## Report on South Central Railway Land Acquisition Notification
**1. Executive Summary:**
This report analyzes a notification (S.O. 1701E) issued by the Ministry of Railways, South Central Railway, regarding land acquisition for Special Railway Projects. The core purpose of this notification is to authorize specific officers to act as Competent Authorities for Land Acquisition for the execution, maintenance, management, and operation of railway projects within Andhra Pradesh. The key finding is the delegation of authority to Revenue Divisional Officers in specific districts to expedite land acquisition for the construction of Road Over Bridges at several Level Crossings.
**2. Introduction:**
This report aims to provide a detailed overview of the land acquisition notification issued by the Ministry of Railways, South Central Railway, as published in the Gazette of India. The analysis is based solely on the provided policy text and focuses on understanding the notification's objectives, provisions, and potential impact.
**3. Policy Overview:**
* **Core Objective(s):** As inferred from the text, the primary objective of this notification is to streamline the land acquisition process for specific railway infrastructure projects (Road Over Bridges) by delegating authority to designated officers. This aims to facilitate the timely execution of these projects.
**4. Background and Rationale:**
* **Rationale:** The notification suggests an effort to expedite infrastructure development in the railway sector. The construction of Road Over Bridges (ROBs) in lieu of Level Crossings (LCs) likely addresses issues related to safety, traffic congestion, and operational efficiency of the railway network. The delegation of land acquisition authority to local Revenue Divisional Officers likely aims to reduce bureaucratic delays and accelerate project implementation.
**5. Key Provisions / Changes:**
* **Amendment or New Policy**: Given the nature of the "S.O." designation and the specific reference to Section 2 of the Railways Act, 1989, it is likely this is a *new* policy *within the framework* of the existing act.
* **Main components:**
* The notification authorizes the officer mentioned in column 5 of the Table to perform the functions of the Competent Authority for Land Acquisition.
* It specifies the Special Railway Projects, States, and Districts to which this authorization applies.
* The authorization is effective from the date of publication of the notification in the Official Gazette.
* The listed projects are the Construction of Road Over Bridges in lieu of Level Crossings in Andhra Pradesh.
**6. Target Audience and Stakeholders:**
Based on the text, the directly affected stakeholders include:
* **The Revenue Divisional Officers** of Anakapalli and Narsipatnam in Andhra Pradesh, who are designated as the Competent Authority for Land Acquisition.
* **Residents of the areas** where the Road Over Bridges will be constructed, as land acquisition may impact their properties.
* **The Railways Ministry and South Central Railway** are stakeholders aiming to improve railway infrastructure and operations.
* **Commuters and businesses** that rely on the railway network and road transportation in the affected areas.
**7. Implementation Aspects (Inferred):**
* **Responsible Agency/Bodies:** The Ministry of Railways, South Central Railway, is the primary body responsible for issuing and implementing this notification. The Revenue Divisional Officers are responsible for carrying out the land acquisition process.
* **Timelines/Procedures:** The notification is effective from the date of its publication in the Official Gazette. Specific timelines and procedures for land acquisition are not detailed in the provided text but are likely governed by the Railways Act, 1989, and other relevant land acquisition laws.
**8. Expected Outcomes / Impact of Changes:**
* **Expected Outcomes:** The intended outcomes of this notification are:
* Accelerated land acquisition for the construction of Road Over Bridges.
* Improved railway infrastructure and reduced traffic congestion at Level Crossings.
* Enhanced safety for both railway and road users.
* Streamlined project implementation and reduced delays.
**9. Conclusion:**
The notification issued by the Ministry of Railways, South Central Railway, represents a strategic effort to expedite land acquisition for critical railway infrastructure projects in Andhra Pradesh. By delegating authority to local Revenue Divisional Officers, the government aims to streamline the land acquisition process, facilitate the timely construction of Road Over Bridges, and ultimately improve the efficiency and safety of the railway network. This notification is significant as it directly impacts infrastructure development and land use in the specified regions of Andhra Pradesh.
Key Entities Referenced
Railways Act, 1989: Act cited as the source of authority for the Central Government's authorization.
Section 2: Reference to a specific section within the Railways Act, 1989.
clause 7A: A specific clause within Section 2 of the Railways Act, 1989, granting powers.
Central Government: The governing body authorizing the officer to perform functions.
Official Gazette: The publication in which the notification is to be published.
Special Railway Project: A railway project mentioned in column 2 of the table for execution, maintenance, management and operation
Ministry of Railways: The government organization issuing the notification.
S.O. 1701E: Notification number
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-टी.एल.-अ.-11042025-262421
CG-TLxx-xEG-I1D1H0x4x2x0 25-262421
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1670] नई ददलली, िुक्रवार, अप्रलै 11, 2025/चत्रै 21, 1947
No. 1670] NEW DELHI, FRIDAY, APRIL 11, 2025/CHAITRA 21, 1947
रेल मत्रं ालय
(दजिण मध्य रेलव)े
अजधसचू ना
जसकंदराबाद, 7 अप्रैल, 2025
का.आ. 1701(अ).— केंद्र सरकार, रेलवे अजधजनयम, 1989 की धारा 2 के खंड (7क) द्वारा प्रदत्त िजियों का प्रयोग
करते हुए, एतद्द्वारा नीच ेदी गई ताजलका के कॉलम (5) म ेंउजललजखत अजधकारी को आजधकाररक रािपत्र म ेंइस अजधसूचना
के प्रकािन की तारीख स े उि ताजलका के कॉलम (3) म ें उजललजखत राज्य म ें जनष्पादन, रखरखाव, प्रबंधन और संचालन के
जलए ताजलका के कॉलम (2) में उजललजखत जविेष रेलवे पररयोिना के संबंध म ेंभूजम अजधग्रहण के जलए सिम प्राजधकारी के
कायों को जनष्पाददत करन े के जलए प्राजधकृत करती ह ैI
2492 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
ताजलका
क्र.स.ं जविषे रेलव ेपररयोिना राज्य जिला भूजम अजधग्रहण के जलए सिम
प्राजधकारी
(1) (2) (3) (4) (5)
1. बय्यावरम् - नरससगं पलली के बीच
दक.मी. 730/17-19 पर जस्ट्ित रेलव े
फाटक नंबर 478 पर रोड ओवर जिि
का जनमााण
रािस्ट्व मडं ल अजधकारी,
आंध्र प्रदेि अनकापलली
2 बय्यावरम् - अनकापलली के बीच अनकापलली
दक.मी. 740/6-8 पर जस्ट्ित रेलव े
फाटक नंबर 482 पर रोड ओवर जिि
का जनमााण
3 गुललीपाडु – नर्सापट्नम ् रोड के बीच
दक.मी. 693/12-14 पर जस्ट्ित रेलव े
फाटक नंबर 455 पर रोड ओवर जिि
का जनमााण
रािस्ट्व मडं ल अजधकारी,
आंध्र प्रदेि अनकापलली
4 नर्सापट्नम् रोड - रेगुपालेम् के बीच नर्सापट्नम्
दक.मी. 709/26-28 पर जस्ट्ित रेलव े
फाटक नंबर 469 पर रोड ओवर जिि
का जनमााण”
[फा. सं. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/115]
मनोि कुमार, मुख्य इंिीजनयर/सी/ आरएसपी[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
MINISTRY OF RAILWAYS
(South Central Railway)
NOTIFICATION
Secunderabad, the 7th April, 2025
S.O. 1701(E).— In exercise of the powers conferred by clause (7A) of Section 2 of the Railways Act, 1989 the
Central Government hereby authorizes the officer mentioned in the column (5) of the Table below to perform the
functions of the Competent Authority for Land Acquisition in respect of the Special Railway Project as mentioned in
column (2) of the Table for execution, maintenance, management and operation in the state mentioned in column (3) of
the said table with effect from the date of publication of this notification in the Official Gazette.
TABLE
Sl.No. Special Railway Project State District Competent authority for
Land Acquisition
(1) (2) (3) (4) (5)
1. Construction of Road Over
Bridge in lieu of Level Crossing
No. 478 at Km. 730/17-19
between Bayyavaram –
Narasingapalli stations Andhra Revenue Divisional Officer,
Anakapalli
pradesh Anakapalli
2. Construction of Road Over
Bridge in lieu of Level Crossing
No. 482 at Km. 740/6-8 between
Bayyavaram - Anakapalle stations
3 Construction of Road Over
Bridge in lieu of Level Crossing
No. 455 at Km. 693/12-14
between Gullipadu - Narsipatnam
Road stations
Andhra Revenue Divisional Officer,
Anakapalli
pradesh Narsipatnam
4 Construction of Road Over
Bridge in lieu of LC No. 469 at
Km. 709/26-28 between
Narsipatnam Road - Regupalem
Stations
[F. No. DYCE/CON/RSP/ROB/LAND AQ/2025/7A/115]
MANOJ KUMAR, Chief Engineer/C/RSP
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.