## Policy Analysis Report: Notification Regarding Land Acquisition for National Highway 731A
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Road Transport and Highways, Government of India, published on April 17, 2025. This notification declares the intention to acquire land for the construction, widening, maintenance, management, and operation of National Highway 731A, specifically along the stretch from Km 49.150 to Km 112.950 in the Kaushambi district of Uttar Pradesh. The core purpose is to facilitate the improvement and upkeep of this segment of the national highway. Key findings include the identification of specific land parcels to be acquired, the process for affected individuals to raise objections, and the delineation of responsibilities for the competent authority.
**2. Introduction:**
This report provides an informative analysis of a government notification concerning land acquisition for National Highway 731A, based solely on the provided text. The purpose is to elucidate the key aspects of the notification, its implications, and the procedures it outlines for affected parties.
**3. Policy Overview:**
* This notification pertains to land acquisition under the National Highways Act, 1956 (48 of 1956).
* Core Objective(s): As inferred from the text, the core objective of this notification is to acquire land to facilitate the construction, widening (two-lane with paved shoulder, four-laning), maintenance, management, and operation of the specified stretch of National Highway 731A.
**4. Background and Rationale:**
* The notification indicates the need to improve the existing road infrastructure. The stated purpose of construction, widening, maintenance, and operation of NH731A suggests that the existing infrastructure is either inadequate or requires upgrading to meet current and future transportation demands. The project aims to enhance connectivity and facilitate smoother transportation in the Kaushambi district of Uttar Pradesh.
**5. Key Provisions / Changes:**
* This is a new policy action, rather than an amendment. This notification outlines the following key provisions:
* **Declaration of Intent:** The Central Government declares its intention to acquire land for the specified purpose.
* **Affected Land:** The notification specifies the land to be acquired is a stretch of land from Km 49.150 to Km 112.950 for NH731A, located in the district of KAUSHAMBI in the state of Uttar Pradesh. A schedule provides details of specific plots within the district, including survey/plot numbers, type of land (Private Agriculture), and area in hectares.
* **Objection Mechanism:** Individuals with an interest in the land have the right to object to the acquisition within twenty-one days of the notification's publication in the Official Gazette.
* **Competent Authority:** Objections must be submitted in writing to the Sub Divisional Magistrate Kaushambi, who serves as the Competent Authority.
* **Hearing Process:** The Competent Authority is required to provide objectors with an opportunity to be heard, either in person or through a legal practitioner. After hearing objections and conducting any necessary inquiries, the authority will either allow or disallow the objections.
* **Finality of Order:** Any order made by the Competent Authority regarding the objections is final.
* **Access to Information:** Land plans and other details related to the acquisition are available for inspection at the office of the Competent Authority.
**6. Target Audience and Stakeholders:**
Based on the text, the primary target audience and stakeholders are:
* Landowners in the specified stretch of land from Km 49.150 to Km 112.950 of NH731A in the Kaushambi district of Uttar Pradesh, whose land is subject to acquisition.
* Residents and businesses in the vicinity of the highway project that may be affected by construction or improved transportation access.
* The Sub Divisional Magistrate Kaushambi, who serves as the Competent Authority for handling objections.
**7. Implementation Aspects (Inferred):**
* Responsible Agency/Bodies: The Ministry of Road Transport and Highways is the responsible government body. The Sub Divisional Magistrate Kaushambi is designated as the Competent Authority.
* Timelines: A 21-day period is provided for affected individuals to submit objections after the notification's publication.
* Procedures: The notification outlines the procedure for filing objections, the hearing process, and the finality of the Competent Authority's decision. It also mentions the availability of land plans for inspection.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes of this notification are:
* Facilitation of land acquisition for the improvement of National Highway 731A.
* Upgrading of the highway infrastructure through construction, widening, maintenance, and operation.
* Improved connectivity and transportation efficiency in the Kaushambi district of Uttar Pradesh.
* Resolution of land acquisition issues through a defined objection and hearing process.
**9. Conclusion:**
The notification from the Ministry of Road Transport and Highways marks a significant step towards improving the infrastructure of National Highway 731A. It outlines the intention to acquire land, establishes a process for addressing objections, and designates responsibilities for the Competent Authority. This notification will have a direct impact on landowners and residents within the specified stretch of the highway, and facilitate infrastructure development and enhance regional connectivity.
Key Entities Referenced
National Highways Act, 1956: Act under which the Central Government is exercising its powers to acquire land for the construction, widening, maintenance, management, and operation of a National Highway.
section 3A: Section of the National Highways Act, 1956 that confers powers related to land acquisition.
section 3C: Section of the National Highways Act, 1956 related to objections to the land acquisition.
Central Government: The governing body responsible for declaring the intention to acquire land.
NH731A: The designation of the National Highway being constructed/widened.
Km 49.150 to Km 112.950: The stretch of land along NH731A affected by the land acquisition.
KAUSHAMBI: District in Uttar Pradesh where the land acquisition is taking place.
Uttar Pradesh: The state where the land acquisition is taking place.
Competent Authority: The authority (Sub Divisional Magistrate Kaushambi) to whom objections regarding the land acquisition can be made.
Sub Divisional Magistrate Kaushambi: Designated Competent Authority for addressing objections.
0.049 Hectare: Area of land to be acquired.
0.055 Hectare: Area of land to be acquired.
0.06 Hectare: Area of land to be acquired.
0.2218 Hectare: Area of land to be acquired.
0.5477 Hectare: Area of land to be acquired.
0.9335: Total area to be acquired.
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS: The Government Ministry responsible for the notification.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-डी.एल.-अ.-19042025-262534
CG-DxLx-xEG-I1D9H0x4x2x0 25-262534
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1757] नई दिल्ली, बृहस्ट्प जतवार, अप्रलै 17, 2025/चत्रै 27, 1947
No. 1757] NEW DELHI, THURSDAY, APRIL 17, 2025/CHAITRA 27, 1947
सड़क पररवहन और रािमाग गमत्रं ालय
अजधसचू ना
नई दिल्ली, 17 अप्रलै , 2025
का.आ. 1790(अ).— केंद्रीय सरकार राष्ट्रीय राजमार् गअधिधनयम, 1956 (1956 का 48) धजसे इसीमें इसके पश्चात
उक्त अधिधनयम कहा र्या ह ैकी िारा 3क की उपिारा (1) द्वारा प्रदत सधक्तयौं का प्रयोर् करते हुए , यह समािान हो जान े
के पश्चात कक उत्तर प्रदशे राज्य के कौशाम्बी धजल े म ें NH731ए के कक. मी. 49.150 स े की.मी. 112.950 कौशाम्बी तक के
भू-खण्ड के धनमाणग (चौडीकरण / पेव्ड शोल्डर सधहत 2 – लने / 4-लने का बनाना आकद),अनुरक्षण, प्रबन्िन और प्रचालन के
लोक प्रयोजन के धलए वह भूधम अपेधक्षत ह ैधजसका संधक्षप्त बणनग धनच े अनुसूची म ेंकदया र्या ह ै,
ऐसी भूधम का अजगन करन े के अपन े आशय की घोसणा करती ह।ै कोई भी व्यधक्त, जो उक्त भूधम म ें धहतबद्ध ह,ै उक्त
अधिधनयम की िारा 3र् की उपिारा (1) के अिीन पुबोक्त्त्त प्रयोजन के धलए ऐसी भूधम के उपयोर् पर शासकीय राजपत्र म ें
इस अधिसूचना के प्रकाशन की तारीख स े इक्कीस कदन के भीतर अपनी आपधत्त प्रकट कर सकेर्ा।
ऐसी प्रत्येक आपधत्त सक्षम प्राधिकारी, अर्ागत/उप धजलाधिकरी कौशाम्बी के धलधखत रूप मप्रे स्तुत की जाएर्ी और
उस म ेंउसके आिार अधिकधर्त ककए जाएंर्े और सक्षम प्राधिकारी , आपधत्तकताग के व्यधक्तर्त रूप म ेया ककसी धबधिक पेशेवर
द्वारा सुन े जान े का अवसर दर्े ा और ऐसी आपधत्तयों की सुनवाई के पश्चात तर्ा ऐसी और जााँच करन े के पश्चात , यकद कोई
हो , जैस े सक्षम प्राधिकारी आबश्यक समझे, आदेश द्वारा या तो आपधत्तयों के अनज्ञु ात कर सकेर्ा या अननज्ञु ात कर सकेर्ा।
2619 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
उक्त अधिधनयम की िारा 3र् की उपिारा (2) के अिीन सक्षम प्राधिकारी द्वारा ककया र्या कोई भी आदेश अंधतम
होर्ा।
इस अधिसूचना को अतं र्तग आने वाली भूधम के भूधम योजनाएं और अन्य ब्योरे सक्षम प्राधिकारी के उक्त कायागलय
में उपलब्ि ह ैंऔर उनका धहतबद्ध व्यधक्त यों द्वारा धनररक्षण कक या जा सकता ह।ै
अनसु चू ी
उत्तर प्रदेश राज्य के कौशाम्बी धजले म ेंNH731ए के कक. मी. 49.150 स े की.मी. 112.950
के धलए अजगन की जाने बाली संरचना रधहत अर्वा संरचना सधहत भूधम का संधक्षप्त धववरण।
राज्य का नाम: उत्तर प्रदेश धजल े का नाम: कौशाम्बी
क्रधमक सवक्षे ण सख्ं या भूधम का प्रकार भूधम की प्रकृधत भूधम का क्षत्रे फल भूधम का क्षत्रे फल
सख्ं या (स्र्ानीय इकाई) (हक्त्े टेयर)
1 2 3 4 5 6
तालकु का नाम: मझं नपरु
र्ावं का नाम: अन्िावा ं
1 22 धनजी कृधि 0.049 (हक्त्े टेयर ) 0.049
2 604 धनजी कृधि 0.055 (हक्त्े टेयर ) 0.055
3 627 धनजी कृधि 0.06 (हक्त्े टेयर ) 0.06
4 636 धनजी कृधि 0.2218 (हक्त्े टेयर ) 0.2218
तालकु का नाम: चायल
र्ावं का नाम: पलहाना उपरहार
5 105 धनजी कृधि 0.5477 (हक्त्े टेयर ) 0.5477
Total 0.9335
[फा. सं. CE-RO/LKO/NH(O)/16/NH-731A/2020-21/3A]
िेख अमीनखान, जनििे क[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 17th April, 2025
S.O. 1790(E).— In exercise of the powers conferred by sub-section (1) of section 3A of the National Highways
Act, 1956(48 of 1956), (hereinafter referred to as the said Act), the Central Government, after being satisfied that for
the public purpose, the land, the brief description of which is given in the Schedule below, is required
for Construction (Widening/two lane with paved shoulder/ four laning etc.) maintenance, management and operation
of NH731A in the stretch of land from Km 49.150 to Km 112.950 in the district of KAUSHAMBI in the state of Uttar
Pradesh, hereby declares its intention to acquired such land.
Any person interested in the said land may, within twenty-one days from the date of publication of this
notification in the Official Gazette, object to the use of such land for the aforesaid purpose under –section (1) of section
3C of the said Act.
Every such objection shall be made to the Competent Authority, namely / Sub Divisional Magistrate
Kaushambi in writing and shall set out the grounds there of and the competent authority shall give the objector and
opportunity of being heard, either in person or by legal practitioner, and may, after hearing all such objection and after
making such further enquire, if any, as the competent authority thinks necessary, by order , either allow or disallow the
objections.
Any order made by the competent authority under sub-section (2) of section 3C of the said Act shall be final.
The land plans and other details of the land to be acquired under this notification are available and can be
inspected by the interested person at the aforesaid office of the Competent Authority.
SCHEDULES
Brief description of the land to be acquired, with or without structures falling NH731A in the stretch of land from
Km 49.150 to Km 112.950 in the district of KAUSHAMBI in the state of Uttar Pradesh.
State: UTTAR PRADESH District: KAUSHAMBI
Sl. No. Survey/Plot Number Type of Land Nature of Area Area
Land (in Local Unit) (in Hectares)
1 2 3 4 5 6
Taluk: Manjhanpur
Village: Andhawan
1 22 Private Agriculture 0.049 (Hectare ) 0.049
2 604 Private Agriculture 0.055 (Hectare ) 0.055
3 627 Private Agriculture 0.06 (Hectare ) 0.06
4 636 Private Agriculture 0.2218 (Hectare ) 0.2218
Taluk: Chail
Village: Palhana Uparhar
5 105 Private Agriculture 0.5477 (Hectare ) 0.5477
Total 0.9335
[F. No. CE-RO/LKO/NH(O)/16/NH-731A/2020-21/3A]
SHAIKH AMINKHAN, Director
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.