## Policy Analysis Report: Construction of ROB on National Highway No. 205 New NH42
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Road Transport and Highways regarding land acquisition for the construction of a Road Over Bridge (ROB) on National Highway No. 205 (New NH42) in Andhra Pradesh. The core purpose is to authorize specific officers to act as competent authorities for land acquisition related to the ROB construction project, replacing a level crossing. Key findings indicate a project focused on improving transportation infrastructure and safety by eliminating a level crossing.
**2. Introduction:**
This report aims to provide a detailed analysis of a government notification (S.O. 3475(E)) published on July 28, 2022, concerning land acquisition for the construction of a Road Over Bridge (ROB) on National Highway No. 205 (New NH42) in Andhra Pradesh. The analysis is based solely on the information provided within the text of the notification.
**3. Policy Overview:**
* This is a **New Policy** initiative focused on a specific infrastructure project.
* **Core Objective(s):** The primary objective is to facilitate the construction of a Road Over Bridge (ROB) on National Highway No. 205 (New NH42) from Km 85400 to Km 87400. This includes authorizing competent authorities for land acquisition necessary for this construction, specifically to replace level crossing No. 41E at Km 86100.
**4. Background and Rationale:**
This is a new policy, the notification addresses the need to replace a level crossing (No. 41E) on National Highway No. 205 (New NH42) with a Road Over Bridge (ROB). The likely reason for this project is to improve traffic flow, reduce congestion and enhance safety by eliminating potential conflicts between road and rail traffic. The construction covers a 2km stretch of land, indicated from Km 85400 to Km 87400.
**5. Key Provisions / Changes:**
As a New Policy notification, the core provisions are:
* **Authorization of Competent Authorities:** The notification authorizes officers mentioned in column 2 of the schedule to perform the functions of competent authorities under the National Highways Act, 1956, effective from the date of publication (July 28, 2022).
* **Land Acquisition for ROB Construction:** The policy mandates land acquisition for the construction of a ROB on National Highway No. 205 (New NH42) from Km 85400 to Km 87400. This construction is intended to replace level crossing No. 41E at Km 86100.
* **Geographic Scope:** The land acquisition applies to specific areas within the Sri Satya Sai District of Andhra Pradesh, specifically the villages of Kadiri, Kutagulla and Saidapuram of Kadiri Taluk/Mandal. The specific area falls between 85.4KM and 87.4KM.
**6. Target Audience and Stakeholders:**
Based on the text, the following are directly affected:
* **Landowners/Residents:** Individuals and entities owning land within the specified stretch of National Highway No. 205 (New NH42) in the Kadiri Taluk/Mandal, which will be acquired for the ROB construction.
* **Commuters and Transportation Companies:** Those who use National Highway No. 205 (New NH42) and will benefit from improved traffic flow and safety after the ROB is constructed.
* **Construction Companies:** Entities likely to be involved in the construction of the ROB.
* **Government Agencies:** Specifically, the Ministry of Road Transport and Highways, the Sri Satya Sai District administration, and relevant local authorities.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency:** The Ministry of Road Transport and Highways is the primary responsible agency. The Joint Collector, Sri Satya Sai District, is identified as the "Competent Authority" (CALA).
* **Procedures:** The policy indicates the application of the National Highways Act, 1956, which outlines the procedures for land acquisition, compensation, and dispute resolution. The competent authority (Joint Collector) has the task of executing these procedures.
* **Timelines:** While a specific project timeline is not stated in the text, the notification takes effect from the date of publication (July 28, 2022), suggesting an immediate commencement of land acquisition procedures.
**8. Expected Outcomes / Impact of Changes:**
The likely intended outcomes are:
* **Improved Transportation Infrastructure:** Construction of the ROB will modernize the transportation infrastructure along National Highway No. 205 (New NH42).
* **Enhanced Safety:** Replacing the level crossing with an ROB will eliminate the risk of accidents between road and rail traffic.
* **Reduced Congestion:** Eliminating the level crossing will improve traffic flow and reduce congestion on the highway.
* **Economic Benefits:** Improved transportation infrastructure can contribute to economic development in the region by facilitating the movement of goods and people.
**9. Conclusion:**
The Ministry of Road Transport and Highways notification authorizes land acquisition and competent authorities for the construction of a ROB on National Highway No. 205 (New NH42) in Andhra Pradesh. This project aims to improve transportation infrastructure, enhance safety, and reduce congestion by replacing an existing level crossing. The implementation will directly impact landowners in the specified area, while the overall outcome is expected to benefit commuters and the regional economy.
Key Entities Referenced
National Highways Act, 1956: An Indian law that empowers the Central Government to declare certain highways as national highways and to regulate their development and maintenance.
Sri Satya Sai District, ANDHRA PRADESH: A district in the state of Andhra Pradesh, India, where the land acquisition is taking place.
Kadiri: A TalukMandal (administrative division) within Sri Satya Sai District, ANDHRA PRADESH
Puttaparthy: A TalukMandal (administrative division) within Sri Satya Sai District, ANDHRA PRADESH
National Highway No.205New NH42: The national highway being upgraded by construction of ROB
Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of national highways.
RAJESH GUPTA: Director at Ministry of Road Transport and Highways
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E2x9xx0 72022-237683
CG-DL-E-29072022-237683
ऄसाधारण
EXTRAORDINARY
भाग II—खण् ड 3—ईप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 3310] नइ ददल्ली, बृहस्ट्प जतवार, िुलाइ 28, 2022/श्रावण 6, 1944
No. 3310] NEW DELHI, THURSDAY, JULY 28, 2022/SHRAVANA 6, 1944
सड़क पररवहन और रािमाग गमत्रं ालय
ऄजधसचू ना
नइ ददल् ली, 28 िुलाइ, 2022
का.अ. 3475(ऄ).—केन्द्रीय सरकार, राष्ट्रीय रािमागग ऄजधजनयम, 1956 (1956 का 48) की धारा 3 के
खंड (क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, आस ऄजधसूचना के िासकीय रािपत्र म ें प्रकाजित होने की तारीख स,े
अंध्र प्रदेि राज्य के श्री सत्य साईं जिलों म ें राष्ट्रीय रािमागग संख्या 205 (नया रारा-42) दक.मी. 85/400 स े
दक.मी. 87/400 पर लेवल क्राससग संख्या.41E पर दक.मी.86/100 के स्ट्थान पर अरओबी जनमागण (दो लेन/चार लेन का
बनाना अदद) प्रबंधन, प्रचलन और अरक्षण हते ु ईि ऄनुसूची के स्ट्तम्भ (4), (5), (6) और (7) म ें क्रमिः ईजल्लजखत राज्य,
जिलों, तालुकों और गावों स े सम्बजन्द्धत ईि ऄनुसूची के स्ट्तम्भ (3) की तत्स्ट्थानी प्रजवजि में जवजनर्ददि भूजम के सम्बन्द्ध म ें
ऄनुसूची के स्ट्तम्भ (2) म ें ईजल्लजखत ऄजधकाररयों को ईि ऄजधजनयम के ऄन्द्तगतग सक्षम ऄजधकाररयों के कृत्यों का जनष्पादन
करने के जलए एतद्द्वारा सक्षम प्राजधकारी के रूप में प्राजधकृत करती है।
5067 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
ऄनसु चू ी
अंध्र प्रदेि राज्य के श्री सत्य साईं जिले म ें राष्ट्रीय रािमाग ग संख्या 205 (नया रारा-42) दक.मी. 85/400
स े दक.मी.87/400 के पर लेवल क्राससग संख्या.41E पर दक.मी. 86/100 के स्ट्थान पर अरओबी जनमागण के संबंध म ेंतक
भूजम का ऄजधग्रहण।
क्रजमक सक्षम प्राजधकारी भूजम का राज्य जिल े तालकु का नाम गावं का नाम
सख्ं या जववरण का
नाम
1 2 3 4 5 6 7
राष्ट्रीय
रािमागग
िॉआंट कलेक्टर, श्री 1 कददरर (अर)
संख्या श्री
सत्य साइ अंध्र
1 NH205 सत्य कददरर 2 कुटागुल्ला
जडजस्ट्रक्ट, पुट्टपर्थथ प्रदेि
के दक.मी. साइ
() 3 साइदापुरम
85.4 से
87.4 तक
[फा. सं. RW/NH-12037/11/2022-23/AP/South-1, Dt.18.04.2022]
रािेि गुप् ता, जनदेिक
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 28th July, 2022
S. O. 3475(E).—In exercise of powers conferred by clause (a) of section 3 of the National Highways
Act, 1956(48 of 1956), the Central Government hereby authorizes the officers mentioned in column (2) of the
Schedule annexed here to as the competent authorities to perform the functions of such authorities under the said Act
with effect from the date of publication of this notification in the Official Gazette, in respect of the stretch of land
specified in the corresponding entry in column (3) of the said Schedule relating to state, districts, taluk/Mandals and
villages mentioned in column (4), (5), (6) and (7) respectively of the said Schedule for building (2 laning/4 laning
etc.,) maintenance, management and operation from Km. 85/400 to Km. 87/400 of Construction of ROB on National
Highway No.205(New NH-42) in lieu of level crossing No.41E at Km. 86/100 in Sri Satya Sai District in the state of
ANDHRA PRADESH.
SCHEDULE
Acquisition of land in respect of Construction of ROB on National Highway No. 205 (New NH-42) from Km. 85/400
to Km. 87/400 in lieu of level crossing No. 41E at Km. 86/100 in Sri Satya Sai District in the state of
ANDHRA PRADESH.
Sl. CALA Stretch State District Taluk/Mandal Name of the Village
No.
1 2 3 4 5 6 7
Joint
1 Kadiri (R)
Collector, Sri 85.4KM
ANDHRA Sri Satya
1 Satya Sai To Kadiri 2 Kutagulla
PRADESH Sai
District, 87.4KM
3 Saidapuram
Puttaparthy
[F. No. RW/NH-12037/11/2022-23/AP/South-1, Dt.18.04.2022]
RAJESH GUPTA, Director
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.