Home India Ministry of Power Proposal for extension and upgradation of existing Star rati...
Date: 2025-12-23 Category: Extra Ordinary State: Union Government Country: India

Proposal for extension and upgradation of existing Star ratings of Distribution Transformer

Issued by Ministry of Power · EC, ET and EV Division

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This notification from the Ministry of Power amends a previous notification regarding energy conservation in distribution transformers. It updates the Indian Gazette with changes relating to compliance with type test parameters and the inclusion of a new loss standard table. The new standards are valid from January 1, 2027, to December 31, 2029. **Key Points / Main Content** * **Compliance Requirements:** All distribution transformers manufactured, commercially purchased, or sold in India must: * Meet type test parameter requirements per IS 2026 (Part 1):2011 for short circuit impedance, load loss, no-load loss, and current measurement. * Carry the Bureau of Indian Standards (BIS) certification mark. * **Amendment of Existing Standards:** * In Table 2 and Table 3, the figure "2025" is replaced with "2026". * **Introduction of New Loss Standard Table (Table 4):** * A new Table 4 is inserted, specifying standard losses in watts for transformers up to 11 kV class. * Table 4 is valid from January 1, 2027, to December 31, 2029. * Table 4 defines the maximum permissible losses at 50% and 100% load conditions for 1-star to 5-star rated transformers, across a range of kVA ratings. * **Energy Efficiency for Non-Specified kVA Ratings:** * For kVA ratings not specified in Table 4, the energy efficiency level certified by BIS will be applicable. **Impact Analysis** **Stakeholder: Distribution Transformer Manufacturers** * **Impact:** Manufacturers must ensure their products comply with the updated type test parameters and loss standards outlined in the notification. * **Action Required:** Adjust manufacturing processes and designs to meet the new loss standards specified in Table 4 for transformers manufactured from January 1, 2027. Obtain BIS certification for compliance. **Stakeholder: Purchasers and Sellers of Distribution Transformers** * **Impact:** Purchasers must ensure that the distribution transformers they are acquiring meet the new energy efficiency standards. Sellers must ensure that their products adhere to the new standards. * **Action Required:** Request compliance documentation and BIS certification from manufacturers for all distribution transformers purchased or sold, especially those manufactured from January 1, 2027. **Stakeholder: Bureau of Indian Standards (BIS)** * **Impact:** BIS is the certifying agency. * **Action Required:** Ensure to provide certification of energy efficiency level in cases where kVA ratings aren't specified in Table 4.

Key Entities Referenced

Energy Conservation Act, 2001: The primary legislation that empowers the Central Government to regulate energy efficiency. Section 14(a) is the specific section mentioned as the source of power for this notification. Bureau of Energy Efficiency: The statutory body consulted by the Central Government in framing these regulations related to energy efficiency standards. IS 2026 (Part 1):2011: Indian Standard specifying measurement of short circuit impedance and load loss, and measurement of no-load loss and current in Distribution transformers Distribution Transformer: Subject of the policy; specifies that every distribution transformer being manufactured, commercially purchased or sold in India must meet specified energy efficiency standards Ministry of Power: The central ministry responsible for issuing the notification regarding energy efficiency standards for distribution transformers.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-25122025-268806 CG-DLxx-xEG-I2D5H1x2x2x0 25-268806 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 5769] नई दिल्ली, मंगलिार, दिसम् बर 23, 2025/पौष 2, 1947 No. 5769] NEW DELHI, TUESDAY, DECEMBER 23, 2025/PAUSHA 2, 1947 जिद्यतु मत्रं ालय अजधसचू ना नई दिल्ली, 23 दिसम् बर, 2025 का.आ. 5967(अ).—केंद्रीय सरकार, ऊिाा संरक्षण अजधजनयम, 2001 (2001 का 52) की धारा 14 के खंड (क) द्वारा प्रित्त िजियों का प्रयोग करते हुए, ऊिाा िक्षता ब्यरू ो के परामिा से भारत के रािपत्र, असाधारण, भाग 2, खंड 3, उपखंड (ii) में प्रकाजित जिद्युत मंत्रालय, भारत सरकार की अजधसूचना संख यांक का.आ. 185 (अ) तारीख 12 िनिरी,2009 में जनम् नजलजखत और संिोधन करती ह ैअर्ाात:् - उि अजधसूचना म,ें - (क) पैरा (1) के स्ट् र्ान पर, जनम्नजलजखत पैरा रखा िाएगा, अर्ाात:् - "1. भारत म ेंजिजनर्मात, िाजणजययक रूप से क्रय या जिक्रीत दकया गया प्रत्येक जितरण रांसफामार – (क) टाइप परीक्षण मापिंडों की अनपु ालन अपेक्षाओं को पूरा करें, अर्ाात्:- (i) आईएस 2026 (भाग 1):2011 के अनुसार िॉटा सर्काट प्रजतबाधा और लोड हाजन का माप; (ii) आईएस 2026 (भाग 1):2011 के अनुसार िून् य-लोड हाजन और करंट का माप; 8642 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (ख) भारतीय मानक ब्यूरो प्रमाणन जचह्न लगा होगा’’; (ख) परै ा 2 के, उप परै ा (2) म,ें – (क) सारणी 2 म,ें अंक "2025" के स्ट्र् ान पर, अंक "2026" रख ेिाएंगे; (ख) सारणी 3 म,ें अंक "2025" के स्ट्र् ान पर, अंक "2026" रख ेिाएंगे। (ग) सारणी 3 के पश् चात,् जनम्नजलजखत सारणी अंत:स्ट् र्ाजपत की िाएगी, अर्ाात्: - 'सारणी – 4 (1 िनिरी, 2027 से 31 दिसंबर, 2029 तक जिजधमान् य) 11 केिी िगा तक के िाट में मानक हाजन रेटटंग प्रजतबाधा (केिीए) (प्रजतित) 1 स्ट् टार 2 स्ट् टार 3 स्ट्टार 4 स्ट् टार 5 स्ट् टार 50% 100% 50% 100% 50% 100% 50% 100% 50% 100% भार भार भार भार भार भार भार भार भार भार 16 4.5 120 400 108 364 97 331 87 301 78 274 25 4.5 175 595 158 541 142 493 128 448 115 408 63 4.5 300 1050 270 956 243 870 219 791 197 720 100 4.5 435 1500 392 1365 352 1242 317 1130 285 1028 160 4.5 570 1700 513 1547 462 1408 416 1281 375 1166 200 4.5 670 2100 603 1911 543 1739 488 1582 439 1440 250 4.5 920 2700 864 2488 811 2293 761 2113 714 1947 315 4.5 955 2883 890 2681 829 2494 772 2319 719 2157 400 4.5 1150 3330 1080 3214 1013 3102 951 2994 892 2890 500 4.5 1430 4100 1354 3909 1282 3727 1215 3554 1150 3389 630 4.5 1745 4850 1637 4438 1536 4061 1441 3717 1352 3401 800 5 2147 5838 2015 5323 1892 4853 1776 4425 1667 4035 1000 5 2620 7000 2460 6364 2310 5785 2170 5259 2038 4781 1250 5 3220 8400 3142 7670 3066 7003 2991 6394 2919 5838 1600 6.25 3970 11300 3753 10821 3547 10363 3353 9924 3169 9504 2000 6.25 4790 14100 4543 13254 4309 12459 4088 11711 3877 11009 2500 6.25 5900 17500 5660 16554 5430 15659 5209 14813 4997 14012 टटप्प ण - सारणी-4 में केिीए रेटटंग जिजनर्िाष्ट नहीं, बीआईएस द्वारा प्रमाजणत ऊिाा िक्षता स्ट्तर लाग ूहोगा। [फा. स. ं 10/8/2022-ईसी] धीरि कुमार श्रीिास्ट् ति, मुखय इंिीजनयर टटप्प ण - मलू अजधसूचना भारत के रािपत्र, असाधारण, भाग II, खंड 3, उप-खंड (ii), संख यांक का.आ. 185(अ), तारीख 12 िनिरी, 2009 द्वारा प्रकाजित की गई र्ी, और तत्प श् चात् अजधसूचना संख याकं का.आ. 4062(अ), तारीख 16 दिसंबर, 2016, का.आ. 513 (अ), तारीख 17 फरिरी, 2017, का.आ. 1665 (अ), तारीख 27 मई, 2020, का.आ. 5(अ), तारीख 2 िनिरी, 2023, का.आ. 5247(अ), तारीख 8 दिसंबर, 2023 और का.आ. 5337(अ), तारीख 9 दिसंबर, 2024 द्वारा संिोजधत दकए गए र्े।[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3 MINISTRY OF POWER NOTIFICATION New Delhi, the 23rd December, 2025 S.O. 5967(E).— In exercise of the powers conferred by clause (a) of section 14 of the Energy Conservation Act, 2001 (52 of 2001), the Central Government, in consultation with the Bureau of Energy Efficiency, hereby makes the following further amendments in the notification of the Government of India, Ministry of Power, published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (ii), vide number S.O. 185(E), dated the 12th January, 2009, namely: - In the said notification, - (A) for paragraph (1), the following paragraph shall be substituted, namely: - “1. Every distribution transformer being manufactured, commercially purchased or sold in India shall – (a) meet the compliance requirements of the type test parameters, namely:- (i) measurement of short circuit impedance and load loss as per IS 2026 (part 1):2011; (ii) measurement of no-load loss and current as per IS 2026 (part 1):2011; (b) carry Bureau of Indian Standards certification mark.”; (B) in paragraph 2, in sub-paragraph (2), – (a) in Table 2, for the figures “2025”, the figures “2026” shall be substituted; (b) in Table 3, for the figures “2025”, the figures “2026” shall be substituted; (c) after Table 3, the following Table shall be inserted, namely: - ‘Table – 4 (Validity from 1st January, 2027 to 31st December, 2029) Standard Losses in watts upto 11 kV Class Impedance (Percent) Rating 1 Star 2 Star 3 Star 4 Star 5 Star (kVA) 50% 100% 50% 100% 50% 100% 50% 100% 50% 100% Load Load Load Load Load Load Load Load Load Load 16 4.5 120 400 108 364 97 331 87 301 78 274 25 4.5 175 595 158 541 142 493 128 448 115 408 63 4.5 300 1050 270 956 243 870 219 791 197 720 100 4.5 435 1500 392 1365 352 1242 317 1130 285 1028 160 4.5 570 1700 513 1547 462 1408 416 1281 375 1166 200 4.5 670 2100 603 1911 543 1739 488 1582 439 1440 250 4.5 920 2700 864 2488 811 2293 761 2113 714 1947 315 4.5 955 2883 890 2681 829 2494 772 2319 719 2157 400 4.5 1150 3330 1080 3214 1013 3102 951 2994 892 2890 500 4.5 1430 4100 1354 3909 1282 3727 1215 3554 1150 3389 630 4.5 1745 4850 1637 4438 1536 4061 1441 3717 1352 3401 800 5 2147 5838 2015 5323 1892 4853 1776 4425 1667 40354 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 1000 5 2620 7000 2460 6364 2310 5785 2170 5259 2038 4781 1250 5 3220 8400 3142 7670 3066 7003 2991 6394 2919 5838 1600 6.25 3970 11300 3753 10821 3547 10363 3353 9924 3169 9504 2000 6.25 4790 14100 4543 13254 4309 12459 4088 11711 3877 11009 2500 6.25 5900 17500 5660 16554 5430 15659 5209 14813 4997 14012 Note— For kVA ratings not specified in Table-4, the energy efficiency level certified by BIS shall be applicable. [F. No. 10/8/2022-EC] DHIRAJ KUMAR SRIVASTAVA, Chief Engineer Note. - The principal notification was published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (ii), vide number S.O. 185(E), dated the 12th January, 2009, and subsequently amended vide notification numbers S.O. 4062(E), dated the 16th December, 2016, S.O. 513(E), dated the 17th February, 2017, S.O. 1665(E), dated the 27th May, 2020, S.O. 5(E), dated the 2nd January, 2023, S.O. 5247(E), dated the 8th December, 2023 and S.O.5337(E), dated the 9th December, 2024. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research