Home India Ministry of Road Transport and Highways Publication of notification under Section 3a...
Date: 2021-08-25 Category: Extra Ordinary State: Union Government Country: India

Publication of notification under Section 3a

Issued by Ministry of Road Transport and Highways · Deptt. of Road Transport and Highways

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Report on Notification Regarding Land Acquisition for National Highway 40 Expansion in Andhra Pradesh **1. Executive Summary:** This report analyzes a notification from the Ministry of Road Transport and Highways, published in the Gazette of India on August 25, 2021. The notification authorizes designated officers as competent authorities to perform functions related to land acquisition for the building, maintenance, management and operation for four-laning of a missing link section of National Highway No. 40 in the Chittoor district of Andhra Pradesh. The core purpose is to facilitate the expansion and improvement of this specific highway section. Key findings indicate the notification directly affects landowners and residents within the specified stretch, and delegates authority to designated officials for the land acquisition process. **2. Introduction:** This report provides an overview and analysis of a notification published in the Gazette of India on August 25, 2021, concerning land acquisition for the expansion of National Highway No. 40 in Andhra Pradesh. The analysis is based solely on the information provided in the notification text. **3. Policy Overview:** This is a new policy notification related to specific land acquisition for highway expansion. * **Core Objective(s):** Based on the text, the primary objective is to authorize competent authorities to acquire land for the building, maintenance, management and operation of a four-lane missing link section between NH40 and NH69 from Km. 351.460 to Km. 358.260 of National Highway No. 40. This aims to improve connectivity and infrastructure in the region. **4. Background and Rationale:** This is a new policy notification, therefore, it can be inferred that the underlying issue is the need to expand and improve the existing National Highway 40 to enhance connectivity and transportation efficiency. The notification specifically mentions addressing a "missing link," suggesting a gap in the existing infrastructure that hinders seamless travel. The expansion to four lanes likely aims to reduce congestion, improve traffic flow, and enhance safety along this route. **5. Key Provisions / Changes:** The notification outlines the following key provisions: * **Authorization of Competent Authorities:** The central government authorizes officers, as specified in the schedule, to act as competent authorities under the National Highways Act, 1956, for land acquisition. * **Geographic Scope:** The authorization applies to land required for the four-laning of the missing link between NH40 and NH69 from Km. 351.460 to Km. 358.260 of National Highway No. 40. * **Specific Locations:** The land acquisition affects villages within the Chittoor district of Andhra Pradesh, specifically: Thenabanda, Mangasamudram, Murkambattu, and Timmasamudram. * **Purpose of Acquisition:** The acquired land will be used for building, maintenance, management and operation of the four-lane highway. **6. Target Audience and Stakeholders:** The directly affected target audience includes: * **Landowners:** Individuals and entities owning land within the specified stretch of NH40 in the villages mentioned in the schedule. They will be impacted by the land acquisition process. * **Residents:** Individuals residing in the villages who may be displaced or affected by the construction activities. * **Competent Authorities:** The officers authorized to perform functions under the National Highways Act, 1956, responsible for the land acquisition process. Other stakeholders include: * The Ministry of Road Transport and Highways. * Construction companies involved in the highway expansion project. * The local government of Andhra Pradesh and Chittoor district. * Commuters and businesses that will benefit from the improved highway infrastructure. **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies:** The Ministry of Road Transport and Highways is ultimately responsible for the project. The designated officers mentioned in the schedule are directly responsible for the land acquisition process. The "Thenabanda Revenue Divisional Officer, Chittoor, ANDHRA PRADESH" is specifically named. * **Timelines or procedures:** The notification states the authorization is effective "from the date of publication of this notification in the Official Gazette" (August 25, 2021). Specific timelines for the land acquisition process are not detailed in the provided text but would likely follow procedures outlined in the National Highways Act, 1956. * **Land Acquisition Process:** The Competent Authority will be responsible for managing land acquisition, and related tasks to facilitate road construction **8. Expected Outcomes / Impact of Changes:** The likely intended outcomes and impacts of this notification include: * **Improved Connectivity:** Facilitating the completion of the missing link on NH40, leading to better connectivity between NH40 and NH69. * **Enhanced Transportation Efficiency:** The four-lane expansion is expected to reduce congestion, improve traffic flow, and decrease travel times along the route. * **Economic Growth:** Improved transportation infrastructure can stimulate economic activity in the region by facilitating the movement of goods and people. * **Potential Displacement:** Land acquisition may lead to the displacement of residents and businesses, requiring resettlement and compensation measures. **9. Conclusion:** The notification from the Ministry of Road Transport and Highways authorizes specific officers to acquire land for the four-laning of a missing link section of National Highway No. 40 in the Chittoor district of Andhra Pradesh. This initiative is intended to improve connectivity, enhance transportation efficiency, and support economic growth in the region. The notification directly affects landowners and residents within the specified stretch, and requires careful and responsible implementation of the land acquisition process. Further information beyond the scope of this document is needed to fully assess the project's social, environmental, and economic implications.

Key Entities Referenced

National Highways Act, 1956: An Indian law that provides for the declaration of certain highways as national highways and for matters connected therewith. Central Government: The executive authority of the Union of India. NH40: National Highway 40, part of a project to connect it to NH69 NH69: National Highway 69, part of a project to connect it to NH40 Chittoor: A district in the state of Andhra Pradesh. ANDHRA PRADESH: A state in India where the road construction is taking place. Thenabanda: A village in Andhra Pradesh. Mangasamudram: A village in Andhra Pradesh. Murkambattu: A village in Andhra Pradesh. Timmasamudram: A village in Andhra Pradesh. Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of national highways. New Delhi: Location of Ministry of Road Transport and Highways. Annual PlanAP: Annual Plan
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 xxxGIDHxxx सी.जी.-डी.एलxx.x-GअID.-E2x6xx0 82021-229242 CG-DL-E-26082021-229242 ऄसाधारण EXTRAORDINARY भाग II—खण्ड 3—ईप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 3183] नइ ददल्ली, बधु वार, ऄगस्ट्त 25, 2021/भार 3, 1943 No. 3183] NEW DELHI, WEDNESDAY, AUGUST 25, 2021/BHADRA 3, 1943 सड़क पररवहन और रािमाग ग मंत्रालय ऄजधसचू ना नइ ददल्ली, 25 ऄगस्ट् त, 2021 का.अ. 3473(ऄ).—केन्द्रीय सरकार, राष्ट्रीय रािमागग ऄजधजनयम, 1956 (1956 का 48) की धारा 3 के खंड (क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, आस ऄजधसूचना के िासकीय रािपत्र में प्रकाजित होने की तारीख से, अंध्र प्रदिे राज्य के जचत्तूर जिले म ें राष्ट्रीय रािमागग सं. 40 के दक.मी. 351.46 से दक.मी. 358.26 तक के एनएच-40 और एनएच-69 के बीच ऄप्राप्त संपकग के चार लेन के जनमागण (चौड़ीकरण/४ लेन/६ लेन का बनान अदद) ऄनुरक्षण, प्रबंधन और प्रचालन हते ु ईि ऄनुसूची के स्ट्तम्भ (4), (5), (6) और (7) में क्रमिः ईजल्लजखत राज्य, जिलों, तालुकों और गावों से सम्बजन्द्धत ईि ऄनुसूची के स्ट्तम्भ (3) की तत्सस्ट्थानी प्रजवजि में जवजनर्ददि भूजम के सम्बन्द्ध में ऄनुसूची के स्ट्तम्भ (2) में ईजल्लजखत ऄजधकाररयों को ईि ऄजधजनयम के ऄन्द्तगगत सक्षम ऄजधकाररयों के कृत्सयों का जनष्पादन करने के जलए एतद्द्वारा सक्षम प्राजधकारी के रूप में प्राजधकृत करती ह ै। 4729 GI/2021 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] ऄनसु चू ी अंध्र प्रदिे राज्य के जचत्तूर जिले में राष्ट्रीय रािमागग सं. 40 के दक.मी. 351.46 से दक.मी. 358.26 तक के एनएच-40 और एनएच-69 के बीच ऄप्राप्त संपकग के चार लेन के जनमागण, ऄनुरक्षण, प्रबंधन और प्रचालन हते ु भूजम का ऄजधग्रहण। क्रजमक सक्षम प्राजधकारी भूजम का राज्य जिल े का तालकु का नाम गांव का नाम संख्या जववरण नाम 1 2 3 4 5 6 7 राष्ट्रीय रािमागग 1 थेनबंदा संख्या ररवेन्द्यू जडजवजिनल NH40 के 2 मााँगासमुरम 1 अंध्र प्रदिे जचत्तूर जचत्तूर ऑदिसर, जचत्तूर दक.मी. 3 मुरकामबात्तु 351.46 से 4 जतम्मासमुरम 358.26 तक [िा. सं. RW/NH-12037/1/2021-22/ Annual Plan-AP] रािेि गुप् ता, जनदिे क MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 25th August, 2021 S.O. 3473(E).—In excercise of powers conferred by clause (a) of section 3 of the National Highways Act, 1956 (48 of 1956), the Central Government hereby authorizes the officers mentioned in column (2) of the Schedule annexed hereto as the competent authorities to perform the functions of such authorities under the said Act with effect from the date of publication of this notification in the Official Gazette, in respect of the stretch of land specified in the corresponding entry in column (3) of the said Schedule relating to state, districts, taluk and villages mentioned in column (4), (5), (6) and (7) respectively of the said Schedule for building (Widening/Four laning/Six laning etc.,) maintenance, management and operation for four lane of missing link between NH-40 and NH-69 from Km. 351.460 to Km. 358.260 of National Hiwghway No. 40 in the District of Chittoor, in the State of ANDHRA PRADESH. SCHEDULE Land Acquisition for building, maintenance, management and operation for four lane of missing link between NH-40 and NH-69 from Km. 351.460 to Km.358.260 of National Hiwghway No. 40 in the District of Chittoor, in the State of ANDHRA PRADESH. Sl. CALA Stretch State District Taluk/Mandal Name of the Village No. 1 2 3 4 5 6 7 1 Thenabanda Revenue 351.46KM Divisional ANDHRA 2 Mangasamudram 1 To CHITTOOR Chittoor Officer, PRADESH 3 Murkambattu 358.26KM Chittoor 4 Timmasamudram [F. No. RW/NH-12037/1/2021-22/ Annual Plan-AP] RAJESH GUPTA, Director Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research