Date: 2025-04-24Category: Extra OrdinaryState: Union GovernmentCountry: India
Publication of notification in the Extraordinary Gazette of India under the Railways amendment Act 2008 under clause 7 A of section 2 of the Railways amendment Act 2008 for the work of Competent authority for Land Acquisition for Special Railway Project i e Construction of 2 Lane ROB in lieu of L Xing No 19 at km 203/0/2 on CAR/CPU section of Prayagraj Division Mirzapur Uttar Pradesh
## Report on Railway Land Acquisition Policy Amendment
**1. Executive Summary:**
This report analyzes a notification (S.O. 1844(E)) issued by the Ministry of Railways regarding land acquisition for a special railway project in Uttar Pradesh. The notification pertains to an amendment authorizing a specific official to perform land acquisition functions related to the construction of a 2-lane Road Over Bridge (ROB) in lieu of an existing level crossing. The core purpose of this amendment is to delegate authority for land acquisition, facilitating the timely execution of the railway project. Key findings highlight the specific geographic area and official involved, as well as the legal basis for the amendment.
**2. Introduction:**
This report aims to provide an informative overview of a recent notification from the Ministry of Railways concerning land acquisition for a specific infrastructure project. The analysis is based solely on the provided text of the notification (S.O. 1844(E)) published on April 24, 2025.
**3. Policy Overview:**
* This notification constitutes an amendment to existing policies and regulations governing land acquisition for railway projects, specifically referencing the Railway Amendment Act of 2008 (11 of 2008).
* **Core Objective:** The core objective, as inferred from the text, is to expedite the land acquisition process for the construction of a 2-lane Road Over Bridge (ROB) by delegating the necessary authority to a specific official.
**4. Background and Rationale:**
This notification serves as an amendment to streamline land acquisition processes within railway projects, under the Railway Amendment act of 2008. It is likely designed to improve efficiency and reduce delays, especially in critical projects such as replacing level crossings with road over bridges. The specific problem this amendment addresses is the need to delegate authority for land acquisition to a designated official, enabling them to perform the necessary functions in a timely manner, which seems to have been previously inefficient.
**5. Key Provisions / Changes:**
This notification focuses *specifically* on changes introduced by the provided amendment text.
* **What specific part of the original policy is being changed (if discernible from the text).** The notification does not explicitly state which prior policy is being changed, but it references the Railway Amendment Act of 2008, implying that the changes align to delegate authority, under the powers conferred by cause 7A of section 2 of the Railway Amendment Act 2008.
* **What the *new* rule/provision *is*, based *only* on the amendment text.** The new provision authorizes the "Special Land Acquisition Officer, Mirzapur Irrigation" to perform the function for Land Acquisition under the said Act, within Mirzapur district.
* **Explain the *difference* or the *effect* of this specific change.** Previously, this specific officer was potentially not authorized to act as the competent authority for land acquisition under the Railway Amendment Act for this project. This delegation will now empower them to initiate and execute land acquisition procedures, for the defined area under the project, under the said act.
**6. Target Audience and Stakeholders:**
Based on the provided text, the directly affected stakeholders include:
* **The Special Land Acquisition Officer, Mirzapur Irrigation:** This official is now authorized to perform land acquisition functions.
* **Residents of Village Darwan, Hinauta, and Dadara, Tahsil Marihan in the state of Uttar Pradesh:** As the construction impacts these areas, the residents are the target audience.
* **Contractors and workers involved in the construction of the ROB:** As this directly states it has to do with the construction of a new ROB.
* **The Ministry of Railways and North Central Railway:** These entities are responsible for the project's overall execution.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies mentioned:** The Ministry of Railways, North Central Railway, and the Special Land Acquisition Officer, Mirzapur Irrigation are the key bodies involved.
* **Any timelines or procedures specified in the text?** The notification takes effect from the date of publication, April 24, 2025. No specific timelines or procedures beyond standard land acquisition processes are detailed in this notification.
* **(If Amendment):** There aren't any specific implementation aspects directly related to the changes outlined in the amendment, beyond the authority coming into effect from the date of publication.
**8. Expected Outcomes / Impact of Changes:**
* The likely intended outcome of this specific change is the expedited acquisition of land required for the construction of the 2-lane ROB. This should contribute to faster project completion, improved railway infrastructure, and enhanced safety by eliminating a level crossing. The delegation of authority to the Special Land Acquisition Officer is expected to streamline the process and reduce bureaucratic delays.
**9. Conclusion:**
The notification (S.O. 1844(E)) represents an amendment to streamline land acquisition for a specific railway infrastructure project in Uttar Pradesh. By delegating authority to the Special Land Acquisition Officer, it aims to accelerate the process of acquiring land for the construction of a 2-lane ROB. This amendment is significant as it reflects the government's commitment to improving railway infrastructure and enhancing safety through the replacement of level crossings. The amendment demonstrates a focus on efficient project implementation by removing potential bottlenecks in the land acquisition process.
Key Entities Referenced
Railway Amendment act 2008: Name of the act which confers power to the Central Government for land acquisition related to railway projects.
section 2: Reference to a specific section of the Railway Amendment Act 2008.
Central Government: The governmental entity authorizing land acquisition.
Prayagraj Division: A division of the North Central Railway.
North Central Railway Engineering Department: The railway department issuing the notification.
Uttar Pradesh: The state where the railway project is located.
Special Railway Project: Refers to a specific railway project involving construction of a road over bridge.
Special Land Acquisition Officer Mirzapur Irrigation: The officer authorized for land acquisition in Mirzapur district.
Mirzapur: The district where the land acquisition is taking place.
S. C. JAIN, Principal Chief Engineer: The signatory of the notification from the Ministry of Railways.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-यू.पी.-अ.-24042025-262658
CG-UxPx-xEG-I2D4H0x4x2x0 25-262658
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1811] नई दिल्ली, बृहस्ट्प जतवार, अप्रलै 24, 2025/विै ाख 4, 1947
No. 1811] NEW DELHI, THURSDAY, APRIL 24, 2025/VAISAKHA 4, 1947
[ ]
iz;kxjkt] 10 ekPkZ] 2025
.—dsUnz ljdkj] jys os ¼la'kks/ku½ vf/kfu;e ¼2008 dk 11½ ¼tks ;gkWW mDr vf/kfu;e ds #i es a
mfYYkf[kr gS½ dh /kkjk 2 ds [k.M ¼7d½ }kjk iznÙk 'kfDr;ks a dk iz;ksx djrs gq,] bl vf/klwpuk ds jkti= eas izdk'ku dh
rkjh[k ls uhps nh xbZ lkj.kh ds LraHk ¼3½ eas mfYyf[kr fty s ds lacU/k eas mRrj izns'k jkT; es a iz;kxjkt e.My dss
pqukj&pksiu jsyos LVs'ku ds e/;] xzke&njoku] fgukSrk ,oa nknjk] rglhy& efM+gku es a yos y dzkWflax la[;k 19 ij 2 ysu
jksM vksoj fczt ds fuekZ.k ds ckcr fo'ks"k jys ifj;kstuk dss rgr mDr lkj.kh ds LraHk ¼2½ es a ;Fkk mfYyf[kr vf/kdkjh dks
mDr vf/kfu;e vkfn ds v/khu ,sl s inkf/kdkjh ds #i eas Hkwfe vtZu dh dk;Zokgh gsrq l{ke izkf/kdkjh ds #i eas izkf/kd`r
djrh gSA
1 fo'ks"k Hkwfe v/;kfIr vf/kdkjh ¼flapkbZ½ fetkZiqj
fetkZiqj
[bZ&QkbZy uacj %NCR Qk- la- NCR -HQ0ENGG (CORR)/9/2024-O/o Dy.CE/Br./L/ALD ¼daI;Vw j uca j 115213]
,l- lh- tSu] izeq[k eq[; bathfu;j
2713 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
[North Central Railway (Engineering Department)]
NOTIFICATION
Prayagraj, the 10th March, 2025
S.O. 1844(E).—In exercise of the powers conferred by cause (7A) of section 2 of the Railway Amendment
act 2008 (11of 2008) (herein referred at as the said Act), the Central Government hereby authorizes the officer
mentioned in column (2) of the table below as competent such authority to perform the function for Land Acquisition
under the said Act with effect from the date of publication of this notification relating to district mentioned in column
(3) of the said table for Construction of 2 Lane ROB in lieu of L-Xing No.19 between Chunar-Chopan Railway
station of Prayagraj Division, Village-Darwan,Hinauta and Dadara,Tahsil-Marihan in the state of Uttar Pradesh of
such Special Railway Project.
TABLE
Sl.No. Competent Authority District
(1) (2) (3)
1 Special Land Acquisition Officer Mirzapur
(Irrigation) Mirzapur
[e-file No. NCR F. No. NCR -HQ0ENGG (CORR)/9/2024-O/o Dy.CE/Br./L/ALD (Computer No. 115213)]
S. C. JAIN, Principal Chief Engineer
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.