Date: 2026-04-10 Category: Extra Ordinary State: Union Government Country: India

Request for Publication of Gazette Notification for the below mentioned Land Schedule under Subsection 1 of section 20A of the Railways Amendment Act 2008 for ROB No242

Issued by Ministry of Railways · Construction Department

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The Ministry of Railways has issued a notification dated April 10, 2026, declaring its intention to acquire land in the Khurda district of Odisha for the construction of Road Over Bridge (ROB) No. 242. This "Special Railway Project" is located on the Howrah-Visakhapatnam main line between Kuhuri and Gangadharpur stations. Stakeholders must submit any objections regarding the land acquisition within 30 days of the notification's publication. **Key Points / Main Content** **Legal Authority and Purpose** * The notification is issued under Section 20A(1) of the Railways Act, 1989. * The acquisition is for a public purpose: the construction of ROB No. 242 to replace a manned level crossing at KM 510/33-511/1. **Land Acquisition Details** * **Location:** Haripur village, Chilika Tahasil, Khurda district, Odisha. * **Total Area:** A total of 6.805 acres is designated for acquisition. * **Land Types:** The schedule includes Forest land, Government land, Private (Pvt.) land, and Temple land. * **Documentation:** Detailed land plans are available for inspection at the office of the Competent Authority. **Objection and Hearing Process** * **Submission:** Any person interested in the land may raise an objection in writing to the Competent Authority for Land Acquisition (CALA) & Tahasildar, Chilika. * **Timeline:** Objections must be filed within 30 days from the publication of the notification. * **Hearing:** The CALA will provide objectors the opportunity to be heard in person or through a legal practitioner. * **Finality:** Following an inquiry, the CALA will issue an order allowing or disallowing objections; these orders are considered final under Section 20D(2) of the Act. **Impact Analysis** **Landowners and Interested Persons in Haripur Village** **Impact** Properties, including private holdings and temple lands, are subject to mandatory acquisition for the railway project. **Action Required** Must review the land schedule (Annexure-I) and file any written objections stating specific grounds to the CALA & Tahasildar, Chilika, within the 30-day window. **Competent Authority for Land Acquisition (CALA) & Tahasildar, Chilika** **Impact** Designated as the primary authority to manage the legal process of acquisition and dispute resolution. **Action Required** Receive written objections, conduct hearings for objectors, perform necessary inquiries, and issue final orders to allow or disallow the acquisition of specific plots. **Ministry of Railways (East Coast Railway)** **Impact** The project aims to improve rail infrastructure by replacing a manned level crossing with an ROB on the Howrah-Visakhapatnam main line. **Action Required** Proceed with the execution of the Special Railway Project following the resolution of objections and finalization of land acquisition.

Key Entities Referenced

Railways Act, 1989: The primary legislation under which Section 20A authorizes the Central Government to acquire land for public purposes related to railway development. Special Railway Project: The specific initiative for constructing Road Over Bridge (ROB) No. 242 between Kuhuri and Gangadharpur stations on the Howrah-Visakhapatnam main line. Ministry of Railways: The primary central ministry responsible for issuing the notification and overseeing the execution of the railway infrastructure project. Khurda, Odisha: The central geographic location where the land acquisition is taking place for the railway project. Competent Authority for Land Acquisition (CALA): The designated official authority, specifically the Tahasildar of Chilika, responsible for managing land acquisition and hearing public objections.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-ओ.आर.-अ.-13042026-271763 CG-OxRxx-GEI-D1H30xx4x2 026-271763 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण् ड 3—उप-खण्ड (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 1767] िई कदल्ली, िक्रु र्ार, अप्रलै 10, 2026/चत्रै 20, 1948 No. 1767] NEW DELHI, FRIDAY, APRIL 10, 2026/CHAITRA 20, 1948 रेल मत्रं ालय [पर्ू व तट रेलर् े (जिमाणव )] अजधसचू िा भुर्िेश्वर, 10 अप्रलै , 2026 (रेलर् ेअजधजियम एक हिार िौ सौ िर्ासी की धारा बीस ए के तहत सचू िा) का.आ. 1836(अ).— रेलर्े (सिं ोधि) अजधजियम, 1989 (24/89) (जिसे इसके बाद उक्त अजधजियम कहा गया ह)ै की धारा 20ए की उप-धारा (1) द्वारा प्रदत्त िजक्तयों के तहत, केंद्र सरकार इस बात स ेसंतष्टु होिे के बाद कक सार्विजिक उद्देश्य के जलए, भूजम, जिसका संजिप्त जर्र्रण यहा ंसंलग्न अिसु ूची म ेंकदया गया ह,ै जर्िेष रेलर्े पररयोििा के जिष्पादि के जलए आर्श्यक ह,ै अर्ावत,् ओजडिा राज्य के खोदा व जिल े म ें "खुदाव रोड जडर्ीिि के तहत हॉर्डा-जर्िाखापत्तिम मुख्य लाइि पर कुहुडी(KUU)-गगं ाधरपुर(GNGD) स्ट्टेििों के बीच KM 510/33-511/1 पर आर.ओ.बी (रोड ओर्र जिि) संख्या 242 का जिमावण।", इसके द्वारा ऐसी भूजम का अजधग्रहण करिे का इरादा घोजषत करती ह।ै 2585 GI/2026 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] उक्त भूजम म ेंजहतबद्ध कोई भी व्यजक्त, अजधसूचिा के रािपत्र म ें प्रकािि की तारीख स े(30) तीस कदि की अर्जध के भीतर, उक्त अजधजियम की धारा 20घ की उपधारा (1) के अधीि प्रयोिि के जलए ऐसी भूजम के अिवि पर आपजत्त उठा सकेगा। प्रत्येक आपजत्त, सिम प्राजधकारी अर्ावत भूजम अजधग्रहण के जलए सिम प्राजधकारी (काला) तहसीलदार, जचजलका को खुदाव रोड जडर्ीिि के तहत हॉर्डा-जर्िाखापटिम मुख्य लाइि पर कुहुडी(KUU)-गगं ाधरपुर(GNGD) स्ट्टेििों के बीच KM 510/33-511/1 पर आर.ओ.बी (रोड ओर्र जिि) संख्या 242 के जिमावण के संबंध म ें जलजखत रूप म ें आर्ेदि प्रस्ट्तुत की िाएगी तर्ा ऐस े आपजत्त के आधार जिधावररत ककया िाएंगा और सिम प्राजधकारी, आपजत्तकता व को चाह े र्ह व्यजक्तगत रुप स े हो या किर ककसी जर्जध व्यर्सायी के माध्यम स,े सुिर्ाई का अर्सर दगे ा, और ऐसे आपजत्तयां सुििे के पश्चात ्और आर्श्यक आग ेकी िांच, यकद कोई हो, करि ेके पश्चात,् िैसा कक सिम प्राजधकारी आर्श्यक समझे आपजत्तयों को स्ट्र्ीकार या अस्ट्र्ीकार कर सकेगा। उक्त अजधजियम के 20घ की उप-धारा(2) के अंतगवत सिम प्राजधकारी द्वारा िारी ककया गया कोई भी आदेि को अंजतम मािा िाएगा। इस अजधसूचिा के अंतगवत आि ेर्ाली भूजम की योििाए ंऔर अन्य जर्र्रण उपलब्ध ह ैंऔर इच्छुक व्यजक्त द्वारा सिम प्राजधकारी के उपरोक्त कायावलय म ें उिका जिरीिण ककया िा सकता ह।ै अिसु चू ी जर्िषे रेलर् ेपररयोििा अर्ातव ्ओजडिा राज्य के खोदा व जिल ेम ें“खदु ा व रोड जडर्ीिि के तहत हॉर्डा-जर्िाखापटिम मख्ु य लाइि पर कुहुडी(KUU)-गगं ाधरपरु (GNGD) स्ट्टेििों के बीच KM 510/33-511/1 पर (आर.ओ.बी) रोड ओर्र जिि सख्ं या 242 का जिमाणव ” के जलए सरं चिाओं के सार् या जबिा सरं चिाओं के अजधग्रजहत की िाि े र्ाली भजू म का सजं िप्त जर्र्रण (अिलु ग्नक1) यहा ंसलं ग्न ह।ै जिल े का िामााः-खदु ा व अिलु ग्नक-1 भूजम अिुसूची पररयोििा का िाम:-आर.ओ.बी–242 का जिमावण जिले का िाम:-खुदाव, प्रभाग का िाम:-खुदाव रोड, तहसीलदार:-जचजलका कुल िेत्रिल अजधग्रजहत िमीि क्रम स. ं गााँर् का िाम प्लॉट संख्या खाता संख्या भूजम का प्रकार (एकड) म ें (एकड) म ें 1 हररपुर 413 868 िंगल 50.530 0.159 2 हररपुर 426 868 िंगल 4.655 0.067 3 हररपुर 434 868 िंगल 3.160 0.374 4 हररपुर 433 872 सरकारी 6.410 0.398 5 हररपुर 481 871 सरकारी 0.415 0.036 6 हररपुर 469 400 जििी 0.840 0.129 7 हररपुर 480 650 जििी 0.036 8 हररपुर 480/2357 743/89 जििी 0.163 9 हररपुर 480/2358 743/90 जििी 0.086 10 हररपुर 480/2383 743/136 जििी 0.052 0.317 11 हररपुर 480/2393 743/148 जििी 0.040 12 हररपुर 480/2514 743/386 जििी 0.115 13 हररपुर 480/2515 743/388 जििी 0.105[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 3 14 हररपुर 480/2516 743/389 जििी 0.069 15 हररपुर 480/2517 743/390 जििी 0.029 16 हररपुर 480/2518 743/391 जििी 0.070 17 हररपुर 479 153 मंकदर की भूजम 0.972 0.408 18 हररपुर 483 288 जििी 0.400 19 हररपुर 483/2430 743/195 जििी 0.117 20 हररपुर 483/2442 743/218 जििी 0.100 21 हररपुर 483/2448 743/230 जििी 0.072 0.213 22 हररपुर 483/2461 743/248 जििी 0.028 23 हररपुर 483/2465 743/252 जििी 0.140 24 हररपुर 483/2521 743/397 जििी 0.043 25 हररपुर 478 871 सरकारी 0.245 0.057 26 हररपुर 477 288 जििी 0.233 0.155 27 हररपुर 486 871 सरकारी 1.983 0.130 28 हररपुर 459 871 सरकारी 1.223 0.166 29 हररपुर 550 135 जििी 0.206 0.064 30 हररपुर 553 452 जििी 0.012 0.012 31 हररपुर 554 471 जििी 0.126 0.086 32 हररपुर 552 472 जििी 0.550 0.128 33 हररपुर 655 874 सरकारी 3.398 0.069 34 हररपुर 656 874 सरकारी 3.004 0.051 35 हररपुर 657 874 सरकारी 3.490 0.063 36 हररपुर 751 127 जििी 0.105 0.055 37 हररपुर 750 344 जििी 0.432 0.197 38 हररपुर 760 743/416 जििी 0.432 0.133 39 हररपुर 757 743/79 जििी 0.463 0.016 40 हररपुर 759 268 जििी 0.231 0.105 41 हररपुर 762 237 जििी 0.432 0.066 42 हररपुर 770 676 जििी 0.387 0.062 43 हररपुर 763 563 जििी 0.821 0.143 44 हररपुर 764 245 जििी 0.373 0.050 45 हररपुर 768 743/323 जििी 0.305 0.031 46 हररपुर 765 245 जििी 0.095 0.083 47 हररपुर 745 587 जििी 0.733 0.006 48 हररपुर 767 587 जििी 0.483 0.086 49 हररपुर 766 869 सरकारी 0.050 0.0244 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 50 हररपुर 811/2299 226 जििी 0.325 0.172 51 हररपुर 814 583 जििी 1.069 0.018 52 हररपुर 815 350 जििी 1.070 0.342 53 हररपुर 821 871 सरकारी 0.240 0.025 54 हररपुर 823 607 मंकदर की भूजम 0.767 0.172 55 हररपुर 824 252 जििी 0.548 0.111 56 हररपुर 825 631 जििी 1.132 0.118 57 हररपुर 828 688 जििी 0.418 0.094 58 हररपुर 829 6 जििी 0.417 0.144 59 हररपुर 849 374 जििी 0.458 0.105 60 हररपुर 851 476 जििी 2.203 0.463 61 हररपुर 858 592 जििी 0.412 0.150 62 हररपुर 1173 550 जििी 0.160 0.075 63 हररपुर 1172 156 जििी 0.165 0.067 64 हररपुर 1171 557 मंकदर की भूजम 0.371 0.118 65 हररपुर 1170 184 मंकदर की भूजम 0.323 0.134 66 हररपुर 1169 199 मंकदर की भूजम 0.148 0.095 67 हररपुर 1162 743/402 जििी 0.714 0.059 68 हररपुर 1164 871 सरकारी 0.507 0.093 69 हररपुर 1167 743/288 जििी 0.899 0.077 70 हररपुर 1168 871 सरकारी 0.165 0.034 कुल 6.805 [िा. स.ं सीएओ/सीओएि/आरएसपी/बीबीएस/2025/आरओबी संख्या 242/20ए] सुधीर कुमार पररडा, मुख्य अजभयंता(जिमावण -III) MINISTRY OF RAILWAYS [East Coast Railway (Constructions)] NOTIFICATION Bhubaneswar, the 10th April, 2026 Notice under Section 20A of the Railways Act-,1989 S.O. 1836(E).—In exercise of powers conferred by sub-section (1) of section 20A of the Railways(Amendment)Act,1989(24/89) (hereinafter referred as the said Act.), the Central Government, after being satisfied that for the public purpose, the Land, brief description of which is given in the schedule annexed here to is required for the execution of Special Railway Project, namely, “Construction of Road Over Bridge in lieu of closing of manned L.C.NO-242 at KM 510/33-511/1 between Stations Kuhuri(KUU)-Gangadharpur(GNGD) on Howrah Visakhapatnam main line under Khurda Road Division.” in Khurda district in the state of Odisha, hereby declares its intention to acquire such land. Any person interested in the said land may within a period of (30) thirty days from the date of publication of the notification in the Official Gazette, raise objection to the acquisition of such land for the aforesaid purpose under sub-section(1) of section 20D of the said Act.[भाग II—खण् ड 3(ii)] भारत का रािपत्र : असाधारण 5 Every objection shall be made to the competent authority, namely Competent Authority for Land Acquisition (CALA) & Tahasildar, Chilika for Construction of ROB in lieu of closing of manned of L.C.NO-242 at KM 510/33- 511/1 between Stations Kuhuri(KUU)-Gangadharpur(GNGD) on Howrah Visakhapatnam main line under Khurda Rd. Division in writing, and shall set out grounds thereof and competent authority shall give the objector an opportunity of being heard, either in person or through a legal practitioner, and may, after hearing all such objections and after making such further inquiry, if any, as the competent authority thinks necessary, by order, either allow or disallow the objections. Any order made by the competent authority under sub-section (2) of 20D of the said Act shall be final. The land plans and other details of the land covered under this notification are available and can be inspected by the interested person at the aforesaid office of the competent authority. SCHEDULE Brief description of land (Annexure-I) attached here with to be acquired with or without structures, for Special Railway Project, namely “Construction of ROB in lieu of closing of manned of L.C.NO-242 at KM 510/33-511/1 between Stations Kuhuri(KUU)-Gangadharpur(GNGD) on Howrah Visakhapatnam main line under Khurda Road Division)” in Khurda district in the state of Odisha. Name of District:-Khurda Annexure-I LAND SCHEDULE Name of the Project:- Construction of ROB–242 Name of the District:-Khurda, Name of the Division:-Khurda Road, Name of the Tahasil:-Chilika Sl. NAME OF KHATA Total area PROPOSED LAND PLOT No. Type of Land No. VILLAGE No. in Acres in ACRES 1 HARIPUR 413 868 Forest 50.530 0.159 2 HARIPUR 426 868 Forest 4.655 0.067 3 HARIPUR 434 868 Forest 3.160 0.374 4 HARIPUR 433 872 Govt. 6.410 0.398 5 HARIPUR 481 871 Govt. 0.415 0.036 6 HARIPUR 469 400 Pvt. 0.840 0.129 7 HARIPUR 480 650 Pvt. 0.036 8 HARIPUR 480/2357 743/89 Pvt. 0.163 9 HARIPUR 480/2358 743/90 Pvt. 0.086 10 HARIPUR 480/2383 743/136 Pvt. 0.052 11 HARIPUR 480/2393 743/148 Pvt. 0.040 0.317 12 HARIPUR 480/2514 743/386 Pvt. 0.115 13 HARIPUR 480/2515 743/388 Pvt. 0.105 14 HARIPUR 480/2516 743/389 Pvt. 0.069 15 HARIPUR 480/2517 743/390 Pvt. 0.029 16 HARIPUR 480/2518 743/391 Pvt. 0.070 17 HARIPUR 479 153 Temple Land 0.972 0.408 18 HARIPUR 483 288 Pvt. 0.400 19 HARIPUR 483/2430 743/195 Pvt. 0.117 20 HARIPUR 483/2442 743/218 Pvt. 0.100 21 HARIPUR 483/2448 743/230 Pvt. 0.072 0.213 22 HARIPUR 483/2461 743/248 Pvt. 0.028 23 HARIPUR 483/2465 743/252 Pvt. 0.140 24 HARIPUR 483/2521 743/397 Pvt. 0.043 25 HARIPUR 478 871 Govt. 0.245 0.057 26 HARIPUR 477 288 Pvt. 0.233 0.155 27 HARIPUR 486 871 Govt. 1.983 0.130 28 HARIPUR 459 871 Govt. 1.223 0.166 29 HARIPUR 550 135 Pvt. 0.206 0.064 30 HARIPUR 553 452 Pvt. 0.012 0.012 31 HARIPUR 554 471 Pvt. 0.126 0.086 32 HARIPUR 552 472 Pvt. 0.550 0.1286 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 33 HARIPUR 655 874 Govt. 3.398 0.069 34 HARIPUR 656 874 Govt. 3.004 0.051 35 HARIPUR 657 874 Govt. 3.490 0.063 36 HARIPUR 751 127 Pvt. 0.105 0.055 37 HARIPUR 750 344 Pvt. 0.432 0.197 38 HARIPUR 760 743/416 Pvt. 0.432 0.133 39 HARIPUR 757 743/79 Pvt. 0.463 0.016 40 HARIPUR 759 268 Pvt. 0.231 0.105 41 HARIPUR 762 237 Pvt. 0.432 0.066 42 HARIPUR 770 676 Pvt. 0.387 0.062 43 HARIPUR 763 563 Pvt. 0.821 0.143 44 HARIPUR 764 245 Pvt. 0.373 0.050 45 HARIPUR 768 743/323 Pvt. 0.305 0.031 46 HARIPUR 765 245 Pvt. 0.095 0.083 47 HARIPUR 745 587 Pvt. 0.733 0.006 48 HARIPUR 767 587 Pvt. 0.483 0.086 49 HARIPUR 766 869 Govt. 0.050 0.024 50 HARIPUR 811/2299 226 Pvt. 0.325 0.172 51 HARIPUR 814 583 Pvt. 1.069 0.018 52 HARIPUR 815 350 Pvt. 1.070 0.342 53 HARIPUR 821 871 Govt. 0.240 0.025 54 HARIPUR 823 607 Temple Land 0.767 0.172 55 HARIPUR 824 252 Pvt. 0.548 0.111 56 HARIPUR 825 631 Pvt. 1.132 0.118 57 HARIPUR 828 688 Pvt. 0.418 0.094 58 HARIPUR 829 6 Pvt. 0.417 0.144 59 HARIPUR 849 374 Pvt. 0.458 0.105 60 HARIPUR 851 476 Pvt. 2.203 0.463 61 HARIPUR 858 592 Pvt. 0.412 0.150 62 HARIPUR 1173 550 Pvt. 0.160 0.075 63 HARIPUR 1172 156 Pvt. 0.165 0.067 64 HARIPUR 1171 557 Temple Land 0.371 0.118 65 HARIPUR 1170 184 Temple Land 0.323 0.134 66 HARIPUR 1169 199 Temple Land 0.148 0.095 67 HARIPUR 1162 743/402 Pvt. 0.714 0.059 68 HARIPUR 1164 871 Govt. 0.507 0.093 69 HARIPUR 1167 743/288 Pvt. 0.899 0.077 70 HARIPUR 1168 871 Govt. 0.165 0.034 TOTAL 6.805 [F. No. CAO/CON/RSP/BBS/2025/ROB No.242/20A] SUDHIR KUMAR PARIDA, Chief Engineer (Con-III) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.