Date: 2022-02-02Category: Extra OrdinaryState: Union GovernmentCountry: India
Publication of Corrigendum Notification in the Extra Ordinary Gazette of India under the Petroleum and Minerals Pipelines (ARUL) Act, 1962 for Jagdishpur Haldia and Bokaro Dhamra Gas Pipeline (JHBDPL) and Spur Pipeline of GAIL (India) Limited.
## Policy Analysis Report: Corrigendum to Notification S.O. 4274(E) dated 03.09.2021 Regarding Land Acquisition for Petroleum and Minerals Pipelines
**1. Executive Summary:**
This report analyzes a corrigendum issued by the Ministry of Petroleum and Natural Gas, Government of India, regarding Notification S.O. 4274(E) dated 03.09.2021. The corrigendum addresses a discrepancy in land area data (Hectare and Are) specified in the original notification related to land acquisition for the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project. The core purpose of this amendment is to rectify errors in the land schedule to ensure accurate land records for the project's implementation. The key finding is that the land area specified in survey number 735, within a particular district and block in West Bengal, is being revised.
**2. Introduction:**
The purpose of this report is to provide a comprehensive analysis of the corrigendum to Notification S.O. 4274(E) dated 03.09.2021, published by the Ministry of Petroleum and Natural Gas. This analysis is based solely on the content of the provided policy text and aims to inform stakeholders about the changes introduced by this amendment.
**3. Policy Overview:**
* **Original Policy:** Notification S.O. 4274(E) dated 03.09.2021, published in the Extraordinary Gazette of India on 14.10.2021, regarding land acquisition for the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project.
* **Core Objective(s):** Based on the text, the objective of the original policy is to acquire the right of user in land for the Petroleum and Minerals Pipelines, as per Section 6(1) of the Petroleum and Minerals Pipelines (Acquisition of Right of User in Land) Act, 1962. The objective of this specific amendment is to correct inaccuracies within the original notification's land schedule.
**4. Background and Rationale:**
The amendment appears to be necessary due to an error in the initially published land schedule within Notification S.O. 4274(E). Specifically, the area designated for survey number 735 in Purba Medinipur district, Nandakumar block, Pandabasan Mouza in West Bengal was incorrectly recorded. The original record stated "0 Hectare 05 Are and 51 Sq. Meter" where it should have indicated "0 Hectare 03 Are and 51 Sq. Meter". This correction ensures accurate legal documentation for land rights and potentially avoids future disputes or project delays.
**5. Key Provisions / Changes:**
This is an amendment to the original policy. The key change introduced by the amendment is:
* **Specific Part Changed:** The land schedule related to the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project in West Bengal, specifically concerning survey number 735.
* **New Rule/Provision:** The amendment changes the recorded land area for survey number 735 from "0 Hectare 05 Are and 51 Sq. Meter" to "0 Hectare 03 Are and 51 Sq. Meter."
* **Difference/Effect:** The effect of this change is to correct the official land record, ensuring accuracy and potentially preventing legal or administrative complications related to land acquisition or compensation. The area being acquired is reduced by 2 Are.
**6. Target Audience and Stakeholders:**
Based on the provided text, the directly affected stakeholders include:
* The Ministry of Petroleum and Natural Gas.
* Landowners and residents of the specified area (Purba Medinipur district, Nandakumar block, Pandabasan Mouza, West Bengal) affected by the land acquisition.
* Companies involved in the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project.
* Relevant government authorities responsible for land records and project implementation in West Bengal.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Petroleum and Natural Gas is responsible for issuing the corrigendum. The Dte. of Printing at the Government of India Press, Ring Road, Mayapuri, New Delhi, handled the uploading and the Controller of Publications, Delhi, published the Gazette.
* **Timelines/Procedures:** No specific timelines are mentioned in the text. However, the publication of the corrigendum in the Gazette of India indicates a formal and legally binding correction. It can be inferred that relevant land records will need to be updated to reflect the corrected area.
* **Amendment-Specific Implementation:** The primary implementation aspect relates to updating land records with the corrected area (0 Hectare 03 Are and 51 Sq. Meter) for survey number 735 in the specified location. This likely involves coordination between the Ministry, local land authorities in West Bengal, and the project developers.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcome of this specific change is:
* **Accurate Land Records:** The correction of the land area discrepancy ensures accurate official records for the affected survey number.
* **Reduced Potential for Disputes:** Correcting the error minimizes the risk of future legal disputes or administrative challenges related to land ownership or compensation.
* **Smooth Project Implementation:** Accurate land records facilitate smoother implementation of the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project by ensuring clear land rights.
**9. Conclusion:**
The corrigendum to Notification S.O. 4274(E) represents a necessary correction to ensure the accuracy of land records associated with the Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBPL) and Spur Pipeline Project. While seemingly minor, this correction is significant as it ensures accurate land data, which is crucial for legal compliance, project implementation, and minimizing potential disputes. This analysis is based solely on the provided text.
Key Entities Referenced
NEW DELHI: Capital of India, place of publication.
Ministry of Petroleum Natural Gas: The ministry responsible for the notification.
Petroleum and Minerals Pipelines Acquisition of Right of User in Land Act, 1962: Act under which the notification is issued.
Gazette of India: Official government gazette where the notification was published.
JAGDISHPUR HALDIABOKARODHAMRA PIPELINE JHBDPL AND SPUR PIPELINE PROJECT: Name of the pipeline project related to the land schedule.
West Bengal: State where the land is located.
Purba Medinipur: District in West Bengal.
Nandakumar: Block in Purba Medinipur district, West Bengal.
Pandabasan: Mouza (village) in Nandakumar block, Purba Medinipur district, West Bengal.
Rakesh Mishra: Under Secretary who signed the notification
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E0x2xx0 22022-233078
CG-DL-E-02022022-233078
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 406] नई दिल्ली, बुधवार, फरवरी 2, 2022/माघ 13, 1943
No. 406] NEW DELHI, WEDNESDAY, FEBRUARY 2, 2022/MAGHA 13, 1943
परे ोजलयम और प्राकृजतक गसै मत्रं ालय
-
नई दिल्ली, 31 िनवरी, 2022
का.आ. 421(अ).—पेरोजलयम और खजनि पाइपलाइन (भूजम में प्रयोक्ता के अजधकार का अिनज ) अजधजनयम 1962
(1962 का 50) की धारा 6 दक उपधारा (1) के अनुसरनण म ें (इसके बाि इसे उक्त अजधजनयम कहा गया ह ै ), भारत
सरकार एति ् द्वारा पेरोजलयम और प्राक्रजतक गैस मंत्रालय में भारत सरकार की दिनांक 03.09.2021 की अजधसूचना
का.आ. 4274(अ) िो दिनांक 14.10.2021 को भारत के आसाधारण रािपत्र में प्रकाजित की गई, में संलग्न के रूप म ें
संिोधन करती ह ै।
fgUnh ds ist uEcj& 06] 735] {ks=Qy gsDVj&0] vjs&05 ,o a oxZ eh-&51 vkSj bafXy'k ds ist uEcj&11]
-&735] {ks=Qy gDs Vj&0] vjs&05 ,oa oxZ eh-&51 ds fgUnh ,o a bafXy'k uksfVfQds'ku es a Hkkjr
ljdkj ds jkti= 14.10.2021 dk-vk- uEcj&4274¼bZ½ fnukad 03.09.2021 ds ist
uEcj&06] &735 dk {ks=Qy gDs Vj&0] vjs&03 ,oa oxZ eh-&51 ds :i es a i<k+ tk;sA
691 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
3B
1 2 3 4 5 6 7 8
पुवॅ मेदिनीपुर नंिकुमार पाण्डववसान 65 LR 735 0 05 51 00 03 51
[फा. स.ं एल-14014/235/2021-िीपी-II (ई-41150]
राकेि जमश्रा, अवर सजचव
MINISTRY OF PETROLEUM & NATURAL GAS
CORRIGENDUM
New Delhi, the 31st January, 2022
S.O. 421(E).—In pursuance of sub-section (1) of Section 6 of the Petroleum and Minerals
Pipelines (Acquisition of Right of User in Land) Act, 1962 (50 of 1962),(hereinafter called the
said Act), the Government of India hereby makes the amendments as Annexed in the notification
of the Government of India in the Ministry of Petroleum and Natural Gas, S.O. 4274 ( E) dated
03.09.2021 published in the Extraordinary Gazette of India on 14.10.2021.
"In Page no.06 in Hindi survey no. 735 area 0 Hectare 05 Are and 51 Sq. Meter and in
Page no. 11 in English survey no. 735 area 0 Hectare 05 Are and 51 Sq. Meter of 6(1) notification,
notified in the Gazette of India on 14.10.2021 vide S.O No. 4274(E) dated 03.09.2021 may be read
as survey no. 735 area 0 Hectare 03 Are and 51 Sq. Meter in Hindi and English Schedule.
JAGDISHPUR – HALDIA-BOKARO-DHAMRA PIPELINE (JHBDPL) AND SPUR
PIPELINE PROJECT
3B SECTION
LAND SCHEDULE
State : West Bengal
Notified Area Corrected area to be read
J.L. Survey
District Block Mouza Map Hect. Are Sq. Sq.
No. No. Hect. Are
mtr. mtr.
1 2 3 4 5 6 7 8
Purba
Nandakumar Pandabasan 65 LR 735 0 05 51 00 03 51
Medinipur
[F. No. L-14014/235/2021-GP-II (E-41150)]
RAKESH MISHRA, Under Secy.