Publishing Corrigendum for Construction of Road Over Bridge in lieu of Level Crossing No 407 at Km 593/32 34 in between Kadiyam Dwarapudi stations

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Corrigendum to Railway Infrastructure Project in Andhra Pradesh **1. Executive Summary:** This report analyzes a corrigendum issued by the Ministry of Railways, South Central Railways, regarding a previously published notification (S.O. 409E) concerning the construction of a Road Over Bridge (ROB) in lieu of a Level Crossing in Andhra Pradesh. The corrigendum addresses an error in the original notification, specifically correcting the district where the project is located and the level crossing number. The core purpose of this amendment is to ensure the accuracy of the project's geographical location and relevant identification number, facilitating proper implementation and land acquisition. **2. Introduction:** This report aims to provide a detailed analysis of a corrigendum (reference number RSPSCGazette 37ALC.407 BZA VSKPBZACorrigendum01) published by the Ministry of Railways, South Central Railways, concerning a notification regarding the construction of a Road Over Bridge in Andhra Pradesh. The analysis focuses solely on the information presented within the provided document. **3. Policy Overview:** * **Amendment:** This document is a corrigendum, meaning it amends a previous notification (S.O. 409E) published on January 22, 2025. * **Core Objective(s) as stated or inferred:** The objective of the *original* policy, as inferred from the corrigendum, is the Construction of a Road Over Bridge in lieu of a Level Crossing, designated as a "Special Railway Project" for land acquisition. The objective of the *corrigendum* is to correct errors in the original notification, specifically regarding the location and identification of the Level Crossing. **4. Background and Rationale:** Since this is an amendment, the rationale focuses on the reason for the change. The amendment is likely necessary because the original notification (S.O. 409E) contained incorrect information regarding the district where the Road Over Bridge project was to be constructed and the Level Crossing number. This inaccuracy could lead to misdirected land acquisition efforts, construction delays, and potential legal challenges. The corrigendum aims to rectify these errors to ensure the project proceeds smoothly. **5. Key Provisions / Changes:** This section focuses on the *specific changes* introduced by the corrigendum: * **Specific Part of Original Policy Being Changed:** The corrigendum directly alters the information related to the location (district) and identification number of the Level Crossing. * **New Rule/Provision:** The corrigendum specifies the following changes: * **District:** Changes the district from "East Godavari" to "Dr.B.R.Ambedkar Konaseema". * **Level Crossing Number:** Changes the Level Crossing number from "407" to "5933234". * **Difference/Effect of the Change:** * **District:** The correction ensures that land acquisition efforts are directed towards the correct geographical area, preventing potential disputes and ensuring the project is implemented in the intended location. * **Level Crossing Number:** The correction ensures proper identification and referencing of the specific level crossing being replaced, which is crucial for planning, construction, and future maintenance. **6. Target Audience and Stakeholders:** Based on the text, the following are directly affected by this policy (and the changes introduced by the corrigendum): * **Residents and landowners in Dr.B.R.Ambedkar Konaseema District:** The change in district designation directly impacts land acquisition processes. * **Railways personnel involved in the project:** Engineers, surveyors, and construction teams need accurate location information and level crossing identification for effective project execution. * **Relevant government agencies in Andhra Pradesh:** State and local authorities involved in land acquisition, infrastructure development, and project approvals require accurate information to facilitate the project. **7. Implementation Aspects (Inferred):** * **Responsible agency/bodies mentioned:** Ministry of Railways, South Central Railways. The Chief Engineer/CRSP (Manoj Kumar) is also mentioned. * **Timelines or procedures specified:** The effective date is tied to the publication date of the original notification. The corrigendum takes effect from the date of the original notification, meaning the corrected information should be used from that point forward. * **Implementation aspects specific to the changes:** The primary implementation aspect is updating all relevant project documents, databases, and communication channels with the corrected district name and Level Crossing number. **8. Expected Outcomes / Impact of Changes:** The intended outcome of these changes is to ensure the accurate implementation of the Road Over Bridge project. By correcting the district and level crossing number, the corrigendum aims to: * Facilitate correct land acquisition processes in Dr.B.R.Ambedkar Konaseema District. * Prevent delays and potential legal challenges arising from incorrect location information. * Enable accurate planning and construction of the Road Over Bridge. * Ensure the project benefits the intended communities and improves transportation infrastructure in the correct region. **9. Conclusion:** The corrigendum to the Ministry of Railways notification is a crucial administrative step to ensure the accurate and effective implementation of the Road Over Bridge project in Andhra Pradesh. By correcting the district designation and Level Crossing number, the amendment clarifies the project's scope and location, minimizing potential errors and facilitating smooth project execution. The changes are significant because they directly impact land acquisition, project planning, and ultimately, the successful completion of a vital infrastructure project.

Key Entities Referenced

S.O. 1696E: Notification of the Government of India, Ministry of Railways Ministry of Railways: Government organization responsible for railways Gazette of India: Official Government Gazette Part II, Section 3, Subsectionii: Section of the Gazette of India 22 January 2025: Date of notification publication S.O.409E: Notification number regarding Construction of Road Over Bridge Railways Act, 1989: Legislation related to railways Section 2: Section of the Railways Act, 1989 clause 37A: Clause of Section 2 of the Railways Act, 1989 Special Railway Project: Project designation for acquisition of land National Infrastructure: Infrastructure project for a public purpose
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-टी.एल.-अ.-11042025-262410 CG-TLxx-xEG-I1D1H0x4x2x0 25-262410 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1665] नई ददल्ली, िुक्रवार, अप्रलै 11, 2025/चत्रै 21, 1947 No. 1665] NEW DELHI, FRIDAY, APRIL 11, 2025/CHAITRA 21, 1947 रेल मत्रं ालय (दजिण मध्य रेलव)े िजु िपत्र जसकंदराबाद, 4 अप्रैल, 2025 का.आ. 1696(अ).— भारत सरकार, रेल मंत्रालय की अजधसूचना, िो एस.ओ. 409 (ई) के अंतगगत भारत के रािपत्र, असाधारण, भाग II, धारा 3, उपधारा (ii) ददनांदकत 22 िनवरी 2025 को “आध्रं प्रदेि राज्य के डॉ.बी.आर.अम्बेडकर कोनसीमा जिला म ें जस्ट्ित समपार फाटक के स्ट्िान पर ऊपरी पैदल पलु का जनमागण” के संबंध म ें प्रकाजित हुई िी, म ेंरेल मंत्रालय एतद्द्वारा जनम्नजलजखत िुजिपची तैयार करता ह,ै जिसका जववरण नीच े ददया गया ह:ै क्र.स.ं इस रूप म ेंप्रकाजित इस प्रकार पढा िाए 1 केंद्र सरकार, रेलव ेअजधजनयम, 1989 के एस.ओ.409 केंद्र सरकार, रेलवे अजधजनयम, 1989 के (अ) के अंतगगत धारा 2 के खंड (37 क) , ददनांदकत 22 एस.ओ.409 (अ) के अतं गतग धारा 2 के खंड (37 क), िनवरी 2025 द्वारा प्रदत्त िजियों का प्रयोग करत े ददनांदकत 22 िनवरी 2025 द्वारा प्रदत्त िजियों हुए, एतद्वारा, “ कजडयम - द्वारपुजड स्ट्टेिनों के बीच का प्रयोग करते हुए, एतद्वारा, “ कजडयम - द्वारपुजड 593/32-34 दक.मी. पर जस्ट्ित समपार फाटक सं. स्ट्टेिनों के बीच 593/32-34 दक.मी. पर जस्ट्ित 407 के स्ट्िान पर ऊपरी पैदल पुल का जनमागण” को समपार फाटक सं. 407 के स्ट्िान पर ऊपरी पदै ल 2486 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] िन प्रयोिन हते ु राष्ट्रीय अवसरं चना प्रदान करने के पुल का जनमागण” को िन प्रयोिन हते ु राष्ट्रीय जलए आंध्र प्रदिे राज्य के पूव ग गोदावरी जिला म ें भूजम अवसंरचना प्रदान करन ेके जलए आध्रं प्रदेि राज्य के अजधग्रहण हते ु आजधकाररक रािपत्र म ेंइस अजधसूचना डॉ.बी.आर.अम्बेडकर कोनसीमा जिला म ें भूजम के प्रकािन की तारीख स े एक जविेष रेल पररयोिना अजधग्रहण हते ु आजधकाररक रािपत्र म ें इस के रूप म ेंअजधसूजचत करती ह.ै अजधसूचना के प्रकािन की तारीख स ेएक जविेष रेल पररयोिना के रूप म ें अजधसूजचत करती ह.ै [फा. स.ं RSP/SC/Gazette /37A/LC.407 /BZA -VSKP/BZA/Corrigendum/01] मनोि कुमार, मुख्य इंिीजनयर/जन /आरएसपी MINISTRY OF RAILWAYS (South Central Railways) CORRIGENDUM Secunderabad, the 4th April, 2025 S.O. 1696(E).— In the notification of the Government of India, Ministry of Railways published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section(ii) Dated 22 January 2025 vide S.O.409(E) regarding “Construction of Road Over Bridge in lieu of Level Crossings in the District of Dr.B.R.Ambedkar Konaseema, in the of State of Andhra Pradesh” the Ministry of Railways hereby makes the following corrigendum as detailed below: Sl.No. Published as To be read as 1 In exercise of the powers conferred by clause (37A) In exercise of the powers conferred by clause of Section 2, dated 22nd January 2025 vide (37A) of Section 2, dated 22nd January 2025 vide S.O.409(E) of the Railways Act, 1989 the Central S.O. 409(E) of the Railways Act, 1989 the Central Government hereby notifies “Construction of Road Government hereby notifies “Construction of Over Bridge in lieu of Level Crossing No. 407 at Km. Road Over Bridge in lieu of Level Crossing No. 593/32-34 in between Kadiyam - Dwarapudi 407 at Km. 593/32-34 in between Kadiyam - stations" as a Special Railway Project for acquisition Dwarapudi stations" as a Special Railway Project of land in the State of Andhra Pradesh in the District for acquisition of land in the State of Andhra of East Godavari for providing National Pradesh in the District of Dr.B.R.Ambedkar Infrastructure for a public purpose with effect from Konaseema for providing National Infrastructure the date of publication of this notification in the for a public purpose with effect from the date of Official Gazette. publication of this notification in the Official Gazette. [F. No. RSP/SC/Gazette /37A/LC.407 /BZA -VSKP/BZA/Corrigendum/01] MANOJ KUMAR, Chief Engineer/C/RSP Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.