Publication of notification in the Extraordinary Gazette of India under the Railways amendment Act 2008 under Sub section of 06 of 20F of the Railways Act 1989 Competent authority as Arbitrator for Land Acquisition for Special Railway Project i.e. Construction of 2 Lane ROB in lieu of L Xing No. 19 at km.203/0 2 on CAR CPU section of Prayagraj Division Mirzapur Uttar Pradesh.
## Report on Railway Land Acquisition Policy for Special Projects
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Railways, Government of India, regarding land acquisition for a special railway project in Uttar Pradesh. The notification appoints the District Magistrate of Mirzapur as the arbitrator for land acquisition related to the construction of a 2-lane Road Over Bridge (ROB) in lieu of Level Crossing No. 19 on the ChunarChopan Railway section within the Prayagraj Division. This aims to facilitate a smoother and more efficient process for land acquisition for this critical infrastructure project.
**2. Introduction:**
This report provides an overview and analysis of the notification S.O. 1845(E) issued by the Ministry of Railways on March 10, 2025, concerning the appointment of an arbitrator for land acquisition related to a specific railway project. The analysis is based solely on the information contained within the provided text.
**3. Policy Overview:**
This notification is an *implementation* of the Railway Act, 1989 and the Railway Amendment Act, 2008, specifically under section 20F(6). The core objective, as inferred from the provided text, is to expedite the land acquisition process required for the construction of railway infrastructure by appointing a dedicated arbitrator.
**4. Background and Rationale:**
This is not a new policy, but an implementation step under existing laws. The notification addresses the need to acquire land efficiently for special railway projects. The construction of railway infrastructure, such as bridges, often requires land acquisition, which can be a complex and time-consuming process. The appointment of an arbitrator streamlines this process by providing a designated authority to resolve disputes related to land acquisition. The need for this specific land acquisition arises from the project to replace a Level Crossing with a Road Over Bridge.
**5. Key Provisions / Changes:**
This notification specifies the following:
* **Appointment of Arbitrator:** The District Magistrate of Mirzapur is appointed as the arbitrator.
* **Scope of Authority:** The arbitrator is authorized to perform the functions related to land acquisition under the Railway Act, 1989.
* **Project Specificity:** The appointment is specific to land acquisition for the construction of a 2-lane Road Over Bridge (ROB) in lieu of Level Crossing No. 19.
* **Geographic Location:** The project is located between ChunarChopan Railway station of Prayagraj Division, VillageDarwan, Hinauta and Dadara,TahsilMarihan in the state of Uttar Pradesh.
* **Legal Basis:** The action is taken under the powers conferred by subsection 6 of section 20F of the Railway Act 1989 and Railway amendment Act, 2008.
**6. Target Audience and Stakeholders:**
The target audience and stakeholders include:
* **Landowners:** Individuals and entities owning land within the specified area that needs to be acquired for the project.
* **Mirzapur District Administration:** The District Magistrate and related departments are directly responsible for implementing the land acquisition process.
* **North Central Railway (Engineering Department):** The railway division responsible for the construction project.
* **Contractors:** Companies involved in the construction of the Road Over Bridge.
* **Local Residents:** The residents who will benefit from the improved infrastructure upon the completion of the Road Over Bridge.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The District Magistrate of Mirzapur is the primary responsible authority. The North Central Railway Engineering Department also has a role in initiating the land acqusition requests.
* **Procedures:** The notification refers to the Railway Act, 1989, which outlines the procedures for land acquisition, including valuation, compensation, and dispute resolution. The arbitrator will likely follow these procedures.
* **Timelines:** The notification is effective from the date of its publication in the Official Gazette (April 24, 2025). Specific timelines for the land acquisition process are not provided in the text.
**8. Expected Outcomes / Impact of Changes:**
The intended outcome of this notification is to:
* **Expedite Land Acquisition:** Streamline the land acquisition process by providing a designated arbitrator.
* **Facilitate Infrastructure Development:** Enable the timely construction of the Road Over Bridge, improving railway infrastructure.
* **Reduce Delays:** Minimize potential delays caused by land acquisition disputes.
* **Improve Safety:** Eliminate a level crossing and thus, enhancing safety for both railway and road users.
**9. Conclusion:**
The notification S.O. 1845(E) represents an important step in facilitating the construction of a critical railway infrastructure project. By appointing the District Magistrate of Mirzapur as the arbitrator for land acquisition, the Ministry of Railways aims to streamline the process, minimize delays, and ensure the timely completion of the 2-lane Road Over Bridge. This will ultimately improve transportation efficiency and safety in the region. This action is significant because it applies existing law to a specific project, showing active implementation of railway development plans.
Key Entities Referenced
Railway Act 1989: Act cited as the basis for exercising powers related to land acquisition for railway projects.
Railway amendment Act, 2008: Amendment Act cited in conjunction with the Railway Act 1989.
section 20F: Specific section of the Railway Act 1989 granting powers related to land acquisition.
Central Government: The entity exercising powers conferred by the Railway Act to appoint an arbitrator.
Prayagraj Division: Division under which the railway construction project falls.
Uttar Pradesh: The state where the land acquisition and railway project are located.
District MagistrateMirzapur: The officer appointed as the arbitrator for land acquisition.
Mirzapur: The district related to the land acquisition process.
North Central Railway Engineering Department: Department responsible for the notification.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-यू.पी.-अ.-24042025-262659
CG-UxPx-xEG-I2D4H0x4x2x0 25-262659
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1812] नई दिल्ली, बृहस्ट्प जतवार, अप्रलै 24, 2025/विै ाख 4, 1947
No. 1812] NEW DELHI, THURSDAY, APRIL 24, 2025/VAISAKHA 4, 1947
jsy ea=ky;
[mRrj e/; jys os ¼bathfu;fjxa foHkkx½]
vf/klwpuk
iz;kxjkt] 10 ekpZ] 2025
.—dsUnz ljdkj] jys vf/kfu;e]1989 (1989 dk 24)] ,oe jys os (la’kks/ku) vf/kfu;e (2008 dk
11) ¼ftls bles a blds i’pkr mDr vf/kfu;e dgk x;k gS) dh /kkjk 20 p dh mi /kkjk (6) ds v/khu iznÙk ’kfDr;ks a
dk iz;ksx djrs gq,] bl vf/klwpuk ds jkti= eas izdk’ku dh rkjh[k ls uhps nh xbZ lkj.kh ds LraHk ¼2½ eas mfYyf[kr
e/;LFk dks mDr lkj.kh ds LraHk (3½ eas mYyfs[kr fty s ds lacU/k eas mRrj izn’s k jkT; eas iz;kxjkt e.My ds s pqukj&pksiu
jys os LVs’ku ds e/; fLFkr xzke&njoku] fgukSrk ,oa nknjk] rglhy& efM+gku eas yos y dzkWflax la[;k 19 ij 2 ysu jksM
vksoj fczt ds fuekZ.k ds ckcr fo’ks"k jsy ifj;kstuk ds rgr Hkwfe vtZu dh dk;Zokgh ea s e/;LFk gsrq mDr vf/kfu;e ds
v/khu ,sl s izkf/kdkjh ds ÑR;¨a dk ikyu ds fy, l{ke izkf/kdkjh ds #i eas fu;qfDr djrh gSA
lkj.kh
dze la- vf/kdkjh ftyk
¼1½ ¼2½ ¼3½
1 ftykf/kdkjh @fetkZiqj fetkZiqj
[bZ&QkbZy uacj %NCR Qk- la- NCR -HQ0ENGG (CORR)/09/2024-O/o Dy.CE/Br./L/ALD ¼daI;Vw j uca j
115213½]
,l- lh- tSu] izeq[k eq[; bathfu;j
2714 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
MINISTRY OF RAILWAYS
[North Central Railway (Engineering Department)]
NOTIFICATION
Prayagraj, the 10th March, 2025
S.O. 1845(E).—In exercise of the powers conferred by sub-section (6) of section 20F of the Railway Act
1989 (24 of 1989) Railway (amendment) Act, 2008 (11 of 2008) (hereinafter referred to as the said Act), the Central
Government hereby appoints the arbitrator mentioned in column (2) of the table below to perform the functions of
arbitrator in Land Acquisition as such authority under the said Act with effect from the date of publication of this
notification in the Official Gazette, relating to district mentioned in column (3) of the said table for Construction 2
Lane ROB in lieu of L-Xing No.19 between Chunar-Chopan Railway station of Prayagraj Division, Village-Darwan,
Hinauta and Dadara,Tahsil-Marihan in the state of Uttar Pradesh of such Special Railway Project.
TABLE
Sl.No. Officer District
(1) (2) (3)
1 District Magistrate/Mirzapur Mirzapur
[e-file No. NCR F. No. NCR -HQ0ENGG (CORR)/9/2024-O/o Dy.CE/Br./L/ALD (Computer No. 115213)]
S. C. JAIN, Principal Chief Engineer
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.