Home India Ministry of Road Transport and Highways Publication of notification under Section 3a...
Date: 2022-03-03 Category: Extra Ordinary State: Union Government Country: India

Publication of notification under Section 3a

Issued by Ministry of Road Transport and Highways · Deptt. of Road Transport and Highways

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Okay, I'm ready to analyze the provided policy text and generate the report. **Report: Analysis of National Highways Act Notification S.O. 959(E)** **1. Executive Summary:** This report analyzes a notification (S.O. 959(E)) issued by the Ministry of Road Transport and Highways on March 3, 2022, regarding land acquisition for the construction of a 4-lane bypass connecting NH29 and NH2 as part of the Varanasi Phase II bypass project in Uttar Pradesh. The notification authorizes specific officers to act as competent authorities under the National Highways Act, 1956 for land acquisition within specified districts, taluks, and villages along the designated stretch of the bypass. The key finding is the authorization for land acquisition, which will directly impact landowners and residents along the defined route. **2. Introduction:** This report aims to provide a detailed overview of the notification S.O. 959(E), issued by the Ministry of Road Transport and Highways on March 3, 2022. The analysis is based solely on the information presented in the provided policy text. **3. Policy Overview:** * **Core Objective(s) (Inferred):** The core objective is to facilitate the construction of a 4-lane bypass connecting NH29 and NH2 as part of the Varanasi Phase II bypass project. This involves authorizing officers to act as competent authorities for land acquisition under the National Highways Act, 1956. **4. Background and Rationale:** * **New Policy (Analysis):** The policy addresses the need for land acquisition to enable the construction of infrastructure projects, specifically a bypass. The construction of such a bypass likely aims to improve traffic flow, reduce congestion, and enhance connectivity in the Varanasi region. The need for authorization suggests a formal process is required to secure the land necessary for the project. **5. Key Provisions / Changes:** * **New Policy (Analysis):** This is essentially the implementation of previously planned policy via land acquisition. * The notification authorizes officers (mentioned in column 2 of the schedule) to perform the functions of competent authorities under the National Highways Act, 1956. * This authorization is specifically for land acquisition related to the construction of a 4-lane bypass connecting NH29 and NH2 near Varanasi, Uttar Pradesh. The specific stretch is defined as: from near Sandaha Village (Km 11.170 of NH29) to Revasa Village (Km 818.800 of NH2) as part of Bypass to Varanasi PhaseII, Package 2 from Design Chainage Km. 30.600 to Km. 57.320 and 26.720 Km. Total Length 27.270 Km. including interchange loop at NH2. * The land acquisition is focused in District Chandauli in the State of UTTAR PRADESH. * The schedule details the specific districts (Chandauli), Taluks/Mandals (Pandit Dindayal Upadhyay Nagar Mugalsarai), and Villages (Mawai Kalan, Mahadevpur, Sahjaur, Bhikhpur, Jiwanpur, Kori, Revasa, Barahuli) affected by the land acquisition. **6. Target Audience and Stakeholders:** Based on the text, the primary target audience and stakeholders are: * Landowners and residents in the specified villages (Mawai Kalan, Mahadevpur, Sahjaur, Bhikhpur, Jiwanpur, Kori, Revasa, Barahuli) within Chandauli district, Uttar Pradesh. * The officers authorized as competent authorities under the National Highways Act, 1956. * Construction companies and contractors involved in the Varanasi bypass project. * The local population and businesses that will eventually benefit from the improved infrastructure. **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies:** The Ministry of Road Transport and Highways is the primary responsible agency. The notification also identifies specific officers (listed in the schedule, though their specific titles are not fully clear) who are authorized to act as competent authorities. * **Timelines or procedures:** The notification comes into effect from the date of its publication in the Official Gazette (March 3, 2022). The text doesn't detail the exact procedures for land acquisition, but it implies adherence to the National Highways Act, 1956. Further, more information regarding these procedures is needed to fully understand implementation. **8. Expected Outcomes / Impact of Changes:** * The primary intended outcome is the successful acquisition of land necessary for the construction of the 4-lane bypass. This is expected to facilitate the construction of the bypass, leading to: * Improved connectivity between NH29 and NH2. * Reduced traffic congestion in the Varanasi region. * Economic benefits due to improved transportation infrastructure. **9. Conclusion:** Notification S.O. 959(E) authorizes land acquisition for the construction of a crucial 4-lane bypass connecting NH29 and NH2 near Varanasi. The notification empowers specific officers to act as competent authorities under the National Highways Act, 1956, facilitating the land acquisition process within defined geographical areas. The successful implementation of this notification is a vital step towards improving transportation infrastructure and connectivity in the region.

Key Entities Referenced

National Highways Act, 1956: Act of the Indian Parliament that provides for the declaration of certain highways to be national highways and for the control of such highways. Central Government: The Union Government of India. Official Gazette: A public journal and the official newspaper of record of the government. 4 Lane NH29 Bypass: A four-lane bypass road connecting NH29 near Sandaha Village and NH2 Revasa Village. Sandaha Village: Village in Uttar Pradesh near Km. 11.170 of NH29 NH29: National Highway 29 Revasa Village: Village in Uttar Pradesh near Km. 818.800 of NH2. NH2: National Highway 2 Varanasi PhaseII, Package 2: Road construction project of bypass to Varanasi PhaseII, Package 2 from Design Chainage Km. 30.600 to Km. 57.320 Uttar Pradesh: State in India NHDP Phase VII: National Highways Development Project Phase VII Ring Road: Road in Uttar Pradesh from Km. 40.18 to Km. 57.32 Chandauli: District in Uttar Pradesh Ring Road PhaseII PkgII: Road project in Chandauli district, Uttar Pradesh Mawai Kalan District: District in Uttar Pradesh Mahadevpur: Village in Uttar Pradesh Sahjaur: Village in Uttar Pradesh Pandit Dindayal Upadhyay Nagar: Taluk/Mandal in Uttar Pradesh Mugalsarai: Taluk/Mandal in Uttar Pradesh Bhikhpur: Village in Uttar Pradesh Jiwanpur Chandauli: Village in Uttar Pradesh Kori: Village in Uttar Pradesh Revasa: Village in Uttar Pradesh Barahuli: Village in Uttar Pradesh Ministry of Road Transport and Highways: Government of India ministry responsible for the development and maintenance of national highways
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-04032022-233891 xxxGIDHxxx CG-DL-E-04032022-233891 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण्ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 929] नई दिल्ली, बहृ स्ट्प जतवार, माच ग3, 2022/ फाल्ग नु 12, 1943 No. 929] NEW DELHI, THURSDAY, MARCH 3, 2022/PHALGUNA 12, 1943 सड़क पररवहन और रािमाग ग मत्रं ालय अजधसचू ना नई दिल् ली, 3 माच,ग 2022 का.आ. 959(अ).—केन्द्रीय सरकार, राष्ट्रीय रािमागग अजधजनयम, 1956 (1956 का 48) की धारा 3 के खंड (क) द्वारा प्रित्त िजियों का प्रयोग करते हुए, उत्तर प्रिेि राज्य के चंिौली जिल े म े नीच े िी गयी अनुसूची म े यथा जवजनदिष्ट कंस्ट्रक्िन आफ् 4 लने ऑफ़ एन एच 29 बाईपास कनेक्ऍट ंग एन एच-29 (जनयर संिहा गााँव के दकमी 11.170 आफ् एन एच -29) (रेवासा गााँव के दकमी. 818.800 आफ् एन एच -2) एि पा ् ग आफ् बाईपास ू वाराणसी (फेय्ज़ –२ , पैकेि 2) फ्रॉम जडज़ैन् चनै ेि दकमी 30.600 ू दकमी 57.320 = 26.720 दकमी (कुल लम्बाई = 27.270 दकमी इन्द्क्लुडडंग अन्द्तर लूप एन एच-२ ) इन् ि स्ट् ेय् आफ् उत्तर प्रिेि एन एच डी पी – VII आन् ईपीसी मोड टरंग रोड फेि-2 (फैकेि-II) के दकमी. 40.18 दकमी. स े 57.32 दकमी तक के भुखण्ड के संबंध म ें उि राष्ट्रीय रािमाग ग के जनमागण (चौड़ा करन/े चार लेन का बनाने, आदि), अनुरक्षण,प्रबंध और प्रचालन हते ु उि अजधजनयम के अधीन सक्षम प्राजधकारी के कृत्यो का पालन करन े के जलए इस अजधसूचना के रािपत्र म े प्रकािन दक तारीख स े सक्षम प्राजधकारी के रूप म ेप्राजधकृत करती ह ै। अनसु चू ी उत्तर प्रििे राज्य म ेंराष्ट्रीय रािमाग गसख्ं या-टरंग रोड फेि-2 (फैकेि-II) उत्तर प्रििे राज्य के चिं ौली जिल ेम ेतक की भजू म का अिनग । क्रजमक सक्षम प्राजधकारी भजू म का राज्य जिल ेका तालकु का नाम गावं का नाम सख्ं या जववरण नाम 1 2 3 4 5 6 7 1473 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 1 मवईकला राष्ट्रीय 2 महािेवपुर रािमागग अपर संख्या 3 सहिौर जिलाजधकारी Ring उत्तर पंजडत िीनियाल उपाध्याय नगर 4 भीखपुर 1 (जव0/रा0) Road के चन्द्िौली प्रिेि (मुगलसराय 5 िीवनपुर चन्द्िौली दक.मी. 40.18 से 6 कोरी 57.32 7 रेवसा तक 8 बरहुली [फा. स.ं 11015/5/PD/Varanasu/Ring-road,Phase-II(Pkg-II] रािेि गुप् ता, जनिेिक MINISTRY OF ROAD TRANSPORT AND HIGHWAYS NOTIFICATION New Delhi, the 3rd March, 2022 S.O. 959(E).—In exercise of powers conferred by clause (a) of section 3 of the National Highways Act, 1956(48 of 1956), the Central Government hereby authorizes the officers mentioned in column (2) of the Schedule annexed here to as the competent authorities to perform the functions of such authorities under the said Act with effect from the date of publication of this notification in the Official Gazette, in respect of the stretch of land respect of the stretch of land specifird in the corresponding entry in column (3) of the said schedule relating to Districts, Taluks, Police Stations and Villages mentioned in columns (4), (5), (6) and (7) respectively of the said Schedule for Construction of 4 Lane NH-29 Bypass Connecting NH-29 (near Sandaha Village Km. 11.170 of NH-29) (Revasa Village Km. 818.800 of NH-2) as part of Bypass to Varanasi (Phase–II, Package 2) from Design Chainage Km. 30.600 to Km. 57.320 = 26.720 Km. (Total Length = 27.270 Km. including interchange loop at NH-2) in the State of Uttar Pradesh under NHDP Phase – VII on EPC mode from Km. 40.18 to Km. 57.32 of the Ring Road for building (widening / four-laning, etc.), in District Chandauli in the State of UTTAR PRADESH. SCHEDULE Land acquisition on National Highway No. Ring Road Phase-II (Pkg-II) in District Chandauli in the State of UTTAR PRADESH. Sl. CALA Stretch State District Taluk/Mandal Name of the No. Village 1 2 3 4 5 6 7 Mawai 1 Additional Kalan District 2 Mahadevpur Magistrate 3 Sahjaur (finance 40.18KM UTTAR Pandit Dindayal Upadhyay 1 and To CHANDAULI 4 Bhikh pur PRADESH Nagar (Mugalsarai) revenue), 57.32KM 5 Jiwanpur Chandauli 6 Kori 7 Revasa 8 Barahuli [F. No. 11015/5/PD/Varanasu/Ring-road,Phase-II(Pkg-II] RAJESH GUPTA, Director Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research