Executive Summary & Key Takeaways
## Policy Analysis Report: Acquisition of Right of User for Kandla to Gorakhpur LPG Pipeline Project (Uttar Pradesh)
**1. Executive Summary:**
This report analyzes a government notification regarding the acquisition of the Right of User (ROU) in land in the state of Uttar Pradesh for the Kandla to Gorakhpur LPG Pipeline Project by IHB Limited. The core purpose, as stated in the notification, is to facilitate the transportation of petroleum products (LPG) through the establishment of a pipeline. The key finding is that the government intends to acquire ROU in specific land parcels identified in the schedule attached to the notification and provides a process for landowners to object to the acquisition.
**2. Introduction:**
This report aims to provide an informative overview of a government notification pertaining to the Kandla to Gorakhpur LPG Pipeline Project in Uttar Pradesh, based solely on the provided text. The report analyzes the policy's objectives, provisions, and potential impacts on affected stakeholders.
**3. Policy Overview:**
This is a new policy directly related to land acquisition for a specific infrastructure project.
* **Core Objective(s):** As stated in the notification, the core objective is to facilitate the transportation of petroleum products (LPG) in the state of Uttar Pradesh by laying a pipeline from Kandla to Gorakhpur. This aims to improve energy infrastructure and accessibility within the region.
**4. Background and Rationale:**
The policy addresses the need for a robust and efficient infrastructure for transporting petroleum products. The construction of the Kandla to Gorakhpur LPG Pipeline Project suggests an effort to improve the supply and distribution of LPG in Uttar Pradesh. The policy directly tackles a specific obstacle: securing the necessary land rights (ROU) to construct the pipeline.
**5. Key Provisions:**
The notification outlines the following key provisions:
* **Declaration of Intent:** The Central Government declares its intention to acquire the Right of User (ROU) in the land described in the attached schedule.
* **Project Authority:** IHB Limited is responsible for implementing the Kandla to Gorakhpur LPG Pipeline Project.
* **Land Identification:** The schedule lists specific land parcels by District (Raebareli and DALMAU), Tehsil, Village, and Survey Number, along with the area to be acquired in Hectares, Are, and Square Meters.
* **Objection Mechanism:** Any person with an interest in the specified land can submit objections in writing to the Competent Authority (Additional District Magistrate Executive, Raebareli, IHB Limited, KandlaGorakhpur LPG Pipeline KGPL, Dist.Raebareli UP) within twenty-one days from the date the notification is made available to the general public.
* **Legal Basis:** The notification is issued in exercise of powers conferred by subsection 1 of Section 3 of the Petroleum and Minerals Pipeline (Acquisition of Right of User in Land) Act, 1962 (50 of 1962).
**6. Target Audience and Stakeholders:**
The primary target audience and stakeholders are:
* Landowners in the District Raebareli and DALMAU of Uttar Pradesh whose land falls within the identified survey numbers.
* IHB Limited, as the implementing agency for the pipeline project.
* The Central Government, specifically the Ministry of Petroleum and Natural Gas.
* The general public in the region who will benefit from improved access to LPG.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Petroleum and Natural Gas is responsible for issuing the notification. IHB Limited is responsible for implementing the project and dealing with land acquisition issues. The Additional District Magistrate Executive, Raebareli, is designated as the Competent Authority to receive and process objections.
* **Timelines:** Landowners have twenty-one days from the date the notification is made available to the public to submit objections.
* **Procedures:** The notification outlines a procedure for landowners to submit objections in writing to the Competent Authority. The details of how the objections will be processed and resolved are not specified in this document.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes of this policy are:
* Facilitation of the Kandla to Gorakhpur LPG Pipeline Project.
* Acquisition of necessary land rights (ROU) for the pipeline construction.
* Improved infrastructure for transporting petroleum products (LPG) in Uttar Pradesh.
* Enhanced availability and accessibility of LPG to consumers in the region.
* Economic development and industrial growth in the region due to improved energy infrastructure.
**9. Conclusion:**
The government notification regarding the acquisition of ROU for the Kandla to Gorakhpur LPG Pipeline Project in Uttar Pradesh is a crucial step toward improving energy infrastructure in the region. The policy establishes a clear process for acquiring land rights, while also providing a mechanism for landowners to raise objections. Successful implementation of this policy will likely lead to enhanced LPG accessibility, economic development, and industrial growth in Uttar Pradesh.
Key Entities Referenced
NEW DELHI : Place of notification publication.
Ministry of Petroleum and Natural Gas : The ministry responsible for the notification.
Uttar Pradesh : The state in which the pipeline is to be laid.
Kandla to Gorakhpur LPG Pipeline Project : The name of the pipeline project.
IHB Limited : The company implementing the Kandla to Gorakhpur LPG Pipeline Project.
Petroleum and Minerals Pipeline Acquisition of Right of user in Land Act, 1962 : The law under which the land is being acquired.
Raebareli : District in Uttar Pradesh where land acquisition is taking place for the pipeline project.
KGPL : Abbreviation for KandlaGorakhpur LPG Pipeline.
LALGANJ : Tehsil in Raebareli district, Uttar Pradesh.
DALMAU : Tehsil in Raebareli district, Uttar Pradesh.
Government of India Press, Ring Road, Mayapuri, New Delhi-110064 : Place of printing
Controller of Publications, Delhi-110054 : Publisher of the gazette
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-22032022-234361
xxxGIDHxxx
CG-DL-E-22032022-234361
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1189] नई दिल्ली, सोमवार, माच च21, 2022/फाल्ग नु 30, 1943
No. 1189] NEW DELHI, MONDAY, MARCH 21, 2022/PHALGUNA 30, 1943
परे ोजलयम और प्राकृजतक गसै मत्रं ालय
अजधसचू ना
नई दिल् ली, 15 माचच, 2022
का.आ. 1229(अ).—केन्द्रीय सरकार को ऐसा प्रतीत होता ह ै दक लोकजहत म ें यह आवश्यक ह ै दक उत्तर प्रिेि
राज्य म ें पेरोजलयम पिार्थो के पररवहन के जलए काण्डला (गुिरात) स े गोरखपुर (उ०प्र०) एल०पी०िी० पाइप लाइन
पररयोिना के दियान्द्वयन हते ु आई॰एच॰बी॰ जलजमटेड द्वारा पाइप लाइन जबछाई िाना आवश्यक ह।ै
केन्द्रीय सरकार को ऐसी पाइप लाइन जबछाने के प्रयोिन के जलए यह आवश्यक प्रतीत होता ह ै दक उस भूजम म ें
जिस के भीतर उक्त पाइप लाइन जबछाई िाने का प्रस्ट्ताव ह ै और िो इस अजधसूचना से संलग्न अनुसूची में वर्णचत ह,ै
उपयोग के अजधकार का अिचन दकया िाए।
अतः अब, केन्द्रीय सरकार, परे ोजलयम और खजनि पाइप लाइन (भूजम में उपयोग के अजधकार का अिचन)
अजधजनयम 1962 (1962 का 50) की धारा 3 की उपधारा (1) द्वारा प्रित्त िजक्तयों का प्रयोग करते हुए, उस भूजम म ें
उपयोग के अजधकार का अिचन करन े के अपन े आिय की घोषणा करती ह।ै
कोई व्यजक्त, िो उक्त अनुसूची म ें वर्णचत भूजम स े जहतबद्ध ह,ै उस तारीख स,े जिसको इस अजधसूचना स े युक्त भारत
के रािपत्र की प्रजतयााँ भूजम स े जहतबद्ध व्यजक्तयों को उपलब्ध करा िी िाती ह,ै इक्कीस दिन के भीतर भूजम के नीच े पाइप
लाइन जबछाये िाने हते ु उसमें उपयोग के अजधकार के अिचन के संबंध में सक्षम प्राजधकारी / अपर जिलाजधकारी (प्रिासन),
रायबरेली / आई॰एच॰बी॰ जलजमटेड, काण्डला-गोरखपुर एल०पी०िी० पाइप लाइन पररयोिना (के०िी०पी०एल०),
जिला-रायबरेली (उत्तरप्रिेि) को जलजखत रूप में आक्षेप भेि सकेगा।
1898 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
अनसु चू ी
जिला : रायबरेली राज्य : उत्तर प्रिेि
क्षत्रे फल
तहसील गावाँ सव ेन ं
हक्े टेयर आर वग च मीटर
1 2 3 4 5 6
लालगिं रमवु ा परु िबु ई 365 00 05 39
367 00 03 66
366 00 00 20
373 00 02 32
371 00 03 05
372 00 01 27
374 00 12 32
645 00 07 83
646 00 07 20
663 00 25 91
662 00 00 92
644 00 01 24
640 00 08 44
647 00 01 43
661 00 00 20
639 00 15 19
1220 00 01 49
1224 00 05 32
1223 00 09 19
1229 00 00 46
1230 00 06 51
1231 00 04 78
1233 00 04 45
1234 00 04 45
1236 00 03 64
1237 00 01 58
1232 00 00 78
लालगिं समे री 1680 00 05 81[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
1 2 3 4 5 6
1678 00 01 75
1677 00 13 57
1696 00 01 94
1714 00 06 89
1713 00 01 58
1712 00 01 70
1711 00 03 72
1709 00 03 13
1710 00 02 45
1708 00 01 26
लालगिं चकगिराि 15 00 09 47
16 00 03 24
17 00 04 94
18 00 01 51
23 00 00 27
59 00 20 22
89 00 04 65
90 00 00 31
57 00 06 66
58 00 00 54
56 00 00 19
लालगिं चकफेरिाह 48 00 00 41
52 00 00 28
49 00 01 71
50 00 02 78
51 00 01 44
54 00 07 05
55 00 00 91
57 00 00 83
56 00 04 46
62 00 01 514 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
61 00 01 95
63 00 09 83
209 00 00 99
208 00 07 73
210 00 00 27
203 00 02 14
230 00 03 59
229 00 00 31
228 00 02 37
227 00 00 40
216 00 02 22
218 00 06 69
217 00 00 72
219 00 00 21
220 00 01 32
223 00 00 59
224 00 00 77
225 00 01 35
222 00 01 32
221 00 01 64
लालगिं लच्छीपरु 420 00 33 08
419 00 06 89
412 00 05 03
427 00 02 44
428 00 00 35
410 00 05 47
409 00 03 26
407 00 04 40
404 00 05 17
403 00 03 65
402 00 00 42
399 00 05 17[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 5
1 2 3 4 5 6
400 00 02 69
401 00 01 23
385 00 01 16
384 00 06 35
383 00 12 73
378 00 02 99
382 00 00 96
511 00 00 20
514 00 00 20
541 00 04 59
542 00 03 76
543 00 05 39
544 00 00 64
550 00 01 29
551 00 00 24
554 00 14 09
555 00 00 35
556 00 02 35
557 00 00 33
559 00 13 44
560 00 02 76
570 00 00 33
564 00 02 52
565 00 01 77
569 00 00 96
568 00 05 77
567 00 06 66
572 00 03 58
573 00 01 31
574 00 07 31
577 00 01 10
578 00 02 736 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
लालगिं श्यामपरु 381 00 00 40
380 00 00 32
378 00 00 49
376 00 10 34
377 00 01 47
339 00 00 40
338 00 08 34
335 00 00 31
333 00 00 59
334 00 05 37
332 00 00 43
330 00 04 91
329 00 00 42
328 00 00 74
344 00 09 92
345 00 02 00
325 00 00 57
323 00 00 20
324 00 02 41
349 00 00 27
358 00 00 27
356 00 03 31
355 00 06 78
271 00 04 97
270 00 05 12
268 00 08 14
367 00 04 34
436 00 02 08
437 00 11 94
444 00 00 23
448 00 08 81
449 00 04 02
451 00 00 35[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 7
1 2 3 4 5 6
455 00 13 21
466 00 00 29
463 00 08 32
465 00 00 30
577 00 00 20
584 00 00 89
581 00 04 10
580 00 01 39
579 00 02 21
576 00 00 25
574 00 07 55
575 00 00 82
571 00 00 36
570 00 01 30
569 00 03 60
556 00 00 27
554 00 02 83
555 00 05 83
552 00 16 30
551 00 05 58
550 00 10 38
[फा. सं. आर-11025(15)/6/2020-ओआर-I/(ई-33882)]
पी. सोमाकुमार, अवर सजचव
MINISTRY OF PETROLEUM AND NATURAL GAS
NOTIFICATION
New Delhi, the 15th March, 2022
S.O. 1229(E).—Whereas, it appears to the Central Government, that it is necessary in the public interest that
for the transportation of the petroleum product in the state of Uttar Pradesh Pipeline should be laid for implementing
of Kandla to Gorakhpur LPG Pipeline Project by the IHB Limited.
And whereas it appears to the Central Government that for the purpose of laying the said pipeline. It is
necessary to acquire the right of user (ROU) in the land under which the said pipeline is proposed to be laid, and
which is described in the Schedule annexed to this notification.
Now therefore, in exercise of the powers conferred by sub section (1) of Section 3 of the Petroleum and
Minerals Pipeline (Acquisition of Right of user in Land) Act, 1962 (50 of 1962), The Central Government hereby
declares its intention to acquire the right of user there in;
Any person interested in the land described in the said schedule, may submit objection in writing to
Competent Authority / Additional District Magistrate (Executive), Raebareli, IHB Limited, Kandla-Gorakhpur LPG8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
Pipeline (KGPL), Dist.-Raebareli (UP) within twenty one days from the date on which the copies of the notification
issued under sub-section (1) of section 3 of the said Act, as published in the Gazette of India, are made available to the
general public.
SCHEDULE
District : Raebareli State : Uttar Pradesh
Area
Tehsil Village Survey No.
Hect.-Are - Sq. mtr.
1 2 3 4 5 6
LALGANJ RAMUWA PUR DUBAI 365 00 05 39
367 00 03 66
366 00 00 20
373 00 02 32
371 00 03 05
372 00 01 27
374 00 12 32
645 00 07 83
646 00 07 20
663 00 25 91
662 00 00 92
644 00 01 24
640 00 08 44
647 00 01 43
661 00 00 20
639 00 15 19
1220 00 01 49
1224 00 05 32
1223 00 09 19
1229 00 00 46
1230 00 06 51
1231 00 04 78
1233 00 04 45
1234 00 04 45
1236 00 03 64
1237 00 01 58
1232 00 00 78
LALGANJ SEMARI 1680 00 05 81
1678 00 01 75
1677 00 13 57
1696 00 01 94
1714 00 06 89
1713 00 01 58[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 9
1 2 3 4 5 6
1712 00 01 70
1711 00 03 72
1709 00 03 13
1710 00 02 45
1708 00 01 26
LALGANJ CHAKGAJRAJ 15 00 09 47
16 00 03 24
17 00 04 94
18 00 01 51
23 00 00 27
59 00 20 22
89 00 04 65
90 00 00 31
57 00 06 66
58 00 00 54
56 00 00 19
LALGANJ CHAKPHER SHAH 48 00 00 41
52 00 00 28
49 00 01 71
50 00 02 78
51 00 01 44
54 00 07 05
55 00 00 91
57 00 00 83
56 00 04 46
62 00 01 51
61 00 01 95
63 00 09 83
209 00 00 99
208 00 07 73
210 00 00 27
203 00 02 14
230 00 03 59
229 00 00 31
228 00 02 37
227 00 00 40
216 00 02 22
218 00 06 69
217 00 00 72
219 00 00 2110 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
220 00 01 32
223 00 00 59
224 00 00 77
225 00 01 35
222 00 01 32
221 00 01 64
LALGANJ LACHHIPUR 420 00 33 08
419 00 06 89
412 00 05 03
427 00 02 44
428 00 00 35
410 00 05 47
409 00 03 26
407 00 04 40
404 00 05 17
403 00 03 65
402 00 00 42
399 00 05 17
400 00 02 69
401 00 01 23
385 00 01 16
384 00 06 35
383 00 12 73
378 00 02 99
382 00 00 96
511 00 00 20
514 00 00 20
541 00 04 59
542 00 03 76
543 00 05 39
544 00 00 64
550 00 01 29
551 00 00 24
554 00 14 09
555 00 00 35
556 00 02 35
557 00 00 33
559 00 13 44
560 00 02 76
570 00 00 33[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 11
1 2 3 4 5 6
564 00 02 52
565 00 01 77
569 00 00 96
568 00 05 77
567 00 06 66
572 00 03 58
573 00 01 31
574 00 07 31
577 00 01 10
578 00 02 73
LALGANJ SHYAMPUR 381 00 00 40
380 00 00 32
378 00 00 49
376 00 10 34
377 00 01 47
339 00 00 40
338 00 08 34
335 00 00 31
333 00 00 59
334 00 05 37
332 00 00 43
330 00 04 91
329 00 00 42
328 00 00 74
344 00 09 92
345 00 02 00
325 00 00 57
323 00 00 20
324 00 02 41
349 00 00 27
358 00 00 27
356 00 03 31
355 00 06 78
271 00 04 97
270 00 05 12
268 00 08 14
367 00 04 34
436 00 02 08
437 00 11 94
444 00 00 2312 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
448 00 08 81
449 00 04 02
451 00 00 35
455 00 13 21
466 00 00 29
463 00 08 32
465 00 00 30
577 00 00 20
584 00 00 89
581 00 04 10
580 00 01 39
579 00 02 21
576 00 00 25
574 00 07 55
575 00 00 82
571 00 00 36
570 00 01 30
569 00 03 60
556 00 00 27
554 00 02 83
555 00 05 83
552 00 16 30
551 00 05 58
550 00 10 38
[F. No. R-11025(15)/6/2020-OR-I/(E-33882)]
P. SOMAKUMAR, Under Secy.
अजधसचू ना
नई दिल् ली, 15 माच,च 2022
का.आ.॰1230(अ).—केन्द्रीय सरकार को ऐसा प्रतीत होता ह ै दक लोकजहत म ें यह आवश्यक ह ै दक उत्तर प्रिेि
राज्य म ें पेरोजलयम पिार्थो के पररवहन के जलए काण्डला (गुिरात) स े गोरखपुर (उ०प्र०) एल०पी०िी० पाइप लाइन
पररयोिना के दियान्द्वयन हते ु आई॰एच॰बी॰ जलजमटेड द्वारा पाइप लाइन जबछाई िाना आवश्यक ह।ै
केन्द्रीय सरकार को ऐसी पाइप लाइन जबछाने के प्रयोिन के जलए यह आवश्यक प्रतीत होता ह ै दक उस भूजम म ें
जिस के भीतर उक्त पाइप लाइन जबछाई िाने का प्रस्ट्ताव ह ै और िो इस अजधसूचना से संलग्न अनुसूची में वर्णचत ह,ै
उपयोग के अजधकार का अिचन दकया िाए।
अतः अब, केन्द्रीय सरकार, पेरोजलयम और खजनि पाइप लाइन (भूजम में उपयोग के अजधकार का अिचन)
अजधजनयम 1962 (1962 का 50) की धारा 3 की उपधारा (1) द्वारा प्रित्त िजक्तयों का प्रयोग करते हुए, उस भूजम म ें
उपयोग के अजधकार का अिचन करन े के अपन े आिय की घोषणा करती ह।ै
कोई व्यजक्त, िो उक्त अनुसूची म ें वर्णचत भूजम स े जहतबद्ध ह,ै उस तारीख स,े जिसको इस अजधसूचना स े युक्त भारत
के रािपत्र की प्रजतयााँ भूजम स े जहतबद्ध व्यजक्तयों को उपलब्ध करा िी िाती ह,ै इक्कीस दिन के भीतर भूजम के नीच े पाइप
लाइन जबछाये िाने हते ु उसमें उपयोग के अजधकार के अिचन के संबंध में सक्षम प्राजधकारी / अपर जिलाजधकारी (प्रिासन),[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 13
रायबरेली / आई॰एच॰बी॰ जलजमटेड, काण्डला-गोरखपुर एल०पी०िी० पाइप लाइन पररयोिना (के०िी०पी०एल०),
जिला-रायबरेली (उत्तरप्रिेि) को जलजखत रूप म ें आक्षेप भेि सकेगा।
अनसु चू ी
जिला : रायबरेली राज्य : उत्तर प्रिेि
क्षत्रे फल
तहसील गावाँ सव ेन ं
हक्े टेयर आर वग च मीटर
1 2 3 4 5 6
डलमऊ ऐहार 1492 00 06 70
1490 00 06 06
1489 00 00 20
1491 00 00 87
1482 00 00 21
1481 00 00 29
1472 00 03 84
1473 00 11 25
1471 00 02 48
1462 00 00 20
1461 00 01 44
1458 00 01 43
1474 00 10 57
1478 00 00 69
1497 00 01 00
1518 00 07 64
1517 00 00 20
1516 00 06 51
1521 00 01 07
1528 00 00 26
1530 00 06 54
1531 00 06 92
1553 00 04 61
1551 00 03 97
1552 00 00 20
1550 00 04 63
1548 00 02 1314 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
1541 00 06 97
1547 00 00 20
1890 00 01 29
1994 00 04 05
1995 00 04 78
1980 00 08 94
2019 00 01 49
2000 00 11 99
2001 00 07 00
2002 00 05 13
1979 00 06 89
1977 00 11 32
1975 00 00 20
1976 00 04 89
2020 00 25 80
2032 00 00 50
2033 00 07 53
2031 00 05 17
2030 00 00 20
2039 00 07 79
2058 00 01 03
2059 00 00 20
डलमऊ रनमऊ 226 00 04 38
224 00 02 80
223 00 00 78
225 00 04 47
229 00 02 59
228 00 01 05
258/267 00 02 55
231 00 00 26
232 00 00 20
238 00 00 35[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 15
1 2 3 4 5 6
253 00 05 79
254 00 06 78
255 00 00 20
252 00 00 62
243 00 02 87
244 00 04 74
245 00 00 82
246 00 00 34
249 00 03 56
248 00 06 37
207 00 00 20
206/A 00 05 94
206/B 00 06 28
204 00 00 20
203 00 02 66
डलमऊ सुल्तानपुर िाला 4 00 08 83
3 00 02 61
5 00 03 36
7 00 00 72
6 00 09 02
14 00 00 33
8 00 01 51
10 00 04 63
13 00 02 42
12 00 02 74
34 00 02 54
35 00 00 21
38 00 00 20
45 00 07 15
47 00 06 74
48 00 01 36
58 00 00 2016 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
248 00 13 45
60 00 05 91
62 00 16 48
66 00 01 03
245 00 05 13
247 00 00 20
244 00 05 25
243 00 00 20
239 00 00 20
238 00 09 23
255 00 00 94
236 00 00 20
235 00 09 92
281 00 00 20
256 00 00 20
280 00 09 09
279 00 06 77
267 00 00 20
278 00 14 46
277 00 00 20
332 00 01 30
333 00 03 52
334 00 06 83
339 00 03 32
328 00 13 46
348 00 13 04
350 00 14 31
349 00 00 20
354 00 00 71
डलमऊ रामपुर मिरे ऐहार 10 00 06 82
8 00 05 38
9 00 07 08[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 17
1 2 3 4 5 6
7 00 00 20
36 00 04 97
37 00 07 20
35 00 06 78
34 00 14 12
26 00 00 48
32 00 00 20
30 00 00 65
31 00 02 85
29 00 00 46
169 00 07 57
172 00 04 52
176 00 00 20
177 00 02 75
178 00 10 70
247 00 02 41
डलमऊ िेवगााँव 851 00 11 70
844 00 01 67
845 00 03 29
847 00 03 02
846 00 01 06
849 00 06 80
856 00 09 88
857 00 00 20
866 00 06 24
865 00 04 05
862 00 05 65
861 00 13 41
887 00 01 75
950 00 04 42
डलमऊ लोिीपुर उतरांवा 2196 00 00 2018 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
2197 00 00 45
2208 00 01 47
2209 00 02 45
2210 00 02 15
2211 00 00 20
2212 00 04 10
2213 00 05 80
2207 00 01 46
2206 00 02 77
2205 00 04 86
2204 00 00 20
2214 00 00 65
2247 00 10 01
2255 00 00 93
2156 00 05 50
2257 00 00 20
2261 00 19 70
2260 00 00 50
2262 00 06 60
2263 00 03 49
2266 00 01 99
2268 00 14 41
2269 00 00 20
2272 00 14 43
2271/3153 00 01 19
2278 00 04 26
2298 00 01 48
2305 00 08 61
2313 00 03 90
2306 00 08 38
2309 00 00 20
2330 00 28 20
2329 00 13 39[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 19
1 2 3 4 5 6
2328 00 02 83
2393 00 00 86
2392 00 13 79
2390 00 07 92
2389 00 03 27
2387 00 00 23
2388 00 07 35
2412 00 00 67
2413 00 05 02
2415 00 01 55
2416 00 04 74
2418 00 03 45
2419 00 02 32
2427 00 03 57
2420 00 00 20
2422 00 01 39
2426 00 01 53
2423 00 08 63
2424 00 01 79
2425 00 01 42
2573 00 09 76
2541 00 12 80
2542 00 11 18
2543 00 04 63
2544 00 04 04
2547 00 00 20
2548 00 02 70
2533 00 00 37
2531 00 05 11
2549 00 00 24
2741 00 02 14
2743 00 01 31
2742 00 07 1920 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
2739 00 03 39
2767 00 04 44
2761 00 15 16
2762 00 00 20
2850 00 00 80
2848 00 08 06
2794 00 00 95
2847 00 10 70
2845 00 00 62
2797 00 12 82
2798 00 00 20
2844 00 02 86
2827 00 00 38
2826 00 02 09
2799 00 01 30
2800 00 02 94
2802 00 03 57
2801 00 01 01
2807 00 02 86
2810 00 01 40
2809 00 01 57
[फा. सं. आर-11025(15)/6/2020-ओआर-I/(ई-33882)]
पी. सोमाकुमार, अवर सजचव
NOTIFICATION
New Delhi, the 15th March, 2022
S.O. 1230(E).—Whereas, it appears to the Central Government, that it is necessary in the public interest that
for the transportation of the petroleum product in the state of Uttar Pradesh Pipeline should be laid for implementing
of Kandla to Gorakhpur LPG Pipeline Project by the IHB Limited.
And whereas it appears to the Central Government that for the purpose of laying the said pipeline. It is
necessary to acquire the right of user (ROU) in the land under which the said pipeline is proposed to be laid, and
which is described in the Schedule annexed to this notification.
Now therefore, in exercise of the powers conferred by sub section (1) of Section 3 of the Petroleum and
Minerals Pipeline (Acquisition of Right of user in Land) Act, 1962 (50 of 1962), The Central Government hereby
declares its intention to acquire the right of user there in;
Any person interested in the land described in the said schedule, may submit objection in writing to
Competent Authority / Additional District Magistrate (Executive), Raebareli, IHB Limited, Kandla-Gorakhpur LPG
Pipeline (KGPL), Dist.-Raebareli (UP) within twenty-one days from the date on which the copies of the notification[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 21
issued under sub-section (1) of section 3 of the said Act, as published in the Gazette of India, are made available to the
general public.
SCHEDULE
District : Raebareli State : Uttar Pradesh
Area
Tehsil Village Survey No.
Hect.-Are - Sq. mtr.
1 2 3 4 5 6
DALMAU AIHAR 1492 00 06 70
1490 00 06 06
1489 00 00 20
1491 00 00 87
1482 00 00 21
1481 00 00 29
1472 00 03 84
1473 00 11 25
1471 00 02 48
1462 00 00 20
1461 00 01 44
1458 00 01 43
1474 00 10 57
1478 00 00 69
1497 00 01 00
1518 00 07 64
1517 00 00 20
1516 00 06 51
1521 00 01 07
1528 00 00 26
1530 00 06 54
1531 00 06 92
1553 00 04 61
1551 00 03 97
1552 00 00 20
1550 00 04 63
1548 00 02 13
1541 00 06 97
1547 00 00 20
1890 00 01 29
1994 00 04 05
1995 00 04 78
1980 00 08 94
2019 00 01 49
2000 00 11 99
2001 00 07 00
2002 00 05 13
1979 00 06 89
1977 00 11 3222 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
1975 00 00 20
1976 00 04 89
2020 00 25 80
2032 00 00 50
2033 00 07 53
2031 00 05 17
2030 00 00 20
2039 00 07 79
2058 00 01 03
2059 00 00 20
DALMAU RANMAU 226 00 04 38
224 00 02 80
223 00 00 78
225 00 04 47
229 00 02 59
228 00 01 05
258/267 00 02 55
231 00 00 26
232 00 00 20
238 00 00 35
253 00 05 79
254 00 06 78
255 00 00 20
252 00 00 62
243 00 02 87
244 00 04 74
245 00 00 82
246 00 00 34
249 00 03 56
248 00 06 37
207 00 00 20
206/A 00 05 94
206/B 00 06 28
204 00 00 20
203 00 02 66
DALMAU SULTANPUR JALA 4 00 08 83
3 00 02 61
5 00 03 36
7 00 00 72
6 00 09 02
14 00 00 33
8 00 01 51
10 00 04 63[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 23
1 2 3 4 5 6
13 00 02 42
12 00 02 74
34 00 02 54
35 00 00 21
38 00 00 20
45 00 07 15
47 00 06 74
48 00 01 36
58 00 00 20
248 00 13 45
60 00 05 91
62 00 16 48
66 00 01 03
245 00 05 13
247 00 00 20
244 00 05 25
243 00 00 20
239 00 00 20
238 00 09 23
255 00 00 94
236 00 00 20
235 00 09 92
281 00 00 20
256 00 00 20
280 00 09 09
279 00 06 77
267 00 00 20
278 00 14 46
277 00 00 20
332 00 01 30
333 00 03 52
334 00 06 83
339 00 03 32
328 00 13 46
348 00 13 04
350 00 14 31
349 00 00 20
354 00 00 71
DALMAU RAMPUR MAJRE AIHAR 10 00 06 82
8 00 05 38
9 00 07 08
7 00 00 20
36 00 04 97
37 00 07 2024 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
35 00 06 78
34 00 14 12
26 00 00 48
32 00 00 20
30 00 00 65
31 00 02 85
29 00 00 46
169 00 07 57
172 00 04 52
176 00 00 20
177 00 02 75
178 00 10 70
247 00 02 41
DALMAU DEVGAON 851 00 11 70
844 00 01 67
845 00 03 29
847 00 03 02
846 00 01 06
849 00 06 80
856 00 09 88
857 00 00 20
866 00 06 24
865 00 04 05
862 00 05 65
861 00 13 41
887 00 01 75
950 00 04 42
DALMAU LODIPUR UTTARANWA 2196 00 00 20
2197 00 00 45
2208 00 01 47
2209 00 02 45
2210 00 02 15
2211 00 00 20
2212 00 04 10
2213 00 05 80
2207 00 01 46
2206 00 02 77
2205 00 04 86
2204 00 00 20
2214 00 00 65
2247 00 10 01
2255 00 00 93
2156 00 05 50[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 25
1 2 3 4 5 6
2257 00 00 20
2261 00 19 70
2260 00 00 50
2262 00 06 60
2263 00 03 49
2266 00 01 99
2268 00 14 41
2269 00 00 20
2272 00 14 43
2271/3153 00 01 19
2278 00 04 26
2298 00 01 48
2305 00 08 61
2313 00 03 90
2306 00 08 38
2309 00 00 20
2330 00 28 20
2329 00 13 39
2328 00 02 83
2393 00 00 86
2392 00 13 39
2390 00 07 92
2389 00 03 27
2387 00 00 23
2388 00 07 35
2412 00 00 67
2413 00 05 02
2415 00 01 55
2416 00 04 74
2418 00 03 45
2419 00 02 32
2427 00 03 45
2420 00 00 20
2422 00 01 39
2426 00 01 53
2423 00 08 63
2424 00 01 79
2425 00 01 42
2573 00 09 76
2541 00 12 80
2542 00 11 18
2543 00 04 63
2544 00 04 04
2547 00 00 20
2548 00 02 7026 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
1 2 3 4 5 6
2533 00 00 37
2531 00 05 11
2549 00 00 24
2741 00 02 14
2743 00 01 31
2742 00 07 19
2739 00 03 39
2767 00 04 44
2761 00 15 16
2762 00 00 20
2850 00 00 80
2848 00 08 06
2794 00 00 95
2847 00 10 70
2845 00 00 62
2797 00 12 82
2798 00 00 20
2844 00 02 86
2827 00 00 38
2826 00 02 09
2799 00 01 30
2800 00 02 94
2802 00 03 57
2801 00 01 01
2807 00 02 86
2810 00 01 40
2809 00 01 57
[F. No. R-11025(15)/6/2020-OR-I/(E-33882)]
P. SOMAKUMAR, Under Secy.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.