See Full Document Text
Regarding need to ensure connectivity of upcoming Thane
High-Speed Rail Station with the existing regional transport
network-Laid
DR. SHRIKANT EKNATH SHINDE (KALYAN): I wish to draw the
urgent attention of the Hon'ble Minister of Railways towards the
critical need for integrating the upcoming Thane High-Speed Rail
(HSR) station with the region's existing transport network. While I
thank the Government for approving the Thane Integral Ring
Metro, a major connectivity gap remains regarding the Thane HSR
station under the Mumbai-Ahmedabad High-Speed Rail project.
Unlike the BKC station, Thane HSR station is situated at a remote
location between Diva and Dombivli, currently lacking adequate
links to Metro or Suburban railway lines. To maximize ridership and
ensure utility for the dense populations of Thane, Navi Mumbai,
and Kalyan, seamless feeder connectivity is imperative. I strongly
recommend the Ministry to consider three specific connector
corridors: a 9.75 km link connecting the HSR station to Thane
Junction (Metro and Rail, a 4.1 km link to Kopar (Dombivli) Railway
Station, and a 3.2 km connectivity to the Sonarpada Metro Line-12
station. These connections will transform the HSR station into a
true multi-modal hub, significantly reducing travel barriers and
boosting socio-economic growth in the region. I earnestly urge the
Ministry of Railways and NHSRCL to grant in-principal approval
and extend financial support for these integration projects so that a
Detailed Project Report (DPR) can be initiated immediately to
benefit millions of commuters.