Home India Ministry of Heavy Industries PROMOTION OF EVS AND INSTALLATION OF EV CHARGING STATIONS...
Date: 2025-12-16 Category: Press Release State: Union Government Country: India

PROMOTION OF EVS AND INSTALLATION OF EV CHARGING STATIONS

Issued by Ministry of Heavy Industries · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document outlines various government schemes implemented to promote the adoption of electric vehicles (EVs) and the installation of EV charging stations across India. It details financial incentives, manufacturing promotion schemes, and infrastructure guidelines, with a focus on fostering a connected and interoperable charging ecosystem. As of the report date, 29,151 EV charging stations have been installed. **Key Points / Main Content** * **FAME India Scheme (Phase II):** * Implemented from April 1, 2019, to March 31, 2024. * Budgetary outlay of Rs. 11,500 crore. * **PLI Scheme for Automobile and Auto Component Industry (PLI-Auto):** * Approved on September 23, 2021. * Budgetary outlay of Rs. 25,938 crore. * Aims to enhance manufacturing of Advanced Automotive Technology (AAT) products, including EVs, with minimum 50% Domestic Value Addition (DVA). * **PLI Scheme on Advanced Chemistry Cell (ACC) Battery Storage:** * Approved on May 12, 2021. * Budgetary outlay of Rs. 18,100 crore. * Aims to establish domestic manufacturing for 50 GWh of ACC batteries. * **PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme:** * Implemented from April 1, 2024, to March 31, 2028. * Budgetary outlay of Rs. 10,900 crore. * Supports electric vehicles (e-2W, e-3W, e-Trucks, e-buses, e-Ambulances), EV public charging stations, and upgrades to testing agencies. * Provides demand incentives in the form of upfront price reduction. * Includes Rs.2,000 crore allocation for EV public charging stations (EV PCS) on pan India basis including national and state highways. * **PM e-Bus Sewa-Payment Security Mechanism (PSM) Scheme:** * Notified on October 28, 2024. * Budgetary outlay of Rs. 3,435.33 crore. * Aims to support deployment of over 38,000 electric buses by providing payment security to e-bus operators. * **Scheme for Promotion of Manufacturing of Electric Passenger Cars in India (SPMEPCI):** * Notified on March 15, 2024. * Aims to promote the manufacturing of electric cars in India. * **EV Charging Infrastructure Guidelines:** * Setting up EV charging stations is unlicensed activity, allowing private entrepreneurs. * "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure–2024" issued on September 17, 2024, to strengthen EV charging, including on National Highways, promotes a connected and interoperable charging ecosystem by including battery-swapping stations. **Impact Analysis** **Automobile and Auto Component Manufacturers** * **Impact:** Benefit from financial incentives to boost domestic manufacturing of AAT products, including EVs, and attract investments. * **Action Required:** Align manufacturing processes to meet DVA requirements and leverage incentives under the PLI-Auto scheme. **Electric Vehicle Buyers (Consumers/End Users)** * **Impact:** Reduced upfront cost of EVs due to demand incentives under the PM E-DRIVE Scheme. * **Action Required:** Take advantage of the available incentives when purchasing electric vehicles. **E-bus Operators** * **Impact:** Payment security in case of default by Public Transport Authorities (PTAs) under the PM e-Bus Sewa-Payment Security Mechanism (PSM) Scheme. * **Action Required:** Participate in the scheme to deploy electric buses and ensure payment security. **Private Entrepreneurs** * **Impact:** Opportunity to set up EV charging stations as an unlicensed activity. * **Action Required:** Participate in the activity and adhere to the "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure–2024".

Key Entities Referenced

FAME India Scheme: Faster Adoption and Manufacturing of Electric (&Hybrid) Vehicles in India Scheme, aimed at promoting the adoption of electric vehicles. Production Linked Incentive (PLI) Scheme for Automobile and Auto Component Industry in India (PLI-Auto): Scheme to enhance India's manufacturing capabilities for Advanced Automotive Technology (AAT) products. PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme: Scheme to support electric vehicles and EV public charging stations. PM e-Bus Sewa-Payment Security Mechanism (PSM) Scheme: Scheme to support the deployment of electric buses. Ministry of Heavy Industries: Primary government body overseeing the schemes.
Official Source Record View Original Source →
See Full Document Text
Ministry of Heavy Industries PROMOTION OF EVS AND INSTALLATION OF EV CHARGING STATIONS प्रव तथ: 16 DEC 2025 3:51PM by PIB Delhi The Government has implemented following schemes to promote the adoption of Electric Vehicles (EVs) across the country: - i. Faster Adoption and Manufacturing of Electric (&Hybrid) Vehicles in India' (FAME India) Scheme : The second phase of FAME India scheme was implemented for a period of 5 years i.e. 01.04.2019 till 31.03.2024 with an outlay of Rs.11,500 crore. ii. Production Linked Incentive (PLI) Scheme for Automobile and Auto Component Industry in India (PLI-Auto): The Government approved this scheme on 23.09.2021 for Automobile and Auto Component Industry in India for enhancing India's manufacturing capabilities for Advanced Automotive Technology(AAT) products with a budgetary outlay of Rs.25,938 Crore. The scheme proposes financial incentives to boost domestic manufacturing of AAT products including EVs with minimum 50% Domestic Value Addition (DVA) and attract investments in the automotive manufacturing value chain. iii. Production Linked Incentive Scheme on National Programme on Advanced Chemistry Cell (ACC) Battery Storage: The Government on 12.05.2021 approved PLI Scheme for manufacturing of ACC in the country with a budgetary outlay of Rs.18,100 crore. The scheme aims to establish a competitive domestic manufacturing ecosystem for 50 GWh of ACC batteries. iv. PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme: This scheme with an outlay of Rs. 10,900 crore is implemented w.e.f. 01.04.2024 till 31.03.2028. The scheme aims to support electric vehicles including e-2W, e-3W, e-Trucks, e-buses and e- Ambulances. The scheme also includes support for EV public charging stations and upgradation of testing agencies. Under this scheme, demand incentive is provided to buyers (consumers/end users) of e-2Ws, e-3Ws (e-rickshaws & e-carts), e-3Ws (L5), e-trucks and e-ambulances in the form of an upfront price reduction at the time of purchase of the electric vehicle. v. PM e-Bus Sewa-Payment Security Mechanism (PSM) Scheme: This Scheme notified on 28.10.2024, has an outlay of Rs.3,435.33 crore and aims to support deployment of more than 38,000 electric buses. The objective of scheme is to provide payment security to e-bus operators in case of default by Public Transport Authorities (PTAs). vi. Scheme for Promotion of Manufacturing of Electric Passenger Cars in India (SPMEPCI): This scheme was notified on 15.03.2024 to promote the manufacturing of electric cars in India. Setting up of electric vehicle charging stations is an unlicensed activity and private entrepreneurs can also participate in the activity. The Ministry of Power issued the “Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure–2024” on 17.09.2024 to strengthen EV charging including on National Highways. These guidelines promote a connected and interoperable charging ecosystem by including battery-swapping stations.In addition to this, an allocation of Rs.2,000 crore has been made under the PM E-DRIVE Scheme, for setting up of electric vehicle public charging stations (EV PCS) on pan India basis including national and state highways. As per inputs received from BHEL, a total of 29,151 EV charging stations have been installed so far. This information was given by the Minister of State for Heavy Industries, Shri Bhupathiraju Srinivasa Varma in a written reply in the Lok Sabha today. ***** TPJ/NJ (रलीज़ आईडी: 2204630) आगंतुक पटल : 488 इस वज्ञ को इन भाषाओ ंम पढ़: ही

Continue your research