GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS
RAJYA SABHA
UNSTARRED QUESTION NO. 1832
ANSWERED ON 09/03/2026
WATER TREATMENT PLANT UNDER AMRUT 2.0
1832. MS. DOLA SEN:
Will the Minister of Housing and Urban Affairs be pleased to state:
(a) the number of Water Treatment Plants (WTPs) approved and completed under AMRUT 2.0
and State/UT-wise status;
(b) whether it is a fact that 133 WTPs were approved but only 2 were completed and if so, the
reasons for such low completion;
(c) the details of pending WTPs with stage of work, cost and revised timelines project-wise; and
(d) the accountability fixed for delays and cost escalation, if any?
ANSWER
THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS
(SHRI TOKHAN SAHU)
(a) to (d): Water is a State subject. Government of India supplements the efforts of the States
through schematic interventions/ advisories. It provides financial and technical support to the
States through various Mission/ Schemes such as Atal Mission for Rejuvenation and Urban
Transformation 2.0 (AMRUT 2.0).
Under AMRUT 2.0, States/UTs are empowered to select, appraise, prioritise and
implement the projects within the broad framework of Mission guidelines. As per the information
updated by the States/ Union Territories (UTs) on AMRUT 2.0 Portal, a total of 910 water supply
projects worth ₹ 56,727.68 crore (with Operation and Maintenance Cost) with Water Treatment
Plants (WTPs) of a total capacity of 11,395.20 Million Litre per Day (MLD) have been approved
under AMRUT 2.0. 792 projects have been awarded so far with cost (capex) of ₹38,750.83 crore
and works worth ₹15,985.35 crore have been physically completed. The status of projects, cost
and revised timelines of water supply projects with WTPs are available on the website
https://amrut.mohua.gov.in/.
The projects taken-up under AMRUT and AMRUT 2.0 are large infrastructure projects
with long gestation periods. As reported by the States from time to time, delay in some projects
occur due to delay in preparation and approval of Detailed Project Reports, statutory clearances,
land issues, etc. The Mission guidelines have specific provisions for formation of State High
Powered Steering Committee (SHPSC) headed by the Chief Secretary of the State, to monitor and
supervise the implementation of the scheme at the State/ UT level. State Level Technical
Committee (SLTC) headed by the Secretary, Urban Development & Housing Department provides
technical support to the SHPSC in monitoring and supervising the scheme at the State level.
Further, an Apex Committee constituted under the ambit of Mission guidelines reviews and
monitor the Mission periodically. For assessment and monitoring of work done under AMRUT in
the States/ UTs, there is a provision of Independent Review and Monitoring Agencies (IRMAs).
Also, in order to fast-track the implementation of AMRUT, the progress is periodically reviewed
& monitored through regular video conferences/ webinars/ workshops/ site-visits etc. by Ministry
of Housing and Urban Affairs (MoHUA) with the States/ UTs & their Urban Local Bodies. There
is a dedicated AMRUT 2.0 online portal for tracking the progress and monitoring of projects
provided by the States/ UTs.
*****