Publication of E Gazette Notification for Nomination of Competent Authority under Section 7A for land acquisition Proposed Construction of ROB and RUB 4 nos in lieu of Level Crossing Gates in the jurisdiction of Bhusawal division Taluka Chalisgaon Dist Jalgaon central Railway under Railway Amendment Act 2008
## Policy Analysis Report: Railway Amendment Act 2008 - Authorization of Competent Authority for ROB Construction
**1. Executive Summary:**
This report analyzes a notification pertaining to the Railway Amendment Act 2008, specifically concerning the authorization of a Competent Authority for a special railway project. The project involves the proposed construction of a Road Over Bridge (ROB) in lieu of Level Crossing Gate no. 120 in the Bhusawal Division of Central Railway. The core purpose of this notification is to designate a Deputy Collector Land Acquisition as the Competent Authority to perform functions related to the execution, maintenance, management, and operation of this specific railway project. Key findings indicate a focus on streamlining land acquisition and project execution by delegating authority to a local official.
**2. Introduction:**
This report aims to provide a comprehensive overview of a notification regarding the Railway Amendment Act 2008, based solely on the information contained within the provided text. The report details the authorization of a Competent Authority for a specific railway project involving the construction of a Road Over Bridge.
**3. Policy Overview:**
* **Amendment:** This is an amendment related to clause 7A of the Railway Amendment Act 2008 which is linked to Section 2 of the Railways Act, 1989.
* **Core Objective(s):** The core objective of this notification is to authorize a specific officer to act as the Competent Authority for the execution, maintenance, management, and operation of the special railway project, namely the construction of a ROB in lieu of a level crossing. This appears to be related to land acquisition required for the construction of the new ROB.
**4. Background and Rationale:**
This notification likely amends the implementation of the Railway Amendment Act 2008 by clarifying or specifying the individual responsible for carrying out specific tasks related to land acquisition for railway projects. The amendment likely stems from a need to expedite project execution by empowering a local authority familiar with the region and associated land acquisition processes. The switch from a Level Crossing Gate to a ROB indicates a probable safety and/or efficiency upgrade.
**5. Key Provisions / Changes:**
This notification introduces the following key change:
* **Specific Part of Original Policy Being Changed:** While the original policy section isn't entirely clear from the limited text, this notification clarifies *who* is the Competent Authority under Clause 7A of the Railway Amendment Act 2008 for *this specific* project.
* **New Rule/Provision:** The notification designates the "Deputy Collector Land Acquisition, Chalisgaon" as the Competent Authority for the ROB project.
* **Effect of Change:** This delegation of authority likely aims to streamline the land acquisition process and facilitate smoother project execution by empowering a local official to handle the necessary tasks. It also creates clear accountability for this aspect of the project.
**6. Target Audience and Stakeholders:**
Based on the text, the primary target audience and stakeholders include:
* **Central Railway officials:** Specifically, those involved in the Bhusawal Division and the Igatpuri Bhusawal section.
* **The Deputy Collector Land Acquisition, Chalisgaon:** As the designated Competent Authority, this individual is directly affected by the notification.
* **Residents of Chalisgaon and Vagali:** Likely impacted by the land acquisition, construction, and eventual operation of the ROB.
* **Railway Passengers:** Who will ultimately benefit from the increased safety/efficiency of replacing a Level Crossing with a ROB.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Central Government (Ministry of Railways) is the issuing authority. Central Railway, specifically the Bhusawal Division, is responsible for project implementation. The Deputy Collector Land Acquisition, Chalisgaon is responsible for actions under the Railways Act.
* **Timelines or Procedures:** The notification takes effect from the date of publication in the Official Gazette. No specific procedures are detailed in the text, but the Competent Authority will likely follow established land acquisition procedures under relevant legislation.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcome of this amendment is to expedite the construction of the ROB by streamlining the land acquisition process. It is expected that this will lead to:
* Faster project completion.
* Improved coordination between railway authorities and local administration.
* Reduced delays related to land acquisition.
* Ultimately, enhanced safety and efficiency in the affected railway section.
**9. Conclusion:**
The notification regarding the Railway Amendment Act 2008 represents a targeted effort to improve the efficiency of railway project implementation. By designating a local official as the Competent Authority for the ROB construction project, the government aims to streamline land acquisition and facilitate smoother project execution. The change reflects a commitment to improving railway infrastructure and safety. The limited text provides a snapshot of a larger initiative. Further documentation regarding the overall project scope and budget would provide a more complete picture.
Key Entities Referenced
2004: Year of publication.
MAY 8, 2025: Date of the gazette notification.
VAISAKHA 18, 1947: Date according to the Indian national calendar.
Railway Amendment Act 2008: Act being amended.
S.O. 2049E: Statutory Order number.
Railways Act, 1989: Reference to the Railways Act, 1989.
24 of 1989: Act number and year of the Railways Act.
Central Government: The authorizing body.
Official Gazette: The official publication for the notification.
special railway project Proposed construction of ROB in lieu of Level Crossing Gates no. 120: Description of the special railway project.
Railway Km 330810: Railway kilometer marker.
Chalisgaon Vagali: Block section of railway.
Igatpuri Bhusawal section: Railway section.
Bhusawal Division: Railway division.
Chalisgaon: Taluka mentioned in the table.
Deputy Collector Land Acquisition, Chalisgaon: Competent Authority.
Jalgaon: District in which Chalisgaon is located.
F. No. G197BSLdivROBRUBLC120Chalisgaon7A: File number.
AVANISH KUMAR PANDEY: Chief Administrative Officer Construction.
Government of India Press, Ring Road, Mayapuri, New Delhi110064: Place of printing.
Controller of Publications, Delhi110054: Publisher of the document.
MINISTRY OF RAILWAYS: The ministry issuing the notification.
Central Railway: Railway zone.
Mumbai: City where the notification was issued from.
6th May, 2025: Date of notification.
New Delhi: Place of Publication.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-एम.एच.-अ.-08052025-262986
CG-MxHx-xEG-I0D8H0x5x2x0 25-262986
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण्ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 2004] नई कदलली, बहृ स्ट्प जतवार, मई 8, 2025/विै ाख 18, 1947
No. 2004] NEW DELHI, THURSDAY, MAY 8, 2025/VAISAKHA 18, 1947
रेल मत्रं ालय
(मध्य रेलव)े
अजधसचू ना
म ंबई, 6 मई, 2025
रेलव े(सिं ोधन) अजधजनयम 2008 की धारा 7A के तहत।
का.आ. 2049(अ).— केन्द्रीय सरकार, रेल अजधजनयम, 1989 (1989 का 24) की धारा 2 के खडं (7 क) द्वारा प्रदत्त
िजियों का प्रयोग करत े हुए, इस अजधसूचना के रािपत्र म ें प्रकािन की तारीख से नीचे दी गई सारणी के स्ट्तंभ (3) म ें
उजललजखत तालक ा के संबंध में, “मध्य रेलवे के अंतगगत “भस ावल मडं ल के इगतपर ी-भस ावल खडं के बीच चालीसगावं -वागली
ब्लॉक खडं , रेलव े ककमी 330/8-10, लवे ल क्रॉससगं गटे सख्ं या 120 के स्ट्थान पर आरओबी का प्रस्ट्ताजवत जनमाणग ” की जविेष
रेल पररयोिना के भूजम अजधग्रहण करने हते महाराष्ट्र राज्य के िलगावं जिला म ेंजनष्पादन, अन रक्षण, प्रबंधन, और संचालन
के लोक प्रयोिन के जलए नीच े दी गई सारणी के स्ट्तम्भ (2) में उललेजखत अजधकारी को उि अजधजनयम के अधीन ऐस े
प्राजधकारी के रूप में कृत्यों का जनवगहन करने के जलए सक्षम प्राजधकारी के रूप म ेंप्राजधकृत करती ह ै|
3027 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
सारणी
क्रम सक्षम प्राजधकारी तालक ा जिला
सख्ं या
(1) उप कलेक्टर (भूजम अजधग्रहण), चालीसगांव चालीसगांव िलगांव
[फा. स.ं G197/BSLdiv/ROB&RUB/LC120/Chalisgaon/7A]
अवनीि क मार पाण्डेय, म ख्य प्रिासजनक अजधकारी (जनमागण)
MINISTRY OF RAILWAYS
(Central Railway)
NOTIFICATION
Mumbai, the 6th May, 2025
Under clause 7A of the Railway (Amendment) Act 2008
S.O. 2049(E).— In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989
(24 of 1989), the Central Government hereby authorize the officer mentioned in column (2) of the table below as
“Competent Authority” to perform the functions as such authority under the said Act with effect from the date of
publication of this notification in the Official Gazette in respect of the special railway project “Proposed construction
of ROB in lieu of Level Crossing Gates no. 120, Railway Km 330/8-10, block section Chalisgaon- Vagali between
Igatpuri- Bhusawal section of Bhusawal Division” Taluka Mentioned in Column (3) of the said table for the public
purpose of execution maintenance, Management and operation of such special Railway Project.
TABLE
Sr. No. Competent Authority Taluka District
(1) Deputy Collector (Land Acquisition), Chalisgaon Chalisgaon Jalgaon
[F. No. G197/BSLdiv/ROB&RUB/LC120/Chalisgaon/7A]
AVANISH KUMAR PANDEY, Chief Administrative Officer (Construction)