## Policy Analysis Report: Authorization of Competent Authority for Railway Projects in Andhra Pradesh
**1. Executive Summary:**
This report analyzes a notification from the Ministry of Railways, Government of India, authorizing a Competent Authority to perform functions under the Railways Act, 1989, for specific railway projects in Andhra Pradesh. This is a new policy. The core purpose, as inferred from the text, is to expedite the construction of Railway Over Bridges (ROBs) in lieu of existing Level Crossings (LCs) in the Khurda Road Division. The key finding is the delegation of authority to the Revenue Divisional Officer, Palasa, for specific ROB projects, aiming to streamline project execution and potentially improve railway safety and efficiency.
**2. Introduction:**
The purpose of this report is to provide an informative analysis of a notification published by the Ministry of Railways regarding the authorization of a Competent Authority for special railway projects. This analysis is based solely on the text of the notification provided.
**3. Policy Overview:**
* **Core Objective(s):** The core objective, inferred from the text, is to facilitate and expedite the construction of Railway Over Bridges (ROBs) to replace existing Level Crossings (LCs) within the Khurda Road Division in Andhra Pradesh. This appears to be aimed at improving safety and reducing delays related to train and road traffic interaction at level crossings.
**4. Background and Rationale:**
* **New Policy:** The policy likely addresses the challenges associated with the timely completion of railway infrastructure projects, specifically ROBs intended to replace busy or unsafe level crossings. By designating a Competent Authority, the government aims to streamline the approval and execution processes, potentially overcoming bureaucratic hurdles and accelerating project completion. The replacement of level crossings with ROBs usually aims to reduce accidents, improve traffic flow, and increase railway efficiency.
**5. Key Provisions / Changes:**
* **New Policy:** This policy establishes the authorization of a "Competent Authority" to perform functions under the Railways Act, 1989, Clause 7A of Section 2.
* The Revenue Divisional Officer, Palasa, is designated as the Competent Authority for the following specific projects:
* Proposed ROB in lieu of LC.No.326 between Surla Road-SLRDIchhapuram IPM Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.329 between Surla Road-SLRDIchhapuram IPM Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.330 between IchhapuramIPMJhadupudiJPI Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.334 between IchhapuramIPMJhadupudiJPI Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.341 between JhadupudiJPISompetaSPT Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.343 between JhadupudiJPISompetaSPT Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.348 between SompetaSPTBaruvaBAV Stations of Khurda Road Division.
* Proposed ROB in lieu of L.C.No.345 between SompetaSPTBaruvaBAV Stations of Khurda Road Division.
* Proposed ROB in lieu of L.C.No.351 between SompetaSPTBaruvaBAV Stations of Khurda Road Division.
* Proposed ROB in lieu of LC.No.353 between BaruvaBAVMandasa RoadMMS Stations of Khurda Road Division.
* Proposed ROB in lieu of L.C.No.354 between BaruvaBAVMandasa Road MMS Stations of Khurda Road Division.
* Proposed ROB in lieu of L.C.No.358 between BaruvaBAVMandasa Road MMS Stations of Khurda Road Division.
* The authorization is effective from the date of publication of the notification in the Official Gazette (April 8, 2025).
**6. Target Audience and Stakeholders:**
The directly affected stakeholders include:
* **East Coast Railway:** As the responsible railway zone for the projects.
* **Revenue Divisional Officer, Palasa:** As the designated Competent Authority.
* **Residents of the Khurda Road Division Area:** As beneficiaries of improved infrastructure and safety.
* **Construction Companies:** Potentially bidding for and executing the ROB projects.
* **Commuters and Travellers:** Users of both rail and road transport in the affected areas.
* **Ministry of Railways:** Responsible for overseeing the implementation and achieving the desired outcomes.
**7. Implementation Aspects (Inferred):**
* **Responsible agency/bodies:** The Ministry of Railways is ultimately responsible. The East Coast Railway is the implementing agency, with the Revenue Divisional Officer, Palasa, holding specific authority to expedite the projects.
* **Timelines or procedures:** The policy is effective immediately upon publication. No specific timelines for project completion are mentioned in the provided text. The Competent Authority is expected to follow established procedures under the Railways Act, 1989.
**8. Expected Outcomes / Impact of Changes:**
* **New Policy:** The likely intended outcomes are:
* Accelerated construction of ROBs in lieu of existing level crossings.
* Improved safety for both rail and road traffic.
* Reduced traffic congestion and delays at level crossings.
* Enhanced efficiency of railway operations.
* Streamlined project approvals and land acquisition processes, potentially resulting in cost savings.
**9. Conclusion:**
This notification represents a step towards improving railway infrastructure in Andhra Pradesh by streamlining the project execution process for ROB construction. By delegating authority to the Revenue Divisional Officer, Palasa, the Ministry of Railways aims to expedite project completion, enhance safety, and improve traffic flow in the Khurda Road Division. The success of this policy will depend on the effective implementation of the Railways Act, 1989, and the efficient coordination between the various stakeholders involved.
Key Entities Referenced
Railways Act, 1989: Act authorizing the Central Government to delegate authority for railway projects.
Section2: A section of the Railways Act, 1989.
Clause 7A: A clause within Section 2 of the Railways Act, 1989.
Central Government: The governing body that authorizes the officer for the railway project.
Ministry of Railways: Government ministry responsible for railways.
East Coast Railway Construction: Name of the railway construction project.
S.O. 1673E: Notification number for the authorization.
Official Gazette: The official publication where the notification is published.
Special Railway Project: Designation for the specific railway project mentioned in the table.
Andhra Pradesh: The state where the Special Railway Project is located.
LC.No.326: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.329: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.330: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.334: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.341: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.343: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
L.C.No.348: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
L.C.No.345: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
L.C.No.351: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
LC.No.353: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
L.C.No.354: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
L.C.No.358: Level crossing number, proposed to be replaced by ROB (Road Over Bridge).
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99
सी.जी.-ओ.आर.-अ.-11042025-262380
CG-OxRx-xEG-I1D1H0x4x2x0 25-262380
xxxGIDExxx
असाधारण
EXTRAORDINARY
भाग II—खण् ड 3—उप-खण्ड (ii)
PART II—Section 3—Sub-section (ii)
प्राजधकार स ेप्रकाजित
PUBLISHED BY AUTHORITY
स.ं 1642] नई ददल्ली, मगं लवार, अप्रैल 8, 2025/चत्रै 18, 1947
No. 1642] NEW DELHI, TUESDAY, APRIL 8, 2025/CHAITRA 18, 1947
रेल मत्रं ालय
[पर्ू व तट रेलर् े (निर्मणव )]
अजधसचू ना
भुबिेश्वर, 8 अप्रैल, 2025
का.आ. 1673(अ).—केंद्रीय सरकमर, रेल अनिनियर् १९८९ (१९८९ कम २४) की िमरम २ के खंड ७ (ए) द्वमरम
प्रदत शनियों कम प्रयोग करत े हुए, सरकमरी गजट र् ें इस अनिसूचिम के प्रकमशि की तमरीख स े आध्रं प्रदेि रमज्य र् ें एतद्वमरम
निच े दी गई तमनलकम के स्तम्भ (२) र् ें बर्णवत अनिकमररओं के| स्तम्भ (३) र् ें उनललनखत नर्शषे रेल पररयोजिम के क्षत्रे के
सम्बन्ि र् ें इस तरह कमय व करि ेके नलए सक्षम प्रमनिकमरी के रूप र् ेंअनिकृत करती ह|ै
तमनलकम
क्रर् स ं सक्षम प्रमनिकमरी कम िमर् नर्शषे रेल पररयोजिम के क्षत्रे
(1) (2) (3)
सुरलम रोड(एसएलआरडी)-इच्छमपुरर्(आईपीएर्) स्टेशिों के बीच एल.सी.
1.
संख्यम 326 के स्थमि पर प्रस्तमनर्त आरओबी, खुदमव रोड नडर्ीजि।
सुरलम रोड(एसएलआरडी)-इच्छमपुरर्(आईपीएर्) स्टेशिों के बीच एल.सी.
2.
रािस्ट्व अनुजवभागीय अजधकारी, संख्यम 329 के स्थमि पर प्रस्तमनर्त आरओबी, खुदमव रोड नडर्ीजि।
3. पलमसम इच्छमपुरर् (आईपीएर्) - झडुपुडी (जेपीआई) स्टेशिों के बीच एल.सी. संख्यम 330
2447 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
के स्थमि पर प्रस्तमनर्त आरओबी, खुदमव रोड नडर्ीजि।
इच्छमपुरर् (आईपीएर्) - झडुपुडी (जेपीआई) स्टेशिों के बीच एल.सी. संख्यम 334
4.
के स्थमि पर प्रस्तमनर्त आरओबी, खुदमव रोड नडर्ीजि।
खुदमव रोड नडर्ीजि के झडुपुडी (जेपीआई) - सोर्पेटम (एसपीटी) स्टेशिों के बीच
5.
एल.सी. संख्यम 341 के स्थमि पर प्रस्तमनर्त आरओबी।
खुदमव रोड नडर्ीजि के झडुपुडी (जेपीआई) - सोर्पेटम (एसपीटी) स्टेशिों के बीच
6.
एल.सी. संख्यम 343 के स्थमि पर प्रस्तमनर्त आरओबी।
खुदमव रोड नडर्ीजि के सोर्पेटम (SPT) - बरुर्म (BAV) स्टेशिों के बीच
7.
L.C.No.348 के स्थमि पर प्रस्तमनर्त ROB।
खुदमव रोड नडर्ीजि के सोर्पेटम (SPT) - बरुर्म (BAV) स्टेशिों के बीच
8.
L.C.No.345 के स्थमि पर प्रस्तमनर्त ROB।
रािस्ट्व अनुजवभागीय अजधकारी,
पलमसम खुदमव रोड नडर्ीजि के सोर्पेटम (SPT) - बरुर्म (BAV) स्टेशिों के बीच
9.
L.C.No.351 के स्थमि पर प्रस्तमनर्त ROB।
खुदमव रोड नडर्ीजि के बरुर्म (बीएर्ी) - र्ंडसम रोड (MMS) स्टेशिों के बीच
10.
एल.सी. संख्यम 353 के स्थमि पर प्रस्तमनर्त आरओबी।
खुदमव रोड नडर्ीजि के बरुर्म (बीएर्ी) - र्ंडसम रोड (MMS) स्टेशिों के बीच
11.
एल.सी. संख्यम 354 के स्थमि पर प्रस्तमनर्त आरओबी।
खुदमव रोड नडर्ीजि के बरुर्म (बीएर्ी) - र्ंडसम रोड (MMS) स्टेशिों के बीच
12.
एल.सी. संख्यम 358 के स्थमि पर प्रस्तमनर्त आरओबी।
[फा. सं. ECoR/Dy.CE/RSP/BBS/ROBs/PH-30/12 ROBs/CALA]
अजय कुर्मर समर्ल, चीफ इंजीनियर (निर्मवण -१)
MINISTRY OF RAILWAYS
[East Coast Railway (Construction)]
NOTIFICATION
Bhubaneswar, the 8th April, 2025
S.O. 1673(E).—In exercise of the powers, conferred by Clause 7(A) of Section–2 of the Railways Act, 1989
(24 of 1989) the Central Government hereby authorize the officer mentioned in column (2) of the Table below as the
Competent Authority to perform the function of such authority under said Act in respect of area of the Special
Railway Project mentioned in column (3) of the Table below in the State of Andhra Pradesh with effect from the
date of publication of this notification in the Official Gazette.
TABLE
S.No. Competent Authority Area of the Special Railway Project
(1) (2) (3)
Proposed ROB in lieu of LC.No.326 between Surla
1. Road(SLRD)–Ichhapuram (IPM) Stations of Khurda
Road Division.
Proposed ROB in lieu of LC.No.329 between Surla
2. Road(SLRD)–Ichhapuram (IPM) Stations of Khurda
Road Division.
Proposed ROB in lieu of LC.No.330 between
3. Ichhapuram(IPM)–Jhadupudi(JPI) Stations of Khurda
Road Division.
The Revenue Divisional Officer,
Proposed ROB in lieu of LC.No.334 between
Palasa
4. Ichhapuram(IPM)–Jhadupudi(JPI) Stations of Khurda
Road Division.[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3
Proposed ROB in lieu of LC.No.341 between
5. Jhadupudi(JPI)–Sompeta(SPT) Stations of Khurda Road
Division.
Proposed ROB in lieu of LC.No.343 between
6. Jhadupudi(JPI)–Sompeta(SPT) Stations of Khurda Road
Division.
Proposed ROB in lieu of LC.No.348 between
7. Sompeta(SPT)–Baruva(BAV) Stations of Khurda Road
Division.
Proposed ROB in lieu of L.C.No.345 between
8. Sompeta(SPT)–Baruva(BAV) Stations of Khurda Road
Division.
Proposed ROB in lieu of L.C.No.351 between
9. Sompeta(SPT)–Baruva(BAV) Stations of Khurda Road
Division.
Proposed ROB in lieu of LC.No.353 between
10. Baruva(BAV)–Mandasa Road(MMS) Stations of Khurda
The Revenue Divisional Officer, Road Division.
Palasa Proposed ROB in lieu of L.C.No.354 between Baruva
11. (BAV)–Mandasa Road (MMS) Stations of Khurda Road
Division.
Proposed ROB in lieu of L.C.No.358 between Baruva
12. (BAV)–Mandasa Road (MMS) Stations of Khurda Road
Division.
[F. No. ECoR/Dy.CE/RSP/BBS/ROBs/PH-30/12 ROBs/CALA]
AJAYA KUMAR SAMAL, Chief Engineer (Con-I)
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.