## Report on Land Acquisition Policy for Kashi Railway Station Construction
**1. Executive Summary:**
This report analyzes a new government policy, as evidenced by the provided official notification, regarding land acquisition for the proposed construction of the "Kashi Railway Station" in Varanasi district, Uttar Pradesh. The policy establishes the government's intention to acquire specific lands for this public purpose, outlines procedures for affected individuals to raise objections, and defines the authority responsible for addressing these objections. The core purpose is to facilitate the necessary land acquisition for infrastructure development by enabling the construction of a railway station.
**2. Introduction:**
The purpose of this report is to provide an informative overview of the government policy outlined in the provided notification concerning the acquisition of land for the construction of the proposed "Kashi Railway Station" in Varanasi district, Uttar Pradesh. This report is based solely on the information contained within the provided policy text.
**3. Policy Overview:**
This is a **New Policy**.
* **Core Objective:** The core objective, as inferred from the text, is to acquire land deemed necessary for the construction of the proposed "Kashi Railway Station" in Varanasi district, Uttar Pradesh, serving a public purpose.
**4. Background and Rationale:**
This is a **New Policy**.
* The policy addresses the necessity of land acquisition for infrastructural development. The construction of a railway station requires land, and this policy outlines the process by which the government intends to acquire the necessary land, likely due to the need for improved transportation infrastructure in the Varanasi district.
**5. Key Provisions / Changes:**
This is a **New Policy**. Therefore, the provisions are as follows:
* **Declaration of Intent to Acquire:** The central government formally declares its intention to acquire land for the construction of the proposed railway station.
* **Objection Process:** Individuals with interests in the land have 30 days from the notification's publication to raise objections to the acquisition.
* **Competent Authority:** The Special Land Acquisition Officer, Varanasi, Uttar Pradesh, is designated as the "competent authority" responsible for receiving and addressing objections.
* **Objection Requirements:** Objections must be submitted in writing to the competent authority, stating the grounds for the objection.
* **Hearing of Objectors:** The competent authority is required to provide objectors with an opportunity to be heard, either personally or through a legal representative.
* **Authority Decision:** The competent authority has the power to either allow or disallow the objections after conducting necessary inquiries.
* **Finality of Order:** The order made by the competent authority regarding the objections is final.
* **Land Details Availability:** Land plans and other details are made available for inspection at the competent authority's office.
* **Description of Land:** The notification includes a schedule detailing the specific plots of land being considered for acquisition, including village names, plot numbers, and affected areas in hectares, categorized as either "Part" or "Full" acquisitions.
**6. Target Audience and Stakeholders:**
Based on the provided text, the primary target audience and stakeholders are:
* **Landowners:** Individuals or entities owning land within the defined areas earmarked for acquisition in the villages of Palang Shaheed, Bhadau, Kazzakpur, and Amarpur in Varanasi district, Uttar Pradesh.
* **Residents/Occupants:** Individuals residing or occupying the land within the specified areas, even if they are not the direct owners.
* **Legal Professionals:** Lawyers and legal representatives who may represent the interests of the landowners or residents.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The Ministry of Railways, through the Northern Railways Construction Organization, is the primary responsible agency. The Special Land Acquisition Officer, Varanasi, Uttar Pradesh, is the key authority responsible for handling objections and overseeing the acquisition process at the local level.
* **Timeline:** A 30-day period is provided for affected individuals to raise objections from the date of publication of the notification. The overall timeline for the acquisition process is not specified in this document.
* **Procedure:** The procedure involves the publication of the notification, submission of objections by affected parties, review and hearing of objections by the competent authority, and the issuance of a final order. Land plans and other relevant documents are available for inspection at the competent authority's office.
**8. Expected Outcomes / Impact of Changes:**
This is a **New Policy**. Therefore, the outcomes are inferred as follows:
* The expected outcome is the successful acquisition of the designated land for the construction of the Kashi Railway Station. This will likely facilitate the development of improved railway infrastructure in the region.
* Potentially negative impacts for landowners include displacement and loss of property. The objection process aims to mitigate these impacts by providing a platform for affected parties to voice their concerns and potentially influence the acquisition process.
**9. Conclusion:**
The policy outlines the procedures for land acquisition for the Kashi Railway Station project. It is significant because it sets the legal and administrative framework for acquiring the necessary land for a major infrastructure project. The policy's effectiveness will depend on the fair and transparent implementation of the objection process and the consideration given to the concerns of affected landowners.
Key Entities Referenced
Amarpur: Name of Village
JUNE 13, 2025: Date of publication of the notification.
JYAISHTHA 23, 1947: Date in the Indian national calendar, corresponding to the date of publication.
dsUnzh; ljdkj: Central Government (Hindi)
jys vfkfu;e 1989: Railways Act, 1989 (Hindi)
1989 dk 24: Act No. 24 of 1989
yksd iz;kstu: Public purpose (Hindi)
ftys ds dk'kh: District Kashi (Hindi)
jkT;: State
vkksi: Objection (Hindi)
fo'ks"k Hkwfe v;kfIr vfkdkjh okjk.klh mRRkj izns'k: Special Land Acquisition Officer, Varanasi, Uttar Pradesh (Hindi)
lke izkfkdkjh: Competent Authority (Hindi)
THE GAZETTE OF INDIA: Official publication of the Indian government.
Kashi Railway Station: Proposed railway station to be constructed in District Varanasi, Uttar Pradesh.
DistrictVaranasi: District where the land acquisition is taking place.
State of Uttar Pradesh: The state in which the land acquisition is taking place.
Railways Act, 1989: The act under which the land is being acquired; specifically, Section 20A.
Central Government: The governing body undertaking the land acquisition.
Special Land Acquistion officer, Varanasi, Uttar Pradesh: The competent authority to whom objections regarding the land acquisition should be made.
Northern Railways Construction Organization: Name of the organization issuing the notification.
New Delhi: Place of Notification
11th June, 2025: Date of notification
Sadar: Tehsil
Palang Shaheed: Name of Village
Bhadau: Name of Village
Kazzakpur: Name of Village
SHYAM SINGH: Chief Administrative OfficerConstructionII
Government of India Press, Ring Road, Mayapuri, New Delhi110064: Government printing press
Controller of Publications, Delhi110054: Publisher
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
ससीी..जजीी..--डडीी..एएलल..--अअ..--1166006622002255--226633888888
CCGG--DDxLLx--xEEG--I11D66H00x66x22x00 2255--226633888888
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण्ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 2573] नई दिल्ली, िुक्रवार, िनू 13, 2025/ज्य ष्े ठ 23, 1947
No. 2573] NEW DELHI, FRIDAY, JUNE 13, 2025/JYAISHTHA 23, 1947
[ ]
ubZ fnYyh] 11 twu] 2025
.—dsUnzh; ljdkj] jys vf/kfu;e] 1989 ¼1989 dk 24½ ¼ftls bles a blds i'pkr~ mDr vf/kfu;e
dgk tkrk gS½ dh /kkjk 20d ds [kaM ¼1½ }kjk iznRr 'kfDr;ks a dk iz;ksx djrs gq,] ;g lek/kku gks tku s ds i'pkr~ fd
yksd iz;kstu ds fy,] ,slh Hkwfe dk] ftldk laf{kIr fooj.k blls mikc) vuqlwph eas fn;k x;k gS] jkT; ds
ftys ds dk'kh eas izLrkfor gsrq visf{kr gS] ,slh Hkwfe dk vtZu djus eas
viu s vk'k; dh ?kks"k.kk djrh gS(
mDr Hkwfe eas fgrc) dksbZ O;fDr] bl vf/klwpuk ds jkti= eas izdk'ku dh rkjh[k ls rhl fnu dh vof/k ds Hkhrj]
mDr vf/kfu;e dh /kkjk 20?k dh mi&/kkjk ¼1½ ds v/khu iwoksZDr iz;kstu ds fy, ,slh Hkwfe ds vtZu vkSj mi;ksx ds laca/k
eas vk{ksi dj ldsxk(
,slk izR;sd vk{ksi] l{ke izkf/kdkjh] vFkkZr ~ fo'ks"k Hkwfe v/;kfIr vf/kdkjh] okjk.klh+] mRRkj izns'k dks fyf[kr eas fd;k
tk,xk vkSj mleas mlds vk/kkj miof.kZr fd, tk;sxs rFkk l{ke izkf/kdkjh] vk{ksidrkZ dks O;fDrxr :i ls ;k fof/k
O;olk;h ds ek/;e ls lquokbZ dk volj iznku djxs k vkSj ,sl s lHkh vk{ksiks a dh lquokbZ djus rFkk ,slh vkSj tkWp] ;fn
dksbZ gks] djus ds i'pkr~] tks l{ke izkf/kdkjh vko';d le>s] vkns'k }kjk] vk{ksika s dks ;k rks vuqKkr ;k vuuqKkr dj
ldsxk(
mDr vf/kfu;e dh /kkjk 20?k dh mi&/kkjk ¼1½ ds v/khu l{ke izkf/kdkjh }kjk fd;k x;k dksbZ vksn'k vfUre gksxk(
bl vf/klwpuk ds v/khu vku s okyh Hkwfe dk j[s kkad vkSj vU; C;kSj s miyC/k gS vkSj fgrc) O;fDr }kjk mudk l{ke
izkf/kdkjh ds iwoksZDr dk;kZy; eas fujh{k.k fd;k tk ldrk gSA
3873 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6 7
1 okjk.klh lnj ¼1½ iyxa 'kghn 26 vakf'kd 0.0920
27 vakf'kd 0.0592
28 lEiw.kZ 0.2100
29 vakf'kd 0.2435
0.6047
¼2½ HknÅ 112 vakf'kd 0.0200
113 vakf'kd 0.0984
101 vakf'kd 0.0112
121 vakf'kd 0.1312
122 vakf'kd 0.0225
123 lEiw.kZ 0.0040
0.2873
¼3½ dTtkdiqj 329 vakf'kd 0.0160
346 vakf'kd 0.0240
379 vakf'kd 0.0028
380 lEiw.kZ 0.0450
381 vakf'kd 0.1020
382 vakf'kd 0.2473
0.4371
¼4½ vejiqj 72 vakf'kd 0.0020
73 vakf'kd 0.0338
77 vakf'kd 0.0163
79 vakf'kd 0.0816
123 vakf'kd 0.0463
0.1800
1.5091
[Qk- la- 190&W/Land/Kashi/BSB-I]
“;ke flag] eq[; iz'kklfud vf/kdkjh@fuekZ.k&II[भाग II—खण्ड 3(ii)] भारत का रािपत्र : असाधारण 3
MINISTRY OF RAILWAYS
[Northern Railways (Construction Organization)]
NOTIFICATION
New Delhi, the 11th June, 2025
S.O.. 2637(E).—In exercise of he powers conferred by sub-section (1) of Section 20A of the Railways
Act, 1989 (24 of 1989), (hereinafter referred to as the said Act), the Central Government, after being satisfied that for
the public purpose, the land, the brief description of which has been given in the Schedule annexed hereto, is required
for construction of proposed "Kashi Railway Station'' in District-Varanasi in the State of Uttar Pradesh, hereby
declares its intention to acquire such land.
Any person interested in the said land may, within thirty days from the date of publication of this notification in
the Official Gazette, raise objection to the acquisition and use of such land for the aforesaid purpose under sub-section
(1) of section 20D of the said Act.
Every such objection shall be made to the competent authority, namely, Special Land Acquistion officer,
Varanasi, Uttar Pradesh in writing and shall set out the grounds thereof and the competent authority shall give the
objector an opportunity of being heard, either in person or by legal practitioner, and may, after hearing all such
objections and after making such further enquiry, if any, as the competent authority thinks necessary, by order, either
allow or disallow the objections.
Any order made by the competent authority under sub-section (2) of section 20D of the said Act shall be final.
The land plans and other details of the land covered under this notification are available and can be inspected by
the interested person at the aforesaid office of the competent authority.
SCHEDULE
Brief Description of the land to be acquired, with or without structure, falling within the proposed construction
of Kashi Railway Station in District-Varanasi in the State of Uttar Pradesh
Sl Name of Name of Name of Village Plot No. Affected Plot Affected Area
No. District Tehsil (Full/Part) (Hectare)
1 2 3 4 5 6 7
1 Varanasi Sadar (1) Palang Shaheed 26 Part 0.0920
27 Part 0.0592
28 Full 0.2100
29 Part 0.2435
Total 0.6047
(2) Bhadau 112 Part 0.0200
113 Part 0.0984
101 Part 0.0112
121 Part 0.1312
122 Part 0.0225
123 Full 0.0040
Total 0.2873
(3) Kazzakpur 329 Part 0.0160
346 Part 0.0240
379 Part 0.0028
380 Full 0.0450
381 Part 0.10204 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
382 Part 0.2473
Total 0.4371
(4) Amarpur 72 Part 0.0020
73 Part 0.0338
77 Part 0.0163
79 Part 0.0816
123 Part 0.0463
Total 0.1800
Grand Total 1.5091
[F. No. 190-W/Land/Kashi/BSB-I]
SHYAM SINGH, Chief Administrative Officer/Construction-II
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.