GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2021
ANSWERED ON 30TH JULY, 2026
UPGRADATION WORK ON NH-148
2021. SHRI MURARI LAL MEENA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the current status of construction/upgradation of National
Highway (NH)-148 and the total number of packages sanctioned
under the project along with project-wise and section-wise details
thereof;
(b) the details of the number of packages for which tenders have
been issued, awarded, packages where construction work has
commenced, packages completed and those currently pending
under the project, stage-wise;
(c) the details of sanctioned cost, executing agency, stipulated
completion period, physical and financial progress achieved so far
and reasons for delay, if any, in respect of each package;
(d) whether the Government proposes to implement a special action
plan for time-bound completion of the remaining works on NH-148;
and
(e) if so, the details thereof and the estimated timeline for
completion of the construction/ upgradation work of the highway?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (e) The details of current status, sanctioned cost, executing
agency, completion date, physical and financial progress achieved
is attached as enclosure.To expedite project execution, various initiatives have been
undertaken, including streamlining of the land acquisition process
through the Bhoomi Rashi Portal, revamping of the Parivesh Portal
through the Ministry of Environment, Forest & Climate Change
(MoEFCC) for expeditious forest and environmental clearances,
online approval of General Arrangement Drawings (GAD) for Road
Over Bridges (ROBs) and Road Under Bridges (RUBs) from the
Railways, and conduct of review meetings at various levels with all
stakeholders, including State Governments. National Highway
projects are regularly reviewed and monitored at various levels,
including through the Project Monitoring Group and "PRAGATI".ANNEXURE REFERRED TO IN REPLY TO PART (a) to (e) OF LOK SABHA UNSTARRED QUESTION NO. 2021
ANSWERED ON 30TH JULY, 2026 ASKED BY SHRI MURARI LAL MEENA REGARDING UPGRADATION WORK
ON NH-148.
Implement Sanctione Phy.
Date of Compl
Sr. ing Agency Total Length d Cost Date of Prog
Project Name commencem etion Status/ Remark
No. (Km) (In Rs. Award ress
ent Date
Cr) (%)
National The existing carriageway is
Highway having 2 lane configuration
Authority and DPR for its upgradation is
of India under preparation.
Upgradation of
existing 2L+PS of The decision of investment are
1 62.318 - - - - -
Manoharpur-Dausa based on the outcome of DPR,
section of NH-148 techno-economic feasibility of
proposals, traffic intensity,
inter-se priority and synergy
with PM Gati Shakti National
Master Plan (NMP).
The Dausa–Lalsot section of
NH-148 from Ch. 0+000 to
Ch. 34+225 is already
Four Laning/ Two Dausa- Lalsot
developed as a 4-lane
Laning with paved section (NH-148,
Highway with Rigid pavement
Shoulder of Dausa- Length-
and from Ch. 34+225 to Ch.
Lalsot-Kothun 49.200 Km)
49+200 is 2-lane with paved
Section of NH-11A & Lalsot- Kothun
05.11. 100 shoulder highway with
2 Extn. (New NH-148 section (NH-23, 881 28.07.2016 31.05.2017
2020 % flexible pavement.
& 23) in the State of Length-
Rajasthan under 34.253Km)
Currently, there is no proposal
NHDP PHASE IV of Total 83.453 Km
under consideration for the
Hybrid Annuity
widening of the NH-148
Mode
section from Chainage 34+225
to Chainage 49+200 from 2-
lanes to 4-lanes.
*****