GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
STARRED QUESTION NO. 180
ANSWERED ON 30TH JULY, 2026
UPGRADATION OF NATIONAL HIGHWAY-65
180. SHRI KESINENI SIVANATH:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government is expanding/upgrading National Highway (NH)-
65 connecting Pune to Machilipatnam;
(b) if so, the places where six-laning of the highway has been undertaken
along with the physical progress of such projects;
(c) the details of funds released for the project and the timeline fixed for its
completion;
(d) whether the Government proposes to make any changes in the proposals
for the expansion of NH-65; and
(e) if so, the details thereof and if not, the reasons therefor?
ANSWER
THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (e) A statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY TO PART (a) to (e) OF LOK SABHA
STARRED QUESTION NO. 180 ANSWERED ON 30TH JULY, 2026 ASKED BY
SHRI KESINENI SIVANATH REGARDING “UPGRADATION OF NATIONAL
HIGHWAY-65”.
(a) to (e) Development of National Highways (NHs) in the country is a
continuous process and the Government keeps on undertaking Detailed
Project Report (DPR)/Feasibility Study to improve/widen /construct National
Highway/Expressway to improve the connectivity and integration with the
grid of National Highways/ Expressways as also to provide last-mile
connectivity. Decision for project implementation and investment is taken
based on the outcome of the Detailed Project Report (DPR), requirement of
connectivity, traffic density and synergy with PM Gati Shakti National Master
Plan. As far as improvement of NH-65 connecting Pune to Machilipatnam is
concerned, the status is annexed and considering the status, it is premature
in indicate the cost/timeline of the project.ANNEXURE REFERRED TO IN REPLY TO PART (a) to (e) OF LOK SABHA
STARRED QUESTION NO. 180 ANSWERED ON 30TH JULY, 2026 ASKED BY
SHRI KESINENI SIVANATH REGARDING “UPGRADATION OF NATIONAL
HIGHWAY-65”.
Status of Pune- Machlipatnam Stretch
S. N Length (i Lane confi
State Project Stretch Status
o. n km) guration
Pune-Solapur Pa Bids for the consult
1 110 4 Lane
ckage-1 ancy work for prep
aration of DPR for i
Pune-Solapur Pa mprovement of the
2 101 4 lane
Maharashtra ckage-2 corridor have been
invited.
Solapur-Mahara
Bids for preparatio
3 shtra/Karnataka 100 4 lane
n of DPR for improv
Border
ement of the corrid
Maharashtra/Ka
or have been invite
4 Karnataka rnataka Border- 145 4 lane
d
Sangareddy
Upgradation to 6-la
Sangareddy-Hyd ne access-controlle
5 Telangana 29.5 4 lane
erabad d highway taken up
on EPC Mode.
Hyderabad-Nan
6 Telangana 181.3 4 lane DPR work for 6-lane
digama
access-controlled h
Andhra Prades Nandigama-Vija
7 45 4 lane ighway prepared.
h ywada
Andhra PradesVijaywada-Mach DPR work for 6-lane
8 59.695 4 lane
h lipatnam access-controlled h
771.495 ighway prepared.
*****