Publication of Notification in the Extraordinary Gazette of India under Section 3(1) of the Petroleum and Minerals Pipelines (ARUL) Act, 1962 for acquiring RoU in land for Dahej Parvat Ethane Pipeline.

Issued by Ministry of Petroleum and Natural Gas · Gas Projects (GP) Division

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary:** This notification from the Ministry of Petroleum and Natural Gas, dated September 17, 2025, declares the government's intention to acquire the Right of User (ROU) for land in Gujarat for laying an ethane pipeline. The pipeline is to be laid by M/s Reliance Ethane Pipeline Limited, connecting Dahej Manufacturing Division to Parvat. Interested parties have 21 days to object to the acquisition in writing to Mr. B. S. Dave. **Key Points / Main Content:** * **Pipeline Project:** A liquid ethane pipeline will be laid by M/s Reliance Ethane Pipeline Limited, connecting Dahej Manufacturing Division to Parvat, Gujarat. * **Acquisition of Right of User (ROU):** The government intends to acquire the ROU for land required for laying the pipeline. * **Affected Areas:** The land falls within the Talukas of Vagra and Hansot in the Bharuch District, Gujarat. Specific village survey numbers and areas to be acquired are listed in the schedule. * **Objection Procedure:** Anyone with interest in the listed land may object to the acquisition in writing within 21 days from the date the notification copies are made available to the general public. * **Objection Submission:** Objections should be sent to Mr. B. S. Dave, Competent Authority, Reliance Ethane Pipeline Limited, Surat, Gujarat. **Impact Analysis:** **Landowners/Interested Parties in Vagra and Hansot, Bharuch District, Gujarat:** * **Impact:** Landowners in the specified areas will have the ROU of their land acquired for the pipeline project. * **Action Required:** If they object to the acquisition, they must submit written objections to Mr. B. S. Dave within 21 days of the notification copies being made available to the general public. **Reliance Ethane Pipeline Limited:** * **Impact:** Enabled to proceed with the ethane pipeline project between Dahej and Parvat. * **Action Required:** Proceed with the pipeline laying operations after obtaining the necessary rights. **Mr. B. S. Dave, Competent Authority, Reliance Ethane Pipeline Limited:** * **Impact:** Responsible for receiving and processing objections related to the land acquisition. * **Action Required:** Review and address any received objections.

Key Entities Referenced

Petroleum and Minerals Pipelines (Acquisition of Right of User in Land) Act, 1962 (50 of 1962): The legal framework used to acquire the right of user in land for laying petroleum and mineral pipelines. Reliance Ethane Pipeline Limited: Company laying the Dahej-Parvat ethane pipeline. Gujarat: Indian state where the Dahej-Parvat ethane pipeline is being laid. Dahej Manufacturing Division: Starting point of the ethane pipeline. Parvat: Ending point of the ethane pipeline.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-19092025-266249 CG-DxLx-xEG-I1D9H0x9x2x0 25-266249 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 4107] नई दिल्ली, बृहस्ट्प जतवार, जसतम्ब र 18, 2025/भाद्र 27, 1947 No. 4107] NEW DELHI, THURSDAY, SEPTEMBER 18, 2025/BHADRA 27, 1947 isVªksfy;e vkSj izkÑfrd xSl ea=ky; अजधसचू ना नई दिल्ली, 17 जसतम्ब र, 2025 का.आ. 4224(अ).— Hkkjr ljdkj dk s ykds fgr eas ;g çrhr gksrk gS fd ngts euS qQSDpfjax fMfotu ¼xqtjkr½ ls ioZV rd] tgka bls Mh-,u-b-ih-,y- dk ekStwnk ikbiykbu lqfo/kkvkas ds lkFk tkMs +k tk,xk] tks vkj-vkbZ-,y-& gthjk esU;qqQDpfjax fMoh u ls tqM+xs h] rjy bZFksu ds ifjogu ds fy, eSllZ fjyk;la bZFksu ज़ ikbiykbu fyfeVsM dks ngts &ioZV bZFksu ikbiykbu fcNkbZ tkuh pkfg,( vkSj] Hkkjr ljdkj dks mDr ikbiykbu fcNkus ds iz;kts u ds fy, ;g vko”;d izrhr gksrk gS fd ml Hkfwe eas] ftlds Hkhrj mDr ikbiykbu fcNkbZ tkus dk izLrko gS vkSj tk s bl vf/klwpuk ls mikc) vuqlwph eas of.kZr gS] mi;kxs ds vf/kdkj dk vtZu fd;k tk, ( vr%] vc] Hkkjr ljdkj] iVs ªkfsy;e vkSj [kfut ikbiykbu ¼Hkfwe es a mi;kxs ds vf/kdkj dk vtZu½ vf/kfu;e] 1962 ¼1962 dk 50½ ¼ftls blds i”pkr~ mDr vf/kfu;e dgk x;k gS½ dh /kkjk 3 dh mi&/kkjk ¼1½ }kjk inz Rr “kfDr;ks a dk iz;kxs djrs gq,] mueas mi;kxs ds vf/kdkj dk vtZu djus ds vius vk”k; dh ?kk’s k.kk djrh gS ( dkbs Z O;fDr] tks mDr vuqlwph eas of.kZr Hkfwe eas fgrc) gS] ml rkjh[k ls ftldk s mDr vf/kfu;e dh /kkjk 3 dh mi&/kkjk ¼1½ ds v/khu tkjh dh xbZ vf/klwpuk dh izfr;k¡ lk/kkjk.k turk dks miyC/k djk nh tkrh gSa] bDdhl fnu ds Hkhrj Hkfwe ds uhps mDr ikbiykbu fcNk, tkus ds fy, mi;kxs ds vf/kdkj ds vtZu ds lEcU/k eas Jh ch- ,l- nos] l{ke izkf/kdkjh] fjyk;al ,Fkus ikbiykbu fyfeVsM & Mhihbih,y izkstsDV] ,&foax] rhljh efaty] Jhth vkdsZM] vkuan egy jkMs ] vMktu] lwjr & 395009] xqtjkr jkT; dk s fyf[kr :Ik eas vk{ksi Hkst ldsxkA 6196 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] vuqlwph rkyqdk % okxjk ftyk % Hk#p jkT; % xqtjkr vkj-vk-s;w- vftZr djus ds fy, xk¡o dk uke losZ la0@lc fMfotu la0 {ks=Qy gsDVs;j ,;j oxZ-eh- 1 2 3 4 5 1´ lqok 33 00 01 60 2´ tksyok 293 00 04 80 rkyqdk % gkla ksV ftyk % Hk#p jkT; % xqtjkr 1´ 'kjs k 442 00 25 59 [फा. स.ं ,y--14014&3&2025-th-ih-&II (bZ&52145)] jkethyky ehuk, voj lfpo MINISTRY OF PETROLEUM AND NATURAL GAS NOTIFICATION New Delhi, the 17th September, 2025 S.O. 4224(E).— Whereas it appears to Government of India that it is necessary in public interest that for transportation of Liquid Ethane from Dahej Manufacturing Division in Gujarat to Parvat, where it will be hooked-up with the existing pipeline facilities of DNEPL, interconnecting with RIL-Hazira Manufacturing Division should be laid by M/s Reliance Ethane Pipeline Limited; And whereas, it appears to Government of India that for the purpose of laying such pipeline, it is necessary to acquire the Right of User in land under which the said pipeline is proposed to be laid and which are described in the Schedule annexed here to; Now therefore, in exercise of the powers conferred by sub-section (1) of Section 3 of the Petroleum and Minerals Pipelines (Acquisition of Right of User in Land) Act, 1962 (50 of 1962) (hereinafter referred to as the said Act), Government of India hereby declares its intention to acquire the Right of User therein; Any person interested in the land described in the said Schedule may, within twenty-one days from the date on which the copies of this notification, as published in the Gazette of India under sub-section (1) of Section 3 of the said Act, are made available to the general public, object in writing to the acquisition of the Right of User therein for laying the said pipeline under the land to Shri B. S. Dave, Competent Authority, Reliance Ethane Pipeline Limited – DPEPL Project, A-Wing, 3rd Floor, Shreeji Arcade, Anand Mahal Road, Adajan, Surat-395009, Gujarat State. SCHEDULE Taluka: VAGRA District: BHARUCH State:GUJARAT Name of Village Survey No./Sub-Division No. Area to be acquired for ROU Hec Are Sq.m. 1 2 3 4 5 1) Suva 33 00 01 60 2) Jolwa 293 00 04 80 Taluka: HANSOT District: BHARUCH State:GUJARAT 1) Shera 442 00 25 59 [F. No. L-14014/3/2025-GP-II(E:52145)] RAMJI LAL MEENA, Under Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.