## Policy Analysis Report: Land Acquisition for National Highway No. 205 in Andhra Pradesh
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Road Transport and Highways, Government of India, regarding land acquisition for the construction of a 4-lane Road Over Bridge (ROB) on National Highway (NH) 205 in Andhra Pradesh. The core purpose, as inferred from the text, is to facilitate infrastructure development by acquiring land necessary for the ROB construction. The key finding is the authorization of specific officers to act as competent authorities for land acquisition in designated areas.
**2. Introduction:**
This report aims to provide a comprehensive overview of a government notification pertaining to land acquisition for the construction of a Road Over Bridge (ROB) on National Highway No. 205 in the State of Andhra Pradesh. The analysis is based solely on the provided policy text.
**3. Policy Overview:**
This appears to be a *New Policy* regarding land acquisition for a specific project.
* **Core Objective(s):** The core objective, based on the provided text, is to enable the construction of a 4-lane Road Over Bridge (ROB) on National Highway No. 205 by authorizing land acquisition in the specified area.
**4. Background and Rationale:**
* **New Policy - Likely Problem/Issue:** The policy addresses the need for improved infrastructure and connectivity. The construction of the ROB likely aims to replace an existing level crossing (L.C 95 SPL3E) on the Pakala Tirupati Railway section, potentially to reduce traffic congestion, enhance safety, and improve overall transportation efficiency. The need for land acquisition arises as the construction requires land currently not under government control.
**5. Key Provisions / Changes:**
* **New Policy - Main Components:** The notification establishes the following key provisions:
* **Authorization of Competent Authorities:** The notification authorizes officers (mentioned in column 2 of the Schedule) to act as "competent authorities" under the National Highways Act, 1956. This implies these officers have the power to make decisions and take actions related to land acquisition.
* **Specific Geographic Scope:** The authorization applies to a specific stretch of land required for the construction of a 4-lane ROB at Km. 272.600 of Ananthapur to Chennai Road NH205.
* **Land Designation:** The policy specifies the state (Andhra Pradesh), district (Tirupati), taluk/mandal (Chandragiri and Tirupati Rural), and villages (Mittapalem and Kalur) where the land acquisition will take place. The exact stretch is defined by KM points 271 and 276.
**6. Target Audience and Stakeholders:**
The target audience and stakeholders directly affected by this policy include:
* **Landowners in the specified areas:** Individuals or entities owning land within the designated stretch in Mittapalem and Kalur villages, Chandragiri and Tirupati Rural taluks of Tirupati district, Andhra Pradesh will be impacted by the land acquisition process.
* **Residents and Commuters:** The construction of the ROB will impact residents and commuters who use the NH205 and the Pakala Tirupati Railway section.
* **Construction Companies:** Companies involved in the construction of the ROB.
* **Relevant Government Agencies:** The Ministry of Road Transport and Highways, the Tirupati district administration, and other related government departments involved in the project.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Road Transport and Highways is the primary responsible agency. The authorized officers (Joint Collector, Tirupati) will be responsible for implementing the land acquisition process on the ground.
* **Timelines or Procedures:** The notification states that the authorization is effective from the date of publication in the Official Gazette (December 2, 2022). The specific procedures for land acquisition will likely follow the guidelines outlined in the National Highways Act, 1956.
* **Specifics on implementation:** The CALA (Competent Authority for Land Acquisition) is identified as the Joint Collector, Tirupati.
**8. Expected Outcomes / Impact of Changes:**
* **New Policy - Likely Intended Outcomes:** The intended outcomes of this policy are likely:
* **Smooth Land Acquisition:** Facilitating a legally sound and efficient land acquisition process for the ROB construction.
* **Infrastructure Development:** Enabling the construction of the 4-lane ROB, improving transportation infrastructure.
* **Reduced Congestion and Enhanced Safety:** Replacing the level crossing (L.C 95 SPL3E) potentially leading to reduced traffic congestion and improved safety for both road and rail users.
* **Improved Connectivity:** Improving connectivity and transportation efficiency on NH205.
**9. Conclusion:**
The notification represents a crucial step in the process of constructing a 4-lane Road Over Bridge on National Highway No. 205 in Andhra Pradesh. By authorizing specific officers to act as competent authorities for land acquisition, the policy aims to facilitate the smooth and efficient acquisition of land necessary for this infrastructure project. The construction of the ROB is expected to improve transportation infrastructure, reduce congestion, enhance safety, and improve connectivity in the region.
Key Entities Referenced
National Highways Act, 1956: An act of the Indian Parliament that empowers the Central Government to declare certain highways as national highways and to provide for their development and maintenance.
Central Government: The executive authority of the Union of India.
Ananthapur to Chennai Road: A road connecting Ananthapur and Chennai.
Tirupati: A district in Andhra Pradesh, India.
Andhra Pradesh: A state in India.
Chandragiri: A Taluk/Mandal in Tirupati district, Andhra Pradesh.
Mittapalem: A village in Chandragiri Taluk/Mandal, Tirupati district, Andhra Pradesh.
Tirupati Rural: A Taluk/Mandal in Tirupati district, Andhra Pradesh.
Kalur: A village in Tirupati Rural Taluk/Mandal, Tirupati district, Andhra Pradesh.
Ministry of Road Transport and Highways: A ministry in the Government of India responsible for the development and maintenance of national highways and other road infrastructure.
RAJESH GUPTA: Director in the Ministry of Road Transport and Highways.
New Delhi: The location of the Ministry of Road Transport and Highways.
NH205: National Highway number 205.
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
xxxGIDHxxx
सी.जी.-डी.एलxx.x-GअID.-E0x3xx1 22022-240775
CG-DL-E-03122022-240775
ऄसाधारण
EXTRAORDINARY
भाग II—खण् ड 3—ईप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 5394] नइ ददल्ली, िुक्रवार, ददसम्ब र 2, 2022/ऄग्रहायण 11, 1944
No. 5394] NEW DELHI, FRIDAY, DECEMBER 2, 2022/AGRAHAYANA 11, 1944
सड़क पररवहन और रािमाग गमत्रं ालय
ऄजधसचू ना
नइ ददल् ली, 2 ददसम् बर, 2022
का.अ. 5626(ऄ).—केन्द्रीय सरकार, राष्ट्रीय रािमाग ग ऄजधजनयम, 1956 (1956 का 48) की धारा 3 के खडं
(क) द्वारा प्रदत्त िजियों का प्रयोग करते हुए, आस ऄजधसूचना के िासकीय रािपत्र म ें प्रकाजित होने की तारीख स,े अंध्र
प्रदेि राज्य के जतरुपजत जिले म े पाकला - जतरुपजत रेलवे सेक्िन के एल.सी .संख्या .95 एसपीएल /3 इ के स्ट्थान पर
ऄनन्द्तपुरम - चेन्नइ रोड के दकमी 272/6 पर अरओबी के जनमागण के जलए राष्ट्रीय रािमागग -205 मोिुदा का ईन्नयन चार
लेन म े हते ु ईि ऄनुसूची के स्ट्तम्भ (4), (5), (6) और (7) म ें क्रमिः ईजल्लजखत राज्य, जिलों, तालुकों और गावों स े
सम्बजन्द्धत ईि ऄनुसूची के स्ट्तम्भ (3) की तत्सस्ट्थानी प्रजवजि म ें जवजनर्ददि भूजम के सम्बन्द्ध म ें ऄनुसूची के स्ट्तम्भ (2) म ें
ईजल्लजखत ऄजधकाररयों को ईि ऄजधजनयम के ऄन्द्तगगत सक्षम ऄजधकाररयों के कृत्सयों का जनष्पादन करन े के जलए एतद्द्वारा
सक्षम प्राजधकारी के रूप म ेंप्राजधकृत करती ह।ै
8027 GI/2022 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
ऄनसु चू ी
अंध्र प्रदेि राज्य म ेंराष्ट्रीय रािमागग संख्या 205 पर भूजम का ऄजधग्रहण
क्रजमक सक्षम भूजम का राज्य जिल ेका नाम तालकु का नाम गावं का नाम
सख्ं या प्राजधकारी जववरण
1 2 3 4 5 6 7
राष्ट्रीय
रािमागग
संयुि संख्या चंरजगरर 1 जमत्तापलेम
1 कलेक्टर, NH205 के अंध्र प्रदेि जतरुपजत
जतरुपजत जतरुपजत ग्रामीण 1 कलूर
दक.मी. 271
से 276 तक
[फा. स.ं RW/NH-12014/AP(32)LA/16-S&R(B)]
रािेि गुप् ता, जनदेिक
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, the 2nd December, 2022
S.O. 5626(E).— In exercise of powers conferred by clause (a) of section 3 of the National Highways Act,
1956(48 of 1956), the Central Government hereby authorizes the officers mentioned in column (2) of the Schedule
annexed here to as the competent authorities to perform the functions of such authorities under the said Act with effect
from the date of publication of this notification in the Official Gazette, in respect of the stretch of land specified in
the corresponding entry in column (3) of the said Schedule relating to state, districts, taluk and villages mentioned
in column (4), (5), (6) and (7) respectively of the said Schedule for construction of 4 lane ROB at Km. 272/600 of
Ananthapur to Chennai Road NH-205 in lieu of L.C 95 SPL/3E of Pakala - Tirupati Railway section in the district of
Tirupati in the State of Andhra Pradesh.
SCHEDULE
Land acquisition on National Highway No. 205 in the State of ANDHRA PRADESH.
Sl. CALA Stretch State District Taluk/Mandal Name of the Village
No.
1 2 3 4 5 6 7
271
JOINT Chandragiri 1 Mittapalem
KM. To ANDHRA
1 COLLECTOR , Tirupati
276 PRADESH
TIRUPATI Tirupati Rural 1 Kalur
KM.
[F. No. RW/NH-12014/AP(32)LA/16-S&R(B)]
RAJESH GUPTA, Director
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064