Official Gazette Notification Text
Official TranscriptGOVERNMENT OF INDIA MINISTRY OF CIVIL AVIATION LOK SABHA UNSTARRED QUESTION NO. : 918 th (To be answered on the 4 December 2025) UPGRADATION OF FACILITIES AT AIRPORTS 918. SHRI RAJIV PRATAP RUDY Will the Minister of CIVIL AVIATION be pleased to state:- (a) the details of the ongoing projects for upgradation of facilities at the airports across the country along with the amount sanctioned and...
GOVERNMENT OF INDIA MINISTRY OF CIVIL AVIATION LOK SABHA UNSTARRED QUESTION NO. : 918 th (To be answered on the 4 December 2025) UPGRADATION OF FACILITIES AT AIRPORTS
918. SHRI RAJIV PRATAP RUDY
Will the Minister of CIVIL AVIATION be pleased to state:-
(a) the details of the ongoing projects for upgradation of facilities at the airports across the country along with the amount sanctioned and timeline for their completion, airport-wise;
(b) whether the Air Navigation Services at the airports are commensurate with the handling of traffic and if so, the details thereof;
(c) whether the constraints in navigation and landing systems have resulted in cancellations and reduced operations and if so, the details thereof along with the reasons therefor; and
(d) the details of the steps taken by the Government to improve the navigation and landing systems? ANSWER Minister of State in the Ministry of CIVIL AVIATION (Shri Murlidhar Mohol)
(a): The airport-wise details of the major projects undertaken by the Airports Authority of India (AAI) for upgradation of facilities at the airports across the country, along with the amount sanctioned and projected date of completion, is at Annexure. However, the timeline for completion of the airport projects depends upon many factors such as land acquisition, availability of mandatory clearances, financial closure etc.
(b) to (d): The Airports Authority of India (AAI), as the sole Air Navigation Service Provider (ANSP) in the country, continually modernises air navigation infrastructureand upgrades air traffic management systems to keep pace with increasing air traffic.
Communication, Navigation and Surveillance/Air Traffic Management (CNS/ATM) facilities are provided at airports based on operational requirements and in compliance with the Directorate General of Civil Aviation (DGCA) Civil Aviation Requirements
(CAR) and the International Civil Aviation Organization (ICAO) Standards and Recommended Practices (SARPs).
With regard to disruptions, flight operations may occasionally be affected by a range of factors, such as weather conditions, congestion or technical issues, or operational constraints. Such instances are addressed through standard safety and operational procedures.
The air traffic management systems are continuously upgraded by AAI to meet the growing demands of air travel. Initiatives like IP-based Voice Communication Control Systems (VCCS) and IP-based VHF radios, Automatic Dependent Surveillance-Broadcast (ADS-B) ground stations, Performance-Based Navigation
(PBN) procedures RNP-Z (LPV) procedures based on GAGAN, Central Air Traffic Flow Management (CATFM) system and Airport Collaborative Decision Making (A-CDM) have been implemented at various airports by AAI. AAI has also undertaken the replacement of the existing IP-based Automatic Message Switching System (AMSS) with the new Air Traffic Services Message Handling System
(AMHS). *****Annexure referred to in reply to part (a) of Lok Sabha Unstarred Question No. 918 for 04.12.2025 Rs. In Cr.
S.No. Airport Name of Project Sanctioned Cost 1 Modernization of Chennai Airport Phase.II 2467.00 Construction of Rapid Exit Taxiways, Extension Chennai 2 of parallel 480.06 Taxi Track and Link Taxi-Tracks Construction of New Integrated Passenger 3 Udaipur 887.00 Terminal Building at Udaipur Airport 4 Jammu Construction of New Civil Enclave at Jammu 861.37 Airport 5 Leh Construction of New Terminal Building at Leh 640.00 Airport Construction of New Integrated Terminal 6 Vijayawada Building including associated works at 611.80 Vijayawada Airport.
Construction of New Integrated Terminal Building, Control Tower Cum Technical Block, 7 Imphal Apron, Link Taxiway and 499.00 Associated works at Imphal Interntional Airport, Imphal 8 Jodhpur Construction of New Terminal Building at 480.00 Jodhpur Airport Construction of New Domestic Terminal Building and Miscellaneous works including 9 Rajahmundry 347.15 Maintenance, Operation and AICMC at Rajahmundry Airport.
Expansion of Terminal Building and associated 10 Belagavi works at 322.45 Belagavi Airport Construction of new Domesticterminal b 11 Hubballi uilding and 320.47 miscellaneous works at Hubballi AirportConstruction of new Domestic terminal building and miscellaneous works including 12 Kadapa 265.91 maintenance, operation and AICMC at Kadapa Airport Extension of Existing Integrated Terminal 13 Goa 255.69 Building & Allied Works at Goa Airport.
14 Darbhanga Development of New Civil Enclave at 911.66 Darbhanga, Bihar.
Development of Lal Bahadur Shastri 15 Varanasi 2869.65 International Airport, Varanasi.
16 Agra Development of New Civil Enclave at Agra 579.00 Airport.
17 Bagdogra Development of New Civil Enclave at 1549.00 Bagdogra Airport.
Construction of Integrated Terminal Building, Cargo Terminal, ATC Tower cum Technical 18 Hisar Block, Fire Station 660.80 Building with Fire Control Tower at Hisar Airport 19 Keshod Development of Keshod Airport. 363.10 Re-Construction of Rigid portion of Sec. RWY, 20 328.3 'K' & 'A' taxi Kolkata Construction of Common User Domestic Cargo 21 Terminal 229.43
(CUDCT) at NSCBI Airport, Kolkata.
Widening of basic strip at Pakyong Airport including slope stabilization balance work of 22 Pakyong 323.26 uphill and developing the Storm Water drainage system.
Development of additional Runway End Safety Area on either end on Runway 10-28 and 23 Calicut 484.57 relocation and augmentation of CNS facilities at Calicut Airport.