GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3051
ANSWERED ON 06TH AUGUST, 2026
UPGRADATION OF ROADS
3051. SHRI RAJKUMAR ROAT:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the rising traffic on the Banswara-Dungarpur, Udaipur-
Ratlam and Nimbahera-Dahod routes is resulting in higher number of
accidents and longer travel times;
(b) if so, the details of road accidents, fatalities and injuries on
these routes during the last five years, year-wise;
(c) whether any Detailed Project Report (DPR), feasibility study or
any other proposal for the four-laning of these routes is being
considered or has been sanctioned by the Government;
(d) if so, the present status, date of approval, cost, name of
construction agency and the likely timeline for the completion of
such project;
(e) if not, whether the Government proposes to upgrade these
routes to four lanes in view of road safety, regional connectivity and
future traffic needs; and
(f) if so, the details thereof?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)(a) to (f) The details of accidents on Banswara-Dungarpur,
Udaipur-Ratlam and Nimbahera-Dahod sections of National
Highways are at Annexure.
The present status of these sections is as under:
(i) Banswara-Dungarpur: This section of NH-927A is having traffic
valume of about 6500 Passenger Car Units (PCUs) and has recently
been developed to 2-Lane with Paved Shoulder configuration.
(ii) Udaipur-Ratlam: Only the Banswara–Rajasthan/MP Border
section is National Highway, having 2-Lane/2-Lane with Paved
Shoulder configuration with traffic volume of about 7800 PCUs and
balance stretches are State roads, being maintained by the
Governments of Rajasthan and Madhya Pradesh in respective
States.
(iii) Nimbahera-Dahod NH-56 : The present traffic is about 8000
PCUs. The Nimbahera to Pratapgarh section has 2-Lane
configuration and is presently under Build Operate Transfer (BOT)
Concession. The Pratapgarh-Padi-Dahod section of this corridor
have 2-Lane/2-Lane with Paved Shoulder configuration and is
presently maintained under short-term maintenance contracts.
The work of preparation of Detailed Project Report (DPR) for
further improvement/upgradation of the Banswara-Ratlam (part of
Udaipur-Ratlam section), Padi-Dahod & Banswara-Padi (part of
Nimbahera-Dahod section) sections has been initiated. Decisions of
implementation and investment are taken based on the outcome of
the DPR, fulfilment of the criteria, requirement of connectivity,
traffic density and synergy with PM GatiShakti National Master
Plan.ANNEXURE REFERRED TO IN REPLY TO PART (a) TO (f) OF LOK
SABHA UNSTARRED QUESTION NO. 3051 ANSWERED ON 06TH
AUGUST, 2026 ASKED BY SHRI RAJKUMAR RAOT REGARDING
“UPGRADATION OF ROADS”.
Details of accidents district-wise, year-wise during the last five
years on NH sections:
S. No. District Year No. of fatal Non-fatal Total
accidents accidents
1 Dungarpur 2021 2 2 4
2 NH-927A 2022 1 3 4
3 2023 11 14 25
4 2024 12 18 30
5 2025 9 16 25
Total 35 53 88
1 Banswara 2021 13 16 29
2 NH-927A and 2022 10 11 21
3 NH-56 2023 11 8 19
4 2024 9 8 17
5 2025 17 11 28
Total 60 54 114
1 Pratapgarh 2021 9 16 25
2 NH-56 2022 19 31 50
3 2023 27 22 49
4 2024 27 22 49
5 2025 19 31 50
Total 101 122 223
1 Chittorgarh 2021 6 3 9
2 NH-56 2022 2 6 8
3 2023 5 5 10
4 2024 11 4 15
5 2025 4 2 6
Total 28 20 48
*****