyangjan coaches. * Features include enhanced aesthetics, jerk-free couplers, improved crashworthiness, CCTV system, improved toilets, improved ladder design, LED lighting, EP assisted braking system, aerosol fire suppression, USB charging sockets, emergency talkback, and a non-AC pantry. * **Namo Bharat Rapid Rail:** * Designed to enhance travel for suburban and regional commuters. * 4 services are operational on the Indian Railway network. * Features include automatic sliding doors, CCTVs, modular interior, emergency talk system, continuous LED lighting, FRP modular toilets with vacuum evacuation, and fully air-conditioned with driver cab AC. * **Manufacturing:** * Vande Bharat, Amrit Bharat, and Namo Bharat Rapid Rail trains are manufactured indigenously. * **Udaipur Train Services:** * Currently served by 27 pairs of train services. * 5 pairs connect Udaipur to Asarva, 2 pairs connect Udaipur to Surat & Mumbai each, and 1 pair connects Udaipur to Mysuru/Bengaluru/Belagavi. * **New Train Services Considerations:** * Introduction of new services is an ongoing process depending on section capacity, path availability, rolling stock availability, matching infrastructure, and maintenance requirements. * **Railway Electrification:** * Electrification work between Udaipur and Ahmedabad has been completed, with an expenditure of Rs. 247.66 crore. **Impact Analysis** **Stakeholder: Passengers** * **Impact:** Improved travel experience through modern coaches, enhanced safety features, and better amenities on Vande Bharat, Amrit Bharat, and Namo Bharat Rapid Rail trains. Increased connectivity via new train services. * **Action Required:** Utilize and provide feedback on the new train services and features. **Stakeholder: Indian Railway Production Units** * **Impact:** Increased responsibility in manufacturing trains indigenously. * **Action Required:** Continue manufacturing components to global standards, contributing to employment generation and the domestic Rolling Stock manufacturing ecosystem. **Stakeholder: Western Railway** * **Impact:** Potential operation of Vande Bharat Express train between Udaipur and Asarwa (Ahmedabad). * **Action Required:** Evaluate feasibility and operational readiness for introducing new train services. **Stakeholder: Ministry of Railways** * **Impact:** Accountable for progress and response for questions regarding 'Make in India' initiative. * **Action Required:** Monitor performance and improve travel experience for passengers, by introducing new features and connectivity based on various factors.

Key Entities Referenced

Make in India Initiative: Government initiative focused on promoting domestic manufacturing, referenced in the context of train manufacturing. Vande Bharat Express: A type of indigenously designed and manufactured train with modern features, central to the discussion on train services and manufacturing. Ministry of Railways: The central ministry responsible for railway-related matters, as this document is an answer provided by the Minister of Railways. Indian Railways: The state-owned railway company of India, responsible for the operation and development of the railway network. Udaipur: City in Rajasthan, India. Focus of new train service proposals.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 1781 ANSWERED ON 10.12.2025 TRAINS MANUFACTURED UNDER MAKE IN INDIA INITIATIVE †1781 DR. MANNA LAL RAWAT: Will the Minister of RAILWAYS be pleased to state: (a) whether the names of trains manufactured under the ‘Make in India’ initiative are presently operational in the country and the major technical features thereof; (b) whether the railway track electrification work between Udaipur and Ahmedabad has been completed and if so, the complete details of the expenditure incurred on this project; (c) whether there is any proposal by the Western Railway to operate a Vande Bharat Express train between Udaipur and Asarwa (Ahmedabad); (d) if so, the expected date for its commencement; (e) whether there is any plan to introduce new train services from Udaipur to Surat, Mumbai and South India via Ahmedabad; and (f) if so, the details thereof and the timelines fixed for their implementation and if not, the reasons therefor? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (f) With a view to improve travel experience of the passengers, Indian Railways has introduced indigenously designed and manufactured Vande Bharat trains with modern coaches, advanced safety features and passengeramenities. Presently, 164 Vande Bharat services are in operation on the Indian Railway network. These new Vande Bharat Trains have following features: I. Fitted with KAVACH. II. Jerk Free Semi-Permanent couplers. III. Centrally controlled Automatic Plug Doors and Fully Sealed wider gangways. IV. Emergency Alarm Push buttons and Talk Back Units on all Coaches. V. Improved fire safety – Aerosol based fire detection and suppression system in electrical cabinets and lavatories. VI. Higher acceleration with design/operating speed of 180/160 KMPH. VII. Driver-Guard communication with voice recording facility & Crash hardened memory. VIII. Air conditioning units with indigenously developed UV-C lamp based disinfection system. IX. Better Ride Comfort. X. CCTVs in all Coaches. XI. For Divyangjan passengers special lavatory in the driving coaches on each end. XII. Coach condition monitoring System (CCMS) display with remote monitoring. Railways have developed fully non-AC modern train named as Amrit Bharat express. Already 30 services are in operation. Presently, these modern trains comprise of 11 General Class coaches, 8 Sleeper Class coaches, 01 Pantry car and 02 Luggage cum Divyangjan coaches. These trains have following enhanced features and amenities: I. Better aesthetics of seat and berths with enhanced look & feel on the lines of Vande Bharat Sleeper. II. Jerk Free Semi-Automatic Couplers. III. Improved Crashworthiness in coaches by provision of crash tube. IV. Provision of CCTV system in all coaches and Luggage room. V. Improved designs of toilets. VI. Improved design of Ladder for ease of climbing on to the berth. VII. Improved LED Light fitting & Charging Sockets. VIII. Provision of EP assisted braking system. IX. Aerosol based fire suppression system in toilets and electrical cubicles. X. USB Type-A and Type-C mobile charging sockets. XI. Emergency Talk Back system for two-way communication between Passenger and Guard/Train Manager. XII. Non-AC pantry with enhanced heating capacity.XIII. Fully sealed gangways with quick release mechanism for easy attachment and detachment. Namo Bharat Rapid Rail has been introduced to enhance the travelling experience of suburban and regional commuters for inter-city short distance movement by harnessing the features of Vande Bharat Trains. Presently, 4 Namo Bharat Rapid Rail services are in operation on the Indian Railway network. The prominent features of Namo Bharat Rapid Rail are as follows: I. Centrally controlled Double Leaf Automatic Sliding Doors. II. CCTVs for safety and passenger surveillance. III. Modular interior with Cushioned Seats and Sealed Flexible Gangway. IV. Emergency Talk System. V. Continuous LED lighting with Energy Efficient Lighting system. VI. FRP Modular Toilets with vacuum evacuation. VII. Fully Air-Conditioned trains with Driver cab AC. Vande Bharat, Amrit Bharat, and Namo Bharat Rapid Rail trains are being manufactured indigenously by Indian Railway Production Units. Manufacturing of components of these trains to the global standards have given major boost to Indian Industries contributing to employment generation and domestic Rolling Stock manufacturing ecosystem under the 'Make in India' initiative. Udaipur is presently being served by 27 pairs of train services. Of these, 05 pairs of train services connect Udaipur to Asarva, 02 pairs of train services each connect Udaipur to Surat & Mumbai, while 01 pair of train services connect Udaipur to Mysuru/Bengaluru/Belagavi. Besides, introduction of new train services, including Vande Bharat Express services, to enhance connectivity, is an ongoing process on Indian Railways and depends on various factors which include-  Capacity of that section.  Availability of path.  Availability of required rolling stock.  Availability of matching infrastructure for rolling stock.  Maintenance requirement of railway tracks and other assets. Further, Railway Electrification work between Udaipur and Ahmedabad has been completed and expenditure of Rs. 247.66 crore has been incurred on this till date. ****