Executive Summary & Key Takeaways

**Executive Summary:** This document outlines the Indian Railway's initiatives concerning the utilization of railway land, redevelopment of railway stations, and provision of affordable train travel. It details steps taken by the Rail Land Development Authority (RLDA) to generate non-tariff revenue, progress under the Amrit Bharat Station Scheme, and efforts to increase non-AC coach availability. The information was provided to the Lok Sabha on August 6, 2025. **Key Points / Main Content:** * **Utilization of Vacant Railway Land:** * Vacant railway land is entrusted to RLDA for commercial redevelopment to generate non-tariff revenue. * RLDA assesses commercial potential through feasibility studies. * Open competitive bids are invited for commercially viable land parcels. * RLDA has awarded bids for 19 Railway colonies, 48 commercial sites, and 56 Multi-Functional Complexes. * **Removal of Encroachments:** * Regular eviction drives are conducted to remove encroachments on railway land. * Soft encroachments are removed with the assistance of Railway Protection Force and civic authorities. * Hard encroachments are removed under the Public Premises Eviction of Unauthorized Occupants Act, 1971. * State governments and police provide assistance for actual eviction. * **Station Redevelopment:** * The Amrit Bharat Station Scheme aims for continuous station development with a long-term approach. * The scheme involves master plans and phased implementation to improve station amenities. * 1337 stations have been identified for development under the scheme. * Phase I works of 105 stations have been completed. * Development is funded under Plan Head 53 Customer Amenities, with ₹12,118 crore allocated for FY 2025-26. * RLDA is redeveloping 15 stations, with work in progress on 14 of them. * **Non-AC General/Sleeper Coaches:** * Indian Railways (IR) are increasing facilities for economically weaker passengers. * 1250 general coaches were utilized in long-distance trains in FY 2024-25. * 17,000 non-AC coaches (general/sleeper) will be added over the next 5 years. * Non-AC coaches constitute approximately 70% of total coaches. * The number of passengers traveling in general unreserved coaches is increasing. * **Amrit Bharat Express:** * A fully non-AC modern train with enhanced features. * 14 services are currently in operation. * Composition includes 11 General Class coaches, 8 Sleeper Class coaches, 1 Pantry car, and 2 Luggage cum Divyangjan coaches. * Features include better aesthetics, jerk-free couplers, improved crashworthiness, CCTV, improved toilets and ladders, charging sockets, and more. * **Unreserved Travel:** * IR operates unreserved non-AC passenger trains/MEMU/EMU for affordable travel. * The policy for Mail/Express trains includes 12 General/Sleeper class non-AC coaches and 8 AC coaches in a 22-coach train. **Impact Analysis** * **Passengers:** * *Impact:* Improved station amenities, increased availability of non-AC coaches, and affordable travel options via Amrit Bharat Express and unreserved trains. * *Action Required:* Utilize available services and provide feedback on amenities. * **Rail Land Development Authority (RLDA):** * *Impact:* Responsible for commercial redevelopment of vacant railway land, generating non-tariff revenue. * *Action Required:* Conduct feasibility studies, invite bids, and oversee development projects. * **Ministry of Railways:** * *Impact:* Oversees station redevelopment, coach manufacturing, and encroachment removal. * *Action Required:* Allocate funds, implement schemes, and enforce regulations. * **State Governments and Police:** * *Impact:* Assist in the removal of encroachments on railway land. * *Action Required:* Provide support for eviction drives and maintain law and order.

Key Entities Referenced

Ministry of Railways: The government ministry responsible for the Indian Railways. Rail Land Development Authority (RLDA): The authority responsible for the commercial redevelopment of vacant railway land to generate non-tariff revenue. Amrit Bharat Station Scheme: A scheme launched by the Ministry of Railways for the continuous development of railway stations with a long-term approach. Public Premises Eviction of Unauthorized Occupants Act, 1971 (PPE Act, 1971): The Act governing the eviction of unauthorized occupants from public premises, including railway land. Amrit Bharat Express: A fully non-AC modern train developed by Indian Railways with enhanced safety standards and amenities. Thane, Maharashtra: One of the 15 stations where RLDA is executing redevelopment work. Railway Protection Force: The security force assisting in the removal of soft encroachments on railway land. Indian Railways: The state-owned national railway system of India.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2963 TO BE ANSWERED ON 06.08.2025 UTILIZATION OF RAILWAY LAND 2963. SHRI ARUP CHAKRABORTY: Will the Minister of RAILWAYS be pleased to state: (a) the details of the steps taken for the re-development of vacant railway lands so as to generate a non-tariff revenue stream; (b) the details of the status of the re-development of various railway stations across the country; (c) whether the Government intends to launch affordable trains in the non-AC or sleeper category; (d) if so, the details thereof; and (e) the details of the steps taken to free railway land from illegal encroachments? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (e): Vacant Railway land, which is not required by Railways for its immediate operational needs, is entrusted to Rail Land Development Authority (RLDA) for commercial redevelopment. RLDA carries out feasibility study of such vacant land through reputed architect, marketing and valuation consultant to assess the commercial potential - 1 -to generate non tariff revenue for railways. For commercially viable land parcels, open competitive bids are invited & highest bidder is awarded the site for commercial development. So far RLDA has awarded bids for commercial development of 19 Railway colonies, 48 commercial sites and 56 Multi Functional Complexes for generation of non tariff revenue to Railways. Indian Railways carry out regular eviction drives to remove encroachments on railway land. Whereas soft encroachments (encroachments of temporary nature) such as hawkers and squatters are removed with the assistance of Railway Protection Force and civic authorities, Hard encroachments (pucca structures) are removed in accordance with provisions contained in Public Premises (Eviction of Unauthorized Occupants) Act, 1971 (PPE Act, 1971), as amended from time to time. Actual eviction of unauthorized occupants is carried out with the assistance of State Government and police. Station Redevelopment: Ministry of Railways has launched Amrit Bharat Station Scheme for development of stations on a continuous basis with a long-term approach. It involves preparation of master plans and their implementation in phases to improve the amenities at the stations like improvement of station access, circulating areas, waiting halls, toilets, lift/escalators as necessary, platform surfacing and cover over platform, cleanliness, free Wi-Fi, kiosks for local products through schemes like ‘One Station One Product’, better passenger information systems, executive lounges, nominated spaces for business meetings, landscaping, etc. keeping in view the necessity at each station. - 2 -The scheme also envisages improvement of building, integrating the station with both sides of the city, multimodal integration, amenities for Divyangjans, sustainable and environment friendly solutions, provision of ballastless tracks, etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1337 stations have been identified for development under this scheme. Development works at railway stations under Amrit Bharat Station Scheme have been taken up at a good pace. Till now, phase-I works of 105 stations has been completed. Development/Redevelopment/Upgradation/Modernisation of stations on Indian Railways is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se priority and availability of funds. The priority for development/redevelopment/upgradation/modernisation of stations is accorded to higher category of station over lower category of station while sanctioning and executing the works. Development/Upgradation/Modernization of stations including Amrit Bharat Station Scheme is generally funded under Plan Head - 53 ‘Customer Amenities’. The fund allocation of ₹ 12,118 crore has been made for the financial year 2025-26 under Plan Head - 53 and expenditure (up to June, 2025) of ₹ 2,612 crore has been incurred so far. RLDA is also executing the redevelopment work of 15 stations across the country. Out of this, work at one station (Thane) is in planning stage & in progress on 14 stations. - 3 -Non A/C (General & Sleeper coaches): IR, have significantly increased the facilities for the benefit of economically weaker passengers who demand general/sleeper class travel. During the last financial year 2024-25 alone, 1250 general coaches have been utilised in various long-distance trains. To cater to the travel demand of the low and middle income families, Indian Railways have taken up 17,000 non-AC coaches (general/sleeper) over the next 5 years. On IR, the percentage of non-AC coaches is about 70% as indicated below: Table 1: Distribution of coaches: Coach type No. of Coaches Percentage Non-AC coaches (general ~57,200 ~70% and sleeper) AC coaches ~25,000 ~30% Total coaches ~82,200 100% Due to higher availability of general coaches, the number of passengers traveling in general/ unreserved coaches has shown an increasing trend as shown below: - 4 -Table 2: Passengers in general/unreserved coaches: Year No. of Passengers 2020-21 99 Cr (Covid year) 2021-22 275 Cr (Covid year) 2022-23 553 Cr 2023-24 609 Cr 2024-25 651 Cr The number of seats available for non-AC passengers has also increased over the years. The current composition is as follows: Table 3: Distribution of seats: Seat Type No. of seats Percentage Non-AC seats ~ 54 lakhs ~ 78% AC seats ~ 15 lakhs ~ 22% Total ~ 69 lakhs 100% Given the above data, it is clear that Indian Railways is committed to the low and middle income families who prefer railways as an affordable means of transportation. - 5 -Amrit Bharat Express: Railways have developed a fully non-AC modern train named as Amrit Bharat Express. Already 14 services are in operation. The present composition of Amrit Bharat consists of 11 General Class coaches, 8 Sleeper Class coaches, 01 Pantry car and 02 Luggage cum Divyangjan coaches. High Speed and enhanced Safety standards are the hallmarks of these trains with following enhanced features and amenities: i. Better aesthetics of seat and berths with enhanced look & feel on the lines of Vande Bharat Sleeper. ii. Jerk Free Semi-Automatic Couplers. iii. Improved Crashworthiness in coaches by provision of crash tube. iv. Provision of CCTV system in all coaches and Luggage room. v. Improved designs of toilets. vi. Improved design of Ladder for ease of climbing on to the berth. vii. Improved LED Light fitting & Charging Sockets. viii. Provision of EP assisted braking system. ix. Aerosol based fire suppression system in toilets and electrical cubicles. x. USB Type-A and Type-C mobile charging sockets. xi. Emergency Talk Back system for two-way communication between Passenger and Guard/Train Manager. xii. Non-AC pantry with enhanced heating capacity. xiii. Fully sealed gangways with quick release mechanism for easy attachment and detachment. - 6 -Development of Amrit Bharat Express trains, manufacturing of MEMU trains, and increasing the share of general coaches clearly shows that Indian Railways is catering effectively to the demand for travel in general class. Further, to cater to the needs of passengers desirous of availing unreserved accommodation, Indian Railways (IR) operate unreserved non-AC passenger trains/MEMU/EMU etc. for affordable travel, which are in addition to the unreserved accommodation (coaches) available in Mail/Express services. Standard Composition: To provide greater accommodation for the passengers using General and non-AC Sleeper Coaches, the extant policy regarding composition of Mail/Express trains provides for 12 (Twelve) General class & Sleeper class non-AC coaches and 08 (eight) AC-Coaches, in a train of 22 coaches. ******* - 7 -