Home India Ministry of Railways Publication of 7A for Construction of new Road Over Bridge i...
Date: 2025-04-17 Category: Extra Ordinary State: Union Government Country: India

Publication of 7A for Construction of new Road Over Bridge in lieu of Level Crossing in Prakasam district in Andhra pradesh state

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Land Acquisition for Railway Projects in Andhra Pradesh **1. Executive Summary:** This report analyzes a notification from the Ministry of Railways, South Central Railway, published in the Gazette of India on April 17, 2025. This notification authorizes specific officers as Competent Authorities for Land Acquisition for several Special Railway Projects, specifically the construction of Road Over Bridges (ROBs) in lieu of Level Crossings in Andhra Pradesh. The key finding is the delegation of authority to Revenue Divisional Officers within Prakasam District for land acquisition related to these infrastructure projects. **2. Introduction:** The purpose of this report is to provide an overview and analysis of a government notification pertaining to land acquisition for railway projects. This analysis is solely based on the information contained within the provided text of the notification. **3. Policy Overview:** This document establishes authority for land acquisition related to specific railway construction projects. The core objective, as inferred from the text, is to facilitate the efficient and legal acquisition of land required for the construction of Road Over Bridges (ROBs) along the South Central Railway network in Andhra Pradesh. **4. Background and Rationale:** This is a new policy action, not an amendment. The notification addresses the need to overcome existing Level Crossings, which can cause traffic congestion and safety concerns. The construction of ROBs in their place necessitates the acquisition of land. The government is delegating the authority to specific officers to expedite this land acquisition process, thus accelerating project implementation. **5. Key Provisions / Changes:** This is a new policy action, not an amendment. The primary provision of this notification is the authorization of specific officers, namely Revenue Divisional Officers within Prakasam District, as the "Competent Authority for Land Acquisition" for particular railway projects. Specifically, it covers: * Construction of new Road Over Bridge in lieu of Level Crossing No. 213 at Km. 2981416 between Ongole and Karavadi Stations * Construction of Road Over Bridge in lieu of Level Crossing No. 199 at Km. 2802426 in between Surareddipalem Ongole stations * Construction of Road Over Bridge in lieu of Level Crossing No. 193 at Km. 2721820 in between Tanguturu Surareddypalem stations * Construction of Road Over Bridge in lieu of Level Crossing No. 187 at Km. 262382632 in between Singarayakonda Tanguturu stations These authorizations are made under Section 2(7A) of the Railways Act, 1989, granting the designated officers the power to perform functions related to land acquisition for the projects. The notification takes effect from the date of its publication in the Official Gazette. **6. Target Audience and Stakeholders:** The primary target audience includes: * **Landowners in the specified areas of Prakasam District, Andhra Pradesh:** Those whose land is required for the construction of the ROBs. * **Railway authorities and construction companies:** Responsible for the planning and execution of the Road Over Bridge projects. * **Local communities and commuters:** Who will benefit from improved infrastructure and reduced traffic congestion once the ROBs are constructed. **7. Implementation Aspects (Inferred):** * **Responsible Agency:** The Ministry of Railways, South Central Railway, is the issuing authority. The Revenue Divisional Officers are the responsible bodies for land acquisition. * **Procedure:** The notification itself triggers the start of land acquisition procedures under the Railways Act, 1989. While specific timelines are not provided in the text, the notification’s effective date signals the immediate commencement of these processes. It can be inferred that the standard procedures for land acquisition as per the Railways Act will now be initiated by the authorized officers. * **Timeline:** No specific timelines are mentioned in the document. **8. Expected Outcomes / Impact of Changes:** The intended outcome of this policy is to expedite the land acquisition process for the construction of Road Over Bridges in the designated locations. This is expected to: * Facilitate the timely completion of the ROB projects. * Reduce traffic congestion and improve safety at Level Crossings. * Enhance the overall efficiency of the railway network. **9. Conclusion:** The Ministry of Railways notification designates specific officers as Competent Authorities for Land Acquisition, streamlining the process for constructing Road Over Bridges in Andhra Pradesh. This action is crucial for upgrading railway infrastructure, improving safety, and reducing traffic congestion. While the notification itself is brief, its impact is significant as it directly enables the execution of essential infrastructure projects.

Key Entities Referenced

Railways Act, 1989: Act that confers powers to the Central Government regarding railway projects. Section 2: Section of the Railways Act, 1989. clause 7A: Specific clause within Section 2 of the Railways Act, 1989. Central Government: The governing body authorizing the officer to perform functions of the Competent Authority for Land Acquisition. Special Railway Project: A railway project for execution, maintenance, management and operation. MINISTRY OF RAILWAYS: Government organization overseeing railway operations. SOUTH CENTRAL RAILWAY: A division of the Indian Railways. Official Gazette: The official publication for government notifications. Revenue Divisional Officer, Andhra Pradesh: Competent authority for Land Acquisition.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-21042025-262547 CG-TLxx-xEG-I2D1H0x4x2x0 25-262547 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1740] नई ददलली, बृहस्ट्प जतवार, अप्रलै 17, 2025/चत्रै 27, 1947 No. 1740] NEW DELHI, THURSDAY, APRIL 17, 2025/ CHAITRA 27, 1947 रेल मत्रं ालय (दजिण मध्य रेलवे) अजधसचू ना जसकंदराबाद, 15 अप्रैल, 2025 का.आ. 1773(अ).—केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग करत े हुए, एतद्द्वारा नीचे दी गई ताजलका के कॉलम (5) म ें उजललजखत अजधकारी को आजधकाररक रािपत्र म ें इस अजधसूचना के प्रकािन की तारीख से उि ताजलका के कॉलम (3) म ें उजललजखत राज्य म ें जनष्पादन, रखरखाव, प्रबधं न और संचालन के जलए ताजलका के कॉलम (2) म ें उजललजखत जविेष रेलव े पररयोिना के संबंध म ें भजू म अजधग्रहण के जलए सिम प्राजधकारी के कायों को जनष्पाददत करने के जलए प्राजधकृत करती ह.ै ताजलका क्र.सं. जविेष रेलवे पररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम प्राजधकारी (1) (2) (3) (4) (5) 1. ओंगोल करवदद के बीच दक.मी. 298/14- 16 पर जस्ट्ित रेलवे फाटक नंबर 213 पर रोड ओवर जिि का जनमााण 2 सुरीरेड्डीपलेम-ओंगोल स्ट्टेिनों के बीच आंध्र प्रदेि प्रकािम रािस्ट्व मंडल अजधकारी, ओंगोल दक.मी. 280/24-26 पर समपार फाटक सं. 199 के स्ट्िान पर ऊपरी सड़क पुल का जनमााण 2593 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 3 टंगुटूरु - सूरारेड्डीपालेम स्ट्टेिनों के बीच दक.मी. 272/18-20 पर जस्ट्ित समपार फाटक सं.193 के स्ट्िान पर ऊपरी सड़क पुल का जनमााण 4 ससंगरायकोंडा – टंगुटूरु स्ट्टेिनों के बीच दक.मी. 262/38-263/2 पर जस्ट्ित समपार फाटक सं.187 के स्ट्िान पर ऊपरी सड़क पुल का जनमााण [फा. सं. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/117] मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी MINISTRY OF RAILWAYS (SOUTH CENTRAL RAILWAY) NOTIFICATION Secunderabad, the 15th April 2025 S.O. 1773(E).—In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of the said table with effect from the date of publication of this notification in the Official Gazette. Table Sl.No. Special Railway Project State District Competent authority for Land Acquisition (1) (2) (3) (4) (5) 1. Construction of new Road Over Bridge in lieu of Level Crossing No. 213 at Km. 298/14-16 between Ongole and Karavadi Stations 2. Construction of Road Over Bridge in lieu of Level Crossing No. 199 at Km. 280/24-26 in between Surareddipalem – Ongole stations Revenue Divisional Officer, Andhra Pradesh Prakasam 3 Construction of Road Over Bridge in Ongole lieu of Level Crossing No. 193 at Km. 272/18-20 in between Tanguturu - Surareddypalem stations 4 Construction of Road Over Bridge in lieu of Level Crossing No. 187 at Km. 262/38-263/2 in between Singarayakonda – Tanguturu stations [F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/117] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research