Home India Ministry of Road Transport and Highways Revised Document for Request for Proposal (RFP) for appointm...
Date: 2025-10-24 Category: Not Applicable State: Union Government Country: India

Revised Document for Request for Proposal (RFP) for appointment of Consultancy Services for Authority Engineer (AE) in respect of National Highways and centrally sponsored road works proposed to be implemented on EPC mode of contract

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This circular from the Government of India, Ministry of Road Transport & Highways, announces a revised Request for Proposal (RFP) document for the appointment of Consultancy Services for Authority Engineer (AE) in National Highway projects implemented on EPC mode. The revised RFP replaces the earlier circular dated 15.02.2019 and subsequent amendments. The revised RFP is to be followed from 01.12.2025, after the publication of the rating of firms by NHAI/Ministry on its website. **Key Points / Main Content** *Revised RFP Document:* * A revised Request for Proposal (RFP) document has been prepared for appointing Consultancy Services for Authority Engineers (AE) for National Highway projects implemented on EPC mode. * The revised RFP supersedes the circular dated 15.02.2019 and all subsequent amendments. *Modification of Project Sections:* * Tender Issuing Authority has the option to modify project-specific sections of the RFP before its issuance: * Appendix to RFPL: Tender Information Summary (TIS) * Appendix -1 to TIS Eligibility Criteria * Section III: Appendix to Instructions to Consultants (AITC) * Section V: Special Conditions of Contract (SCC) * Section VI: Terms of Reference * Section VII: Evaluation/ Scoring Criteria- Relevant portion as per project * Schedule for submission of Reports and Documents * Cost Estimate by Tender Issuing Authority (QBS mode) *Implementation Date:* * The revised RFP shall be followed for all National Highways and centrally sponsored road works from the date of publication of Rating of firms by NHAI/Ministry on its website, i.e. 01.12.2025. *Request to NHAI:* * The Chairman, NHAI, is requested to finalize and publish ratings for AE/IE firms before 1.12.2025 **Impact Analysis** **Tender issuing Authority** *Impact* May modify project-specific sections of the RFP before issuing it. *Action Required* May modify project-specific sections of the RFP before its issuance. **National Highways Authority of India (NHAI)** *Impact* Responsible for finalizing and publishing ratings for Authority Engineer (AE) and Independent Engineer (IE) firms. *Action Required* Finalize and publish the ratings for AE/IE firms before 1.12.2025. **Consulting Firms and Interested Bidders** *Impact* Must follow the revised RFP document for National Highway and centrally sponsored road works projects. *Action Required* Comply with the revised RFP from 01.12.2025, and monitor the publication of firm ratings by NHAI/Ministry. **Ministry of Road Transport & Highways** *Impact* It is responsible for the overall governance and issuance of the revised RFP *Action Required* Upload this RFP on the Ministry's website under "What's new" and "Comprehensive Compendium circulars."

Key Entities Referenced

Request for Proposal (RFP): A document inviting consultants to submit proposals for consultancy services related to Authority Engineer (AE) appointments for National Highways and centrally sponsored road works, specifically for EPC contracts. This document outlines the requirements, evaluation criteria, and procedures for the tendering process. National Highways Authority of India (NHAI): Referenced as a key entity involved in publishing ratings of firms and generally overseeing the implementation of the subject matter. Ministry of Road Transport & Highways: The central governmental body responsible for the subject matter; issues the circular and related policy documents. Engineering, Procurement, and Construction (EPC): The specific contract mode for national highway and road development projects covered by the policy. New Delhi: Location of Ministry of Road Transport & Highways and applicable to road projects in the city
Official Source Record View Original Source →
See Full Document Text
No. RW/NH-33044/02/2023-S&R (Comp No 218375) 130.248 Government of India Ministry of Road Transport & Highways Transport Bhawan, 1, Parliament Street, New Delhi-110001 ~~ Dated 24th October, 2025 CIRCULAR To 1. The Chief Secretaries of all the State Governments/ UTs. 2. The Principal Secretaries/ Secretaries of all States/ UTs Public Works Department/ Road Construction Department/ Highways Department (dealing with National Highways and other centrally sponsored schemes). 3. The Chairman, National Highways Authority of India, G-5 6 6, Sector-10, Dwarka, New Delhi-110075. 4. The Managing Director, NHIDCL, 1st & 2nd floor, Tower-A, World Trade Centre, Nauroji Nagar, New Delhi-110029. 5. The Director General (Border Roads), Seema Sadak Bhawan, Ring Road, New Delhi- 110010. 6. All Engineers-in-Chief and Chief Engineers of Public Works Department of States/ UTs/ Road Construction Department/ Highways Departments (dealing with National Highways and other centrally sponsored schemes). 7. The Secretary General, Indian Roads Congress 8. The Director, IAHE, Noida, UP 9. All CE-ROs, ROs and ELOs of the Ministry. Subject: Revised Document for Request for Proposal (RFP) for appointment of Consultancy Services for Authority Engineer (AE) in respect of National Highways and centrally sponsored road works proposed to be implemented on EPC mode of contract-reg. Reference: Ministry's Circular no. RW/NH-39011/30/2015-P&P (Pt-1) dated 15.02.20219 and subsequent amendments. Madam/Sir, Please refer to Request for Proposal (RFP) document for appointment of Consultancy Services for Authority Engineer (AE) in respect of National Highways and centrally sponsored road works proposed to be implemented on EPC mode of contract. Ministry has subsequently issued further amendments to the said RFP. 2. Now, in suppression of circular dated 15.02.2019 and all subsequent amendments, the revised RFP has been prepared. The revised document for Request for Proposal (RFP) for appointment of Consultancy Services for Authority Engineer (AE) in respect of National Highways and centrally sponsored road works proposed to be implemented on EPC mode of contract, is enclosed herewith. 3. Tender issuing Authority may modify the following project specific sections before issuing of RFP:-i) Appendix to RFPL: Tender Information Summary (TIS) ii) Appendix -1 to TIS Eligibility Criteria iii) Section Ill: Appendix to Instructions to Consultants (AITC) iv) Section V: Special Conditions of Contract (SCC) v) Section VI: Terms of Reference vi) Section Vil: Evaluation/ Scoring Criteria- Relevant portion as per project vii) Schedule for submission of Reports and Documents viii) Cost Estimate by Tender Issuing Authority (QBS mode) 4. The Revised RFP shall be followed for all National Highways and centrally sponsored road works, from date of publication of Rating of firms by NHAI/Ministry on its website i.e 01.12.2025. 5. This issues with the approval of Competent Authority. s aithfully, Ends: -as above, (Akil Ahmad) Superintending Engineer (S&R) for DG(RD)&SS Copy:- 1. The Chairman, NHAI, with a request to finalise and publish ratings for AE/IE firms before 1.12.2025 2. Technical circular file of S&R (P&B) Section 3. NIC-for uploading on Ministry's website under "What's new" and "Comprehensive Compendium circulars" Copy for kind information to: 1. PS to Hon'ble Minister (RT&H) 2. PS to Hon'ble MOS (RT&H) 3. OSD to Hon'ble MOS (Corporate Affairs and RT&H) 4. Sr. PPS to Secretary (RT&H) 5. Sr. PPS to DG (RD) & SS 6. Sr. PPS to Addl. Secretary (Transport)/ Addl. Secretary (H & LA)/ Joint Secretary (GA) 7. Sr. PPS/ PPS to AS&FA 8. Sr. PPS/ PPS to all ADGs/ CEs2397404/2025/S&R Zone Model Tender Document for Consultancy Services Authority Engineer for supervision of ***** on EPC mode Request for Proposal (RFP) Government of India Ministry of Road Transport & Highways < Address of Agency> < October 2025> File No. RW/NH-33044 /02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Table of Contents SECTION I: REQUEST FOR PROPOSAL LETTER (RFPL) ...........................................1-2 Request for Proposal Letter RFPL)................................................. 1 The RFP Document ..........................................................................1 1.1. Consultants must read the complete ‘RFP Document’ ............................1 1.2. Availability of the RFP Document.....................................................1 1.3. Clarifications....................................................................................1 Eligibility and Qualification Criteria for Participation in this RFP ...............1 Purchase Policies of the Government ..................................................1 4.1. Relaxation in Prior Turnover and Experience to Startups ........................2 Pre-Proposal Conference ........................................................................2 Submission of Proposals........................................................................2 Proposal Opening..............................................................................2 APPENDIX: TENDER INFORMATION SUMMARY (TIS)................................. 4-7 SECTION II: INSTRUCTIONS TO CONSULTANTS (ITC)................................12-15 The RFP Document ............................................................................................12 1.1. Basic Tender Details .......................................................................12 1.2. Interpretations, Definitions, Abbreviations and Document Conventions .......12 1.3. Over view content……………………………………………………………………………………………………12 1.4. Sections of the RFP Document ...........................................................12 1.5. Forms (To be filled, digitally signed, and uploaded by Consultants) ..............14 1.6. Other Formats .....................................................................................14 Procuring Entity - Rights and Disclaimers ...........................................................................15-16 2.1. The Procuring Entity............................................................................15 2.2. Right to Intellectual Property and confidentiality ...................................15 2.3. Right to Reject any or all Proposals ..............................................15 2.4. Disclaimers.................................................................................16 Consultants – Participation in this RFP process....................................................16-18 3.1. Eligibility to Participate ...........................................................16 3.2. Conflict of Interest ...................................................................17 The Terms of Reference (TOR) and Form of Contract .............................................18 4.1. Facilities to be provided by the Procuring Entity ....................................18 4.2. Forms of BOQ/ Contract and Selection Methods........................................18 4.3. Inputs of Key Experts ........................................................................18 Proposal Prices, Taxes and Duties .................................................................................18-21 5.1. Prices .................................................................................................18 5.2. Firm/ Variable Price............................................................................19 5.3. Taxes ................................................................................................20 5.4. Payments...................................................................................................21 Downloading the RFP Document; Corrigenda and Clarifications ..................................................21 6.1. Downloading the RFP Document ..................................................................21 6.2. Corrigenda/ Addenda to RFP Document ..........................................................21 6.3. Clarification of the RFP Document ..........................................................................21 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Pre-Proposal conference .....................................................................................22 Preparation of Proposals..............................................................................22-25 8.1. The Proposal ..................................................................................22 8.2. Documents comprising the Proposal:......................................................23 8.3. Proposal Validity .................................................................................24 8.4. Bid Security - Related Documents ........................................................24 Signing and Uploading Proposals...............................................................25-27 9.1. Relationship between Consultant and eProcurement Portal .................................25 9.2. Signing of Proposal ......................................................................25 9.3. Submission/ uploading of Proposals……………………………………………………………26 9.4. Modification, Re-submission and Withdrawal of Proposals .................27 Proposal Opening ...........................................................................27 Evaluation of Proposals and Award of Contract.........................................28-35 11.1. General norms ...................................................................................28 11.2. Evaluation of Proposals.........................................................................29 11.3. Techno-commercial Evaluation ...............................................................30 11.4. Financial Proposals Evaluation and Ranking of Proposals..............................31 Contract Negotiation ...............................................................................35-36 12.1. Invitation to Negotiate.............................................................................35 12.2. Verification of Original Documents ...............................35 12.3. Availability of Key Experts: .............................................35 12.4. Technical Negotiations.......................................................35 12.5. Financial Negotiations ...............................................................................................36 12.6. Conclusion of Negotiations……………………………………………………………….36 Award of Contract .............................................................36 13.1. Letter of Award (Acceptance - LoA) and Signing of Contract ................36 Grievance Redressal/ Complaint Procedure ......................................37 Code of Integrity in Public Procurement, Misdemeanors and Penalties..........37 SECTION III: APPENDIX TO INSTRUCTIONS TO CONSULTANTS (AITC) ..............38 SECTION IV: GENERAL CONDITIONS CONTRACT (GCC) ..................40 General..........................................................................................40-43 1.1. Tenets of Interpretation.................................................................40 1.2. Definitions...........................................................................................40 1.3. Document Conventions.........................................................................43 1.4. Abbreviations: ................................................................................43 The Contract .............................................................................44 2.1. Language of Contract ....................................................................44 2.2. The Entire Agreement ...............................................................44 2.3. Severability .................................................................................44 2.4. Relationship between Parties ....................................................................44 2.5. Contract Documents and their Precedence .....................................................45 2.6. Modifications/ Amendments, Waivers and Forbearances .............................45 Governing Laws and Jurisdiction ...........................................................46 3.1. Governing Laws and Jurisdiction ..........................................................46 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 3.2. Changes in Laws and Regulations ...........................46 4. Communications.............................................................................46-47 4.1. Communications ..........................................................................................46-47 4.2. Persons signing the Communications...................................................................47 4.3. Address of the parties for sending communications by the other party ...........47 5. Consultant’s Obligations and restrictions on its Rights .....................................48-56 5.1. Changes in Constitution/ financial stakes/ responsibilities of a Contract’s Business .......48 5.2. Obligation to Maintain Eligibility and Qualifications ...........................48 5.3. Restriction on Potential Conflict of Interests ..............................................48 5.4. Consequences of breach by Constituents of a Consultant ...........................49 5.5. Assignment and Sub-contracting..................................................49 5.6. Obligation to Indemnify Procuring Entity............................................................49 5.7. Confidentiality, Secrecy and Property and IPR Rights ..........................................51 5.8. Performance Bond/ Security ......................................................53 5.9. Permits, Approvals and Licenses ............................................................55 5.10. Insurances ........................................................................................55 5.11. Accounting, Inspection and Auditing.................................................56 5.12. Book Examination Clause ..........................................................................56 5.13. Legal Compliance.................................................................................56 5.14. Custody and Return of the Procuring Entity’s Assets loaned to Consultant ............56 6. Procuring Entity’s Obligations........................................................................56-58 6.1. Assistance by the Procuring Entity.........................................................57 6.2. Facilities to be provided by the Procuring Entity ...........................................57 6.3. Counterpart Personnel ........................................................................57 6.4. Payment Obligation...............................................................................58 7. Scope of Services and Performance Standards ................................58-59 7.1. Scope of Services...................................................................58 7.2. Eligible Services .........................................................................58 Deployment of Resources.........................................................................59-65 8.1. Site and Assets thereon ..........................................................................59 8.2. Key and Non-key Personnel.................................................................60 8.3. Equipment and Tools of Trade......................................................................65 Delivery of Services and delays ..................................................................66-70 9.1. Works plan..............................................................................................66 9.2. Commencement of Services .........................................................................66 9.3. Contract Management .............................................................................67 9.4. Delivery of services, Time of Delivery and Extensions Thereof ..................67 9.5. Damages and Deductions Thereof.....................................................69 9.6. Force Majeure ....................................................................................70 10. Prices and Payments ............................................................71-79 10.1. Prices ...............................................................................................71 10.2. Taxes and Duties ..................................................................................72 10.3. Terms and Mode of Payment .....................................................................73 10.4. Withholding and lien in respect of sums claimed...........................................74 10.5. Payments to Consultant ................................................................74 10.6. Suspension of Payments ................................................................79 10.7. Payment Against Time-Barred Claims ....................................................79 10.8. Commissions and Fees ...............................................................................79 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Resolution of Disputes .......................................................................80-86 11.1. Disputes and Excepted Matters ....................................................................80 11.2. Excepted Matters .................................................................................80 11.3. Adjudication ..................................................................................................80 11.4. Conciliation of disputes ..............................................................................81 11.5. Arbitration Agreement ......................................................................82 12. Defaults, Breaches, Termination, and closure of Contract .................................86-90 12.1. Termination due to Breach, Default, and Insolvency.........................................86 12.2. Termination for Default/ Convenience of Procuring Entity or Frustration of Contract .........................88 12.3. Closure of Contract ........................................................................89 Code of Integrity in Public Procurement; Misdemeanors and Penalties ..............................................90- 13.1. Code of Integrity..............................................................................91 13.2. Obligations for Proactive Disclosures ...................................................91 13.3. Misdemeanors .................................................................................92 13.4. Penalties for Misdemeanors..............................................................92 SECTION V: SPECIAL CONDITIONS OF CONTRACT (SCC) .....................................94-100 SECTION VI: TERMS OF REFERENCE ..............................................................101- 13.5. Scope…………………………………………………………………………………………………102 13.6. Definitions and interpretation…………………………………………………………..102 13.7. General………………………………………………………………………………………………………102 13.8. Role and responsibility of Officers of the Authority………………………………………………..103 13.9. Construction Period……………………………………………………………………………………………..104 13.10. Maintenance Period …………………………………………………………………………………………….110 13.11. Determination of costs and time………………………………………………………………………120 13.12. Payments ………………………………………………………………………………………………………………120 13.13. Other duties and functions …………………………………………………………………………………121 13.14. Miscellaneous………………………………………………………………………………………………………121 13.15. Performance Clause ……………………………………………………………………………………….121 13.16. Consultant’s Proposal ……………………………………………………………………………………….122 13.17. Period Of Services ……………………………………………………………………………………….123 13.18. Project Coordinator ……………………………………………………………………………………….124 SECTION VII: EVALUATION/ SCORING CRITERIA .............................................. BIDDING FORMS ................................................................................................287 TECHNICAL PROPOSAL ...........................................................................288 FORM T-1: PROPOSAL FORM (COVERING LETTER)...........................................289-294 FORM T-1A: CONSULTANT’S COMMERCIAL INFORMATION ........................294-297 FORM T-2: CONSULTANT’S ORGANISATION AND EXPERIENCE ...................298-305 FORM T-3: COMMENTS AND SUGGESTIONS ON THE TERMS OF REFERENCE,COUNTERPART STAFF, AND FACILITIES TO BE PROVIDED BY THE PROCURING ENTITY………….306 FORM T-4: DESCRIPTION OF APPROACH, METHODOLOGY AND WORK PLAN IN RESPONDING THE TERMS REFERENCE .....................307 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone FORM T-5: WORK SCHEDULE AND PLANNING FOR DELIVERABLES …… 308-309 FORM T-6: TEAM COMPOSITION, ASSIGNMENT, AND KEY EXPERTS’ INPUTS Annex to Form T-6: Key Expert Curriculum Vitae (CV) ............................310 FORM T-7: TERMS AND CONDITIONS - COMPLIANCE................314 FORM T-8: CHECKLIST FOR CONSULTANTS ....................... 315-316 FORM T-9A: BANK GUARANTEE FORMAT FOR EARNEST MONEY DEPOSIT 317-318 FORM T-9B: BID SECURING DECLARATION.............................................319 FORM T-10: INTEGRITY PACT ........................................................320-324 FORMATS ...........................................................................................326 FORMAT 1: CONTRACT FORM ........................................................327 APPENDIX A: DESCRIPTION OF SERVICES ............330 Terms of Reference ..................................................................................331 Approach and Methodology ...............................................................332 Work Schedule and Planning for Deliverables ..............................................333 APPENDIX B: KEY EXPERTS...........................................................................................334 APPENDIX C – REMUNERATION COST ESTIMATES .........................................336-348 Annex to Appendix C: Breakdown of Agreed Fixed Rates in Consultant’s Contract ..........338 APPENDIX D-1: BANK GUARANTEE FORMAT FOR PERFORMANCE SECURITY ............347-348 APPENDIX D-2: BANK GUARANTEE FORMAT FOR ADVANCE PAYMENT ..................349-350 FORMAT 2: CERTIFICATION BY PROSPECTIVE ARBITRATORS........................... 351 FORMAT 3: AUTHORIZATION TO ATTEND PRE-PROPOSAL CONFERENCE.............352-354 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone SectionI:RequestforProposalLetter(RFPL) Request for Proposal Letter (RFPL) The President of India through the Secretary (RT&H) / Chairman NHAI/ MD NHIDCL, (hereinafter referred to as ‘the Authority’, ‘the Head of Procurement’, ‘the Procuring Entity’ and ‘the Procuring Organisation’ respectively), invites proposals (hereinafter referred as ‘the Proposal(s)’) from eligible consultants on the basis of International Comptetive Bidding (please see Tender Information Summary (TIS) appendedtothisletterforreference), forenteringintoacontractforthedeliveryof Consultancy Services for engaging an Authority Engineer (AE) (hereinafter referred to as ‘the Services’), using the selection method as specified in TIS. This Request for Proposal (RFP) Document, reference number, RFP No./ xxxx(hereinafterreferredtoas‘theRFP Document’),gives furtherdetails. The RFP Document 2.1. Consultantsmustreadthecomplete‘RFPDocument’. This RFPL, an integral part of the RFP Document, serves the limited purpose of invitation and does not purport to contain all relevant details for submitting Proposals. ‘Tender Information Summary’ (TIS) appended to this letter gives a salient summary of the relevant information, including the Type of BPQ/ Contract, basic eligibility and Selection Method to evaluate RFP. Any generic reference to RFPL shall also imply a reference to TIS as well. However, Consultants must go through the complete RFP Document for details before submission of theirProposals. 2.2. Availability of the RFP Document The RFP Document shall be published on “INFRACON” (www.infracon.nic.in)/ e-Procurement portal (https://eprocure.gov.in) for download after the date and time of the start of availability till the deadline for availability as mentioned in TIS. The Consultant who download the RFP document from the website will be required to pay the non- refundable fee of Rs. 5,000/- towards cost of RFP at the time of the submission of the Bid proposal through online mode in favour of MoRTH/NHAI/NHIDCL/Agency. If the Procuring Entity happens to be closed on the deadline for the availability of theRFP Document, the deadline shall not be extended. Any query/ clarification regarding downloading RFP Documents and uploading Proposals on the e-Procurement portal may be addressedto…….. (pleaserefertoTISfordetails). As such before submitting the proposal the Consultant shall mandatorily register and enlist themselves (the firm and all key personnel), on the MoRTH portal “INFRACON” and furnish registration details along with its RFP. A copy of Infracon Operation Procedure is also enclosed for bidder’s reference. All the bidders registered on Infracon shall form a Team on Infracon and which would be assigned unique Infracon Team ID. Bidders while submitting theproposalshallquotetheInfraconTeamID.Bidmust be submitted onlineat e-tender portal of<Agency> https://eprocure.gov.in 2.3. Clarifications AConsultantmayseekanyclarificationoftheRFPDocumentthroughtheeProcurement portal before thedateandtimestipulatedinTIS (or,ifnotmentioned,before14 days of the deadline for the proposal submission). This deadline shall not be extended in case of any intervening holidays.Noother means of submissionofqueries shall beentertained. EligibilityandQualificationCriteriaforParticipation inthisRFP Consulting firms meeting the eligibility criteria as mentioned in Appendix-1 to Tender Information Summary (TIS) are only eligible for applying for this assignment. Firms notmeetingthese criteria,need not apply. Purchase Policies of the Government 1) Central Government policies restrict the participationof entities from i) Certain countries sharing land borders with India and ii) Countries that restrict the participation of Bidders from India. Consulting firms shall submit the declaration regarding these restrictions as mentioned in Appendix- 1 to Tender Information Summary ( TIS). They should ensure that they continue to comply with such declarations till completion of biddingprocess. 1 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Pre-Proposal Conference: If indicated in TIS, Consultants are requested to attend a Pre-Proposal conference to clarify the RFP's technical requirements and commercial conditions at the time, date, and place mentionedtherein. Submission of Proposals: 1) Proposals must be uploaded by the submission deadline mentioned in TIS. If the office happens to be closed on that date, this deadline shall not be extended. Further details are giveninITC. 2) IntegrityPact:AllConsultantsshallhavetosigntheIntegrityPact with the Procuring Entity as per ‘Form T-10: Integrity Pact’. Proposals without a signed Integrity Pact shall be rejected. Proposal Opening Proposals received shallbeopened onlineonor after thespecified dateand timeinTIS.Ifthe officeisclosedonthespecifieddateofopeningoftheProposals,theopeningshall bedoneonthe nextworkingday at thesame time. Digitally Signed by Tender Inviting Authority (TIA) [Insert Name, Designation, and contact details of Tender Inviting Authority] Appendix: Tender Information Summary (TIS) 2 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone AppendixtoRFPL:TenderInformationSummary(TIS) RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices(Ref ITC-clause 1.4) Tender Information Summary (TIS) 1.0 BasicTenderDetails Tender Title/ CONSULTANCYSERVICESFORAUTHORITY’SENGINEER Name of FORSUPERVISIONOF ******************ONEPC Assignment TenderReference RFPNo./xxxx Tender ID [Fillup] Number Tender Type International TenderCategory ConsultancyServices Competitive Bidding No. of Covers [TwoCovers] ProductCategory [Consultancy] SelectionMethod [QCBS] Appointing Authority for Head of the Arbitration Procuring Basedon Highest Organization score assessed TheSecretary/ on Technical,PBG The Chairman and Financial Secretary/ NHAI/MD Chairman Criteria. NHIDCL NHAI/MD NHIDCL Organisation: MoRTH/NHAI/ The Procuring Entity: Procuring Entity NIHIDCL/BRO / PWD Authority on President of ThroughtheCE/RO/General Head of whose behalf Indiathrough Managerasthecasemaybe RFP isinvited Procurement thesecretary or The chairman concerned NHAIor MD RO/General NHIDCLas Manageras thecasemay thecasemaybe Be TenderInviting Address [Fillup] Authority(TIA) 2.0 CriticalDates (ITC-clauses6,7;8;9,and10) ForthescheduleofdatesforthePre-proposalConference,ifany,pleaserefertoSection7.0 below 3 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Published [Fillup] Proposal Validity (Days from [fill up both periods Date the date of Proposal Opening) (default 100 days) in days and the –ITC-clause 8.3 calculated date] Document [Normally Document Download End [Normallyuptoafewhours/ DownloadStart start of Date &Time one day before the time of ProposalOpening] Date & Time business on the day afterpublishing] Clarification [Normally Clarification End Date [Normallynotlaterthan7 Start Date & start of &Time days before the Proposal Time submission deadline to business on the give time to the day after Procuring Entity for a publishing] response] Proposal [Normally Proposal Submission 45daysfromdateof Submission start of ClosingDate & Time invitation Start Date & Time business on the day after publishing] Proposal Opening (techno- Nextdateofbidclosing date commercial Proposal) Date & Time ProposalOpening(Financial [To be intimated later] Proposal)Date & Time 3.0 TermsofReference(ITC-Clause4) Consignee/ [Fillup] GSTIN Code of Consignee [Fillup] State: Period of ConstructionPeriod+maintenanceperiodofCivil Contract contract. Service ConsultancyServices forAuthority Engineer Details: 4.0 ObtainingtheRFPDocumentandclarifications(ITC-Clause6) https://eproc fillthecontactdetails ure.gov.in/e Procuring procure/app Entity’s Portal andhelpdesk [Fillinyourorganisation’sportalURLandhelpdeskiftheRFPDocument download/submissionfacilityisalsoprovidedthere] Cost of Rs5000/- RFP Document (INR) 4 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Office/Contact [SameasTIAabove] Person/ email for clarifications 5.0 Pre-ProposalConference(ITC-clause7) Is aPre-Proposal Conference yes proposedtobeheld? Place,time,anddate ofthePre- [Fillifitis'Yes'aboveanddeletetherowifitis'No'above.Ifonlya Proposal Conference video-conferenceistobe held,then mentionthis factalong with credentialsof the meeting,e.g.,MeetingLink,MeetingNumber and Password] Place, time, and date before [Fillifitis‘Yes’aboveanddeletetherowifitis‘No’above.] which Written queries for the Pre-Proposalconference must be received Place, time, and date before [Fillifitis‘Yes’aboveanddeletetherowifitis‘No’above.] which registration of participants forthe Pre- Proposal conference must be received 6.0Preparation andSubmissionandOpeningofProposals (ITC-clause 8,9and10) Proposals to PresidentofIndia,ThroughHeadofProcurement,ProcuringEntity beaddressedto Instructionsfor All the bidders registered on Infracon shall form a Team on Infracon and which would be assigned unique Infracon Team ID. Bidders while submitting the proposal shall quote the Infracon Team ID. All the bidders Online registered on Infracon shall form a Team on Infracon and which would be assigned unique Infracon Team ID. Bidders while submitting the proposal shall quote the Infracon Team ID. Bid must be submitted online at e-tender portalof<Agency> https://eprocure.gov.inonor before <Time, Date ProposalSubmission Language of [English] BidValidity [100days Submission fromopening date].Noextension beyond150dayswill grantedinanycase.The biddingprocesswilllapse 150days,ifLoAnot issuedwithin150days. Proposal [One-procurement portal(s) mentioned above] Opening Place 7.0 DocumentsrelatingtoBidSecurity(ITC-clause8.4)andPerformanceSecurity (ITC-clause13.1.2) 5 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Bid Security Rs 10,00,000/- Is Bid Securing yes (EMD) Amount Declaration permitted in inINR: lieuof BidSecurity Performance Tobe quote by Bid/ Performance President of bidder as pert opf Security Security to be addressed/ India/Chairman NHAI/ financial proposal infavourof subjectedto MD NHIDCL Minimum of 5% Form of Bid/ AsperprescribedformatinRFP Performance Security 6 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Appendix-1toTIS:EligiblyCriteria 1.1 Consultants should meet the following eligibilitycriteria as of the date of their RFP submission and should continue to meet these until the subsequent RFP process andcontract award. Consultants shall be required to demonstrate fulfilment of the Eligibility Criteria in clause1.2/ Form 1.2(EligibilityDeclarations). Consultant unless otherwisestipulatedin: 1) mustbe: (a) a natural person (an individual Consultant), a private entity (a Consulting Company/ LLP /Partnership firm/ Society registered under an applicable Act in India), a public Entity (Government-owned enterprise or institution), Joint Venture/ Consortium (an association of several persons, firms, or companies - hereinafterreferred toas JV/C). (b) a Consultancy Services provider with valid registration regarding GSTIN, PAN, EPF, ESI, Labour, or equivalent registration certificate, issued by the concerned authority/government as applicable tothesubjectServices. 2) must: (a) notbeinsolvent,inreceivership,bankruptorbeingwoundup,nothaveits affairs administered by a court or a judicial officer, not have its business activities suspended and must not be the subject of legal proceedings for any of aforesaid reasons. (b) (Including their affiliates, subsidiaries, or contractors/ sub-consultants for any part ofthecontract): i) Not stand declared ineligible/ blacklisted/ banned/ debarred by the MoF/MoRTH/NHAI/NHIDCL/BRO/PWD from participation in its procurement processes. The applicability of debarment of firm from bidding shallbe as per Ministryof finance OM No F.1/20/2018-PPDdated 02.11.2021 anditsmodificationifany, thereof ; and/ or ii) Not be convicted (within three years preceding the last date of RFP submission) or stand declared ineligible/ suspended/ blacklisted/ banned/ debarred by appropriate agencies of the Government of India from participationinprocurement processesofall its entities,for:  offences involving moral turpitude in business dealings under the Preventionof CorruptionAct,1988orany otherlaw; and/or  offences under the Indian Penal Code or any other law for causing any loss of life/ limbs/ property or endangering Public Health during the executionofa publicprocurement contract and/ or  Suspected to be or of doubtful loyalty to the Country or a National Security risk as determined by appropriate agencies of the Government ofIndia. iii) Not have changed its name or created a new “Allied Entity”, consequent to havingdeclaredineligible/suspended/blacklisted/banned/debarredas above. (c) Not have an association (as a consultant/ partner/ director/ employee in any capacity) ofanyretiredemployee(ofGazettedRank)oranyretiredGazettedOfficerof the Central or State Government or its Public Sector Undertakings, if such a retired person has not completed theone-year cooling-off period(oranyother period stipulated by their erstwhile Employer) after his retirement. However, this shall not apply if such employees/ officers have obtained a waiver of the cooling-off periodfrom theirformer organisation.  of the near relations of executives of Procuring Entity involved/ likely tobe involvedinthis procurement process (d) Not have a conflict of interest (as defined in clause 4.5 below), which substantially affects fair competition. No attempt should be made to induce any otherconsultant tosubmitornot tosubmitanRFP torestrict competition. 7 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone (e) mustfulfil any otheradditional eligibilitycondition,ifany, as may beprescribed intheRFP document. (f) Mustfulfilthe technical capacityrequirements atthetimeof award. 3) from certain countries shall be eligible subject to certain conditions as detailed in Clause1.2below. 4) must provide such evidence of their continued eligibility to the Procuring Entity if requested. 1.2 Eligibility of Consultants from Restricted countries 1.2.1 Restrictions based on Reciprocity. Entities from countries (if so, identified in Section II: Appendix) as not allowing Indian companies to participate in their Government procurement shall not be allowed to participate (directly or as a sub-contractor or as a member of a JV/C) on a reciprocal basis in this RFP 1 process under the “Public Procurement (Preference to Make in India) Order 2017 ” (MII – para 10 -d) of Department for Promotion of Industry and Internal Trade, (DPIIT). Consultants mustapprisethemselvesofthelatestversionofthisorder. 1.2.2 Restrictions Based on Land Borders 2 Order (Public ProcurementNo.1)issuedby theGovernmentof India(Ministryof Finance Departmentof Expenditure PublicProcurementDivision)restrictingprocurementfrom consultantsfromcertaincountriesthatsharealandborderwithIndiashall applytothis procurement.Consultants mustapprisethemselves ofthe latestversionofthisorder.Any 3 consultantfromacountrythatsharesalandborderwithIndia ,excludingcountriesto which the Government of India has extended lines of credit orinwhichtheGovernmentofIndiais 4 engagedindevelopmentprojects(aslistedonthe websiteoftheMinistry ofExternal Affairs ), –hereinafter called‘RestrictedCountries’shall be 5 Eligible to participate in this RFP, only if the consultant is registered with the Registration CommitteeconstitutedbytheDepartmentforPromotionofIndustryandInternalTrade(DPIIT). ConsultantsshallenclosethecertificateinForm1-RFPForm. 6 1.3 Joint Venture/ Consortium (JV/C) 1.3.1 InthecasewhereaconsultantisorproposestobeaJointVenture/Consortium (that is, an association of several persons, firms, or companies - hereinafter referred to as JV/C),thenunlessotherwisespecifiedinSectionII:Appendix,inJV/C: a) membersshouldnotbemorethan i)Two(02)fortheProjectforwhichAEbidhavebeeninvitedhavingCivilcostupto1000crores ii)Three (03) for Project for which AE bid have been invited having civil cost more than1000crores b) nomembershouldhavelessthan10%participation; c) members having participation between 10% and 20% shall be termed as non- substantialmembers. d) Members having more than 20% participation shall be termed as substantial members. e) TheLeadmembermusthaveatleast40%participation. f) Theleadmember/consultantandvariouscategoriesofmembersoftheJV/Cmust be identified. g) Numberofnon-substantialmembersshallnotbemorethanone(01) 1. No.P-45021/2/2017-PP(BE-II)dated16thSeptember2020 2. F.N0.6/18/2019-PPD dated23rdJuly, 2020 3. https://mea.gov.in/india-and-neighbours.htm 4. http://meadashboard.gov.in/indicators/92 5 https://dipp.gov.in/sites/default/files/Revised-Application-Format-for-Registration-of-Consultants-15Oct2020.pdf 6 the expressions "Joint Venture" or "JV" shall mean a joint venture, association, consortium, or other unincorporatedgrouping oftwo ormore persons, whetherin the form ofapartnership orotherwise. Similarly, in the context of Joint Venture as the context permits, the word "leader, is synonymous with the words "representative"and"LeadPartner";theword"member"issynonymouswiththewordwith"partner”. 8 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 1.3.2 TheJV/C andall members mustsatisfyallthe eligibilityrequirements inthisRFP document. 1.3.3 JV/CanditsmembersmustjointlymeetthequalificationcriteriainSectionIII – QualificationCriteria. Thetechnical/ experience qualificationof all JV/Cmembers (substantialmembers,Leadmemberandnon-substantialmembers)shall be evaluated jointly as per Evaluation Criteria. However, forfinancial criteria of qualification, credentials ofsubstantialandlead members (excludingnon-substantial members) shall onlybe considered. 1.3.3 Allthemembersshallbejointlyandseverallyliablefortheentirecontract ifselected intheRFP Process. 1.3.4 In caseaJoint Venture offirms,theproposal shall beaccompanied byacertifiedcopy oflegallybindingMemorandum ofUnderstanding(MoU)onastamppaperofRs. 100/-signedbyallfirmstotheJointVentureindicatingroleandshareoftheJV partners intheproject as pereligibilityconditions. 1.4 Conflict of Interest 1.4.1 Any consultant with a conflict of interest that substantially affects fair competition shall not be eligible to participate in this procurement process. RFPs found to have a conflict of interest shall be rejected as non-responsive. Consultant shall be required to declare the absence of such conflict of interest in Form 1.2 - Eligibility Declarations. A consultant inthis procurement process shall be consideredtohave a conflict of interest iftheconsultant: a) directlyorindirectlycontrols,iscontrolledbyorisundercommoncontrol with another Consultant;or b) receives or has received any direct or indirect subsidy/ financial stake from another consultant;or c) has the same correspondence address or same legal representative/ agent as another consultant forpurposes ofthis RFP;or d) has a relationship with another consultant, directly or through common third parties, which puts it in a position to have access to information about or influence the RFP of anotherConsultant; or e) would be providing goods, works, or non-consulting services resulting from or directly related to consulting services that it provided (or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm) for the procurement planning (inter-alia preparation of feasibility/ cost estimates/ Detailed Project Report (DPR), design/ technical specifications,termsofreference (TOR)/ Activity Schedule/ schedule of requirements ortheRFP Documentetc) of thisprocurement process; or f) has a close business or family relationship with a staff of the Procuring Organization who: i) are directly or indirectly involved in the preparation of the RFP document or Terms of Referenceoftheprocurementprocessand/ortheevaluationinRFP process;or ii) wouldbeinvolvedintheimplementationorsupervisionoftheresultingcontract Any conflict stemming from such a relationship must be reported and resolved in a manner acceptable to the Procuring Entity throughout the RFP processes and execution of the contract. 9 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 1.4.2 ParticipationofonlyOneEntityfromAffiliates:OnlyoneentityfromamongaConsultantandits affiliates (that directlyor indirectlycontrol orare controlledby orare under commoncontrol with that firm) individually or as part of a joint venture shall be permitted to participate in RFP. 1.4.3 The consultant shall furnish information on commissions and gratuities,if any,paid or to be paidtoagents orany otherpartyrelating tothisRFPprocess. 1.5 QualificationCriteria:- S.No. Experienceofthefirminlast7years Annual Turnover*** PreparationofDPR Project Supervision/IC (NH/SH/Expressway) (NH/SH/Expressway) 1(a). The firm should have The firm should have minimum Annual turnover minimumexperienceof experience ofProjectSupervision/ (updatedaverage preparation of detailed IndependentEngineer/Authority oflast 3years) Project Report/ Engineer/PMC Consultantof ofthe firm from Feasibility Study cum 2/4/6**-laning/Bridge projectof consultancy Preliminary Design aggregatelength equal to3 times businessrelatedto Report of 2/4/6**- ormoreofsimilarcategory** for civilEngineering laning/Bridgeproject which RFP is invited. projectsshouldbe ofaggregatelength equal toor equal tolengthof more than Project or50km 3%% of whicheveris more, of Estimatedcivil similar category for Project whichRFP isinvited Costforwhich AEisinvited.. 1(b) Firm should also have experience of Project Supervision/ Independent Engineer/Authority’ Engineer/ PMC of at least one project of similar category of two/four/six** laning/bridgeworkof lengthequalto40%ofprojectlength. Additional requirement in case of specialized projects*** ** Similar project means 2/4/6 lane project of Expressway/NH/SH standards andspecificationas applicablefor the project for which RFPisinvited. For 2-lane projects experience of 4/6 lane also to be considered with a multiplicationfactor of 1.5.Experience of4/6 lane shall be considered interchangeably for 4/6 laning projects. For 4/6 laning projects, experience of 2 lane will be considered with a multiplication factor of 0.4,butonlyforthose2laneprojectswhosecostofconsultancyservices was more than Rs.3.0 crores. For standalone bridge projects, experience in 10 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone bridge work (either standalone project or as a part of road project) onlybe considered. ***Incasetheprojectincludesanyspecializednatureofworksuchas tunnels, specialized structures etc. in substantial quantum, this requirement maybesuitablyincluded. Note:- Experience of only those projects, which has been awarded by Govt Agencies will be considered for calculating qualification under clause 1.5above. : NotetoConsultant:DuringRFPProcess,whileoriginaldocuments/certificates arecalledfor to authenticate thequalificationclaimed,the followingmay bekept inmind: 1) When a joint venture submits the bid, in that case, all members (other than non- substantialmembers) in the JV/C must submit their technical and financial statements in orderofthemember's shareinthepartnership,greatestto least. For determination of technical compliance, the figure of all members (Lead, substantial and non- substantial) shall be added to determine compliance with the minimum technical qualification. The figures of members of a JV/C (other than non-substantial members) shall be added to determine compliance with the minimum financial qualifying criteria. However, for JV/C to qualify, the Lead member must meet at least50percent of thosetechnical/financial minimum criteriaforanindividualBidder and other substantial members at least 25% of the technical/financialcriteria. Failure to complywiththisrequirementshallresultintherejectionoftheJV/C'sbid. 2) Theweightage givenfor experience ofa firm woulddepend ontheroleofthe firm intherespective assignments.The firm’sexperience wouldget full creditifitwasthe solefirm intherespectiveassignment.Iftheapplicantfirm hascompletedprojectsas JVwithsomeotherfirms,weightageshallbegivenas per theJVshare***.However iftheapplicant firm has executedtheproject as associate/ nonsubstantial partner withsomeother firms,weightage shall begivenas pertheActual share subjected to maximumof25% totheapplicant firm for theprojects completedunder such association. *** Forweightageof experienceinanypastConsultancyassignment,experience certificatefrom theclient shall besubmittedwithcleardemarcationofJVsharein clientcertificateAnnualturnoverdulycertifiedbyChartered Accountantshall be accepted.In caseofnon-availabilityofsuch documents noweightage of turnover/experience will beconsidered. 3) In case the financial figures and values of services provided are in foreign currency current market exchange rate (State Bank of India BC Selling rate as on last date of submission of the bid) will be applied for the purpose of conversion of amount in foreigncurrency intoIndian Rupees. 4) The consultant shall submit the audited balance sheet and/or banking reference and certificate from Statutory Auditor with UDIN certifying that turnover is from civil engineering consultancy business with their RFP proposal. An authorised representativeofthe consultant must-sign thestatement. 11 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Section II: Instructions to Consultants (ITC) The RFP Document 1.1. This‘RFPDocument’Document(hereinafterreferredtoas‘theRFPDocument’)details the terms and conditions for entering a contract for delivery of the Consultancy Services (hereinafter called ‘the Services’) described in Section VI: “Terms of Reference”. The ‘Services’ may include incidental Goods, Works, and other Services if so indicated. Inthis RFP Document, any generic reference to ‘Services’ shall be deemed to include such incidentalGoods,Works,and otherServices.Proposalsareinvitedfromthe Consultants meeting the criteria (hereinafter called ‘theConsultants') as mentioned RFPL. 1.2 Interpretations,Definitions,Abbreviations andDocument Conventions Section IV: General Conditions of Contract (GCC), details tenets of interpretation (GCC- clause 1.1), definitions (GCC-clause 1.2), document conventions (GCC-clause 1.3) and abbreviations(GCC-clause1.4),whichshallalsoapplytotherestoftheRFPDocument. 1.3 OverviewofContents 1) Unless otherwise stipulated inAITC, theSections, Forms and Formats comprising this RFP Document are described in ITC-clauses 1.4, 1.5 and 1.6 below. A separate BOQ file for Financial Proposal on the eProcurement Portal is also part of this RFP Document. Any generic reference to RFP Document shall also imply a reference to any/ all the sections, Forms, Formats and the BOQ file orother files that comprise this RFP Document. 2) Consultants must submit the Proposal in the Forms/ Formats mentioned in ITC- clauses 1.5and1.6below(as relevant). 1.4 SectionsoftheRFPDocument 1.4.1 SectionsoftheRFPDocument UnlessotherwisestipulatedinAITC,theRFPDocumentcontainsthefollowingsections,which aredescribed insubsequent sub-clauses: SectionI:RequestforProposalLetter(RFPL) anditsAppendix:TenderInformation Summary (TIS) Section II: Instructions to Consultants (ITC) Section III: Appendix to Instructions to Consultants (AITC) Section IV: General ConditionsofContract (GCC) SectionV: Special ConditionsofContract (SCC) SectionVI:TermsofReference a) SectionVI-A:ListofKeyExpertsandRequiredQualifications SectionVII: Evaluation/ScoringCriteria 1.4.2 Section I: Request for Proposal Letter (RFPL) and its Appendix: TenderInformation Summary (TIS) Section I – Request for Proposal Letter (RFPL) and its Appendix – Tender Information 12 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Summary (TIS) provides a synopsis of information relevant for a Consultant to decide on participating in the RFP. Consultants must fill up ‘Form T-7: Terms and Conditions - Compliance’ regardinganyproposed deviations from this Section. 1.4.3 Section II: Instructions to Consultants (ITC) and Section III: Appendix to Instructions to Consultants (AITC) Section II: “Instructions to Consultants” (ITC), along with Section III: “Appendix to Instructions to Consultants (AITC)”, provides the relevant information as well as instructionstoassisttheConsultantsinpreparingtheirproposals.It alsoincludes themode and procedure adopted for receipt/ opening, evaluation of Proposals, and contract award. In case of a conflict, provisions of AITC shall prevail over those in the ITC. Any generic reference to ITC shall also imply a reference to AITC as well. Consultants must fill up ‘Form T-7: Terms andConditions -Compliance’ regarding any proposed deviations from theseSections. 1.4.4 Section IV: General Conditions of Contract (GCC) and Section V: Special Conditionsof Contract (SCC) SectionIV– GeneralConditionsofContract(GCC)andSectionV–SpecialConditions of Contract(SCC)describetheconditionsgoverningtheresultingcontract.Incaseofa conflict, provisions of the SCC shall prevail over those in the GCC. Any generic reference to GCC shall also imply a reference to SCC as well. In case of any conflict, provisions of GCC/ SCC shall prevail over those in ITC/ AITC. Consultants must fill up ‘Form T-7: Terms and Conditions - Compliance’ regarding any proposed deviations from terms and conditionsintheseSections. 1.4.5 Section VI: Terms of Reference (TOR) and Section VI-A: List of Key Experts andRequired Qualifications SectionVI: Terms ofReference describe thebackground,purpose/ objectives, description/ scope, deliverables/ outcomes, timelines, Procuring Entity’s inputs and counterpart personnel,statutoryrequirementsofServicesrequiredetc.SectionVI-A:‘List ofKeyExperts and Required Qualifications’ describes the team composition, expertise, experience and professional qualifications required for each Key Experts. Any generic reference to TOR shall imply a reference to Section VI-A: ‘List of Key Experts and Required Qualifications’ as well. Consultants must fill up ‘Form T-3: Comments and Suggestions on Terms of Reference, Counterpart Staff, and Facilities to be provided by the Procuring Entity’regardingtheseSections.RegardingthisSection,Consultantsmust filloutFormT-3: Comments and Suggestions on Terms of Reference, Counterpart Staff, and Inputs to be providedbytheProcuringEntity. 1.4.6 SectionVII:Evaluation/ScoringCriteria 1) Section VII – Evaluation/ Scoring Criteria stipulates the scoring scheme for evaluating various Technical criteria. These may cover scoring of criteria relating to the Consultant’s experience, Technical Approach and Methodology, understanding of requirements, qualification and experience of Key Experts, transfer of knowledge etc. It may also lay down a minimum technical score to qualify for the next stage of Financial Evaluation. In a specific evaluation scheme, instead of a scheme of scoring, ascheme maybelaiddown toevaluate criteriaona pass/fail basis. 13 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2) ConsultantsmustfillupthefollowingFormsregardingthisSection: a) FormT-2:Consultant’sOrganisationandExperience andpast performance b) Form2-AConsultant’s TechnicalCapacity c) Form T-3: Comments and Suggestions on Terms of Reference, Counterpart Staff,andInputs tobeProvidedbythe ProcuringEntity d) Form T-4: Description of Approach, Methodology and Work Plan in RespondingtotheTerms ofReference e) FormT-5:WorkScheduleandPlanningforDeliverables f) FormT-6:TeamComposition,Assignment,andKeyExperts’Inputs i) AnnextoFormT-6:KeyExperts’CurriculumVitae(CV) 1.5 Forms (Tobefilled,digitallysigned,anduploaded byConsultants)Pleaserefer toITC-clause 1.4abovetorelatethefollowingformstothecorresponding Sections. 1) TechnicalProposal: a) Form T-1: Proposal Form – (To serve as a covering letter to both the Techno- commercial and Financial Proposals) b) Form1.2-EligibilityDeclaration c) FormT-1A:Consultant’sCommercialInformation d) FormT-2:Consultant’sOrganisationandExperience e) FormT-2A:-ConsultantTechnical capacity f) Form T-3: Comments and Suggestions onTerms of Reference,Counterpart Staff, andInputs tobeProvidedbythe ProcuringEntity g) Form T-4: Description of Approach, Methodology and Work Plan inRespondingtotheTerms ofReference h) FormT-5:WorkScheduleandPlanningforDeliverables i) FormT-6:TeamComposition,Assignment,andKeyExperts’Inputs j) AnnextoFormT-6:KeyExperts’CurriculumVitae(CV) k) FormT-7: Terms andConditions -Compliance l) Form T-8: Checklist for Consultants. The consultant must also upload the Checklist to confirm that he has complied with all the instructions in the RFP Document and that nothing is inadvertently left out. This checklist is only for generalguidance,isnotcomprehensive,anddoesnotabsolvetheConsultant from complyingwithall therequirements stipulatedelsewhere intheRFP Document. m) FormT-9A:BankGuaranteeFormatforEarnestMoneyDeposit n) FormT-9B:BidSecuringDeclaration o) FormT-10:IntegrityPact p) Any other format/ Form if stipulated in AITC or considered relevant by the Consultant. 2) Financial Proposal Thefinancial proposal is tobe submittedina separatefileavailable ontheeProcurement Portal. 1.6 OtherFormats Format1:ContractForm(RequiredafterLetterof Award) AppendixA:TermsofReference 14 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone AppendixB:KeyExperts AppendixC:RemunerationCostEstimates i) Annex to Appendix C: Breakdown of Agreed Fixed Rates in Consultant’s Contract AppendixD: ReimbursableExpensesCost Estimates AppendixE-1:BankGuaranteeFormatforPerformanceSecurity AppendixE-2:BankGuaranteeFormatforAdvancePayment 2) Format2:CertificationbyProspectiveArbitrators 3) Format 3: Authorisation to Attend Pre-Proposal Conference. (To be filled up, if required, byConsultant) ProcuringEntity -Rightsand Disclaimers 2.1. TheProcuringEntity Proposals are to be addressed to the President of India through the Head of Procurement/ Chairman NHAI/ MD NHIDCL, Procuring Entity in the Procuring Organization(headed by the Head of the Procuring Organisation). The Tender Inviting Authority (TIA) is the designated officer for uploading and clarifying this RFP Document. The contract may designate, as required, a counterpart Contract Manager (or Contract Management Team); andPayingauthoritywhoshalldischargethedesignatedfunctionduringcontract execution. 2.2. RighttoIntellectualPropertyandconfidentiality: 1) The RFP Document and associated correspondence are subject to copyright laws and shallalwaysremainthepropertyoftheProcuringEntityandmustnotbesharedwiththird parties or reproduced, whether in whole or part, without the Procuring Entity’s prior writtenconsent. 2) However,Consultantsmaysharethese toprepare andsubmittheirProposals with their employees, Sub-consultant(s) or holding Company after obtaining an undertaking of confidentialitysimilar tothat imposedontheConsultant. 3) This condition shall also apply to Consultants who do not submit a Proposal after downloadingitor are not awardeda contract. 4) The obligationof the Consultants under sub-clauses above,however, shall not apply to informationthat: a) now or hereafter is or enters the public domain through no fault of Consultant; b) is legally possessed by consultant at the relevant time and was not previously obtained,directlyor indirectly, from theProcuring Entity; or c) otherwise lawfully becomes available to Consultant from a third party with no obligationofconfidentiality. 5) The provisions of this clause shall survive completion or termination for whatever reason oftheProcurement Process or thecontract. 2.3. RighttoRejectanyorallProposals The Procuring Entity reserves its right to accept or reject any or all Proposals, abandon/ cancel the Procurement Process, and issue another RFP for the same or similar Services before the awardof the contract. It would have no liability to the affected Consultant(s) or anyobligation toinformthem ofthegroundsfor suchaction(s). 15 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2.4. Disclaimers 2.4.1 RegardingthePurposeoftheRFPDocument The RFP Document is neither an agreement nor an offer to the prospective Consultant(s) or any other party. The purpose of the RFP Document is to provide the Consultant(s) with informationtoassistthem inparticipationinthisProcurement Process. 2.4.2 RegardingDocuments/guidelines TheRFP Document, ensuingcommunications, andContracts shall determine the legal and commercial relationship between the Consultants and the Procuring Entity. No other Government or Procuring Entity’s document/ guidelines/ Manuals, including its Procurement Manual (for internal and official use of its officers), notwithstanding any mention thereof in the RFP Document, shall have any locus-standii in such a relationship. Therefore, suchdocuments/ guidelines/ Manualsshallnot beadmissibleinlegal ordispute resolutionorgrievanceredressal proceedings. 2.4.3 RegardingInformationProvided Informationcontained in the RFP Document or subsequently provided to the Consultant(s) is on the terms and conditions set out in the RFP Document or subject to which that was provided. Similar terms apply to information provided verbally, in the documentary, or any other form, directly or indirectly, by the Procuring Entity, its employees, or associated agencies. 2.4.4 RegardingRFPDocument: 1) The RFP Document does not purport to contain all the information Consultant(s) may require. It may not address the needs of all Consultants. They should conduct due diligence, investigation, and analysis,check the information's accuracy, reliability, and completeness, and obtain independent advice from appropriate sources. Information providedintheRFPDocumenttotheConsultant(s)isonvariousmatters, some of which may depend upon interpreting the law. The information given is not an exhaustive account of statutory requirements and should not be regarded as a complete or authoritativestatement oflaw.TheProcuringEntity, itsemployees and otherassociated agenciesacceptnoresponsibilityfortheaccuracyorotherwisefor any interpretation or opiniononlawexpressedherein. 2) The Procuring Entity, its employees and other associated agencies make no representation or warranty for the accuracy, adequacy, correctness, completeness or reliability of any assessment, assumption, statement, or information in the RFP Document. They have no legal liability, whether resulting from negligence or otherwise, for any loss, damages, cost, or expense arising from/ incurred/ suffered, howsoever caused,toanyperson, includingany Consultant,onsuchaccount. Consultants– Participation in thisRFP process 3.1. EligibilitytoParticipate 1) Consulting firms meeting the eligibility criteria as mentioned in Appendix-1 to Tender Information Summary (TIS) are only eligible for applying for this assignment.Firms notmeetingthesecriteria,neednot apply. 2)Participation inonlyoneProposal: TheConsultantshall not participateinmore than oneProposalinthisRFPProcess.ParticipationinanycapacitybyaConsultant (including 16 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone the participation of a Consultant as a Sub-consultant or as a member of a JV/C or vice- versa) in more than one Proposal shall result in the disqualification of all Proposals in which he is a party. A Consultant shall not be allowed to participate both as an individual Consultantandas apart ofthejointventure 3.2. ConflictofInterest The Consultant must provide professional, objective, and impartial advice, holding the Procuring Organisation’s interests paramount at all times, and shall not try to get benefits beyond the legitimate payments and credentials in the contract. He should strictly avoid conflicts with other assignments or their corporate interests. Consultants must disclose to theProcuringEntityinFormT-1‘ProposalForm(CoveringLetter)’any actual or potential conflict that impacts its capacity to serve the best interest of the Procuring Organisation. Failuretodisclosesuchsituationsshallbetreatedasaviolationof the Code of Ethics (ITC- Clause 15) and shall attract penalties mentioned therein. Proposalsfoundtohaveaconflict of interest shall be rejected as non-responsive. Without limitation on the generality of the preceding,a Consultant inthis Procurement Process shall be considered to have a conflict ofinterest iftheConsultant: 1) ConflictingAssociations:- a) directly or indirectly controls, is controlled by or is under common control withanother Consultant;or b) receives or has received any direct or indirect subsidy/ financial stake from anotherConsultant;or c) has the same correspondence address or same legal representative/ agent as anotherconsultant for purposes ofthisproposal; or d) has a relationship with another Consultant, directly or through common third parties, that puts it in a position to have access to information about or influence the Proposal of another Consultant or influence the decisions of the ProcuringEntityregardingthis Procurement Process;or 2) Unfair Competitive Advantage and Conflicting Activities: had (or any of its Affiliates) been engaged by the Procuring Entity to provide goods, works, or services for a project, shall be disqualified from providingconsulting services resulting from or directly related to those goods, works, or services. Conversely, a firm (or any of its Affiliates)hiredtoprovideconsultingservicesforthepreparation or implementation of a project shall be disqualified from subsequently providing goods or works or services resulting from or directly related to the consulting services for such preparation or implementation. 3) ConflictingAssignments:would(includingitsExpertsandSub-consultants)oranyof its Affiliates)beorareprovidingconsultancyservicesinanotherassignmentfor the same oranother ProcuringEntitythat,byits nature, mayconflict withthis assignment. 4) Commissions and Gratuities: The Consultant shall disclose any commissions or fees that may have been paid or are to be paid to agents, representatives, or commission agents concerning the selection process or execution and performance of the resulting Contract. The information disclosed must include the name and address of the agent, representative, or commission agent, the amount and currency, and the purpose of the commissionorfee. 5) Conflicting Relationships: has close business/ family relationship with a staff of the Procuring Organisation who are/ would be directly/ indirectly involved in any of the 17 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone followingactivities: a) preparationoftheRFPdocumentorTORoftheProcurementProcess b) evaluationof ProposalsorawardofContract,or c) implementation/supervisionoftheresultingContract TheTermsofReference(TOR)andFormofContract 4.1 FacilitiestobeprovidedbytheProcuringEntity All inputs, relevant project data, and reports required for preparing the Consultant’s Proposal shall be included in the TOR. Unless otherwise stipulated in the TOR, utilities or facilities (e.g., Rooms, Furniture, Transport, and Access to IT Services etc.) shall NOT be providedbytheProcuringEntity totheConsultant. 4.2 Forms of BOQ/ Contract and Selection Methods Evaluation of Proposals and the resulting Contract shall be based on the form of BOQ/ Contractand the Selection method applicable for the RFP, as elaborated in ITC-Clause 11 and12below. 4.2.1 Time-Based(InputsAdmeasurement)formofBOQ/Contract: Unless otherwise stipulated in the TIS form of BOQ/ Contract shall be ‘Time-Based (Inputs Admeasurement)’. In such contracts, the Consultant shall provide services on a timed basis according to the Terms of Reference. The Consultant’s remuneration shall be determined basedonthe timespentby theConsultantincarryingoutthe Servicesbasedon (i)agreed-uponunitratesfortheConsultant’sexpertsmultipliedbytheactual time spent by the experts in executing the assignment and (ii) reimbursable expenses using actual expensesand/or agreedunit prices. 4.2.2 SelectionMethod 1) Unlessotherwise specifiedinTIS, theselectionmethodapplicableinthis RFPshall beQualityandCostBasisSelection(QCBS). 2) PleaserefertoITC-Clause 11and12fordetails. 4.3 InputsofKeyExperts 4.3.1 Consultant shall not propose alternative Key Experts. Only one CV shall be submittedforeachKeyExpert position.Failure tocomplywiththisrequirementshall make theProposal non-responsive. ProposalPrices, Taxes and Duties 5.1. Prices 5.1.1 CompetitiveandIndependentPrices The prices should be arrived at independently, without restricting competition, any consultation, communication, or agreement with any other Consultant or competitor relatingto: i) thoseprices;or ii) theintentiontosubmitanoffer;or iii) themethodsorfactorsusedtocalculatethepricesoffered. 18 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone ThepricesshouldnotbeknowinglydisclosedbytheConsultant,directlyorindirectly, to any other Consultant or competitor before the Financial Proposal opening unless otherwiserequiredbylaw. 5.1.2 PriceComponents Consultant shall indicate in the Price Schedule prices/ rates against all the specified components,includingtheunit prices andtotal Proposal prices. 5.1.3 PriceSchedule Consultants are to upload only the downloaded BOQ (in excel format) after entering the relevant fields without any alteration/ deletion/ modification of other portionsoftheexcelsheet.Allthecolumnsinthepricescheduleshouldbefilled up as required. If any column does not apply to a Consultant, he should clarify the same. Consultants shall fill in rates other than zero value in the specified cells without leavingthem blank. The quoted price shall be considered to include all relevant financial implications, including inter-alia the scope of the Services to be delivered and the incidental goods/ works to be supplied, location of the Consultant, site(s) of the deliveryofServices,termsofdelivery, extantrulesandregulationsrelatingto taxes, duties, customs, transportation, environment, labour, Mining & Forest of the Consultant's countryand inIndia. 5.1.4 ProvisionsofGST Break upofdifferent price elements,i.e.,as per GST Act, shallbe indicatedseparately,alongwithitsassociatedHSNcodeandGSTrate. While quoting the basic rate, the Consultant should offset the input credit available as perthe GSTAct. PleaserefertoITC-Clause5.3for further details. 5.1.5 CurrenciesofProposalandPayment 1) Unless otherwise stipulated in the AITC, the Consultant's currency of Proposal and payment shall be quoted entirely in Indian Rupees. All payments shall be made in IndianRupees only. 2) Where the AITC permits quotations in different currencies, then, for Services performed in or sourced from India, prices shall be quoted in Indian rupees only, and for Services performed from foreign locations, prices shall be quoted in Indian rupees or the currency stipulated in the AITC. For evaluation, all quoted prices shall be converted into Indian Rupees as per the procedure mentioned in ITC-clause 11.4.2 below. 5.1.6 Non-compliance Tenders,wherepricesarequotedinanyotherway,shallberejectedasnonresponsive. 5.2. Firm/ VariablePrice 5.2.1 FirmPrice UnlessotherwisestipulatedintheAITC,prices quotedbytheConsultantshallremain firm andfixedduringthecurrencyofthecontractandnotsubjecttovariationonanyaccount. 19 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 5.2.2 PriceVariation Clause: 1) In case the RFP Documents require/ permit offers on a variable price basis, the price quoted by the Consultants shall be subject to adjustment during the original delivery period to take care of the changes in the input cost of labour, material, and fuel/ power components under theprice variationformulaas stipulatedintheRFP Document. 5.3. Taxes The Consultant and its Sub-consultants and Experts are responsible for meeting all tax liabilities arisingfrom theContract. 5.3.1 GSTRegistrationStatus: 1) Allthe Consultants should ensure that they areGST compliantandthat theirquoted tax structure/ rates are as per GST Act/ Rules. Consultants should be registered under GST and furnish a GSTIN number and GST Registration Certificate in their offer unless they are specifically exempted from registration under a specific notification/ circular/ section/ruleissuedbystatutoryauthorities. 2) GST Registration Number (15-digit GSTIN). If the Consultant has multiple businessverticals inastateandhasseparateregistrationforeachvertical,theGSTIN of each vertical concerned with the service delivery shall be quoted. If the services provided are from multiple states, the Consultant should mention GST registration numbers for eachstateseparately. 3) Composition scheme: If the Consultant has opted for a composition levy under Section 10 of CGST, he should declare the fact while bidding along with GSTIN and GSTregistrationcertificate. 4) Exemption from Registration: If a Consultant is not liable to take GST registration, i.e., having turnover below threshold, he shall submit undertaking/ indemnification against tax liability. Consultant claiming exemption in this respect shall submit a valid certificate from practicing Chartered Accountant (CA)/ Cost Accountant with Unique Document Identification Number (UDIN) to the effect that Consultant fulfils all conditions prescribed in notification exempting him from registration. Such Consultant/ dealer shall not charge any GST and/ or GST Cess in the bill/ invoice.In such case, applicable GST shall be deposited under ReverseCharge Mechanism(RCM) or otherwise as per GST Act by the Procuring Entity directly to concerned authorities. The consultant should note that his offer would be loaded with the payable GST under the RCM. Further, the Consultant should notify and submit to the Procuring Entity within15days ofbecomingliablefor registrationunder GST. 5.3.2 HSNCode and GST Rate: 1) If provided in this RFP Document, the HSN (Harmonized System of Nomenclature) codeshallbeonlyindicative.ItshallbetheresponsibilityoftheConsultanttoensure that they quote the exact HSN Code and corresponding GST rate for each activity of the Services beingofferedbythem a) As per the GST Act, the Proposal and contract must show the GST Tax Rates (and GST Cess if applicable) and GST Amount explicitly and separately from theProposal/contract price (exclusiveofGST). 20 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2) Applicability to Imported Goods/ Services: If imported into India, the supply of commodities, services, or both shall be considered as supply under inter-state commerce/tradeandshallattractintegratedtax(IGST).TheIGSTrateandGSTcessshall be applicable on the ‘Custom assailableValue’ plus the ‘Basic Customs duty applicable thereon’. 5.4. Payments 5.4.1 General Unless otherwise stipulated in AITC, the usual payment term is 100% on delivery and acceptance of Services at ‘the Site’ by the Procuring Entity and production of all required documents. However, periodic “On Account” payments shall be made unless otherwise stipulatedas pertheprocedure laiddowninGCC. 5.4.2 NoAdvancePayments Unless otherwise stipulatedinAITC, theProcuring Entityshall make noadvancepayment of any type (Mobilization, secured advances, etc.). If AITC does stipulate advance payments,these shall besubject toconditions stipulatedtherein. Downloading the RFP Document; Corrigenda and Clarifications 6.1. DownloadingtheRFPDocument TheRFPdocumentcanbedownloadedasperthedetailsgiveninRFPLclause2.2. 6.2. Corrigenda/Addendato RFP Document 1) Before the deadline for submitting Proposals, the Procuring Entity may update, amend, modify, or supplement the information, assessment or assumptions contained in the RFPDocumentbyissuingcorrigendaandaddenda.Thecorrigenda andaddendashallbe publishedin the same manner as the original RFP Document. Without any liability or obligation, the Portal may send intimation of such corrigenda/ addenda to Consultants who have downloaded the document under theirlogin.However,the Consultants must check the website(s) for any corrigenda/ addenda. Any corrigendum or addendum thus issuedshallbeconsideredapartofthe RFP Document. 2) To give reasonable time to the prospective Consultants to take such corrigendum/ addendum into account in preparing their Proposals,the Procuring Entity may suitably extend the deadline for the Proposal submission as necessary. After the procuring entity makes such modifications, any Consultant who has submitted his Proposal in response to the original invitation shall have the opportunity to either withdraw his Proposal or re-submit his Proposal superseding the original Proposal within the extendedtimeofsubmissionas per ITC-clause9.4.1below. 3) The Procuring Entity may extend the deadline for the RFP submission by issuing an amendment. In this case, all rights and obligations of the Procuring Entity and the consultants previously subject to the original deadline shall then be subject to the new deadlinefor theRFP submission. 6.3. ClarificationoftheRFPDocument As detailedinRFPL clause 2.3,a Consultantrequiring any clarificationregarding theRFP DocumentmayseekclarificationthroughtheeProcurementPortal.TheProcuring 21 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Entityshall respond no later than seven days before the deadline for RFP submission. The query and clarification shall be shared with all Consultants on the portal without disclosing its source. If a modification of the RFP document is warranted due to such clarification,anaddendum/corrigendumshallbeissuedasperITC-Clause6.2above. Pre-Proposal Conference 1) If a Pre-Proposal conference is stipulated in the TIS, prospective Consultants interested in participating in this tender may attend a Pre-Proposal conference to clarify the techno- commercial conditions of the RFP at the venue, date and time specified therein. 2) Participation is not mandatory: However, if a Consultant chooses not to (or fails to) participateinthePre-Proposal conferenceordoes not submita writtenquery, it shall be assumedthattheyhavenoissuesregardingthetechno-commercialconditions. 3) The date and time by which the written queries for the Pre-Proposal must reach the authority and the last date for registration for participation in the Pre-Proposal conference are also mentionedin the TIS. If the dates are not mentioned,such date and timeshallbe7days beforethedateandtimeofthepre-Proposalconference. 4) DelegatesparticipatinginthePre-Proposalconferencemustprovideaphotoidentity and an authorization letter as per Format 3: "Authorization to attend a Pre-Proposal Conference" from their Company/ principals; else, they shall not be allowed to participate. The pre-Proposal conference may also be held online at the discretion of theProcuringEntity. 5) After the Pre-Proposal Conference, Minutes of the Pre-Proposal conference shall be published on the Procuring Entity’s portal within seven days from the Pre-Proposal Conference. If required, a clarification letter and corrigendum to RFP Document shall be issued, containing amendments to various provisions of the RFP Document. As per ITC-clause6.2above,togivereasonabletimetotheprospectiveConsultants toconsider such clarifications in preparing their Proposals, the Procuring Entity may suitably extend,as necessary, thedeadline for theProposal submission. Preparation of Proposals 8.1. TheProposal 8.1.1 LanguageoftheProposal Unless otherwise stipulated in the AITC, the Proposal submitted by the Consultant and all subsequent correspondence and documents relating to the Proposal exchanged between the Consultant and the Procuring Entity shall be written in the language specified in the AITC /SCC(hereinafter referred toas the ‘Proposal Language’. If nothingis specified, the language shall be English). However, the language of any printed literature furnished by the Consultant in connection with its Proposal may be written in any other language provided a certified translation accompanies it in the Proposal language. For purposes of interpretationoftheProposal,translation inthelanguage oftheProposal shall prevail. 22 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 8.1.2 AcquaintancewithLocalConditionsandFactors Athisowncost,responsibility,andrisk,theConsultantisencouragedtovisit,examine, and familiarise himself with the local conditions and factors. The Consultant acknowledges thatbeforethesubmissionoftheProposal,hehas,afteracompleteand careful examination, made an independent evaluation of the local conditions, infrastructure, logistics, communications, legal, environmental, and any other conditions or factors which would have any effect on the performance of the contract. Consultants shall be responsible for compliance with Rules, Regulations, Laws and Acts in force from time to time at relevant places.Onsuchmatters,theProcuringEntityshall have no responsibility and not entertain anyrequestfrom theConsultants. 8.1.3 CostofpreparationandsubmissionofProposals The Consultant(s) shall bear all direct or consequential costs, losses and expenditures associated with or relating to the preparation, submission, and subsequent processing of their Proposals, including but not limited to preparation, copying, postage, delivery fees, expenses associated with any submission of samples, demonstrations, or presentations which the Procuring Entity may require, or any other costs incurred in connectionwithor relating to their Proposals. All such costs, losses and expenses shall remain with the Consultant(s),andtheProcuringEntityshallnotbeliableinanymanner whatsoever for the same or any other costs, losses and expenses incurred by a Consultant(s) for participation in the Procurement Process, regardless of the conduct or outcome of the Procurement Process. 8.1.4 InterpretationofProvisionsoftheRFPDocument TheRFPdocument'sprovisionsmustbeinterpretedinthecontextinwhichtheseappear.Any interpretation of these provisions far removed from such context, contrived, or between- the-lines interpretationis unacceptable. 8.1.5 AlternateProposalsarenotallowed. Unless otherwise stipulated in the AITC, conditional offers, alternative offers, and multipleProposalsbyaConsultantshallnotbeconsidered.ThePortalshallpermitonly one Proposal tobe uploaded. 8.2. DocumentscomprisingtheProposal: 8.2.1 Techno-commercial Proposal/ Cover "Technical Proposal" shall include inter-alia the scanned copies of duly signed or digitally signed copies of forms as per ITC-Clause 1.6 in pdf format. The Technical Proposal shall notincludeanyfinancialinformation.ATechnicalProposalcontaining materialfinancialinformation shallbedeclarednon-responsive. 8.2.2 Financial Proposal/ Cover "Financial Proposal" shall comprise the Price Schedule (Submitted separately as an excel sheet) available on the eProcurement Portal. Any additional information may be uploaded as a pdf under "Additional Documents" in the "Proposal Cover Content." It should be filledconsideringallfinanciallyrelevantdetails,includingTaxesandDuties, 23 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone asperITC-clause5.3.Itshalllistallcostsassociatedwiththeassignment,including(a) remunerationforKeyExpertsandNon-KeyExperts,(b)reimbursableexpensesintheRFP Document.Noadditional technical details whichhave not beenbrought outintheTechnical Proposalshall bebrought out inthe Financial Proposal. AFinancial Proposal containing material Technical Informationnot disclosedinthe Technical Proposalshall bedeclared non-responsive. 8.3. ProposalValidity 1) UnlessspecifiedtothecontraryintheTIS,Proposalsshallremainvalidforaperiod not less than 90100 days from the deadline for the Proposal submission stipulated in TIS. AProposal validfor ashorter periodshall berejected as non-responsive. 2) In case the day upto which the Proposals are to remain valid falls on/ subsequently declared a holiday or closed day for the Procuring Entity, the Proposal validity shall automaticallybedeemedtobeextendeduptothenextworking day. 3) In exceptional circumstances, before the expiry of the original time limit, the Procuring Entity may request the Consultants to extend the validity period for a specified additional period. The request and the Consultants' responses shall be made inwritingorelectronically. a) The Consultant has the right to refuse to extend the validity of its Proposal, in whichcase suchProposal shall not befurther evaluated. b) If the Consultant agrees to extend the validity of its Proposal, it shall be done without any change in the original Proposal and with the confirmation of the availabilityof theKeyExperts. c) If any Key Experts become unavailable for the extended validity period, the Consultant shall seek permission to substitute another Key Expert. The Consultant shall provide adequate written justification and evidence to the Procuring Entity with the substitution request. In such case, a substitute Key Expert shall have equal or better qualifications and experience than the originallyproposed one. Thetechnical evaluation score, however,shall remain basedontheevaluation oftheCVoftheoriginal KeyExpert. d) If the Consultant fails to provide a substitute Key Expert with equal or better qualifications,oriftheprovidedreasonsforthereplacementorjustification are unacceptabletotheProcuringEntity, suchProposalshall berejected. 8.4. BidSecurity-RelatedDocuments 1) EMD/ BSD as Bid Security: The Consultant shall provide Bid Security as Earnest Money Deposit (EMD) for the amount shown in the TIS (or if permitted in TIS, a Bid SecuringDeclarationas Form T-9B inlieuof EMD). 2) Modalities of EMD: Unless otherwise provided in TIS, the earnest money shall be denominated in Indian Rupees. Wherever relevant, it shall be in favour of the Account specified in TIS and shall be furnished in one of the following modalities valid for forty-five days beyond thevalidityofthe proposal: a) E-BankGuarantee b) InsuranceSuretyBonds 24 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone c) AccountPayeeDemandDraftor d) FixedDepositReceiptor e) Banker’scheque f) Bank Guarantee from/ confirmed by any of the commercial banks in the format specified inForm T-9A, or g) Paymentonlineinanacceptableform 3) Forfeiture of EMD (Enforcement of BSD): EMD shall be forfeited (or in case BSD is permitted, the declaration2 shall be enforced from the date of such decision) if the Consultantbreaches anyofthe followingobligation(s) under theRFP: (a) withdraws or amends his Proposal or impairs or derogates from the Proposal in any respectwithintheperiod ofvalidityofits Proposal;or (b) after having been notified within the period of Proposal validity of the acceptanceofhis Proposal bytheProcuring Entity: i) refuses to or fails to submit the original documents for scrutiny or the required Performance Security within the stipulated time as per the RFP document's conditions. ii) failsorrefusestosignthecontract. 4) ReturnofEMD(ExpiryofBSD):UnsuccessfulConsultants’EMDshallbereturnedto themwithoutanyinterest(orifBSDispermitted,itshallstandexpired)notlaterthanthirty days aftertheconclusionof theresultant contract. SuccessfulConsultant’s EMD shall be returnedwithoutanyinterest(orifBSDispermitted,itshallstandexpired) after receipt ofperformancesecurity from them. Signing and Uploading Proposals 9.1. RelationshipbetweenConsultantandeProcurementPortal The Procuring Entity is neither a party nor a principal in the relationship between the Consultant and the organisation hosting the e-procurement portal (hereinafter called the Portal). Consultants must comply with the rules, regulations, procedures, and implied conditions/ agreements of the eProcurement portal, including registration, compatible DigitalSignatureCertificate(DSC)etc.Consultantsshallsettleclarifications anddisputes,if any, regarding the Portal directly with them. In case of conflict between provisions of the Portal with the RFP Document, provisions of the Portal shall prevail. Consultants may studytheresources providedbythePortal for Consultants. 9.2. SigningofProposal The individual signing/ digitally signing the Proposal or any other connected documents shouldsubmitanauthenticatedcopyofthedocument(s),whichauthorizesthesignatory 2 TheBSDprovidesforautomaticsuspensionoftheConsultant(allmembersindividuallyandjointlyincaseofJV/C) frombeingeligibleforbiddinginanyprocurementintheMinistry/DepartmentofProcuringOrganizationfor2yearsfrom thedateofsuchenforcement. 25 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone to commit and submit Proposals on behalf of the Consultant along with Form T-1: Proposal Form (Covering Letter). 9.3. Submission/uploadingof Proposals. 9.3.1 Submission/ Uploading to the Portal FurthertodetailsmentionedinRFPLclause6: 1) Proposals must beuploaded on the eProcurement Portal mentioned in the TIS until the deadline for the Proposal submission as notified therein. If the office happens to be closed on the deadline to submit the Proposal as specified above, this deadline shall not be extended. No manual Proposals shall be made available or accepted for submission. Proposals submitted through modalities other than those stipulated in TIS shall beliabletoberejected as non-responsive. 2) Inthecaseofdownloadeddocuments,theConsultantmustnotmakeanychanges tothe contents of the documents while uploading, except for filling in the required information– otherwise, the Proposal shall be rejected as non-responsive. Uploaded Pdf documents should not be password protected. Consultants should ensure the clarity/ legibilityofthescanneddocuments uploaded bythem. 3) The date and time of the e-Procurement server clock (also displayed on the dashboard of the consultants) shall be the reference time for deciding the closing time of the Proposalsubmission.Consultantsareadvisedtoensuretheysubmittheir Proposal within the deadline of submission, taking the server clock as a reference, failing which the portal shall not accept the Proposal. No request on the account that the server clock was not showing the correct time and that a particular consultant could not submit their Proposal because of this shall be entertained. Failureordefectsontheinternetor heavy traffic at the server shall not be accepted as a reason for a complaint. The Procuring Entity shall not be responsible for any failure,malfunctionorbreakdownof theelectronicsystemusedduringthee-Tenderprocess. 4) Only one copy of the Proposal can be uploaded, and the Consultant shall digitally sign allstatements,documents,andcertificates uploadedbyhim,owningsoleand complete responsibilityfortheircorrectness/authenticityaspertheITAct2000as amended from time to time. A proposal submitted by a Joint Venture shall be digitally signed by an authorized representative with a written power of attorney signed by each member’s authorizedrepresentativetolegallybindallmembers. 5) Unless otherwise instructed in the RFP Document, the consultant need not sign or up- load the Sections in ITC-clause 1.4 above while uploading his Proposal. However, they must declare in his Proposal Form (Form T-1: Proposal Form) that theyhaveread, understood,compliedwith,andstandboundbyallrequirementsofthese sections: 6) Unless otherwise specified, in TIS, originals of the EMD/ Bid Security instrument/ Bid security declaration must be physically submitted sealed in double cover and acknowledgement be obtained before the bid submission deadline at the venue mentioned in TIS. Failure to do so is likely to result in the bid being rejected. If the office is closed on the deadline for such physical submission, the physical submission deadlineshallstandextendedtothenext workingdayat the sametimeandvenue. 7) The Procuring Entity reserves its right to call for verification, at any stage of evaluation, especially from the successful Consultant(s) before the issue of a Letter of 26 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Award (LoA), originals of uploaded scanned copies of documents (in the RFP stages). If a consultant fails at that stage to provide such originals or, in case of substantive discrepancies in such documents, it shall be construed as a breach of the Code of Integrity (see clause 15 below). Such RFP proposals shall be liable to be rejected as non-responsiveandother punitiveactions forsuch abreach. 8) RegardingtheprotectedPriceSchedule(excelformat,Cover-2),theConsultantshallonly enterhisnameinthespaceprovidedinthespecifiedlocation.Consultantshall typerates in the figure only in the rate column of respective service(s) without any blank cell or Zero values in the rate column, without any alteration/ deletion/ modification of other portions of the excel sheet. If space is inadequate, the Consultant may upload additionaldocumentsunder"AdditionalDocuments"inthe"Proposal Cover Content." 9) All Proposals uploaded by the Consultant to the portal shall get automatically encrypted. The encrypted Proposal can only be decrypted/ opened by the authorised persons on or after the due date and time. The Consultant should ensure the correctness of the Proposal before uploading and take a printout of the system- generatedsubmissionsummary toconfirm thesuccessfulProposal upload. 10) The selected bidder shall use he Link Data Lake Portal' available on website to communicatewithAuthorityandEPC Contractorcorrespondence. 11) No Physical document shall be accepted unless and until the same is specifically statedsointhe RFP orit isa legal requirement 9.3.2 ImpliedacceptanceofproceduresbyConsultants Submission of Proposal in response to the RFP Document is deemed to be acceptance of the procedures and conditions of e-Procurement and the RFP Document. 9.4. Modification,ResubmissionandWithdrawalofProposals 9.4.1 Modification&Resubmission Once submitted in e-Procurement, the Consultant cannot view or modify his Proposal since it is locked by encryption. However, resubmission of the Proposal by the Consultants for any number of times superseding earlier Proposal(s) before the submission date and time is allowed. Resubmission of a Proposal shall require uploading all documents, including the financial Proposal, afresh. The system shall consider only the lastProposal submitted. 9.4.2 Withdrawal 1) TheConsultantmaywithdrawhisProposalbeforetheProposalsubmissiondeadline,and itshallbemarkedaswithdrawn andshallnotgetopenedduringtheProposalopening. 2) No Proposal should be withdrawn after the Proposal submission deadline and before theProposalvalidityperiodexpires. IfaConsultantwithdraws theProposal during this period, the Procuring Entity shall be within its right to forfeit the Bid Security (or enforce the Bid Securing Declaration, if it was allowed in lieu of Bid Security), in addition to other punitive actions provided in the RFP Document for such misdemeanouras per clause 8.4above. Proposal Opening TheProposals shallbe openedonor after thedate & time ofthe openingstipulatedin TIS. 27 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Proposals cannot be opened before the specified date & time, even by the Tender Inviting Officer, the Procurement Officer, or the Publisher. If the specified date of Proposal opening falls on is subsequently declared a holiday or closed day for the Procuring Entity, theProposalsshall be openedat theappointedtimeonthenextworking day. Evaluationof Proposals andAward ofContract 11.1. General norms 11.1.1 Evaluationisbasedonlyondeclaredcriteria. 1) The evaluation shall be based upon scrutiny and examination of all relevant data and details submitted by the Consultant in its/ his Proposal and other allied information deemed appropriate by Procuring Entity. Evaluation of Proposals shall be based only on the criteria/ conditions included in the RFP Document. The SelectionMethodtobe usedforevaluationshallbeQCBSasmentionedintheTIS. 2) The determination shall not consider the qualifications of other firms, such as the consultant's subsidiaries, parent entities, affiliates, or any other firm(s) different from the consultant. 3) Consultants planning to subcontract any Key Activities indicated in Section VI: terms of Referenceanditssub-sectionsmustensurecompliancewithITC-Clause3above. 4) Information relating to the evaluation of RFPs and evaluation results shall not be disclosed to any participant or any other persons not officially concerned with such process until the notification of shortlisting is made in accordance with clause 13.1 below. 11.1.2 Deviations/Reservations/Omissions-SubstantiveorMinor DuringtheevaluationofProposals,thefollowingdefinitionsapply: a) “Deviation” is a departure from the requirements specified in the RFP Document; b) “Reservation” is the setting of limiting conditions or withholding from completeacceptanceof therequirements specifiedinthe RFP Document; and c) “Omission” is failing to submit part or all of the information or documentation required inthe RFPDocument. A deviation/ reservation/ omission from the requirements of the RFP Document shall be considered a substantive deviation as per the following norm, and the rest shallbeconsidered aMinordeviation: a) which affects in any substantive way the scope, quality, or performance standards ofthe Services; b) which limits in any substantive way, inconsistent with the RFP Document, the ProcuringEntity'srights,ortheConsultant'sobligationsunderthecontract; or c) Whose rectification would unfairly affect the competitive position of other Consultants presentingsubstantivelyresponsive Proposals. The decision of the Procuring Entity shall be final in this regard. Proposals with substantivedeviations shall be rejectedas non-responsive. Variations, deviations, and other offered benefits (Techno-commercial or Financial) above the scope/ quantum of Services stipulated in the RFP Document shall not influence evaluation Proposals. If the Proposal is otherwise successful, suchbenefitsshallbeavailed bythe ProcuringEntity, whichwouldbecome part of 28 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone thecontract. The Procuring Entity reserves the right to accept or reject Proposals with minor deviations.Wherevernecessary,theProcuringEntityshallconveyits observation as per ITC-clause 11.1.3 below on such ‘minor’ issues to the Consultant by registered/ speed post/ electronically etc., asking Consultant to respond by a specified date. If the Consultant does not reply by the specified date or gives an evasive reply without clarifying the point at issue in clear terms, that Proposal shallbeliable tobe rejectedas non-responsive. 11.1.3 ClarificationofProposalsandshortfalldocuments 1) During the evaluation of Techno commercial or Financial Proposals, the Procuring Entity may, at its discretion, but without any obligation to do so, ask the Consultant to clarify its Proposal by a specified date. The consultant should answer the clarification withinthatspecifieddate(or,ifnotspecified,7daysfromreceivingsuch arequest).The requestforclarificationshallbesubmittedinwritingorelectronically, and no change in prices or substance of the Proposal shall be sought, offered,or permittedthatmaygrant any undue advantage to such Consultant. Any clarification submitted by a Consultant regardingits Proposalthatis notinresponsetoarequest by the Purchasing Entity shall notbe considered. 2) The ProcuringEntityreserves its right to,but withoutany obligationto doso,seek any shortfallinformation/ documentsonlyincase of historicaldocumentswhichpre-existed at the time of the Proposal Opening and which have not undergone change since then and do not grant any undue advantage to any Consultant. There is a provision on the portal for requesting Short-fall documents from the Consultants. The system allows taking the shortfall documents from consultants only once after the technical Proposal opening. 3) Iftheconsultantfailstoprovidesatisfactoryclarificationand/ormissinginformation, its RFP shallbe evaluatedbasedonavailable informationand documents. 11.1.4 ContactingProcuringEntityduringtheevaluation From Proposal submission to awarding of the contract, no Consultant shall contact the Procuring Entity on any matter relating to the submitted Proposal. If a Consultant needs to contact the Procuring Entity for any reason relating to this tender and/ or its Proposal, it should do so only in writing or electronically. Any effort by a Consultant to influence the Procuring Entity during the processing of Proposals, evaluation, Proposal comparison or awarddecisions shall be construedas a violationof the Code of Integrity, and the Proposal shall be liable to be rejected as non-responsive in addition to other punitive actions for violationofCodeofIntegrity as per theRFP Document. 11.2. EvaluationofProposals 11.2.1 Preliminary Examination of Proposals - Determining Responsiveness A substantively responsive Proposal is complete and conforms to the RFP Document's essential terms, conditions, and requirements without substantive deviation, reservation, or omission.Proposalswithsubstantivetechno-commercialdeviationsorotheressential aspects of the RFP shall be rejected as non-responsive. Only substantively responsive Proposals shall be considered for further evaluation. Procuring entity reserves its right to consider and allow minor deviations in technical and Commercial Conditions. Unless 29 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone otherwise stipulated in the AITC, the following are some of the crucial aspects for which a Proposal shallberejected as non-responsive: 1) TheProposalisnotintheprescribedformatorisnotsubmittedasperthestipulationsin the RFP Document. 2) Failure to provide and/ or comply with the required information, instructions etc., incorporated in the RFP Document or evasive information/ reply against any such stipulations. 3) Required Bid Security (EMD) (or Bid Securing Declaration BSD if permitted) has not been provided. 4) Consultantnolongercomplies withtheeligibilitycriteriaintheRFP; 5) TheServicesofferedarenoteligibleaspertheprovisionofthistender. 6) The consultant has quoted conditional Proposals or more than one Proposal or alternativeProposals unless permittedexplicitlyintheAITC. 7) TheProposalvalidityisshorterthantherequiredperiod. 8) The Proposal departs from the essential requirements stipulated in the bidding document; 9) The consultant has quoted ‘Nil’ Service charges/ margin/overhead over the minimum wages inPersonnelDeploymentSchedule. 10) Non-submission or submission of illegible scanned copies of stipulated documents/ declarations. 11) Furnishing wrong and/ or misguiding data, statement(s) etc. In such a situation, besides rejecting the Proposal as non-responsive, it is liable to attract other punitive actions under relevant provisions of the RFP Document for violating the Code of Integrity. 11.2.2 Theevaluationprocess Unless otherwise stated, only the techno-commercial Proposals shall be opened on the stipulated dateof openingof Proposals. After that, the techno-commercial evaluation shall ascertain whether these Proposals meet the requirements of the Terms of Reference, Technical Criteria and Minimum Score. Subsequent opening of financial Proposals and financial evaluation shall be done only of Proposals declared successful in techno- commercial evaluation. The evaluators of the Technical Proposals shall have no access to the Financial Proposals until the technical evaluation results are declared and financial proposalsare opened. 11.3. Techno-commercialEvaluation 11.3.1 Evaluation ofTechnical Proposals/Score 1) Procuring Entity shall evaluate the Technical proposal and assign scores as per the Scheme of criteria and sub-criteria as laid down in ‘Section VII: Evaluation/ Scoring Criteria’. This determination shall, inter-alia, consider the Consultant’s (i) “Specific experience of the Consultant(as a firm) relevantto the Assignment”;ii) “Adequacyand quality of the proposed methodology, and work plan”; iii) “Key Experts’ qualifications and competence for theAssignment”. 2) In the case of JV/C, the evaluation of the Technical proposal shall include the credentials ofall members,includingnon-substantial members. 3) If it is established that any Key Expert nominated in the Consultant’s Proposal was 30 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone included in the Proposal without his/her confirmation, such Proposal shall be disqualifiedandrejectedfor further evaluationandshallbetreatedas aviolationof the CodeofEthics andwouldbe liableforpenalties thereunder. 4) All Key Experts (including the Team Lead) must meet the minimum requirements specifiedinSectionVI-A: ListofKeyExpertsandRequiredQualifications.If anyKey Expert fails to meet these minimum requirements, his score shall be evaluated as Nil. If any Key Expert or Team Lead of the successful consultant scores less than the 50% 75% the maximum score, Procuring Entity shall be entitled to ask for a better replacementbeforethenegotiationsasperITC-Clause12below. 11.3.2 Evaluation of Conformity to Commercial and Other Clauses Consultants must comply with all the Commercial and other clauses of the RFP Document as per submissions in Form T-7: ‘Terms and Conditions – Compliance’. The Procuring Entity shallalsoevaluatethecommercialconditionsquotedbytheConsultant toconfirmthatallessentialtermsandconditionsstipulatedintheRFPDocumenthave been acceptedwithoutsubstantiveomissions/reservations/exceptions/deviationbytheConsultant. Deviations from or objections or reservations to critical provisions such as those concerning (but not limited to) Governing laws and Jurisdiction (GCC Clause 3), Consultant’s Obligations and Restrictions of its Rights (GCC Clause 5), Performance Bond/ Security (GCC Clause 5.8), Force Majeure (GCC Clause 9.6), Taxes & Duties (GCC Clause 10.2), and Code of Integrity (GCC Clause 13) shall be deemed to be a substantivedeviationandtreatedas unresponsiveas per clause11.1.2(3) above. 11.3.3 Evaluation of Techno-commercially Suitable Consultants and Opening Financial Proposals Each responsive Proposal shall be given a technical score applying the evaluation criteria, sub-criteria, and scoring system specified in Section VII: Evaluation/ Scoring Criteria. A Proposal shall be rejected if it fails to achieve the minimum 75% technical score. Proposals that succeed in the above techno-commercial evaluation shall be considered techno-commercially suitable. The list of such techno-commercially suitable Consultants shall be declared on the Portal announcing a date/time and venue for opening their financial Proposals (not less than 10 days from this declaration, in line with ITC-Clause 14 below).The ProcuringEntityshall notifyall Consultants whether their proposalwasfound responsive/ non-responsive to the RFP and TOR and whether they met the minimum qualifying technical score. Financial proposals of successful Consultants only shall be opened online. The financial proposals of unsuccessful Consultants shall remain encrypted andunopened. 11.4. Financial Proposals Evaluation and Ranking of Proposals 11.4.1Financial ProposalsEvaluation 1) Financial Proposals of all Techno-commercially suitable Proposals are evaluated based on the selection method declared in the RFP Document (LCS/QCBS/FBS) and ranked accordingly. The financial proposal will be in 2 parts consisting of (i) the amountofPerformanceBankGuaranteeofferedbythebidder,(ii)thefinancial quote of theservices quotedbythebidder. 2) Unless otherwise stipulated, the evaluation of prices shall be on total outgo from the Procuring Entity’s pocket, to be paid to the Consultant orany third party, including all 31 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone elements of costs as per the terms of the proposed contract, duly delivered, as the case maybe,includinganytaxes,duties,levies etc. 3) In the case of JV/C, the financial credentials of non-substantial members shall not be considered inthefinancial evaluation. 4) As per policies of the Central Government, from time to time, the Procuring Entity reserves its option to give purchase preferences to eligible categories of Consultants as indicatedintheRFP Document. 5) evaluation of Proposals shall include and consider the following taxes/ duties, as per ITC-clause 5.3above: a) inthe case of Services performed in India or incidental goods of foreign origin already located in India, GST & other similar duties shall be contractually payable on the Services and incidental Goods if a contract is awarded to the Consultant; b) The offers shall be evaluated based on the GST rate quoted by eachconsultant, and the same shall be used for determining the inter-se ranking. The Procuring Entity shall not be responsible for any misclassification of the HSN number or incorrect GST rate quoted by the Consultant. Any increase in GST rate due to misclassification of HSN number shall have to be absorbedbythesupplier;and c) If GST is quoted extra but with the provision that it shall be charged as applicable at the time of delivery, the offer shall be evaluated for comparison purposes by loading the maximum existing rate of GST for the product/ HSN code. d) If a bidder enters “zero/blank” GST or an erroneous GST, the financial evaluationwill be doneconsidering the “Zero” or quoted GSTrate, as the case may be. In cases where the successful bidder quotes the wrong GST rate for releasingthe order,the followingmethodologywill befollowed: i) If the actual GST rate applicable is lower than the quoted GST rate, the actual GST rate will be added to the quoted basic prices. The final cash outflowwillbe basedonthe actualGSTrate. ii) If the actual GST rate applicable is more than the quoted GST rate, the basic prices quoted will be reduced proportionately, keeping the final cash outflowthesameas the overallquoted amount. 6) Correction Errors/ adjustments: a) Loading for Deviations: Unless announced beforehand, the quoted price shall notbeloadedbasedondeviationsincommercialconditions.Ifitissodeclared, such loading of a financial Proposal shall be done as per the relevant provisions; b) DiscrepanciesbetweenTechnicalandFinancialProposal: i) Activities and items described in the Technical Proposal but not priced in the Financial Proposal shall be assumed to be included in the prices of other activities or items, and no corrections are made to the Financial Proposal. ii) If a Lump-Sum contract selection method is declared in the RFP, the Consultant is deemed to have included all prices in the Financial Proposal, soneitherarithmeticalcorrectionsnorpriceadjustmentsshall bemade. 32 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone iii) IfaTime-BasedcontractselectionmethodisdeclaredintheRFP,incase of discrepancy between the Technical and Financial Proposals in indicating quantitiesofinput,anyhigherquantitiesinTechnicalProposal shall prevail, and the quoted total prices shall be assumed to apply to this higher quantum. The unit rate for such activity shall be accordingly adjusted. No such correction shall be done if quantities are lower in the Technical proposal. c) Discounts and Rebates: If any Consultant offers conditional discounts/ rebates in his Proposal or suo-motu discounts and rebates after the Proposal Opening(techno-commercialor financial),such rebates/discountsshall not be consideredforrankingtheoffer.ButifsuchaConsultantgetsselectedas perthe selection method, without discounts/ rebates, such discounts/ rebates shall be availedand incorporated inthe contracts; d) Price Variation: If the tenders have been invited on a variable price basis, the tenders shall be evaluated, compared, and ranked based on the position as prevailing on the last deadline for techno-commercial Proposal submission andnot onanyfuture date. 7) AmbiguousFinancialProposal:IfthefinancialProposalisambiguousandleads totwo equallyvalidtotalprice amounts,it shall berejected as nonresponsive. 8) Time-Based (Input Admeasurement) Contracts: The Consultant’s Proposal must includetheKeyExperts’time-inputperson-monthsnotlessthantheminimum specified inSectionVI-A: List ofKeyExperts andRequired Qualifications. a) Minimum Time Inputs: if a Proposal includes less or more than the required minimumperson-monthtimeinput,theproposalshallbeconsideredasper sub- clause6.b)-iii) abovefor that key-position b) The proposal shall be evaluated based on remuneration cost plus reimbursable expenses as quoted by the consultants in the prescribed financial forms. The travel expense (TA/DA for authorized travel outside the home station)shall be reimbursedbytheProcuringEntityonanactualbasis. It shall be limited to the entitlement in Appendix D to the Contract Form. Therefore, travel expenses (TA/DA for authorized travel outside the home station) need not be quoted in thefinancial proposal for evaluation. 9) Quality and Cost-Based Selection (QCBS): In the case of QCBS, the total score is calculated by 60% weightage to the technical, 20 % Weightage to the performance security Quoted by the bidder and 20% weightage to financial quote submitted by bidder and adding them to obtainacombinedQCBS(Technicalcum Financial)score, as explained in the sub-clauses below. The proposal obtaining the highest total combined score in evaluating quality and cost will be ranked as H-1, followed by the proposals securing lesser marks as H-2, H-3 etc. The proposal securing the highest combined marks and ranked H-1 will be invited for negotiationsasperITC-Clause12 below.Iftwoormorebidshavethesamehighest score in the final ranking, the bid with ahigherfinancialscore will beH-1. a) TheTechnicalProposalsaregivenanabsolutetechnicalscore(Taoutofmax100) based on the evaluation criteria in Section VII: Evaluation/ Scoring Criteria. However,to normalisethis w.r.t.FinancialScore Sfbelow,arelative Technical Score(St)basedontheirrelativerankingshallbecalculated.The 33 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone highest evaluated Technical Score (Ta-max) is assigned the maximum relative Technical Score (St) of 100 (Hundred). The formula for determining the relative Technical scores (St)ofall other Proposals is as follows: St=100xTa/Ta-max, in which "Ta-max" is the highest evaluated absolute Technical Score, "St" is the relative Technical score calculated, and "Ta" is the absolute Technical Score of the proposal under consideration. This normalisation would avoid any unintended magnification of weightage to the financial score due to different scales of Technical Scores and Financial Scores. b) TheFinancialProposalsshallbeevaluatedintwoparts:- i) The relative ranking of performance security, with the highest performance Security (PBGm) being assigned the maximum financial score (PBGf) of 100(Hundred). The formula for determining the financial scores (PBGf) of all otherProposals is as follows: PBGf=100xPBG/PBGm, in which "PBGm" is the highest performance security offered, "PBGf" is the financial score calculated, and "PBG" is the amount of PBG of the proposal under consideration. Note:- If quoted Performance Bang Guarantee if less than 5% of the financial proposal quoted by the bidder, The bid shall be considered as non responsive and willnot befurther evaluated. ii) The cost-score based on the relative ranking of prices, with the lowest evaluatedFinancialProposal(Fm)beingassignedthemaximumfinancialscore (Sf) of 100(Hundred). The formula for determining the financial scores (Sf) of allother Proposals is as follows: Sf=100x Fm/F, in which "Fm" is the price of the lowest offer, "Sf" is the financial score calculated,and"F" is theprice of theproposal under consideration. c) The weights given to the Technical (T), Performance BG (PBG) and Financial (P) QuoteProposals are specifiedinTIS/ AITC: T(theweightgiventotheTechnicalProposal)= 60%,and PBG(the weightgiventothePBGFinancialProposal)=20%% Sf(theweightgiventotheFinancialQuoteofservicesbybidder)=20%%(withT+ PBGf+Sf =100%) d) Proposals would be ranked according to their combined QCBS (weighted technical, St and financial, Sf ( which will include of PBG and financial Quote)) scoresas follows: S=(StxT+PGBfxPBG+SfxP)/100. in which "S" is the combined QCBS score, "St" is the relative technical score calculated as per sub-clause a) above and "Sf" is the financial score calculated as persub-clauseb) above. e) Allscoresshallbecalculateduptotwodecimalplacesonly. 11.4.2 GlobalTenderEnquiry(GTE,InternationalCompetitiveBidding) Thefollowingadditionalaspectsoftheevaluationofthefinancialoffershallalsoapply: 1) CurrencyofTender In GTE tenders, ifpermitted inAITC, theProposal price maybe inforeign currencies, except for expenditure incurred in India (includingincidental Works/ Goods/ Services deliveredinIndia andagencycommission,if any) shouldbestated inIndian Rupees. 2) EvaluationofOffers All financial Proposals shall be converted to Indian Rupees based on the “Bill for Collection (BC) selling” exchange rate on the last deadline for the Proposal submission(Techno-commercialoffer)fromasourceasspecified(StateBankof India, if not so specified) in the tender document. The offers would becompared based on the 34 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone principle of the total outgo from Procuring Entity’s pockets, including all applicable taxesandduties(Customsduty,GST,andGSTCess).For ProposalswithLetterofCredit (LC)payment,thelikelyLCcharges(asascertainedfrom the Procuring Entity’s bankers) should also be loaded. ImportofGoods or servicesorbothattractintegratedtax(IGST). TheIGSTrateandGSTcessshallbe applicable on the ‘Custom Assessable Value’ plus the‘BasicCustomsdutyapplicable thereon’. The terms FOB, FAS, CIF, DDP etc., shall be governed by the rules & regulations prescribed in the current edition of INCOTERMS, published by the International ChamberofCommerce,Paris Contract Negotiation 12.1. InvitationtoNegotiate The negotiations shall be held at the date and address announced after the selection of the successfulConsultantwiththeirrepresentative(s),whomusthavewrittenpowerof attorney to negotiate and sign a contract on behalf of the Consultant. During the negotiations, it shall be ensured that no undue advantage accrues to the Consultant and that nothing shall vitiate the basis on which he has been declared successful. The minutes of negotiations shall be signed bytheProcuringEntityand theConsultant’sauthorized representative. 12.2. Verification of Original Documents Before issuing a Letter of Award (LoA) to the successful Consultant(s), the Procuring Entity may, at its discretion, ask the Consultant to present the originals of all such documentswhose scanned copies were submitted online during shortlisting process and this RFP process. If so decided, the photocopies of such self-certified documents shall be verified and signed by the competent officer and kept in the records as part of the contract agreement. If the Consultant fails to provide such originals or in case of substantive discrepancies in such documents, it shall be construed as a violationof the Code of Integrity. Such Proposal shall be liable to be rejected as non-responsive inadditiontoother punitiveactions inthe CodeofIntegrity. 12.3. AvailabilityofKeyExperts: As a per-requisite to the negotiations, the invited Consultant shall make the all Key Experts includedintheProposalavailableforinteraction/interviewatgivendateandtimebefore theAuthorityorthe committee so constituted for this purpose. Failure to present Key Experts’ for interaction/interview before the Authority at given date and time may result in the Consultant’s Proposal being declarednon-responsiveandtheProcuringEntityproceeding to negotiate the Contract with the next-ranked responsive Consultant. However, Authority may finalise a scheme of empanelment of key personnel and finding their suitability for a specific job profile and update the suitability/ empaneled status on Infracon. Those key personnel who have been declared suitable on Infracon for a particular role shall not be interviewed again at the time of negotiation. Only those key personnel will be interviewed at negotiation stage who has not been empaneled for a particular post on Infracon portal shall be interviewed at negotiation stage tofind theirsuitabilityfor theassignment. Notwithstanding the above, the substitution of Key Experts at the negotiations may be considered if due solely to circumstances outside the reasonable control of and not foreseeablebytheConsultant,includingbutnotlimitedtodeathormedicalincapacity orasper the conditions specified in this RFP.In such case, the Consultant shall offer a substitute Key Expert within the period specified in the invitation letter to negotiate the Contract, who shall haveequivalent orbetterqualifications andexperiencethan theoriginal candidate. As per ITC-Clause 11.3.1-4), Procuring Entity reserves its right to seek during negotiations the replacement of the Team Leader/ other Key Experts who found not suitable for assignmentduringinteraction/interview. 12.4. TechnicalNegotiations The negotiations include discussions of the Terms of Reference (TORs), the proposed methodology, the Procuring Entity’s inputs, the special conditions of the Contract, and finalizing the ‘Appendix A: Terms of Reference’ part of the Contract. These discussions shall notsubstantiallyaltertheoriginalscopeofservicesundertheTORorthetermsof the contract lestthequalityofthe final product,its price, ortheinitialevaluation bevitiated. 35 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 12.5. Financial Negotiations-:- Deleted 12.6. Conclusion of Negotiations The negotiations are concluded with a review of the finalized draft Contract, which shall be initiatedbytheProcuringEntityandtheConsultant’sauthorizedrepresentative. If the negotiations fail, the Procuring Entity shall inform the Consultant in writing of all pending issues and disagreements and provide a final opportunity for the Consultant to respond.Ifdisagreementpersists,theProcuringEntityshalldeclaretheproposalnon-responsive, informing the Consultant of the reasons for doing so. The Procuring Entity shall invite the next-ranked responsive Consultant to negotiate a Contract. Once the Procuring Entity commences negotiations withthenext-rankedConsultant,theProcuring Entity shall not reopen theearlier negotiations. Award of Contract 13.1. Letter of Award (Acceptance - LoA) and Signing of Contract 13.1.1Letter ofAward (LoA) After 10 days from the conclusion of negotiations (in line with ITC-Clause 14 below), the Consultant whose Proposal has been accepted shall be notified of the award by the Procuring Entity before the expiration of the Proposal validity period by written or electronic means. This notification (hereinafter and in the Conditions of Contract called the "Letter of Award - LoA") shall state the sum (hereinafter and in the contract called the"ContractPrice") thatthe ProcuringEntityshallpaytheConsultantinconsideration ofdeliveryofServices.TheLetterof Award(LoA)shallconstitutethelegalformationof thecontract,subjectonlytothefurnishingof performancesecurityaspertheprovisions of the sub-clause below. The Procuring Entity, at its discretion, may directly issue the contract subject only to the furnishing of performance security, skippingtheissueof LoA. 13.1.2PerformanceSecurity 1) The performance security shall be criteria for financial evaluation. The consultants are required to quote the amount of performance Security only. The Cost of proposal shall be fixedbytheAuthority. 2) Withinthenumberofdays stipulatedinAITC(or21daysifnotspecified)ofreceipt ofthe Letter of Award (LoA, or the contract if LoA has been skipped), performance Security as perdetails inGCC-5.8shall besubmittedbytheConsultanttotheProcuring Entity. 3) If the Consultant, having been called upon by the Procuring Entityto furnish Performance Security,failstodosowithinthespecifiedperiod,itshallbelawfulfor theProcuringEntity atitsdiscretiontoannultheawardandforfeitEMD(orenforce BidSecuringDeclarationif it was permitted to be submitted in lieu of Bid Security), besides taking any other administrativepunitiveaction like‘Removal from List ofRegisteredSuppliers’etc. 13.1.3SigningofContract 1) Publication of Results: The Procuring Entity shall send to each techno-commercially suitable Consultant the Notification of Intention to Award the Contract to the successful Consultant. The Notification of Intention to Award shall contain, at a minimum, the followinginformation: a) the name and address of the Consultant with whom the Procuring Entity successfullynegotiated acontract; b) thecontractpriceofthesuccessfulProposal; c) thenamesofallConsultantsincludedintheshortlistforRFP,indicating thosethatsubmittedProposals; d) thefinalcombinedscoresandthefinalrankingoftheConsultants e) The name and address of the successful Consultant(s) receiving the contract(s) shall be published in the Portal and notice board/ bulletin/website of the ProcuringEntity. 2) After the award notification, the Procuring Entity shall share a copy of the Contract 36 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Agreement (as per Format 1: Contract Form along with sub-formats) to a successful Consultant for review. The Consultant may point out to the Procuring Entity, in writing/ electronically, any anomalies noticed in the contract within seven days of receipt. The ContractAgreementshallbeexecutedwithin21daysafterthedateof issue of the Letter of Acceptanceandafter submissionandverificationofthePerformance Security. 3) IfaskedbytheProcuringEntity,thesuccessfulConsultantshallreturntheoriginal copy of the contract, duly signed, and dated, within seven days from the date of receipt of the contract,totheProcuring Entitybyregistered/ speed post orbyasuitable digital means. Grievance Redressal/ Complaint Procedure 1) Theconsultanthastherighttosubmitacomplaintorseekde-briefingregardingtherejection of his proposal, in writing or electronically, within 10 days of the declaration of techno- commercial or financial evaluation results. The complaint shall be addressed to the Head ofProcurement. 2) Within 5 working days of receipt of the complaint, the Tender Inviting Officer shall acknowledge the receipt in writing tothe complainant, indicating that it has beenreceived, andtheresponseshallbesentinduecourseafteradetailedexamination. 3) TheTenderInvitingOfficershallconveythefinaldecisiontothecomplainantwithin 15 days of receiving the complaint. No response shall be given regarding the confidential process of evaluating Proposals and awarding the contract before the award is notified, although the complaint shall be kept inview during such a process.However, no response shall be given regarding the following topics explicitly excluded from such complaint process: a) Only a Consultant who has participated in the procurement process, i.e., pre- qualification, Consultant registration or bidding, as the case may be, can make suchrepresentation. b) OnlyadirectlyaffectedConsultantcanrepresentinthisregard. c) In the case of RFP, before the bidding of Technical/ financial Proposals, an application for review concerning the technical/ financial Proposal may be filed onlybya Consultantwhohas qualified intheRFP; d) If a technical Proposal has been evaluated before the opening of the financial Proposal, an application for review concerning the financial Proposalmaybefiled onlybyaConsultantwhosetechnicalProposalisfoundtobeacceptable. 4) No third-party information (RFPs, evaluation results) can be sought or included in the response. 5) ThefollowingdecisionsoftheProcuringEntityshallnotbesubjecttoreview: a) Determinationoftheneedforprocurement. b) Complaints against Terms of Reference except under the premise that they are eithervague ortoospecific tolimit competition c) Selectionofthemodeofprocurementorbiddingsystem; d) Choiceoftheselectionprocedure. e) Provisions limiting the participation of Consultants in the Procurement Process,interms ofpolicies of theGovernment f) Provisions regarding purchase preferences to specific categories of Consultants interms ofpolicies oftheCentral Government g) Cancellation of the Procurement Process except where it is intended to subsequentlyre-tender thesameServices. Code Integrity in Public Procurement, Misdemeanors and Penalties: Procuring authorities, Consultants, suppliers, contractors, and consultants should observethe highest standard of integrity and not indulge in prohibited practices or other misdemeanors, either directly or indirectly, at any stage during the Procurement Process or the execution of resultant contracts. GCC-clause 13 (including the penalties prescribed therein) shall be considered part of this clause ofITC(even though itisnot being reproduced here for brevity) andshallapply mutatismutandis duringthepre-awardProcurement Process. 37 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Section III: Appendix to Instructions to Consultants (AITC) RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices (Ref ITC-clause 1.4) {Notefor ProcuringEntity:Text ingrey italicsfont withinsquarebracket[e.g.,Mention …] arejust suggestions/directions andmust bereplacedbyapplicabletext -removebracketsandconvert the fonttoregular andblack.Delete the rowsnot required.Clauses other thanthosementionedbelow mayalsobementioned ifthese needtobechanged} Note for Consultants: Following clauses (in column 1), wherever these appear in ITC, shall be taken to be negated or additional provisions be added to, or existing provisions be altered as per column 2. Whenever there is any conflict between the provision in the ITC and that in the AITC, the provision contained in the AITC shall prevail. ITC- Tobereadas Clauses ITC1:ContentsofRFP ITC 1.3, [] As per Section VII of RFP 1.4,1.5 ITC3 Consultants-EligibilityandPreferentialPolicies ITC3.2 [ConsultantsarenotallowedtoassociatewithotherBidders] ITC3.2 Participation of Sub-consultants, Key Experts and Non-KeyExpertsinmorethanone Proposalisnotallowed ITC4 TheTermsofReferenceandFormofContract ITC4.1 AsperSectionVI-TermsofReference ITC5.ProposalPrices,TaxesandDuties ITC5.1.5 [pricesare tobequotedinINR] ITC5.2.2 AspersectionIV-GCCandSectionV-SCC] ITC5.4.1 AspersectionIV-GCCandSectionV-SCC] ITC5.4.2 AspersectionIV-GCCandSectionV-SCC] ITC6to10 Downloading, Preparation, Submission and Opening of Proposals ITC8.1.1 [LanguageinwhichProposalsaretobesubmitted–English] ITC8.2.1 [IntegrityPactistobeSignedbyallpertrnersofJV/CandSubmittedalongwith Proposal. NameandContactDetailsoftheIndependentExternal Monitor (IEM) for Integrity Pactareasfollows:-[Plsaddnames] ITC11and 12EvaluationofProposals andAward ofContract ITC 11.2.1 AspersectionVII 38 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone ITC 11.4.2 [Customise by indicating here whether this is a Global Tender Enquiry (International Competitive Bidding)and theforeign currenciespermitted] ITC 13.1.2 [MentiontheperiodforsubmissionofPerformanceSecurityifdifferentfrom21days] 39 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Section IV: General Conditions of Contract (GCC) General 1.1. TenetsofInterpretation Unlesswherethecontextrequiresotherwise,throughoutthecontract: 1) Theheadingsoftheseconditionsshallnotaffecttheinterpretationorconstructionthereof. 2) Writing or written includes matter either whole or in part, in digital communications, manuscript,typewritten,lithographed,cyclostyled,photographed,orprintedunder or over signatureorsealordigitallyacceptableauthentication,asthecasemaybe. 3) Wordsinthesingularincludethepluralandvice-versa. 4) Words importing the masculine gender shall be taken to include other genders, and words importing persons shall include any company, association, or body of individuals, whetherincorporated ornot. 5) Terms and expressions not herein defined shall have the meanings assigned to them in the contract Act, 1872 (as amended) or the Sale of Goods Act, 1930 (as amended) or the General Clauses Act, 1897 (as amended) or of INCOTERMS, (current edition published bytheInternationalChamberofCommerce,Paris)asthecase maybe. 6) Anyreference to‘Services’shall alsobedeemed toinclude theincidental Works/Goods. 7) Any reference to any legal Act, Government Policies or orders shall be deemed to include allamendments tosuchinstruments,from timetotime,todate. 1.2. Definitions Inthecontract,unlessthecontextotherwiserequires: 1) “Allied Firm” are all business entities that are within the ‘controlling ownership interest’ (ownership of or entitlement to more than twenty-five per cent of the company's shares or capital or profits) or ‘control’( including the right to appoint a majorityofthedirectors or tocontrol the management or policy decisions including byvirtue oftheirshareholding or management rights or shareholder agreements or voting agreements) of the principal firm acting alone or together or through one or more juridical persons. All successor firms or assigns oftheprincipal firm shall beconsidered alliedfirms; 2) “Bill of Quantities” (including the term Price Schedule or BOQ) means the priced and completedBill ofQuantities formingpart ofthe Proposal; 3) "Commercial Bank" means a bank, defined as a scheduled bank under section 2(e) of the ReserveBank ofIndiaAct, 1934; 4) “Contract” (including the terms ‘Purchase Order’ or ‘Supply Order’ or ‘Withdrawal Order’ or ‘Work Order’ or ‘Consultancy Contract’ or ‘Contract for Services’, ‘rate contract’ or ‘frameworkcontract’or‘LetterofAward–LoA’(letterormemorandum communicatingto the Consultant the acceptance of his Proposal) or ‘Agreement’ ora ‘repeat order’ accepted/ acted upon by the Consultant in specific contexts), meansa formal legal agreement in writing relating to the subject matter of procurement, entered into between the Procuring Entity and the Consultant on mutually acceptable terms and conditions and which are in compliance withall therelevant provisions ofthelaws ofthe country; 40 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 5) "Consultant" (as a participant in a Procurement Process - including the term 'contractor', ‘bidder’,‘tenderer‘,participant’or'serviceprovider'inspecificcontexts)means any person or firm or company, including any member of a consortium or joint venture, every artificial juridical person not falling in any of the descriptions of Consultants stated hereinbefore, including any agency branch or office controlled by such person, participatinginaProcurement Process; 6) “Consultant” (as a contract holder - including the terms ‘Supplier’ or ‘Service Provider’ or ‘Contractor’ or ‘Firm’ or ‘Vendor’ or ‘Successful Consultant’ in specific contexts) meanstheperson,firm,company,orJointVenturewithwhomthecontractisenteredintoand shall be deemed to include the Consultant's successors (approved by the Procuring Entity), agents,Sub-consultant,representatives,heirs,executors, andadministratorsasthecasemay beunlessexcludedbythetermsofthecontract; 7) “Contract Manager” means (as distinct from Team Leader of the Consultant) the Procurement Officer or any other officer or a third-party agency who has been assigned theauthoritytotakeallactionsonbehalfoftheProcuringEntityduringthe execution of the contractbythe Consultant; 8) “Day”, “Month”, and “Year” shall mean respectively calendar day, month or year (unless referencetofinancial year is apparent from the context); 9) “EffectiveDate”meansthedateonwhichthisContractcomesintoforceandeffect as per theContract; 10) “Experts” means, collectively, Key Experts, Non-Key Experts, or any other personnelof the Consultant, Sub-consultant or JV member(s) assigned by the Consultant to perform the Services orany part thereof undertheContract; 11) "Goods" (including the terms ‘Stores’, and ‘Material(s)’ in specific contexts) includes all articles, materials, commodities, livestock, medicines, furniture, fixtures, raw material, consumables, spare parts, instruments, machinery, equipment, industrial plant, vehicles, aircraft, ships, railway rolling stock assemblies, sub-assemblies, accessories, a group of machines comprising an integrated production process or such other categories of goods or intangible, products like technology transfer, licenses, patents or other intellectual properties (but excludes books, publications, periodicals, etc., for a library), in specific contexts, procured or otherwise acquired by a Procuring Entity. Any reference to Goods shallbedeemedtoincludesmallworkor someservices that are incidental or consequential tothesupplyofsuchgoods; 12) “Government" means the Central Government or a State Government, as the case may be andincludes agencies and PublicSector Enterprises underit inspecific contexts; 13) “Intellectual Property Rights” (IPR) means the intellectual property owner's rights concerning possession/ exploitation of such property by others of tangible or intangible intellectual property, including rights to Patents, Copyrights, Trademarks, Industrial Designs,Geographical indications(GI); 14) “JointVenture (JVorJV/C)”meansanassociationoraConsortiumwithor withouta legal personality distinct from that of its members, of more than one entity where one member has theauthoritytoconduct all businessesfor andonbehalf of anyandall the members of the JV, and where the members of the JV are jointly and severally liable to the Procuring 41 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Entityfor theperformanceoftheContract.; 15) “KeyExpert(s)”meansanindividualprofessional(usuallyidentifiedbyname)whose skills, qualifications, knowledge, and experience are critical to the performance of the Services under the Contract and whose Curricula Vitae (CV) was considered in the technical evaluationoftheConsultant’s proposal; 16) “Non-Key Expert(s)” means an individual professional (usually not identified by name) provided by the Consultant or its Sub-consultants to perform the Services or any part thereof under theContract; 17) “Parties”: The parties to the contract are the "Consultant" and the “Procuring Entity”,as defined in GCCclause 2.4; 18) “Performance Security” (includes the terms ‘Security Deposit’ or ‘Performance Bond’ ‘Performance Bank Guarantee’ or other specified financial instruments in specific contexts) means a monetary guarantee to be furnished by the successful Consultant or Contractorintheform prescribedfor thedueperformanceof thecontract; 19) “Procurement” (in the context of Public/ Government ‘procurement’ or ‘Purchase’,or ‘Acquisition’ including an award of Public-Private Partnership projects, in specific contexts)meanstheacquisitionofGoods/Services/worksoracombinationthereof by way of purchase, lease, license or otherwise, either using public funds or any other source of funds(e.g.grant,loans,gifts,privateinvestmentetc.)byaProcuring Entity,whetherdirectly or through an agency with which a contract for procurement is entered into, but does not include any acquisition without consideration. The term “procure”/ “procured” or “purchase”/“purchased”shallbeconstruedaccordingly; 20) “Procuring Entity” means the entity in The Procuring Organization procuring Goods, Works,orServices; 21) “Procurement Officer” means the officer signing the Letter of Award (LoA) and/or the contractonbehalf of theProcuringEntity; 22) “Procurement Process” (or “Tender”; “RFP”; “RFP”, “Tender Enquiry” in specific contexts): ‘Procurement Process’ is the whole process from the publishing of the RFP Document to the resultant award of the contract. ‘RFP Document’ means the document (including all its sections, appendices, forms, formats, etc.) published by the Procuring Entity to invite Proposals in a Procurement Process. The RFP Document and Procurement Process may be generically and interchangeably referred to as “BidDocument”,“Tender" or"TenderEnquiry,"whichwouldbeclearfromcontext withoutambiguity; 23) "Proposal" (including the term ‘tender’, ‘offer’, ‘quotation’ or ‘bid’ in specific contexts) means anoffer tosupplygoods, services orexecutionof works made as per the terms and conditionsset out inadocument invitingsuchoffers; 24) “Services” means the activities to be performed by the Consultant under this Contract, as described inAppendixAthereto; 25) “Signed” means ink signed or digitally signed with a valid Digital Signature as perIT Act 2000(amendedfromtimetotime).Italsoincludesstamped,exceptinthecase of a Letter of Award oramendment thereof; 26) “Sub-consultant” means a person or corporate body with an agreement with the Consultanttocarryoutaspecificpartofthe‘Services’whiletheConsultantremains solely 42 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone liableforthe executionofthe Contract; 27) “Variation” means an instruction given by the Contract Manager, which varies the scope, quantumor performancestandards oftheService performed; 28) “Works” refer to any activity involving construction, fabrication, repair, overhaul, renovation, decoration, installation, erection, excavation, dredging, and so on, which make use of a combination of one or more engineering designs, architectural design, material andtechnology, labour,machinery, andequipment. 1.3. DocumentConventions All words and phrases defined in GCC-clause 1.2 are written as ‘Capitalisedwords’ and shall have the defined meaning. The rest of the words shall be as per grammar, inter-alia‘Services’ shall indicate the definition given in the GCC, while ‘services’ shall have the usual dictionary meaning. 1.4. Abbreviations: AITC AppendixtoInstructionsToConsultants BOQ Bill ofQuantities BSD BidSecuringDeclaration CV Curriculum Vitae EMD Monetaryguarantee tobefurnished byaConsultantalong with itsproposal FBS FixedBudgetSelection GCC General Conditions of Contract GST GoodsandServicesTax GSTIN GSTIdentificationNumber GTE GlobalTenderEnquiry(InternationalCompetitiveBidding) HSN HarmonizedSystem ofNomenclature IEM IndependentExternalMonitor IPR Intellectual Property Rights ITC InstructionsToConsultants JV/C JointVenture/Consortium LCS LeastCostSelection LoA LetterofAward(Acceptance) QCBS QualityandCost-BasedSelection RFP RequestforProposal RFPL RequestforProposalLetter SCC SpecialConditions of Contract TIA Tender Inviting Authority 43 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone TIS TenderInformationSummary TOR TermsofReference The Contract 2.1. LanguageofContract The contract and all subsequent correspondence documents, during its execution, between the consultant and the Procuring Entity shall be written in the Language (hereinafter called the contract’s language)as stipulatedintheContract(or, ifnotsospecified, inEnglish). However, the language of any printed literature furnished by a Consultant may be written in any other language provided a certified translation accompanies the same in the contract’s language. Forpurposes ofinterpretation,translationinthecontract’s language shall prevail. 2.2. TheEntireAgreement This Contract and its documents (referred to in GCC-clause 2.5 below) constitute the entire agreement between the Procuring Entity and the Consultant and supersede all other communications, negotiations, and agreements (whether written or oral) of the Parties made before the date of this Contract. No agent or representative of either Party has the authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promiseoragreement not outlinedinthisContract. 2.3. Severability If any provision or condition of this Contract is prohibited or rendered invalid or unenforceable, such prohibition, invalidity or unenforceability shall not affect the validity or enforceabilityoftheContract oranyofits otherprovisions and conditions. 2.4. RelationshipbetweenParties 1) The parties to the contract are the Consultant and the Procuring Entity, as nominated in the contract. 2) Nothing contained herein shall be construed as establishing a relationship in the nature of masterand servant orprincipal andagent betweentheProcuring Entityand theConsultant. The Consultant,subject tothis Contract, is legallythe mainprincipal/masteroftheExperts and Sub-consultants, if any, performing the Services and shall be fully responsible for the Servicesperformedbythemorontheirbehalfhereunder. 3) Authority of Member inCharge: In case the Consultant is aJoint Venture, the members hereby authorize the member specified in the contract to act on their behalf in exercising alltheConsultant’srightsandobligationstowardstheProcuring EntityunderthisContract, includingwithoutlimitationthereceivingofinstructions and payments from theProcuring Entity. 4) Authorised Representative: Any action required or permitted to be taken and any document required or permitted to be executed under this Contract by the Procuring EntityortheConsultant maybetaken orexecutedbythe officials specified inthecontract. 5) Good Faith: The Parties shall act in good faith concerning each other’s rights under this 44 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Contract and adopt all reasonable measures to ensure the realization of the objectives of this Contract. The Consultant shall always act, in respect of any matter relating to this Contract ortheServices, as afaithful adviser totheProcuring Entity and shall at all times support and safeguard the Procuring Entity’s legitimate interests in any dealings with the thirdparties. 2.5. ContractDocumentsandtheirPrecedence The following conditions and documents in indicated order of precedence (higher to lower) shall be considered an integral part of the contract, irrespective of whether these are not appended/ referred to in it. Any generic reference to ‘Contract’ shall imply reference to all thesedocuments as well: 1) ValidandauthorizedAmendmentsissuedtothecontract. 2) The Agreement consisting of the initial paragraphs, recitals, and other clauses, including the appendices annexed to it and signatures of Procuring Entity, set forth immediately before theGCC; 3) AppendixA:TermsofReference; 4) AppendixB:KeyExperts; 5) AppendixC–RemunerationCostEstimates; a) Annex to Appendix C: Breakdown of Agreed Fixed Rates in Consultant’s Contract; 6) AppendixD–ReimbursableExpensesCostEstimates; 7) theLetterofAward(LoA),ifissued 8) the SCC 9) the GCC 10) theConsultant’sProposal; 11) anyotherdocumentlistedinthecontractasformingpartofthisContract. 12) Integrity Pact, if any 2.6. Modifications/Amendments, WaiversandForbearances 2.6.1 Modifications/Amendments ofContract 1) After the contract documents have been signed, no modified provisions shall be applicable unless the Procuring Entity suo-moto or, on request from the Consultant, by writtenorder,amendthecontract,atanytimeduringthecurrencyofthecontract, by making alterations and modifications within the general scope of the Contract. Requests for changes and modifications in the Contract may be submitted in writing by the Consultant to the ProcuringEntity. 2) If the Consultant does not agree to the suo-moto modifications/ amendments made by the Procuring Entity, he shall convey his views within 14 days from the date of amendment/ modification. Otherwise, it shall be assumed that the Consultant has consented to the amendment. 3) Any verbal or written arrangement abandoning, modifying, extending, reducing, or supplementingthecontractoranyofthetermsthereofshallbedeemedconditional and shall not be binding on the Procuring Entity unless and until the same is incorporated in a 45 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone formal instrument and signed by the Procuring Entity, and till then the Procuring Entity shall havetheright torepudiate sucharrangements. 2.6.2 Waivers andForbearance The following shall apply concerning any waivers, forbearance, or similar action taken under thisContract: 1) Any waiver of a Procuring Entity’s rights, powers, or remedies under this Contract must be in writing, dated, and signed by an authorized representative of the Procuring Entity grantingsuchawaiverandmustspecifythetermsunderwhichthewaiver is beinggranted. 2) No relaxation, forbearance, delay, or indulgence by Procuring Entity in enforcing any of the terms and conditions of this Contract or granting of an extension of time byProcuring EntitytotheConsultantshall,inanywaywhatsoever,prejudice,affect, or restrictthe rights ofProcuring Entityunder this Contract,neithershall any waiver byProcuringEntityofany breachofContractoperateasawaiverofanysubsequentor continuingbreach ofContract. Governing Laws and Jurisdiction 3.1. GoverningLawsandJurisdiction 1) This Contract,itsmeaning andinterpretation,and therelation between theParties shall be governedbythe Laws ofIndia for thetimebeinginforce. 2) Irrespective of the place of delivery, the place of performance or the place of payments under the contract, the contract shall be deemed to have been made at the place from which the Letter of Award (LoA, or the contract Agreement, in the absence of LoA) has been issued. The courts of such Delhi shall alone have jurisdiction to decide any dispute arisingoutorinrespectofthecontract. 3.2. ChangesinLawsandRegulations Unless otherwise stipulated in the contract, if after the deadline for the Proposal submission (Techno-commercial), any law, regulation, ordinance, order or bye-law having the force of law is enacted, promulgated, abrogated, or changed in India (which shall be deemed to include anychangeininterpretationorapplicationbythecompetentauthorities)thatsubsequentlyaffects the Delivery Date and/ or the contract Price, then such Delivery Date and/ or Contract Price shall be correspondingly increased or decreased as per GCC clause 2.6, by agreement between the Parties hereto, to the extent that the Consultant has thereby been affected in the performance of any of its obligations under the contract. Notwithstanding the foregoing, such additional or reduced cost shall not be separately paid orcredited if thesame has already been accountedforintheapplicable price adjustment provisions. Communications 4.1. Communications All communications under the contract shall be served by the parties to each other in writing, in the contract's language, and served in a manner customary and acceptable in business and commercial transactions. Any notice, request or consent required or permitted to be given or made pursuant to this contract shall be routed through Data 46 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Lake only unless the law required to send such notices requests etc through physical/any other specified mode only. Any such notice, request or consent shall be deemed to have been delivered when given ormadeontheDataLaketoanauthorized representativeofthePartyspecifiedintheSC. The effective date of such communications shall be either the date when delivered to the recipient or the effective date mentioned explicitly in the communication, whicheverislater. No communication shall amount to an amendment of the terms and conditions ofthe contract,exceptaformalletterofamendmentoftheContractexpresslysodesignated. Such communications would be an instruction, a notification, an acceptance, a certificate from the Procuring Entity, or a submission or a notification from the Consultant. A notification or certificate required under the contract must be communicatedseparatelyfromothercommunications. 4.2. PersonssigningtheCommunications For all purposes of the contract, including arbitration, thereunder all communications to the otherpartyshall be signedby: 1) On behalf of the Consultant: The person who has signed the contract on behalf ofthe Consultant shall sign all correspondences. A person signing communication inrespect of the contract or purported to be on behalf of the Consultant, without disclosing his authority to do so,shall be deemed to warrant that he has authority tobindtheConsultant. If it is discovered at any time that the person so signing has no authority to do so, the Procuring Entity reserves its right, without prejudice to any other right or remedy, to terminate the contract for default in terms of the contract and/ or avail any or all the remedies thereunder and hold such person personally and/ or the Consultant liable to the ProcuringEntityforall costs anddamages arisingfrom suchmisdemeanors. 2) On behalf of the Procuring Entity: Unless otherwise stipulated in the contract, the Contract Manager signing the contract shall administer the contract and sign communications on behalfof theProcuringEntity. PayingAuthorities mentioned in thecontractshallalsoadministerrespectivefunctionsduringContractExecution. 4.3. Address of the parties for sending communications by the other party. For all purposes of the contract, including arbitration, thereunder, the address of parties to which the otherpartyshall address all communications and noticesshall be: 1) The Consultant's address as mentioned in the contract, unless the Consultant has notified change by a separate communication containing no other topic to the Procuring Entity. The Consultant shall be solely responsible for the consequence of an omission to notify a change ofaddress inthemanner aforesaid,and 2) The Procuring Entity's address shall be the one mentioned in the contract. The Consultant shall also send additional copies to officers of the Procuring Entity presently dealing with thecontract. 3) IncaseofcommunicationsfromtheConsultant,copiesofcommunicationsshallbe marked to the Contract Manager and the Procuring Entity’s officer signing the contract and as relevant to the Paying Authorities mentioned in the contract. Unless specified before the 47 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone contract's start, the Procuring Entity and the Consultant shall notify each other if additionalcopies ofcommunications are tobe addressedtoadditional addresses. Consultant’s Obligationsand restrictions on itsRights 5.1. Changes in Constitution/ financial stakes/ responsibilitiesBusiness and Contract’s the Consultant must proactively keep the Procuring Entity informed of any changes in its constitution/financialstakes/responsibilitiesduringtheexecutionofthecontract. 1) Where the Consultant is a partnership firm, the following restrictions shall apply to changes intheconstitutionduringtheexecutionofthecontract: a) Anew partner shall not be introducedinthe firm exceptwiththeprevious consent inwriting ofthe Procuring Entity, which shall begrantedonlyupon executionofa written undertaking by the new partner to perform the contract and accept all liabilities incurred by the firm under the contract before the date of such undertaking. b) On the death or retirement of any partner of the Consultant firm before the complete performance of the contract, the Procuring Entity may, at his option, terminate the contract for default as per the contract and/ or avail any or all remedies thereunder. c) If the contract is not terminated as provided in Sub-clause (b) above, notwithstandingtheretirementofapartnerfromthefirm,thatpartnershall continue to be liable under the contract for acts of the firm until a copy of thepublicnotice given by himunder Section32 of the Partnership Act, has been sent by him to the ProcuringEntityinwritingorelectronically. 5.2. Obligation to Maintain Eligibility and Qualifications The contract has been awarded to the Consultant based on evaluation and scoring criteria stipulated in the RFP process based on eligibility and qualifications criteria stipulatedtherein. The Consultantiscontractually bound to maintain compliance with all such criteria during the execution of the contract. Any change which would vitiate the basis on which the Consultant was shortlisted or awarded the contract should be pro-actively brought to the notice of the ProcuringEntitywithin7days ofitcomingtotheConsultant’s knowledge. 5.3. RestrictiononPotentialConflictofInterests 1) Neitherthe Consultant noritsSub-consultants northePersonnelshallengage,either directly orindirectly, inanyofthe followingactivities: a) During this Contract's term, any business or professional activities in India that wouldconflict withtheactivities assignedtothem. b) After this Contract's termination, such other activities as may be stipulated in the contract. 2) Furthermore, if the Consultant, as part of the Services, has the responsibility of advising the Procuring Entity on the procurement of goods, works or services, the Consultant shall at all times exercise such responsibility in the best interest of the Procuring Entity. Any discounts or commissions obtained by the Consultant in the exercise ofsuchprocurement responsibilityshallbefortheaccountoftheProcuringEntity. 48 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 3) During the term of this Contract and after its termination, the Consultant and its affiliates, aswellas anySub-consultant andanyofitsaffiliates,shallbedisqualified from providing goods, works, or Services (other than the subject Service of this Contract and any continuation thereof) for any project resulting from or closely related to the subject Services ofthis Contract. 4) he payment of the Consultant according to (GCC Clause 10.5) shall constitute the Consultant’sonlypaymentinconnectionwiththisContract.TheConsultantshallnot accept for its benefit any trade commission, discount, or similar payment in connection with activities under this Contract or the discharge of its obligations hereunder. The Consultant shall use its best efforts to ensure that any Sub-consultants and the Experts and agents of eithershall not receiveany additional payment. 5) The Consultant has an obligation and shall ensure that its Experts and Sub-consultants shall have an obligation to disclose any actual or potential conflict that impacts their capacity to serve the best interest of the Procuring Entity, or that may reasonably be perceived as having this effect. Failure to disclose said situations may lead to the disqualificationoftheConsultantand/ortheterminationoftheContract. 5.4. ConsequencesofbreachbyConstituentsofaConsultant ShouldtheConsultantoranyofitspartners,itsSub-consultants,anyofitsmembers in case of JV/C, or their Personnel commit a default or breach of GCC-clause 5.1 to 5.7, theConsultant (incaseofJV, bytheLeadMember,orinthecaseoftheLeadMember beingthedefaulter,by the member nominated as Lead Member of the remaining JV/C) shall remedy such breaches within 21 days, keeping the Procuring Entity informed. Procuring Entity may call upon the Lead Member to assign the work of the defaulting member to any other equally competent party acceptable to the Procuring Entity. However, at its discretion, the Procuring Entityshall beentitled,anditshallbelawfulon his part, to treat it as a breach of contract and avail any or all remedies thereunder. The decision of the Procuring Entity as to any matter or thing concerningorarisingout of GCC-clause 5.1 to5.7 or on any question whether the Consultant oranypartnerof theConsultantfirmhascommittedadefaultorbreachofanyoftheconditions shallbefinal andbindingontheConsultant. 5.5. AssignmentandSub-contracting-Deleted 5.6. ObligationtoIndemnifyProcuringEntity 5.6.1 ForbreachofIPRRights 1) theConsultantshallindemnifyandholdharmless,freeofcosts,theProcuringEntity and its employees and officers from and against all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of any nature, including attorney’s fees and expenses, which may arise in respect of the Services provided by the Consultant under this Contract, as a result of any infringement or alleged infringement of any patent, utility model, registered design, copyright, or other Intellectual Proprietary Rights (IPR) or trademarks, registered or otherwise existing on the date of the contract arising out of or inconnectionwith: a) Anydesign, data, drawing, specification, or other documents orServices provided 49 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone ordesignedbytheConsultant foror onbehalfof theProcuringEntity. b) The sale by the Procuring Entity in any country of the services/ products producedbythe Services delivered byConsultant,and c) The delivery of the Services by the Consultant or the use of the Services at the ProcuringEntity’sSite 2) SuchindemnityshallnotcoveranyuseoftheServicesoranypartthereofotherthan for the purpose indicated by or to be reasonably inferred from the contract, neither any infringement resulting from the use of the Services or any part thereof, or any service/ products produced thereby in association or combination with any other service, equipment,plant,or materials not deliveredbythe Consultant. 3) If any proceedings are brought, or any claim is made against the Procuring Entity arising outofthemattersreferredabove,theProcuringEntityshallpromptlynotify theConsultant. At its own expense and in the Procuring Entity’s name, the Consultant may conduct such proceedings and negotiations to settle any such proceedings or claim, keeping the ProcuringEntityinformed. 4) If the Consultant fails to notify the Procuring Entity within twenty-eight (28) days after receiving such notice that it intends to conduct any such proceedings or claim, then the Procuring Entity shall be free to conduct the same on its behalf at the risk and cost to the Consultant. 5) At the Consultant’s request, the Procuring Entity shall afford all available assistance to the Consultant in conducting such proceedings or claims and shall be reimbursedby the Consultantforall reasonable expenses. 5.6.2 For LossesandDamages Caused byConsultant 1) the Consultant shall indemnify and keep harmless the Procuring Entity, from and against, all actions, suit proceedings, losses, costs, damages, charges, claims, and demands of every nature and description brought or recovered against the ProcuringEntitybecauseof any act or omission or default or negligence or trespass of the Consultant, his agents, or employees despite all reasonable and proper precautions may have been taken, during the execution of the Services. The Consultant shall make good at his own expense all resultinglossesand/ordamagesto: the Services themselves or anyotherpropertyoftheProcuringEntityor thelives,persons,orpropertyofothers 2) IncasetheProcuringEntityiscalledupontomakegoodsuchcosts,loss,ordamagesor to pay any compensation, including that payable under the provisions of the Workmen's CompensationActoranystatutoryamendmentsthereof,theamountof any costs or charges including costs and charges in connection with legal proceedings, which the Procuring Entity may incur about it, shall be charged to the Consultant. All sums payable by way of compensation under any of these conditions shall be considered reasonable compensation to be applied to the actual loss or damage sustained and whether or not any damage shall have beensustained. 3) The Procuring Entity shall have the power and right to pay or to defend or compromise 50 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone any claim of threatened legal proceedings, or in anticipation of legal proceedings being institutedconsequentonthe actionor default of the Consultant, to take such steps as may beconsiderednecessaryordesirabletowardoff ormitigate theeffect of suchproceedings, charging to Consultant, as aforesaid, any sum or sums of money which may be paid and any expenses whether for reinstatement or otherwise which may be incurred and the propriety of any such payment, defence or compromise, and the incurring of any such expensesshallnot becalled inquestionbytheConsultant. 5.7. Confidentiality,SecrecyandPropertyandIPRRights 5.7.1 PropertyRights 1) Physical assets, e.g., Equipment, vehicles and materials made available to the Consultant by the Procuring Entity or purchased by the Consultant wholly or partly with funds providedbytheProcuringEntity,shallbethepropertyoftheProcuring Entityand shall be marked accordingly. Upon termination or expiration of this Contract,the Consultantshall make an inventory of such equipment, vehicles, and materials available to the Procuring Entity and dispose of such equipment, vehicles, and materials in accordance with the Procuring Entity’s instructions. While in possession of such equipment, vehicles and materials, the Consultant, unless otherwise instructed by the Procuring Entity in writing, shall insure them at the expense of the Procuring Entity in an amount equal to their total replacementvalue. 2) Intangible assets, e.g., license agreements, Software Packages, and memberships for purposes of performance of this contract provided by the Procuring Entity or purchased by the Consultant wholly or partly with funds provided by the Procuring Entity, shall be the property of the Procuring Entity and shall be registered accordingly., These shall be obtained in the name of the Procuring entity after obtaining the Procuring Entity’s prior written approval. The Procuring entity shall have an encumbered right to use such assets, even after the termination of the Contract. Any restrictions about the future use of these documentsandsoftwareshallbespecified intheContract. 5.7.2 IPRRights All deliverables, outputs, plans, drawings, specifications, designs, reports, and other documents and software submitted by the Consultant under this Contract shall become and remainthepropertyoftheProcuringEntityandshallbesubjecttolawsofcopyrightand must not be shared with third parties or reproduced, whether in whole or part, without the Procuring Entity’spriorwrittenconsent.TheConsultantshall,notlaterthanuponterminationorexpiration ofthisContract,deliverallsuchdocumentsandsoftwaretotheProcuringEntity,togetherwitha detailedinventorythereof.TheConsultantmay retain a copy of such documents and software butshall not useitfor commercial purposes. 5.7.3 Confidentiality All documents, drawings, samples, data, associated correspondence or other information furnished by or on behalf of the Procuring Entity to the Consultant in connection with the contract, whether such information has been furnished before, duringorfollowingcompletion or termination of the contract, are confidential and shall remain the property of the Procuring 51 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Entityandshall,withoutthepriorwrittenconsent ofProcuringEntityneitherbedivulgedbythe Consultant to any third party, nor be used by him for any purpose other than the design, procurement, or other services and activities required for the performance of this Contract. If advisedbytheProcuringEntity, all copies of all such information in original shall be returned oncompletionofthe Consultant’s performance and obligations under this contract. 5.7.4 Secrecy Ifthecontractdeclares thesubjectmatterofthisContractas comingundertheOfficial Secrets Act,1923orifthecontractismarkedas“Secret”,theConsultantshalltakeall reasonablesteps necessary to ensure that all persons employed in any connection with the contract, have acknowledged their responsibilities and penalties for violations under the Official Secrets Act andanyregulations framed thereunder. 5.7.5 RestrictionsontheUseofInformation 1) Without the Procuring Entity’s prior written consent, the Consultant shall not use the informationmentionedinthesub-clausesaboveexceptforperformingthiscontract. 2) The Consultant shall treat and mark all information as confidential (orSecret – as the case may) and shall not, without the written consent of the Procuring Entity, divulge to any person other than the person(s) employed by the Consultant in the performance of the contract. Further, any such disclosure to any such employed person shall be made in confidenceand onlysofar as necessaryfor suchperformance for this contract. 3) Notwithstanding the above, the Consultant may furnish to its holding company or itsSub- consultant(s) such documents, data, and other information it receives from the Procuring Entityto theextent requiredfor performingthecontract.In this event, the Consultant shall obtain from such holding company/ Sub-consultant(s) an undertaking of confidentiality (or secrecy – as the case may be) similar to that imposed on the Consultant under the above clauses. 4) The obligation of the Consultant under sub-clauses above, however, shall not apply to informationthat: a) the Consultant needs to share with the institution(s) participating in the financing ofthecontract; b) noworhereafter is orenters thepublicdomainthroughnofault ofConsultant; c) can be proven to have been possessed by the Consultant at the time of disclosure and which was not previously obtained, directly or indirectly, from the Procuring Entity; or d) otherwise lawfully becomes available to the Consultant from a third party with no obligationofconfidentiality. 5) The above provisions shall not in any way modify any undertaking of confidentiality (or Secrecy–asthecasemaybe)givenbytheConsultantbeforethecontractdate in respect of thecontract,theRFP Document, oranypart thereof. 6) The provisions of this clause shall survive completion or termination for whatever reason ofthecontract. 5.7.6 ProtectionandSecurityofPersonalData 52 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 1) Where the Consultant is processing Personal Data for the Procuring Entity (as part of Services),the Consultantshall: a) Process the Personal Data only as per instructions from Procuring Entity (which may be specific instructions or instructions of a general nature) as set out in this Contract oras otherwise notifiedbyProcuringEntity; b) Comply withall applicable laws; c) Process the Personal Data only to the extent and in such manner as is necessary for the discharge of the Consultant’s obligations under this Contract or as is required byLaworany RegulatoryBody; d) Implement appropriate technical and organisational measures to protect Personal Data against unauthorized or unlawful Processing and accidental loss,destruction, damage, alteration, or disclosure. These measures shall be appropriate to the harm which might result from any unauthorized or unlawfulProcessing,accidentalloss, destruction,ordamagetothePersonal Data and having regard to the nature of the Personal Data whichis tobe protected; e) Take reasonable steps to ensure the reliability of its staff and agents who may haveaccesstothePersonal Data; f) ObtainpriorwrittenconsentfromtheAuthoritytotransferthePersonalData to any Sub-consultantfor theprovisionoftheServices; g) Not cause or permit the Personal Data to be transferred, stored, accessed, viewed, or processed outside of India without the prior written consent of the Procuring Entity. h) Ensure that all staff and agents required to access the Personal Data are informed of the confidential nature of the Personal Data and comply withthe obligations set outinthis clause. i) Ensure that none of the staff and agents publishes or disclose any personal data to anythirdpartiesunlessdirectedinwritingtodosobytheProcuring Entity. j) Not disclose Personal Data to any third parties in any circumstances other than with the written consent of the Procuring Entity or compliance with a legal obligationimposedupontheProcuringEntity; 2) NotifytheProcuringEntity(withinfiveWorkingDays)ifitreceivesthe; a) a request from an employee of Procuring Entity to have access to his or other employees’Personal Data; or b) acomplaintorrequestrelatingtotheProcuringEntity’sobligationsunderthelaw; 3) Theprovisionofthis clause shall applyduringthe contract periodandindefinitelyafter its expiry. 5.8. PerformanceBond/Security 1) Within twenty-one days (or any other period mentioned in RFP Document or Contract) aftertheissueoftheLetterofAward(LoAorthecontract,ifLoAisskipped)bythe Procuring Entity, the Consultant shall furnish to the Procuring Entity performance security, validup tosixtydays(oranyotherperiodmentionedinRFP DocumentorContract)afterthedateof completionofallcontractualobligationsbytheConsultant. 53 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2) TheamountofPerformancesecurityasquotedbybidderinhisfinancialproposalin Indian Rupees orthecurrencyofthecontractandshallbeinoneofthefollowingforms: a) UnlessotherwisestipulatedintheRFPDocumentortheContract,Insurance Surety Bonds,AccountPayee DemandDraft,FixedDepositReceiptfromany commercial bank in India, or online payment in an acceptable form safeguarding the ProcuringEntity’sinterest, or b) Bank Guarantee (including an e-Bank Guarantee) issued by a commercial bankin India,intheprescribedformprovidedinAppendixE-1toFormat1: Contract Form. 3) If the Consultant, having been called upon by the Procuring Entityto furnish Performance Security,failstodosowithinthespecifiedperiod,itshallbelawfulfor the Procuring Entity at its discretion to annul the award and forfeit the EMD (or enforce Bid Securing Declaration, if that was submitted in lieu of Bid Security), besides taking any other administrativepunitiveaction like‘Removal from List ofRegisteredSuppliers’etc. 4) If the Consultant fails to maintain the quoted Performance Security during the Contract'scurrency,itshallbelawfulfortheProcuringEntityatitsdiscretion. (a) treat it as a breach of contract and avail any or all contractual remedies provided for breaches/default,includingtermination oftheContract for Default,or (b) without terminating the Contract, recover from the Consultant the amountof such security deposit by deducting the amount from the pending bills of the Consultant underthecontractoranyothercontractwiththeProcuringEntityor theGovernmentor any person contracting throughthe Procuring Organisation or otherwise, howsoever asper GCC-clause 10.4. 5) If a contract is amended, the Consultant shall furnish amended Performance Security with revised valueandvaliditywithintwenty-one days oftheissueofsuch anamendment. 6) TheProcuringEntityshallbeentitled,anditshallbelawfulonhispart, (a) to deduct from the performance securities or to forfeit the said security in whole or in part intheevent of: i) Any default, failure, or neglect on the part of the Consultant in the fulfilment or performance in all respect of this contract or any other contract with the ProcuringOrganisation oranypart thereof ii) for any loss or damage recoverable from the Consultant which the Procuring Entitymaysufferorbeputtoforreasonsoforduetotheabovedefaults/ failures/ neglect (b) and in either of the events aforesaid to call upon the Consultant to maintain the said performance security at its original limit by making further deposits, providedfurther thattheProcuringEntityshallbeentitled,andit shallbe lawful on his part, to recover any such claim from any sum then due or which at any time after that may become duetotheConsultantfor similarreasons. 7) Subjecttothesub-clauseabove,theProcuringEntityshallreleasetheperformance security without any interest to the Consultant on completing all contractual obligations. Alternatively, upon the Consultant submitting a suitable separate Defect Liability Security for the duration of Defect Liability obligations, the original Performance Guarantee Securityshall bereleasedmutatismutandis. 54 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 8) No claim shall lie against the Procuring Entity regarding interest on cash deposits, Government Securities, ordepreciationthereof. 5.9. Permits,ApprovalsandLicenses Whenever the Services and incidental Goods/ Works delivery requires the Consultant to obtain permits, approvals, and licenses from local public authorities or any third party, it shall be the Consultant's sole responsibility to obtain these and keep them current and valid. Such requirements may include but not be restricted to licences or environmentalclearanceif required.IfrequestedbytheConsultant,theProcuringEntity shall make its best effort to assist the Consultant in complying with such requirements in a timely and expeditious manner withoutdilutingtheConsultant’s responsibilityinthisregard. 5.10. Insurances The Consultant (s) shall take out and maintain, and shall cause any Sub-consultants to take out and maintain,atits(or the Sub-consultants’,as the case may be)own cost but on terms and conditions approved by the Procuring Entity, insurance against the risks,and for the coverage, as stipulated in the contract or any applicable law including Labour Codes; and at the Procuring Entity’s request, shall provide evidence to the Procuring Entity showing that such insurance has been taken out and maintained and that the current premiums have been paid. The Consultant shall ensure that such insurances are in place before commencing the Services as stated in GCC clause 9.2.Alterations to the terms of insurance shall not be made without the approval of the Contract Manager. The risks and the coverage of insurance shall beas follows (a) Third Party motor vehicle liability insurance as required under MotorVehicles Act,1988 in respect of motor vehicles operated in India by the Consultants or their Personnel or any Sub-consultants or their Personnel for the period of consultancy. (b) ThirdPartyliabilityinsurancewithaminimumcoverage,ofRs. 1.0millionfortheperiodofconsultancy. (c) Professional liability insurance as per 3.4 (a) (ii) of SC of the consultancy, witha minimumcoverageequal toestimatedremunerationandreimbursable. (d) Employer's liability and workers' compensation insurance in respect of the Personnel of the Consultants and of any Sub-consultant, in accordance with therelevant provisions of the Applicable Law, as well as, with respect to such Personnel, any such life, health, accident, travel or other insurance as may be appropriate; and (e) Insurance against loss of or damage to(i) equipment purchased in whole or in partwithfundsprovidedunderthisContract,(ii)theConsultants'property used in the performance of the Services, and(iii)any documents prepared by the Consultantsintheperformance oftheServices. 55 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 5.11. Accounting,InspectionandAuditing TheConsultantshall keepandmake allreasonableefforts tocauseits Sub-consultants tokeep accurateand systematic accounts and records in respect of the Services and in such form and detail as shall identify relevant time changes and costs and as per accounting principles prescribedinIndia. 5.12. BookExamination Clause:-Deleted 5.13 LegalCompliance The Consultant shall perform the Services in accordance with the Contract and the Applicable Law and shall take all practicable steps to ensure that any of its Experts and Sub-consultantscomplywiththeApplicable Law. 5.14 CustodyandReturnoftheProcuringEntity’sAssetsloanedtoConsultant 1) The contractors shall sign accountable receipts for all documents and materials or other assets/ properties made over to them by the Contract Manager on behalf of the Procuring Entity. All such assets shall be deemed in good condition when receivedbytheConsultant unlesshehasnotifiedtheProcuringEntitytothecontrarywithintwenty-fourhoursofreceipt. Otherwise,heshallbedeemedtohavewaived theright todosoat any subsequentstage. 2) These assets shall remain the property of the Procuring Entity, and the Consultant shall takeallreasonablecareofallsuchassets.TheConsultantshallberesponsible foralldamage orlossfromwhatevercausewhileassetsarepossessedorcontrolledby the Consultant, staff, workmen,or agents. 3) WheretheConsultantinsuressuchassetsagainstlossorfireattherequestoftheProcuring Entity, such insuranceshall bedeemed tobe byway of additional precautionand shall not prejudicethe Consultant's liabilityas aforesaid. 4) The Consultant shall return all such assets in good order and repair, reasonable wearand tear excepted, before the completion/ closure/ termination of the contract and shall be responsible for any failure to account for the same or any damage done tothat as assessed bytheProcuringEntitywhosedecisionshallbefinalandbinding. Procuring Entity’s Obligations 6.1. AssistancebytheProcuringEntity Unless otherwise specified in the contract, the Client shall use its best efforts to: • provide the Consultants, Sub-consultants and Personnel with work permits and such other documentsasshallbenecessarytoenabletheConsultants,Sub-consultants or Personnel to perform the Services; • assistforthePersonneland,ifappropriate,theireligibledependentstobeprovided promptly with all necessary entry and exit visas, residence permits, exchange permits and any other documentsrequiredfortheirstayinGovernment's country; • Facilitate prompt clearance through customs of any property required for the Servicesand 56 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone ofthepersonaleffectsofthePersonnelandtheir-eligibledependents; • Issue to officials, agents and representatives of the Government all such instructions as may be necessary or appropriate for the prompt and effective implementation of the Services; • assist the Consultants and the Personnel and any Sub-consultants and or Associates employed by the Consultants for the Services from any requirement to register or obtain any permit topractice their profession or to establish themselves either individually or as a corporateentityaccordingtotheApplicable Law; • grantto theConsultants,anySub-consultants andorAssociates and the Personnel of either of them the privilege, pursuant to the Applicable Law, of bringing into Government's country reasonable amounts of foreign currency for the purposes of the Services or for the personal use of the Personnel and their dependents and of withdrawing any such amounts as maybeearnedthereinbythePersonnel intheexecutionoftheServices: and • Provide to the Consultants, Sub-consultants and or Associates and Personnel any such otherassistanceas maybe specifiedintheSC. 2) Issue instructions and information to its officials, agents, and stakeholders for prompt and effectiveimplementationoftheServices. 3) Access to Project Site: The Procuring Entity warrants that the Consultant shall have, free of charge,unimpededaccesstotheprojectsiteifsuchaccessisrequiredforthe performance of theServices. 6.2. FacilitiestobeprovidedbytheProcuringEntity 1) The Procuring Entity shall make available to the Consultant and the Experts, for the performance of the contract, free of any charge (unless otherwise stated therein), the services, facilities,and property described in the ‘Terms of Reference’(Appendix A) as per terms and conditions and against appropriate safeguards (including Insurances,Bank Guarantee, Indemnity Bonds, Retention Money etc.) specified therein. The Consultant shall use such propertyfortheexecutionofthecontractandnoother purposewhatsoever. 2) In case such services, facilities and property shall not be made available to the Consultant asandwhen specifiedinAppendixA,thePartiesshallagreeon(i)any timeextensionthat it may be appropriate to grant to the Consultant for the performance of the Services, (ii) how the Consultant shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Consultant as a result thereof accordingtoGCC clause 10.1.1. 6.3. CounterpartPersonnel 1) The Procuring Entity shall make professional and support counterpart personnel available totheConsultant,as specifiedinAppendixA. 2) If counterpart personnel are not provided bythe Procuring Entity tothe Consultant as and when specified in Appendix A, the Procuring Entity and the Consultant shall agree on (i) 57 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone how the affected part of the Services shall be carried out, and (ii) the additionalpayments, ifany,tobemadebytheProcuringEntitytotheConsultantas aresult thereof. 3) Professional and support counterpart personnel, excluding Procuring Entity’s Contract Management and liaison personnel, shall work under the exclusive direction of the Consultant. If any member of the counterpart personnel fails to perform any work assigned to such member by the Consultant that is adequately consistentwiththeposition occupied by such member, the Consultant may request the replacement of such member, andtheProcuringEntityshallnotunreasonablyrefuse toact uponsuchrequest. 6.4. Payment Obligation Considering the Services performed by the Consultant under this Contract, the Procuring Entity shall pay the Consultant for the deliverables specified in Appendix A and in such manneras is provided inthe Contract. Scope of Servicesand Performance Standards 7.1. ScopeofServices 1) Services: This contract is for the performance/ delivery of Services of the description, scope/ quantum outlined in Appendix A: ‘Terms of Reference’ during the contract period specified therein. 2) Incidental Works/ Goods/ Other Services: If so stipulated, the Consultant shall be required to perform/ deliver specified incidental Works/ Goods/ other Services as an integral part oftheServices inthe contract. 3) Location: The Services shall be performed at such locations as are specified in Appendix Aand,wherethelocationofaparticulartaskisnotsospecified,atsuch locations,whether intheProcuringEntity’scountryorelsewhere,astheProcuring Entitymayapprove. 4) Reporting Requirements: The Consultant shall deliver to the Procuring Entity the reports, deliverables, outputs, and documents specified in Appendix A: ‘Terms of Reference’, in the form, in the numbers and within the periods outlined in the said Appendix,besides progressreports as per GCCClause 9.3. 5) Standardof Performance: a) The Consultant shall perform and carry out the Services with all due diligence, efficiency, and economy, in accordance with generally accepted professional standards and practices, observe sound management practices, and employ appropriate technology and safe and effective equipment, machinery, materials and methods. b) Unless otherwise specified, the performance standards and quality of the Services shall conform to the Terms of Reference as stipulated in the contract or as per best standards inthemarket, where not sospecified. c) Defects in Services: TheProcuring Entityshall promptlynotifythe Consultant ofany identifieddefects,lapses/deficienciesinservicesrequestingthecorrectionof the notified defect within a reasonable time. If the Consultant has not corrected notified defect within thetime stipulated in the Procuring Entity’s notice, the Procuring Entity may suspend payments as per GCC clause 10.6 and terminate the agreement as per GCC clause 12.1ofcontract agreement. 58 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 6) Consultants' Actions Requiring Client's Prior Approval;- The Consultants shall obtain the Client's prior approval in writing before taking any of the following actions: (a) appointing such members of the Personnel as are listed in Appendix ‘C’ ("Consultants'Sub-consultants'KeyPersonnel") merelybytitlebut not byname; (b) entering into a subcontract for the performance of any part of the Services, itbeing understood(i)thattheselectionoftheSub-Consultantandtheterms and conditions of the subcontract shall have been approved in writing by the Client prior to the executionof the subcontract, and (ii) that the Consultants shall remain fully liable for the performance of the Services by the Sub- Consultantand itsPersonnel pursuant tothis Contract;and (c) taking any action under a civil works contract designating the Consultants as "Authority’s Engineer", for which action, pursuant to such civil works contract, the writtenapproval oftheClient as "Employer" isrequired". 7.2. EligibleServices Unless otherwise stipulated in the Contract, the country of origin of ‘Services’ and related ‘Goods’underthecontractshallhavetheirorigininIndiaorothercountries (if specifiedinthe Contract).Itmustconform tothe declarationmadebytheConsultant during regarding Central Government policies restricting the participation of entities from i) Certain countries sharing landborderswithIndiaandii)Countriesthatrestricttheparticipation ofBidders from India on a reciprocalbasis.Theyshouldensurethattheycontinuetobefree from suchrestrictions. Deployment of Resources 8.1. SiteandAssetsthereon 8.1.1 SiteofServiceDelivery 1) The site for Service delivery shall be the lands, spaces, and other places on, under, in or throughwhichthe Services are tobecarriedoutandanyother lands orplaces provided by theProcuringEntityforthecontract. 2) NolandorbuildingoranyotherassetbelongingtoorinpossessionoftheProcuring Entity shall be occupied/ used by the Consultant without the permission of the Procuring Entity. The Consultant shall not use or allow the site to be used for any purposes other than executingorconcerning theexecutionoftheservices. 3) Prohibition of Smoking and Intoxicants: The Consultant shall exercise influence and authoritytotheutmostextenttosecurestrictcompliancebyhisstaff or any labour employed through Sub-consultants or petty contractors with all the rules and regulations stipulated by the ProcuringEntityrelatingtotheaccesstotheprojectsite,includingbutnotlimitedto a) ProhibitionofSmokingin ‘NoSmoking Zone’ and inPublicPlaces b) Prohibition of the use of any intoxicating substances including, but not limited to, intoxicatingbeveragesduringtheserviceperiodoron-siteornearthesite or in any of the facilities, sites, buildings, encampments, or tenements owned, occupied by orwithinthecontrol oftheConsultant oranyofhis employees. 59 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone c) Safety practices relating to Procuring Entity’s staff, Public and third parties d) Maintenanceofpeaceandbusiness-likeambience 8.1.2 Clearance of Site on Completion 1) Oncompletionof theservices,theConsultant shall hand overthewhole project site to the procuring Entity on ‘as it was’ basis. No final payment in settlement of the accounts for theServicesshallbepaidtotheConsultanttill,inadditiontoanyother condition necessary forfinal payment,siteclearanceshall have beenaffected byhim. 2) In the event of failure on the part of the Consultant to comply with this provision within 7 daysafter receiving noticefor clearance ofProcuring Entity’ssiteand lands,the ContractManager shall cause them to be removed in such a way as deemed fit and convenient and cost as increased by supervision and other incidental charges shall be recovered from the Consultant. The Procuring Entity shall not be held liable for any loss or damage to the Consultant's property as maybe onthesiteandduetosuch removal. 8.2. KeyandNon-keyPersonnel 8.2.1 GeneralRequirements 1) Restrictionson theEmploymentofRetiredStaffor Officers or Managers of Procuring Entity within One Year of their Retirement: the Consultant shall not himself be a retired Government employee of Gazetted rank or engage any employee or associate who is a retired Government employee of Gazetted rank, if such persons have not completed one year (or any other period prescribed by the relevant authority) from the date of retirement,inconnectionwiththisContractinanymannerwhatsoeverwithoutobtainingprior permission of the relevant authority. If the Consultant is found to have contravened this provision, it shall constitute a breach of contract, and Procuring Entity shall be entitled to terminatethe contract and/ oravail any orall theremedies thereunder. 2) Team Lead: The Consultant, when he is not personally present on the workplace site, shall nominate a Team Lead during working hours, which shall, on receiving reasonable notice, present himself to the Contract Manager. Orders given by the ContractManageror his representative to the Team Lead shall be deemed tohave the same force as if given to theConsultant. 3) The Consultant shall employ and provide qualified and experienced Key and Non-key Experts andSub-consultants as requiredtocarryout theServices. 4) AllkeypersonnelandsubprofessionalstaffoftheAuthorityEngineershallusetheAadhaar based biometric attendance/ Geo-tagged selfie-based attendance system for marking their daily attendance. Aadhaar based Biometric attendance/ Geo-tagged selfie-based attendance shall be marked at least once a day and anytime during the day. 1 Aadhaar based biometric attendance/ Gee-tagged selfie-based attendance system shall be installed bytheAuthorityEngineeritsowncost atthesiteofficeinordertofacilitatetheattendance marking. More systems can be installed near the project highway upto a maximum of 1 system per 50 km in order to encourage frequent visits of project highway by key personnel and sub professional staff. A copy of monthly Aadhaar based biometric attendance/ Geo-tagged selfie-based attendance shall be attached with Monthly Status Report. Proper justification shall be provided for cases of absence of key personnel/ sub 60 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone professional staff which do not have prior approval from Project Director of concerned stretch.AuthorityEngineerhavetoprovideacertificatethatallkeypersonnelasenvisaged intheContract Agreement has been actually deployediiithe project. 5) Authority Engineer will intimate concerned Project Director/Project Incharge immediately after establishing its site office regarding installation of Aadhaar based Biometric attendance/ Geotagged selfie-based attendance system and complete address of itssiteoffice 6) Fake CV:- If any case of fake/incorrect/inflated CV is found, it shall be dealt with very severely and would result in all possible penal action including blacklisting from future projects of <Agency>. This would alsoapplyeven when the consulting firm is not successful in getting the assignment. In case CV of a person is turned out to be fake/incorrect/inflated during the assignment, the consultancy firms will have to refundthesalaryand perksdrawn includinginterest@12% per annumin respect of the person apart from other consequences. In addition to above, 10% of the salaryandperks toberefunded shallbe recoveredfrom theFirm as penalty. 8.2.2 KeyPersonnel 1) The titles, job descriptions, minimum qualifications, and estimated periods of the Consultant’s Key Personnel engagement in carrying out the Services are described in AppendixB totheContract. 2) TheKey Experts shall not be entitledtobe paidfor overtime nor totake paid sickleave or vacation leave except as specified inAppendixB, andthe Consultant’s remunerationshall bedeemed tocovertheseitems. 3) Medical Fitness of certificate as per Appendix-B-1, for all key personnel shall be submittedalongwithproposal. 4) Workinghours and holidays for Experts are outlinedin Appendix B. Foreign Key Experts carrying out Services in India shall be deemed to have commenced or finished work in respect of the Services several days before their arrival in or after their departure from India,as isspecified inAppendixB. 5) Any leave-taking by Key Experts shall be subject to the prior approval by the Consultant, who shall ensure that absence for leave purposes shall not delay the progress and or impactadequatesupervisionoftheServices.IfKeyExpertsarenot deployed for significant periods, affecting the progress and quality of the assignment,payments may be suspended as per clause10.6below. 6) SubstitutionofKeyExperts: a) Unless the Procuring Entity may otherwise agree inwriting, no changes shall be made intheKey Experts. b) In case notice to commence services pursuant to Clause 2.1 of this Contract is not ordered by Client within 90 days of signing of contract the key personnel can excuse themselves on valid grounds, e.g., selection on some other assignment, health problem developed after signing of contract, etc. In such a case no penalty shall be levied on the Firm or on the person concerned. The firm shall however be asked to give a replacement byanequal orbetter scoringperson,whenevermobilizationisordered. c) In case notice tocommence services is givenwithin90 days of signing ofcontract the, 61 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone the Authority expects all the Key Personnel specified in the Proposal to be available during implementation of the Agreement. The Authority will not consider any substitution of Key Personnel except under compelling circumstances beyond the control of the Consultant and the concerned Key Personnel. Such substitution shall be limited to not more than three Key Personnel subject to equally or better qualified and experiencedpersonnelbeingprovidedtothesatisfactionoftheAuthority.Replacement oftheTeamLeaderwillnotnormallybeconsideredandmayleadtodisqualificationof the Applicant or termination of the Agreement. Replacement of one Key Personnel shall be permitted subject to reduction of remuneration equal to 5 % (five per cent) of thetotal remuneration specified for the Key Personnel who is proposed to be replaced. Incaseofsecondreplacement thereductioninremunerationshall beequal to10%(ten per cent) and for third and subsequent replacement, such reduction shall be equal to 15% (fifteen per cent). The maximum age limit of replaced key personnel shall be 65 years as on the date of submission of proposal for such replacement. The Consultant shall make all endeavors to ensure that replacement of a Key Personnel is approved before the concerned Key Personnel leaves the consultancy assignment, in any case the Consultant shall submit replacement acceptable to Client not more than 3 weeks after the Key Personnel leaves the consultancy assignment, failing which Client may terminate the Contract in pursuance to Clause 12.1 of GC. The personnel so replaced shallbedebarred fromfuture projects for 2 years. For avoidance of doubt it is clarified that for one position replace shall be allowed only once during currency of contract. Repeated replacement for one key position shall not be allowed except in case of death. d) In case, person permanently employed with the firm is to be replaced, technical score of both the CVs shall be compared excluding the marks given for employment with firm. Replacement would be allowed when the Technical Score (excluding the marks given for employment with firm) of the new key person is equal or better than the existing key person's Technical Score excluding marks assigned for permanent employment with the firm. However, the remuneration of such replacement shall be reduced on proportionate basis in case the overall score of the replacement person is less thantheoverall score of original person. e) Replacement after Commercial Operation date of the Project: - One time replacement without any reduction in remuneration will be allowed after achievement ofCoD oftheProject. The replacement shall however be ofequal orbetterscore. f) If the Employer (i) finds that any of the Personnel has committed serious misconduct or has been charged with having committed a criminal action or (ii) has reasonable ground to be dissatisfied with the performance of any of the Personnel, then the consultant shall, at the Employer’s written request specifying the grounds therefore, forthwith provide a replacement with qualifications and experience acceptable to him. Forsuchreplacementtherewill benoreductioninremuneration. g) The remuneration to the replaced key personnel shall be paid at the original quoted remuneration by the consultancy firm. The amount equivalent to the reduction as 62 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone mentioned in clause 5(e) above shall be deducted from the overhead quoted by the consultancyfirm. h) If any member of the approved team of a consultant engaged by <Agency> leaves that consultant before completion of the job, he shall be barred for a period of6 months to 24monthsfrombeingengagedasateammemberofany otherconsultantworking(orto beappointed)foranyother<Agency>/MoRTHprojects. 6) AdditionalKeyExperts:IfadditionalKeyExpertsarerequiredtocarryouttheServicesduring the execution of the contract, the Consultant shall submit to the Procuring Entity for reviewandapprovalacopyoftheirCurriculaVitae(CVs).IftheProcuring Entitydoesnot object in writing (stating the reasons for the objection) within twenty-one (21) days from receiving such CVs, such additional Key Experts shall be deemed approved by the Procuring Entity. The rate of remuneration payable to such new additional Key Experts shall be based on the rates for other Key Experts' positions which require similar qualifications andexperience. 7) NotwithstandinganythingtothecontrarystatedintheGCCandSCC,itshallbemandatory to deploy the key personnel and sub-professional as per the Man- Months Input specified intheTerms ofReference. Inadequate deployment of key personnel and sub- professional shall lead to deduction in themonthlypayment as per followingtable. The keypersonnel and sub-professional shall be considered to be inadequately deployed if he/she is not present for 90% (Except the leaves as specified in the Special Conditions ofContract/ Appendix B: Hours ofWorkfor Key Personnel) of the time stipulated in the month, as per the Man-Months input in the Terms ofReferenceand theDeploymentSchedule proposed bythefirm Sr. Personnel %reductionof No. monthly remuneration NormalHighwayProject 1 TeamLeadercumSeniorHighwayEngineer 20% 2 ResidentEngineercumHighwayEngineer 25% 3 Bridge/Structural Engineer 20% 4 OtherKeyPersonnel 20% 5 Sub-ProfessionalStaff 15% StandaloneBridgeProject 1 TeamLeadercumSeniorBridgeEngineer 20% 63 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2 ResidentcumPavementSpecialist 25% 3 Bridge/Structural Engineer 20% 4 OtherKeyPersonnel 20% 5 Sub-ProfessionalStaff 15% StandaloneTunnelProject 1 TeamLeadercumSeniorTunnelExpert 20% 2 ResidentEngineercumExcavationSpecialist 25% 3 TunnelDesignEngineer 20% 4 OtherKeyPersonnel 20% 5 Sub-ProfessionalStaff 15% Note:- 1. Inthecaseof“OtherKeyPersonnel(Sr.No.4)”and“Sub–ProfessionalStaff(Sr.No.5)”, “theaverage availabilityacross thegroupshall beconsideredfor calculation. 2. Thekey personnel shall bepaid forthe onlytimehe has beenactuallybeen present at site. Further, a deduction equivalent to the percentage mentioned above, shall be deducted from the gross bill of the consultant as deterrent for inadequate deployment. For avoidance of doubt, in case the Team Leader cum Senior Highway Engineer has been made available for 85 % of the stipulated time in the month, then only 85 % of the monthly remuneration shall be paid for the key personnel and , a penalty equivalent to 20 % of the quoted remuneration of Team leader shall be deducted from the bill. In the case of “Other Key Personnel (Sr. No. 4)” and “Sub – Professional Staff (Sr. No. 5)”,for percentage deduction as mentioned above, total remuneration of that group shall be consideredfor calculation. 3. The non-deployment of any professional staff for any reason including replacement etc shallbeconsideredasabsence.. 4. ConsultantHavetoprovideacertificatethatallkeypersonnelasenvisagedinthe contract Agreement has been actually deployed in the project. They have to submit the proof of Aadhar Based Biometric attendance/ Geo –tagged selfie-based attendance/ or any other document as decidedbytheAuthority, at thetimeofsubmissionofbillstothe<agency> 8.2.3 Non-keyPersonnel the Consultant must ensure the deployment of non-key Personnel as per Annexure C, the Terms of Reference, and the approved Works plan as updated. Daily attendance records of such non-key personnel shall be maintained by the Consultant and shared with the Contract 64 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Manager. If the Contract Manager believes that the Consultant is not employing sufficient Non-key personnel as is specified or otherwise for the proper execution of the Services, he shall issue a notice to the Consultant for remedial measures. The Consultant shall forthwith, on receiving intimation to this effect, deploy the additional number of non-key personnel as specified by the Contract Manager immediately, and failure on the part of the Consultant to comply with such instructions shall entitle the Procuring Entity to suspend payments as per GCCclause 10.6for theshortfall inperformance or terminate the contract and/ or avail all the remedies thereunder. Such action shall be in addition to the deduction from the Consultant’s payment costofshortfall personnel as per AnnexureC. 8.2.4 Removal of Key and Non-key Experts or Sub-consultants on Orders Contract Manager 1) The Consultant shall, at the Procuring Entity’s written request, provide a Replacement,iftheProcuringEntityfindsthatanyoftheExpertsorSub-consultant:commits severe misconduct orhas beenchargedwithhavingcommittedacriminal act a) persistsinanymisconductorlackofcare; b) is foundtobenegligent,incompetent or incapable ofdischarging assigned duties; c) failstocomplywithanyprovisionoftheContract; d) based on reasonable evidence, is determined to have engaged breached the Code of Integrity(includingFraudandCorruption)duringtheexecutionoftheWorks; e) Prolongcontinuousabsenceofmorethan1monthatsite. 2) Subject to the requirements in the sub-clause above, and notwithstanding any requirement from the Procuring Entity to request a replacement, the Consultant shall take immediate action as appropriate in response to any violation in the sub-para above. Such immediate action shall include removing (or causing to be removed) such Key/ Non-Key Expert or sub-consultant from carryingout theServices. 3) Any replacement of the removed Experts or Sub-consultants shall possess equal or better qualifications andexperienceand beacceptable totheProcuringEntity. 4) The Consultant shall bear all costs from or incidental to any removal and/or replacement ofsuchExperts. 8.3. EquipmentandToolsofTrade TheConsultantmustensurethedeploymentofEquipmentandToolsofTradenecessarytodeliver services as per the Terms of Reference and approved Works plan as updated. If the Contract Manager believes that the Consultant is not employing on the Services sufficient Equipment/Toolsof Trade as is specifiedor otherwise for the properexecution of the Services within the prescribed time, the Consultant shall forthwith on receiving intimationtothiseffect deploy the additional equipment/ tools of the trade as specified by the Contract Manager immediately and failure on the part of the Consultant to comply with suchinstructions shall entitle the Procuring Entity to suspend payments as per GCC clause 10.6 for the shortfall in performance or terminate the contract and/ or avail any or all the remedies thereunder for breachofcontract. 65 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Delivery of Servicesand delays 9.1. Worksplan 1) BeforethecommencementoftheServices,theConsultantshallsubmitforapproval of the Contract Manager a Works plan showing the Methods, schedule of delivery of services, and deployment plans for Personnel, Equipment and Materials for the execution of the services. The programme of delivery of Services amended as necessary by discussions with theContractManager shallbetreated as theagreed WorksplanforthisContract.The Servicesshallbecarriedoutandmonitoredasper theapprovedProgram as updated. 2) TheContractManagershalldirecttheorderinwhichtheseveralcomponentsoftheServices shall be provided, and the Consultant shall execute all orders the Contract Manager gives from time to time without delay. Still, the Consultant shall not be relieved thereby from responsibilityfor thedueperformance of theServices inall respects. 9.2. CommencementofServices Effective Date of Contract: Consultant shall commence the Services and shall proceed with due expedition and without delay from the effective date of Contract(all datesofdeliveryshallbecountedfromsuchadate), whichshallbe thedate mentioned astheeffectivedateinthecontract,orifnotsomentioned: a) 30 days from the Procuring Entity’s notice (unless specified otherwise) to the Consultant instructing him to begin carrying out the Services. This notice shall confirmthattheeffectivenessprerequisiteslistedinthecontracthavebeen met. b) If no such order is issued,30 days from the date of the Issue of the LOA or the signingoftheContract agreement,whichever isearlier. 2) Commencement of Services: Not later than the number of days after the Effective Date specified in the Contract or the Notice to proceed, the Consultant shall begin carrying out theServices after confirmingthefollowing: a) As required by the Contract, all JV members and key experts needed at the beginningof theassignmentare effectivelyparticipating. b) That upon provision of Bank Guarantees, advance payments, if any, are implemented. c) That the Procuring Entity has provided facilities (including Data, Documents and BackgroundInformation)as pertheContract d) thatall parties involved inthe assignment (users, security team, and other relevant departments of the Procuring Entity and other third-party stakeholders) have been informedbytheProcuring Entity e) thatallpermits,licences,andauthorisationshavebeenobtained. 3) Termination of Contract for Failure to Become Effective: If this Contract has not becomeeffective(as persub-clause1)above) withinsuchperiodafterthe date ofContract signature as specified in the Contract, either Party may, by not less thanthirty (30) days’ written notice to the other Party, declare this Contracttobe null andvoid,andintheevent of such a declaration by either Party, neither Party shall have any claim against the other Partywithrespecthereto. 66 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 9.3. Contract Management 9.3.1 ConsultancyManagementTeams The Procuring Entity shall nominate a Contract Manager (or a Consultancy Management Team), and the Consultant shall nominate a counterpart Team Lead to monitortheassignment sothattheoutputisinlinewiththeProcuringEntity'sobjectivesoftheContract. 9.3.2 ReviewofPhasesandMilestones The Contract Manager and Consultant/ Team Lead shall hold progress meetings at various phases and Milestones into which the assignment is divided as per Annexure A. Unless otherwiseindicatedinAnnexureA,thefollowingactionswouldbetakenduring such progress meetings. 1) Kick-off Meeting: The contract Manager and the Consultant/ Team Lead shall meet at the start of the assignment to ensure that the Contract requirements are clearly understood byallconcernedandthattheContractManagementprocedures are finalised. 2) Inception Phase Review: The inception meeting shall be held at a period (specifiedin Annexure A or the Notice to Proceed) after the effective date of the contract or, if not so specified, within 21 days of the effective date. Before this meeting, the consultant must provide a draft Inception Report for discussion. The Consultant shall submit a final Inception Report within the specified time in the ‘Terms of Reference’ or as agreed in the InceptionMeeting,orifnotsospecified,within7days oftheInceptionMeeting.Template for Inception Report may be agreed to beforehandintheInceptionMeeting.Itshould,atthe minimum,covercommentsandsuggestions onthefollowing: a) TermsofReference b) Workplanandstaffingschedule c) FacilitiestobeprovidedbytheProcuringEntity d) Workingarrangements and liaison 3) Periodic Reviews: Unless otherwise decided by the Contract Manager and the Consultant’s Team Lead, periodic review meetings (monthly if not otherwise stipulated) shall be held to review the pace of progress as compared to the Work Plan and remedial actions thereto. 4) Deliverables Reviews: The contract Manager and Consultant/ Team Lead may holdother meetings toreview andapprove specific deliverables orphases (including Interim andFinal Reports)as specifiedinAnnexureA oras agreedbetween theparties. 9.4. Deliveryofservices,TimeofDeliveryandExtensionsThereof 9.4.1 DeliveryofServices: The Consultant shall deliver all Services and submit deliverables as per the approved work planinthe mannerspecified intheContract. 9.4.2 TimeofDeliveryofServicesisofEssenceoftheContract: 1) ThetimefordeliveryofServicesshallbedeemedtobetheessenceofthecontract. Subject to any requirement in the contract as to the completion of any portions or portions of the 67 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Services before completion of the whole, the Consultant shall fully and finally complete the whole of the services comprised in the contract as per the Delivery and Completion SchedulestipulatedinAnnexureA:‘TermsofReference’. 2) If at any time during the currency of the contract, the Consultant encounters conditions hindering the timely performance of services; the Consultant shall promptly inform the ProcuringEntityinwritingaboutthesameanditslikelyduration. 3) HemayrequesttotheProcuringEntityforanextensionofthedeliveryschedulenotlessthan onemonthbeforetheexpiryofthedatefixedforcompletionoftheservices.Procuring Entity may agree to extend the completion schedule, with or without liquidated damages and denialclause,byissuinganamendmenttothecontractinterms ofthefollowingclauses. 9.4.3 ExtensionforExcusableDelayNotDuetoConsultant 1) If in the opinion of the Consultant, the progress of Services has at any time been delayed due to the following reasons, then within 15 days of such happening causing delay, he shall give notice thereof in writing to the Contract Manager, but shall nevertheless do due diligencetobringdownormakegoodthedelaysandtoproceedwiththeservices: Proceedingstakenorthreatenedbyordisputewithexternalthirdpartiesarising otherwise thanfrom theConsultant's own default etc. or delayduetocircumstancesbeyondthecontrolofeitherparty delayauthorizedbytheContractManagerpendingarbitration or Anyact orneglect ofProcuring Entity, e.g.: i) Delayorfailuretoissuenoticetocommencetheservicesor ii) delay or failure to issue necessary instructions for which the Consultant had appliedexplicitlyinwriting. iii) Delay in or failure to handover of possession of the site or the necessary facilities/ documents/ data or instructions by the Procuring Entity to the Consultant iv) DelaycausedbymodificationissuedbytheContractManager or v) anyotherdelaycausedbytheProcuringEntityduetoanyothercause. 2) TheConsultantmayalsoindicatetheperiodforwhichtheServices arelikelytobedelayed and ask for anecessaryextensionoftime. On receipt ofsuch request from the Consultant, the Contract Manager shall consider the same and grant such extension of time as, in his opinion, is reasonable regarding the nature and period of delay and the type and quantum of work affected thereby. No other compensation shall be payable for work carried forward to the extended period. The same rates, terms, and conditions as the original Contract shall applyduringtheextendedperiod. 9.4.4 ExtensionofTimeforInexcusableDelayDuetoConsultant 1) If the Consultant fails to deliver theServices within the fixed/ extended period for reasons otherthanthosestipulatedinGCC-clause9.4.3above,theProcuringEntity may,ifsatisfied thattheservicedeliverycanstillbecompleted withinareasonable time, extend the period further. 2) On such extension, the Procuring Entity shall be entitled without prejudice to any other 68 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone right and remedy available on that behalf to recover from the Consultant as agreed damagesandnotbywayofpenaltyLiquidatedDamagesasperGCC-clause 9.5below. 3) Provided further that if the Procuring Entity is not satisfied that the service can be completed by the Consultant or in the event of failure on the part of the Consultant to completetheservicewithintheextensionoftimeallowedfurtherasaforesaid,the Procuring Entity shall be entitled without prejudice to any other right or remedy available in that behalf, treat the delay as a breach of contract and avail any or all theremedies thereunder, whetherornotactualdamageiscausedbysuchdefault. 4) InordinateDelays:DelaysduetotheConsultantofmorethanone-fourth(25%)of the total completion period shall be treated as inordinate delays. Such inordinate delays shall be noted as poor performance and be held against the Consultant in future procurements. A show-causenoticeshallbeissuedtotheConsultantbefore declaring it a poor performance. Such delays may be considered a breach of the contract at the option of the Procuring Entity. 9.4.5 ExtensionofTimeforConcurrentDelayDuetoBothParties If the Contract Manager determines that two or more events responsible for delay overlap each other. The delays may be concurrently attributable to both Procuring Entity and the Consultant.Theproportionfor extensionoftimeas perGCC-Clause9.4.3or 9.4.4 above shall be determined by plotting each contributing concurrent delay on the critical path. 9.5. DamagesandDeductionsThereof 9.5.1 RightoftheProcuringEntitytorecoverDamages. ProcuringEntityshallbeentitledto,anditshallbelawfultorecoverLiquidateddamagesand any other penalty, if levied, as detailed in this clause from all payments due, any Performance Security, or anyretention money. 9.5.2 Liquidateddamages 1) For delays covered under clause 9.4.4 (Extension of Time for Inexcusable Delay Due to Consultant)above: a) The Procuring Entity shall, without prejudice to other rights and remedies availabletotheProcuringEntityunderthecontract,deductfromthecontractprice as liquidated damages for each week of delay or part thereof until actualdeliveryor performance,butnotasapenalty,asumequivalenttothe 1%percent(oranyother percentage if prescribed) of the related monthly bill of the Services. Besides liquidated damages during such a delay, the denialclauseasperGCC-clause9.5.3 shallalsoapply. Total damages inthe contract shall be limited as per clause 9.5.4 below. b) Any failure or delay by any Sub-consultant, though their employment may have beensanctioned,shall notbeadmittedas a groundforanyextension of time or for 69 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone exemptingtheConsultantfrom liabilityforanysuch loss ordamage as aforesaid. 9.5.3 Denial Clause: 1) For delays covered under clause 9.4.4 (Extension of Time for Inexcusable Delay Due to Consultant)above: a) no increases in price on account of any statutory increase in or fresh Impositionof GST, or on account of any other taxes/ duty/ cess/ levy) leviable in respect of the Services and incidental goods/ works stipulated in the said Contract which takes placeaftertheoriginaldeliverydateshallbeadmissibleon suchof the said Services, as are delivered after thesaiddate; and b) Notwithstanding any stipulation in the contract for an increase in price on any otherground,includingthepricevariationclause,nosuchincreaseafter theoriginal deliverydateshallbeadmissibleonsuchServicesdeliveredafterthesaiddate. c) Nevertheless, the Procuring Entity shall be entitled to the benefit of any decrease in price on account of reduction in or remission of GST or on account of any other tax or duty or any other ground as stipulated in the price variation clause, whichtakes place after theexpiryoftheoriginal deliverydate. 9.5.4 LimitontotalDamages However, deduction on account of damages for delays under this clause put together shall be subject to a maximum of 10% of the entirevalueoftheContractofServices or the amount of performance security, which ever is higher. Penalties/ liabilities outside this clause shall be coveredbyGCCclause 12. 9.6. ForceMajeure 1) On the occurrence of any unforeseen event beyond the control of either Party, directly interfering with the delivery of Services arising during the currency of the contract, such as war, hostilities, acts of the public enemy, civil commotion, sabotage, fires, floods, explosions, epidemics, quarantine restrictions, strikes, lockouts, or acts of God, the affected Party shall, within a week from the commencement thereof, notify the same in writingtotheotherPartywithreasonableevidence thereof.Unless otherwise directedbythe Procuring Entity in writing, the Consultant shall continue to perform its obligations under the contract as reasonably practicable and seek all reasonable alternative means for performance not prevented by the Force Majeure event. If the force majeure condition(s) mentioned above be in force for 90 days or more at any time, either party shall have the option to terminate the contract on expiry of 90 days of commencement of such force majeure by giving 14 days’ notice to the other party in writing. In case of such termination, no damages shall be claimed by either party against the other except those whichhad occurredunder anyother clauseofthisContract before suchtermination. 2) Notwithstandingtheremedialprovisions contained inGCC-clause 9.5and12,none of the Party shall seek any such remedies or damages for the other Party's delay and/ or failure infulfilling itsobligations underthecontract ifitis theresult ofan event ofForceMajeure. 70 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone PricesandPayments 10.1. Prices 10.1.1ContractPrice 1) The Contract price is outlined in the Contract. The Contract price breakdown is provided in Appendix C, and the total payments under this Contract shall not exceed this Contract price. 2) Any change to the Contract price specified above can be only made if the Parties have agreed to the revised scope of Services under GCC clause 2.6 and have amended the Terms of Reference inAppendix Ainwriting. 10.1.2FirmPrices Unless otherwise stipulated in the contract, Prices shall be fixed and firm. If the Price VariationClauseis included,suchupand down,variations shallalso bepayable. 10.1.3Variations In case the Contract provides for a Price Variation Clause or variation on any other account, the price shall be subject to adjustment as per such clauses only during the original Delivery Period,subject tothefollowing: For Extension of Time covered by clause 9.4.5 above, any increase due to such variations during the extended delivery period beyond the original delivery period shallnotbe paid bythe Procuring Entity; however,it shall be entitled to any reduction underGCCclause- 9.5.3(Denial Clause). Taxes and duties, if any, chargeable and payable on the Services shall be charged on thenett priceafter variations. While claiming payments where such variations are applicable, the Consultant must submit its calculations for each invoice, even if the payment for these variationsisnil. AnypricereductionduetosuchvariationsmustbepassedtotheProcuring Entity. No Other Claim due to Variations: With the payment of such variations, no additional individual claim shall be admissible on account of fluctuations in market rates,increase intaxes/anyother levies/tollsetc. If the Price Variation clause is applicable as per the contract, the price shall be subject toadjustmentto takecareofthechangesin thecostoflabour,material, andfuel/power componentsasperthepricevariationformulaspecifiedtherein. BaseMonth:Unlessotherwisestipulatedinthecontract,the‘BaseMonth’forthe ‘Price Variation Clause’ shall be taken as the month before the month of the last date of Proposal submission. Unless the contract has stipulated a different time lag for reckoningPriceVariation,themonthofreckoningthevariatedpriceshall be the month before the month in which delivery has been made. The Price Variationshallbebased ontherelevantIndicesintheBaseMonthandMonthof reckoning. Applicability:IftheContractprovidesforsomeinputstobesuppliedbyProcuringEntity free or at a fixed rate, the cost of such inputs shall be excluded from the value of the Goodssuppliedintherelevantmonthforpayment/recoveryOfpricevariation. 71 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 10.2. TaxesandDuties TheConsultant,Sub-consultants,andExpertsshallbeentirelyresponsibleforall taxes, duties, fees, levies etc., incurred relating to the delivery of the Services. Further instruction,ifany, shall be as provided inthe Contract. Ifapplicableunderrelevanttaxlawsandrules,theProcuringEntityshalldeduct fromall paymentsanddepositrequiredtaxestorespectiveauthoritiesonaccountof GST Reverse Charge Mechanism; Tax Deducted at Source (TDS), and Tax Collected at Source (TCS)relatingtoIncome Tax,labourcess,royaltyetc. PaymentofGSTTaxunderthecontract: (a) The payment of GST and GST Cess to the Consultant shall be made only on the latter submitting a GST compliant Bill/ invoice indicating the appropriate HSNcode and applicable GST rate duly supported with documentary evidence as per the provision of the relevant GST Act and the Rules made there under. The delivery of Services shallbeshownasbeingmadeinthename,location/ state,and GSTIN of the beneficiary of the Services only; the location of the procurement office of the procuring entityhas nobearing ontheinvoicing. (b) Provision w.r.t. E-Invoicing requirement as per GST laws: Consultant who is required to comply with the requirements of E-invoice as per the GST Law, all payments shall be made against proper e-invoice(s) only. Invoices issuedin violation shall not be processed for payment, as Procuring Entity shall not be allowed to avail ofInput Tax Credit (ITC)againstsuch invoices. (c) Returns and details required to be filled under GST laws & rules regarding invoices (or e-invoices)shouldbefiledpromptlybythe Consultant.If inputtax credit(ITC)is not available to Procuring Entity for any reason attributable to the Consultant, then Procuring Entity shall not be liable to pay or reimburse GST (CGST & SGST/UTGST or IGST) claimed in the invoice(s) and shall be entitled to deduct / setoff/ recover such GST amounts (CGST & SGST/UTGST or IGST) together with penalties and interest, if any, by adjusting against any amounts paid or becomes payable infuture totheConsultantunder this contract orunder anyothercontract. (d) Whileclaimingreimbursementofduties,taxesetc.(likeGST)fromtheProcuringEntity, as and if permitted under the contract, the Consultant shall also certify that incaseit gets any refund out of such taxes and duties from the concerned authorities at a later date,it(theConsultant)shallrefundtotheProcuringEntity,theProcuringEntity’sshare out of such refund received by the Consultant. The Consultant shall also refund the appropriate amount to the Procuring Entity immediately after receiving the same from theconcerned authorities. (e) All necessary adjustment vouchers, such as Credit Notes/ Debit Notes for any short/ excessdeliveryofServicesorrevisioninpricesoranyotherreasonunder thecontract, shallbesubmittedtotheProcuringEntityincompliancewithGSTprovisions. (f) GSTshallbepaidaspertherateatwhichitisliabletobeassessedorhasbeen assessed, providedthe provisionofServices is legally liabletosuchtaxes and ispayableasper thetermsofthecontractsubjecttothefollowingconditions: i) The Procuring Entity shall not pay a higher GST rate if leviable due to any 72 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone misclassificationof the HSNnumber orincorrect GST rate incorporated inthe contract due to the Consultant's fault. Wherever the Consultant invoices the Goods at GST rate or HSN number, which is different from that incorporated in the contract, payment shall be made as per GST rate, whichis lower of the GSTratesincorporatedinthecontractorbilled. ii) However, the Procuring Entity shall not be responsible for the Consultant's tax paymentordutyunder amisapprehension ofthelaw. iii) The consultant is informed that he shall be required to adjust his basic price to the extent required by a higher tax rate billed as per invoice to match the all- inclusiveprice mentionedinthe contract. iv) In case of profiteering by the Consultant relating to GST tax, the Consultant shall treat it as a violation of the Code of Integrity in the contract and avail any or all punitive actions thereunder, in addition to recovery and action by theGSTauthorities under theAct. (g) The Consultant should issue Receipt vouchers immediately on receipt of all types of payments along with tax invoices after adjusting advance payments, if any, as per Contractual terms and GSTProvisions. (h) Liquidated damages or any other recoveries should be shown as deductions on the invoice,andGSTshallbeapplicableonlyonthenetbalancepaymentdue. Statutory Variation Clause: Unless otherwise stated in the contract, statutory increase in applicable GST rate only during the original delivery period shall beto Procuring Entity’s account. Any increase in the rates of GST beyond the originalcompletion date during the extended delivery period (excepting extension under GCC-Clause 9.4.3) shall be borne by the Consultant. The benefit of any reduction in the GST rate must be passed on to the Procuring Entity during the original and extended delivery period. However, GST rate amendments shall be considered for quoted HSN code only, against documentary evidence, provided such an increase of GSTrates occursafter thelast proposal submissiondate. 10.3. TermsandModeofPayment 1) Unless otherwise stipulated, the usual payment term is 100% on delivery and acceptance of Services at ‘the Site’ by the Procuring Entity and the Consultant's production of all required documents. 2) The payments shall be made as per Procuring Entity’s payment procedures. Unless otherwise stipulated in the contract, payments above INR 5,000 (or any other specified threshold) to Consultants shall only be made through EFT (Electronic Funds Transfer). The Consultant shall consent in a mandate form for receipt of payment through NEFT (National Electronic Fund Transfer). In case of non-payment through EFT or where the EFTfacilityisunavailable, paymentmay bereleasedthrough cheque. 3) In DomesticContracts, payments shall onlybemade inIndian Rupees.In Global Tenders, paymenttoforeignConsultantsshallbemadeinthecurrency/ currencies authorized in the contract. However, agency commission and local value addition shall be paid only in IndianRupees. 73 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 4) The Consultant shall send its claim for payment in writing as per GST-compliant Invoice anddocuments,whencontractuallydue,alongwithrelevant documentsetc., as stipulated in theContract and as specified therein. 5) Whileclaimingpayment,theConsultantisalsotocertifyinthebillthatthepayment being claimedisstrictlyinterms ofthecontract andall theConsultant's obligations for claiming thatpayment has been fulfilledas required. 10.4. Withholdingandlieninrespectofsumsclaimed: 1) Whenever any claim or claims for payment of a sum of money arises against the Consultant,out of or under the contract, the Procuring Entity shall be entitled, and it shall belawful onhispart, towithholdandalsohavealien toretainsuchsumor sums,inwhole orinpartpendingfinalisationoradjudicationofanysuchclaimfrom - a) anysecurityorretentionmoney,ifany,depositedbytheConsultant. b) Any sum(s) payable till now or hereafter to the Consultant under the same Contract or any other contract with the Procuring Entity if the security is insufficient orifnosecurityhas been takenfrom theConsultant. 2) Where the Consultant is a partnership firm or a limited company, the Procuring Entity shallbeentitled,anditshallbelawfulonhispart,towithholdandalsohave a liento retain towards such claimed amount or amounts in whole or inpart from any sum found payable toany partner/ limitedcompany, as thecasemaybe,whether inhis capacityor otherwise. 3) Itisanagreedtermofthecontractthatthesum(s)ofmoneysowithheldorretainedunderthe lien referred above shall be kept withheld or retainedtill the claim arising out of or under the contract is determined under GCC clauses 11 and/ or 12. The Consultantshallhaveno claim for interest or damages whatsoever on any account regarding such withholding or retentionunderthesupralienanddulynotifiedtotheConsultant. 4) Lien in respect of Claims in other Contracts: Any sum of money due and payable to the Consultant (including the security deposit returnable to him) under the contract may be withheld or retained by way of lien by the Procuring Entity or Government against any claim of the Procuring Entity or Government in respect of payment of a sum of money arising out of or under any other contract made by the Consultant with the Procuring EntityorGovernment. 10.5. Payments to Consultant 10.5.1 General 1) All payments under this Contract shall be made to the Consultant's accounts Specified in thecontract. 2) Currency of Payment: Unless otherwise specified in the Contract, any payment shall be madeinIndianRupees (INR). 3) TheItemized Invoices: As soonas practicable and not later than fifteen (15) days after the end of each time interval stipulated in the Contract in this regard (if not stipulated, then aftertheendofeachcalendarmonth),theConsultantshallsubmit totheProcuringEntity,in duplicate, itemized invoices, accompanied by the receipts or other appropriate supporting documents, of the amounts payable for such an interval under GCCClause 10.5.Separate 74 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone invoices shall be submitted for expenses incurred in foreign and local currencies. Each invoiceshallshowremunerationandreimbursable expenses separately. 4) The Contract Manager shall cross-check all relevant records before passing the Consultant's bills. Upon verification of the records by Procuring Entity, payments can be releasedtotheConsultant. 5) TheProcuringEntityshallpaytheConsultant’sinvoiceswithinthirty(30)daysafterthereceipt by the Procuring Entity of such itemized invoices with supporting documents. Only a portionofaninvoicenotsatisfactorilysupportedmaybewithheldfromthepayment.Should any discrepancy exist between actual payment and costs authorized to be incurred by the Consultant, the Procuring Entity may add or subtract the difference from subsequent payments. If payment of the portion supported with documents not made wthin 30 days from date of receipt, the procuring entity shall pay interest @9% per annum for such delayed payments. 6) Except for the final payment under GCC Clause10.5.5 below, payments do not constitute acceptanceoftheServicesnorrelievetheConsultantofanyobligations. 7) Time-Based(Inputs admeasurement): UnlessinstructedinwritingbytheProcuring entity, payments shall not be made for any extra inputs deployed over and above Annexure A, Annexure B, or Annexure C mentioned in the contract. Nevertheless, if such inputs are deployedlessthanthosestipulated,deductionsshallbemadebasedontherates indicated for theinputslistedinAnnexures CandDinthecontract. 8) The remuneration for professional staff (Key personnel and sub professional staff quoted in Appendix C-1 shall be credited into a separate Escrow Account wherein release of the remuneration of the Key-Personnel in their respective salary account would be jointly regulated by the Authority and AE firm. The remaining payment (after deducting the remunerationofprofessionalstaffandanyotherdeduction)asquotedbytheconsultantshall be credited in the bank account of the consultant firm. All payment of salary to all key personnel in their respective bank accounts through electronic mode only. No cash transactionw.r.tsalarywillbemade. 8) Consultants shall be paid billing rates for services rendered by the personnel of all categories namely (i) key Personnel; (ii) sub-Professional personnel and (iii) Support staff on man-month basis (iv) transportation, (v) Duty travel to site (vi) Office Rent, (vii) office supplies communicationetc.(viii)reports&documentprintingand(ix)surveyequipmentetc. 9) Beginning 13thmonths from the last date of submission of bid, billing rates shall be increased to cover all items of contract i.e. remuneration, vehicle hire, office rent,consumables,furnitureetc.@ percentageequivalentto90% of [{(average AICPI in last 12 month- AICPI of the month preceding last 12 months)/ AICPI of the month preceding last 12 months}x 100]. However, for evaluation and award of the Bid proposals, the quoted initial rate (as applicable for first 12 monthsfrom last date of submission of bid) shall bemultiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates. All payments shall be made in Indian Rupees and shall be subjected to applicable Indian laws withholding taxes if any. Remuneration paid pursuanttotheratessetforthinAppendix-C shallbeadjustedeverytwelve(12) months (and, the first time,with effect for the billing ratesearned inthe13th calendar month after the lastdate of submission of bid). Notwithstanding any other provisions in the agreement in this regard, this provisionwillprevailandoverrideanyotherprovisiontothecontraryinthisagreement 75 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 10) Payment of Authority Engineer shall be released on approval of the monthly reports. Report shall be approved by the Authority only if it includes all the sections prescribed in the format and submitted as per specified timeline. If Monthly report( submitted in complete format) is not approved within 15 days from date of submission, the same shall beconsideredas deemedapproved forthepurpose ofrelease ofpayment. 11) PaymentshallbereleasedasperratesquotedinAppendixC3-BreakupofLocalcurrencycosts 12) For equipment based road inspection to be conducted in O&M phase, paymentshallbereleasedas peractual use of equipment onroad andrates quoted in Appendix C3- Breakup of Local currency costs. 13) If any of the report is found to be misleading or containing incorrect informationasdeterminedby theAuthority,10%ofpaymentlinkedtothatreportshallbedeductedaspenalty 14) It is understood(i)that the remuneration rates shall cover(A) such salaries and allowances as the Consultants shall have agreed to pay to the Personnel as well as factors for social charges and overhead,and(B)thecostofbackstopping by home office staff not included in the Personnel listed in AppendixC,and(C)theConsultants' fee;(ii)that bonuses or other means of profit-sharing shall not be allowed as an element of overhead, and(iii)that anyrates specifiedfor persons not yet appointedshallbeprovisionalandshallbesubjecttorevision,withthewrittenapprovaloftheClient, oncetheapplicablesalariesandallowancesareknown. 15) Remuneration for periods of less than one month shall be calculated on an hourly basis for actual time spent in the Consultants' home office and directly attributable to the Services (one hour being equivalentto1/240thofamonth)andona calendar-day basis for timespentawayfromhomeoffice(one daybeingequivalent to1/30thofa month). 10.5.2 Therates forforeignandlocalPersonnelaresetforthinAppendixC-1. 10.5.3 AdvancePayments 1) If thecontract provides explicitlyfor Advance Payments to bemade totheConsultant, then on the request of the Consultant, the Procuring Entity shall make the advance payment to the Consultant against submission of an unconditional Bank Guarantee from a Commercial bank acceptableto the Procuring Entityinamounts equal to110% (one hundred ten per cent) of the amount of the advance payment being requested. Such Bank Guarantee shall be in the form outlined in Appendix E-2 or the other form the Procuring Entity shall have approved in writing. Advance payments shall be releasedinnotless than twoinstallments commensurate withworkprogress. 2) TheBankGuaranteeshallremaineffective untiltheadvancepayment hasbeen repaid, but the amounts repaid by the Consultant shall progressively reduce the guaranteed amount. Interest shall not be charged on the advance payment. However, if the contract is terminated due to the Consultant's default, the Advance payment shall be deemed an interest-bearing advance at the prevailing rate (MIBID - Mumbai Inter bankProposalRate)onthedateofsuchadvancepayment. 76 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 3) The Consultant is to use the advance payment only for the performance of Services. The Consultant shall demonstrate that the advance payment has been used by Utilization certificate enclosing copies of invoices or other documents to the Contract Manager. Further installments shall be released after getting a satisfactory utilization certificatefromtheConsultantfortheearlierinstalment. 4) The advance payment shall be recovered in a time-based manner not linked with the work progress by deducting proportionate amounts from payments otherwise due to the Consultant for the Services performed. Any delayed recoveries due to the late submission of bills by the Consultant shall attract interest at the prevailing rate (MIBID - Mumbai Inter bankProposalRate).Noaccount oftheadvancepaymentorrepaymentshallbetaken in assessing valuations of Services performed, variations, price adjustments, or liquidated damages. 10.5.3 RemunerationandReimbursableExpenses a) The Procuring Entity shall pay to the Consultant (i) remuneration that shall be determined based on time spent by each Expert in the performance of the Services after the date of commencing of Services or such other date as the Parties shall agree in writing; and (ii) reimbursable expenses that are actually and reasonably incurred by theConsultantintheperformanceoftheServices. b) AllpaymentsshallbeattheratesoutlinedinAppendixCand AppendixD. c) Unless the Contract provides for the price adjustment of the remuneration rates, said remunerationshall be fixedfor thedurationof theContract. d) The remuneration rates shall cover: (i) such salaries and allowances as the Consultant shall have agreed to pay to the Experts as well as factors for social charges and overheads (bonuses or other means of profit-sharing shall not be allowed as an element of overheads), (ii) the cost of backstopping (reinforcement/support)byhome office staff not included in the Experts’ list in AppendixB,(iii)theConsultant’s profit, and(iv)anyotheritemsasspecifiedinthecontract. e) Any rates specified for Experts not yet appointed shall be provisional and be subject to revision, with the written approval of the Procuring Entity once the applicable remunerationrates and allowances are known. 10.5.4 "On-Account"Payments 1) the Consultant shall be entitled to be paid (unless otherwise stipulated in the contract)by way of "On-Account" payment, only for such Services, as in the opinion of the Contract Manager, the Consultant has executed in terms of the contract during the period. All payments due against the Contract Manager or his representative's certificates shall be subject to any deductions, which may be made under the contract, always provided that the Contract Manager may by any certificate make any correction or modification in any previous certificate, which he may have issued. The Contract Manager may withhold any certificate if the Services or any part thereof are not carried out as per the contractual performance standards. 2) On-Account Payments Not Prejudicial toFinal Settlement:"On-Account" payments made to the Consultant shall be without prejudice to the final settlement of the accounts.They shall not be considered or used as evidence of any facts stated in or inferred from such 77 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone accounts, any particular quantity of service being executed, or the manner of its execution beingsatisfactory. 3) TheFinalPayment: 10.5.5 FinalPayment 1) The final payment under this Clause shall only be made after the final report/ deliverables and a final invoice, identified as such, shall have been submitted by the Consultant and approved as satisfactory by the Procuring Entity. Completion certificate/ Final payment shall be made only after ensuring that all facilities/ documents/ sites have been returned to the Procuring Entity as per GCC clause 5.14.TheServicesshallbedeemedcompletedandfinallyacceptedbytheProcuringEntity. 2) The Consultant shall submit a final bill on the Contract Manager's acceptance certificate of final deliverables. The Final payment shall be made as per the following calculationsafterreceivingaclear"NoClaimCertificate”signedbytheConsultant: a) necessaryadjustmentforanypaymentsalreadymadeorretained b) anydeductionwhichmaybemadeunderthecontract, c) AcompleteaccountofallclaimstheConsultantmayhaveontheProcuring Entity, andtheContractManagergaveacertificateinwritingthatsuchclaimsare correct, 3) The final report and final invoice shall be deemed approved by the Procuring Entity as satisfactory ninety (90) calendar days after receipt of the final report and final invoice by the Procuring Entity unless the Procuring Entity, within such ninety (90) calendar day period, gives written notice to the Consultant specifying in detail deficiencies in the Services, the final report or final invoice. The Consultant shall promptly make any necessarycorrections,and theprecedingprocess shall berepeated. 4) Any amount that the Procuring Entity has paid or has caused to be paid under this Clause more than the amounts payable under the provisions of this Contract shall bereimbursed bytheConsultanttotheProcuringEntitywithinthirty(30)daysafter receipt by the Consultant of notice thereof. Any such claim by the Procuring Entity for reimbursement must be made within twelve (12) calendar months after receipt by the Procuring Entity of a final report and a final invoice approved by the Procuring Entity in accordancewiththeabove. 10.5.6 NoClaimCertificateandReleaseofContractSecurities TheConsultantshallsubmita‘No-claimcertificate’totheProcuringEntityinsuchformatshall be required by the Procuring Entity after the Services are finally accepted and before the final payment/ performance securities are released. The Procuring Entity shall release the contractual securities without any interest if no outstanding obligation, asset, or payments are due from the Consultant. The Consultant shall not be entitled to make any claim whatsoever against the ProcuringEntityunder orarisingoutofthis Contract, nor shall the Procuring Entity entertain or consider any such claim, if made by the Consultant,afterheshallhavesigneda"NoClaim" Certificatein favouroftheProcuring Entity. The Contractor shall be debarred from disputing thecorrectnessof theitemscoveredbythe"NoClaim"Certificate ordemanding arbitration. 78 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 10.5.7 PostPaymentAudit Notwithstanding the issue of the Completion Certificate and release of final Payment, the Procuring Entityreserves the right to carry out within 180 days (unless otherwise stipulatedin the contract) of such completion/ final payment, a post-payment audit and/ or technical examination of the Services and the final bill including all supporting vouchers, abstracts etc. If any over-payment to the Consultant is discovered due to such examination, the Procuring Entityshallclaim suchamount from the Consultant. 10.5.8 SignatureonReceiptsforAmounts Every receipt for money, which may become payable, or for any security which may become transferable to the contractors under the contract, shall be signed by a person authorized to do so by the Consultant (or otherwise as per GCC-Clause 4.2), to be a suitable and sufficient discharge to the Procuring Entity in respect of the sums of money or security purported to be acknowledged thereby. In the event of the death of any Consultantorpartner during the pendency of the contract, every receipt by anyone of the surviving constituents shall be suitable and sufficient discharge as aforesaid. Nothing in this Clause shall be deemed to prejudice or effect any claim that the Procuring Entity may have againstthe legal representative regarding any breach of any contract conditions by any Consultant partner/member so dying. Nothing in this clause shall be deemed to prejudice or affect the respective rights or obligations of the Consultant partners/ members and the legal representatives ofany deceasedConsultant partners/ members. 10.6. SuspensionofPayments The Procuring Entity may, by written notice of suspension to the Consultant, suspend part or all payments to the Consultant hereunder if the Consultant fails to deliver the Servicesas per the Terms of Reference, including the non-rectification of notified defects in the Services/ deliverables, provided that such notice of suspension (i) shall specify the nature of the failure, and(ii)shallrequesttheConsultanttoremedysuchfailurewithin aperiodnotexceedingthirty (30) calendar days after receipt by the Consultant of such notice of suspension. Such a suspensionshallnotentitletheConsultanttoanyextensionoftimefor delivery ofService. 10.7. PaymentAgainstTime-BarredClaims In accordance with the Limitation Act 1963, all claims against the Procuring Entity shall be legally time-barred after three years calculated from when the payment falls due unless the payment claim has been under correspondence. The Procuring Entity is entitled to, and it shallbelawful toreject suchclaims. 10.8. CommissionsandFees The Consultant shall disclose any commissions or fees that may have been paid or are to be paid to agents, representatives, or commission agents concerning the selection process or executionandperformanceofthisContract.Theinformationdisclosedmust include the name and address of the agent, representative, or commission agent, the amount and currency, and thepurposeofthe commissionorfee. 79 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Resolution Disputes 11.1. DisputesandExceptedMatters All disputes and differences between the parties hereto, as to the construction or operation of this Contract, or the respective rights and liabilities of the parties on any matterinquestion,or anyotheraccountwhatsoever,butexcludingtheExceptedMatters(detailed in GCC-Clause 11.2 below); arising out of or in connection with the contract, within thirty (30) days from aggrieved Party notifying the other Party of such matters; whether before or after the completion/ termination of the contract, that cannot be resolved amicably between the Contract Manager and the Consultant, shall be hereinafter called the “Dispute”. The aggrieved party shall give a ‘Notice of Dispute’ indicating the Dispute and claims citing the relevant Contractual clause to the designated authority requesting invoking the following dispute resolution mechanism. Before any recourse to courts, the dispute shall be resolved through dispute resolution mechanisms detailed subsequently in the sequence mentioned below, and the next mechanism shall not be invoked unless the earlier mechanism has been invokedorhas failedtoresolve itwithinthedeadline mentionedtherein. Adjudication Conciliation Arbitration 11.2. ExceptedMatters Matters for which provision has been made in any Clause of the contract shall bedeemed as‘exceptedmatters’(mattersnotdisputable/arbitrable),anddecisionsoftheProcuringEntity, thereon,shallbefinalandbindingontheConsultant.The‘exceptedmatters’shall stand expresslyexcludedfrom the purviewofthesub-clauses below,includingArbitration. However,wheretheProcuringEntityhasraisedthedispute,this sub-clauseshallnotapply. Unlessotherwisestipulatedinthecontract,exceptedmattersshall include butare not limitedto: 1) Anycontroversiesorclaimsbroughtbyathirdpartyforbodilyinjury,death,propertydamage orany indirectorconsequentiallossarisingoutoforinanywayrelatedto theperformance of this Contract (“Third Party Claim”), including, but not limited to,a Party’s right to seek contributionorindemnity fromthe otherParty inrespectofaThird-Party Claim. 2) Issuesrelatedtothepre-awardProcurementProcessorconditions 3) IssuesrelatedtoambiguityinContracttermsshallnotbetakenupafteraContract has been signed. All such issues should be highlighted before the signing of the contract by the Consultant. 4) Provisionsincorporated in thecontract which are beyond the purview ofThe Procurement EntityorareinpursuanceofpoliciesofGovernment,includingbutnot limitedto a) Provisionsofrestrictions interms of theMake inIndia policyoftheGovernment b) Provisions regarding restrictions on Entities from Countries having land borders withIndia interms oftheCentral Government’s policiesinthis regard. c) RelaxationsstipulatedforStartupsetc. 11.3. Adjudication AfterexhaustingeffortstoresolvetheDisputewiththeContractManagerexecutingthe contract 80 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone on behalf of the Procuring Entity, the Consultant shall give a ‘Notice of Adjudication’ specifying the matters which are in question or subject of the dispute or difference indicating therelevantcontractual clause,asalsotheamountofclaimitem-wise to Head of Procurement or any other authority mentioned in the contract (hereinafter called the “Adjudicator”) for invoking resolution of the dispute through Adjudication. During his adjudication, the Adjudicator shall give adequate opportunity to the Consultant to present his case. Within 60 days after receiving the representation, the Adjudicator shall make and notify decisions in writingonallmattersreferredtohim.During the adjudication proceedings,the parties shall not initiate any conciliation, arbitral, or judicial proceedings in respect of a dispute that is the subjectmatterofthe adjudication proceedings. If not satisfied by the decision in adjudication, or if the adjudicator fails to notify his decision within the abovementioned time-frame, the Consultant mayproceedtoinvoketheprocess of Conciliationas follows. 11.4. Conciliationofdisputes 1) Parties may invoke Conciliation, in terms of the Arbitration and Conciliation Act 1996, by submitting a “Notice of Conciliation” to the other party with a request to the Head of the Procuring Organisation to notify a Conciliator. Since conciliation is voluntary, within 30 days of “Notice of Conciliation”, the Head of the Procuring Organisationshallnotifya soleConciliatoriftheotherpartyisagreeabletoentering Conciliation. If the other party is notagreeabletoConciliation,theaggrievedpartymayinvoke Arbitration. 2) The Conciliator shall proactively assist the parties to reach an amicable settlement independently and impartially within the contract terms within 60 days from the appointmentdate. 3) If the parties agree on a dispute settlement, they shall draw up a written settlement agreement duly signed by the parties and conciliator. When the parties sign the settlement agreement, it shall be final and binding on the parties. The dispute shall be treated as resolved onthedateofsuch agreement. 4) During the conciliation proceedings, the parties shall not initiate any arbitral or judicial proceedings in respect of a dispute that is the subject matter of the conciliation proceedings. 5) Termination of Conciliation: Disputes shall remain alive if the conciliation is terminated as follows: a) By written declaration of the conciliator, after consultationwith the parties, tothe effect that further efforts at conciliationare nolonger justified on the date of such declaration;or b) By a written declaration of any party to the conciliator to the effect that the conciliationproceedingsareterminatedonthedateofsuchdeclaration;or c) Ifthepartiesfailtoreachanagreementonasettlementofthedisputewithin 60 days oftheappointment oftheConciliator 6) On termination of Conciliation, the aggrieved party shall be free to invoke Arbitration if thedisputeisstillalive. 81 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 11.5. Arbitration Agreement 11.5.1 ThisAgreement 1) This Arbitration Agreement (hereinafter referred to as this “Agreement”) relating to this Contract (hereinafter called the “Main Agreement” for this agreement) is made under the provisions of The Arbitration and Conciliation Act, 1996, as amended from timetotime and the rules thereunder (hereinafter called The Arbitration Act). This Agreement shall continue to survive termination, completion, or closure of the Main Agreement for 120 days afterwards. 2) Subject to aforesaid provisions, relevant clauses of the contract shall apply to the appointmentof arbitrators andarbitration proceedings under thisAgreement. 3) The Micro, Small and Medium Enterprises Development (MSMED) Act, 2006 provides partiestoadispute(whereoneofthepartiesisaMicroorSmallEnterprise) to be referred to the Micro and Small Enterprises Facilitation Council if the dispute is regarding any amount due under Section 17 of the MSMED Act, 2006. If a Micro or Small Enterprise, being a party to dispute, refers to the MSMED Act 2006, these provisions shall prevail over this Agreement. However, if an arbitrator has already been appointed under this agreement before the appointment of a conciliator/ arbitrator by the facilitation council, the arbitrator already appointed under this agreement shall continue to perform the duties including on matters related to delayed payments. Such an arbitrator shall be deemed to be the arbitrator appointed by the facilitation council. None of the parties shall approach the facilitation council toappoint an arbitrator oncean arbitrator under this agreement has alreadybeen appointed. 11.5.2 NoticeforArbitration 1) Authority to Appoint Arbitrator(s): For this Arbitration Agreement, ‘The Appointing Authority’ to appoint the arbitrator shall be Head of the Procuring Organisation or any other authority or Arbitration Institution named in the contract and includes if there be no such authority, the officer who is for the time being discharging the functions of that authority, whetherinadditiontootherfunctions orotherwise. 2) In the event of any dispute as per GCC-clause 11.1 above, if the Adjudicator fails to decide within 60 days (as referred in 11.3 above), or the Conciliation is terminated (as referred in sub-clause 11.4 above), then any party to the contract, after 60 days but within 120 days of ‘Notice of Dispute” (clause 11.1 above) shall requesttheother partythrougha“NoticeforArbitration”inwritingthatthedisputeordifference be referred to arbitration. 3) The“Noticeforarbitration”shallspecifythemattersinquestionorthesubjectofthe dispute ordifference,indicatingtherelevantcontractualclauseandtheamountofclaim item-wise. 11.5.3 ReferencetoArbitration After appointingArbitrator(s), theAppointing Authority shall refer the Dispute tothem. Only such dispute or difference shall be referred to arbitration regarding which the demand has beenmade,withcounter-claimsorsetoff.Othermattersshallbebeyond the jurisdiction of the Arbitrator(s) 82 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 11.5.4 AppointmentofArbitrator 1) QualificationofArbitrators: a) InthecaseofretiredofficersofTheProcuringorganization,theyshallhave retired in the rank of Senior administrative grade (or equivalent) and shall have retired at least 1 year prior and must not be over 70 years of age on the date of Notice for arbitration. b) The arbitrator(s) shall be expert withextensive experience in relation to the matter in dispute. c) He/ they shall not have had an opportunity to deal with the matters to which the contract relates or who, in the course of his/ their duties as an officer of the Procuring Organisation, expressed views on any or all of the matters under dispute or differences. A certification to this effect (as per Format 1.1.4) shall be taken from Arbitrators. The proceedings of the Arbitral tribunal or the award made by such Tribunal shall, however, not be invalid merely for the reason that oneormore arbitratorshad, inthecourseofhis service,anopportunitytodealwith the matters to which the contract relates or who in the course of his/ their duties expressedviewsonalloranyofthematters underdispute. d) An Arbitrator may be appointed notwithstanding the total number of arbitration casesinwhich hehas been appointed. e) NotbeotherthanthepersonappointedbyTheAppointingAuthority,andif for any reasonthat is not possible,themattershall not bereferred toarbitration. 2) ReplacementofArbitrators If one or more of the arbitrators appointed as above refuses to act as arbitrator, withdraws from his office as arbitrator, or in the event of the arbitrator dying, neglecting/ unable or unwillingorrefusingtoactforanyreason,orhisawardbeing setaside bythecourt forany reason, orinthe opinionof TheAppointingAuthority fails to act without undue delay, the Appointing Authority shall appoint new arbitrator/ arbitrators to act in his/ their place in the same manner in which the earlier arbitrator/ arbitrators had been appointed. Such a re-constituted Tribunal may, at its discretion, proceed with the reference from the stageatwhichitwasleft bytheprevious arbitrator (s). 3) AppointmentofArbitrator: a) In cases where the total value of all claims in question added together does not exceed Rs 50,00,000/ - (Rupees Fifty Lakh only), the Arbitral Tribunal shall consistofthesoleArbitrator.Forthispurpose,TheAppointingAuthority shall send to the Consultant, within 60 days from receipt of a written and valid notice for arbitration, a panel of at least four (4) names of retired officers duly indicating theirretirement dates. b) The Consultant shall be asked to nominate at least two names out of the panelfor appointmentashisnomineewithin30daysfromthedispatchdate of the request by The Appointing Authority. The Appointing Authority shall appoint at least one out of them as the sole arbitrator within 30 days from the receipt of the names of theConsultant’s nominees. 83 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone c) In cases where the total value of all claims in question added together exceedsRs 50,00,000/ - (Rupees Fifty Lakh only), the Arbitral Tribunal shall consist of three (3) retired Officers of the Procuring Organisation. arbitrators. For this purpose, The Appointing Authority shall send a panel of at least four (4) names of such Officer(s) empanelled to work as Arbitrators duly indicating their retirement date totheConsultantwithin60 days from the day when a written and The Appointing Authorityreceives validdemandfor arbitration. d) The Consultant shall be asked to nominate at least 2 names out of the panel for appointmentashisnomineewithin30days fromthedispatchdateofthe requestby The Appointing Authority. The Appointing Authority shall appoint at least one of themas the Consultant’s nominee.It shall also simultaneously appoint the balance number of arbitrators from the panel or outside the panel, duly indicating the ‘Presiding Arbitrator’ from amongst the 3 arbitratorssoappointedwithin30 days fromthereceiptofthenamesoftheConsultant’s nominees. e) If the Consultant does not suggest his nominees for the arbitral tribunal withinthe prescribed timeframe, The Appointing Authority shall proceed to appoint the arbitral tribunal within 30 days of the expiry of such a time Provided to the Consultant. 11.5.5 Failuretoappoint Arbitrators. If The Appointing Authority fails to appoint an arbitrator within 60 (sixty) days, then the Appointment of the Arbitrator may be sought under the relevant provision of the Arbitration andConciliationAct1996,asamended. 11.5.6 TheArbitralProcedure 1) Effective Date of Entering Reference: The arbitral tribunal shall be deemed to have entered the reference onthe date the arbitrator(s) received notice of their appointment. All subsequenttimelimitsshall becountedfrom suchdate. 2) SeatandVenueofArbitration:TheseatofarbitrationshallbewheretheLetter of Award or the contract is issued. The venue of arbitration shall be the same as the seat of arbitration. However, in section 20 of The Arbitration Act, the arbitrator, at his discretion, may determine a venue other than the seat of the arbitration without affecting the legal jurisdictionalissues linkedtotheseatof thearbitration. 3) IftheAdjudicationand/orConciliationmechanismshadnotbeenexhaustedbefore such a reference to Arbitration, the Arbitrator should ask the aggrieved party to approach the designatedauthorityfor suchmechanismsbefore theArbitrationproceedings are started. 4) TheclaimantshallsubmittotheArbitrator(s)withcopiestotherespondenthisclaims stating thefactssupportingtheclaimsalongwithalltherelevantdocumentsandtherelief or remedy sought against each claim within 30 days from the date of appointment of the Arbitral TribunalunlessotherwiseextensionhasbeengrantedbyArbitral Tribunal. 5) On receipt of such claims, the respondent shall submit its defence statement and counter- claim(s), if any, within 60 days of receipt of the copy of claims, unless otherwise extensionhas been granted byArbitral Tribunal. 84 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 6) No new claim shall be added during proceedings by either party. However, a party may amend or supplement the original claim or defence thereof during arbitration proceedings subject toacceptancebytheTribunal duetothedelayinmakingit. 7) Statement of claims, counterclaims and defence shall be completed within six months from theeffective reference date. 8) Oralarguments tobeheldonaday-to-daybasis: Oralargumentsasfaraspossible shall be heard by the arbitral tribunal daily, and no adjournments shall be granted without sufficient cause. The arbitrator (s) may impose an exemplary cost on the party seeking adjournment without sufficient cause. 9) Award within 12 (twelve) months: The arbitral tribunal is statutorily bound to deliver an awardwithin12(twelve)monthsfromwhenthearbitraltribunalentersreference.The award can be delayed by a maximum of six months under exceptional circumstances where all partiesconsenttosuchanextension.Thecourt's approval shall require further extension if the award is not made out within an extended period. When an application for an extension of time is awaiting before the court, the arbitrator's proceedings shall continue untilthedisposal ofthe application. 10) Fast Track Procedure: The parties to arbitration may choose to opt for a fast-track procedure either before or after the commencement of the arbitration. The award in fast- track arbitration is to be made within six months, and the arbitral tribunal shallbeentitled toadditionalfees.Thesalientfeaturesoffast-trackarbitrationare: a) Thedisputeistobedecidedbasedonwrittenpleadingsonly. b) Arbitral Tribunal shall have the power to call for clarifications and the necessarywrittenpleadings. c) An oral hearing may only be held if all the parties request or the arbitral tribunal considers it necessary. d) Theparties are free todecide thefees ofthearbitrator(s) fora fast-trackprocedure. 11) Powers of Arbitral Tribunal to grant Interim Relief: The parties to arbitration may approach the arbitral tribunal toseek interim relief on the grounds available under section 9 of the act. The tribunal has the powers of a court while making interim awards in the proceedings before it. 12) Confidentiality: As provided in Section 42A of The Arbitration Act, all the details and particulars of the arbitration proceedings shall be kept confidential except in certain situations, like if the disclosure is necessary for the implementation or execution of the arbitral award. 13) Obligation During Pendency of Arbitration: Performance of the contract shall, unless otherwise directed by the Procuring Entity, continue during the arbitration proceedings, and no payment due or payable by the Procuring Entity shall be withheld on account of such proceedings, provided; however, it shall be open for Arbitral Tribunal to consider and decide whether or not the performance of the contract or payment therein should continueduringarbitrationproceedings. 85 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 11.5.7 TheArbitralAward In thecaseoftheTribunal,comprisingthree members,anyrulingonanaward shallbe made byamajority of members of theTribunal. In theabsenceofsuch a majority, the viewsof thePresidingArbitrator shall prevail. The arbitral award shall state item-wise the sum and reasons it is based. The analysis andreasons shallbe detailedenough toinfer the award. It is further aterm ofthis arbitrationagreementthatwherethearbitral awardis forthe payment of money, no interest shall bepayable on the whole or any part of the money foranyperiodtillthedateonwhichtheawardismadeintermsof Section 31 (7) (a) of TheArbitrationAct. Thearbitrator'sawardshallbefinalandbindingonthepartiestothisContract. Apartymayapplyforcorrectionsofanycomputationalerrors,typographical orclerical errors, orany othererror of similar natureoccurring inthe award or interpretationof aspecific pointof theawardtotheTribunal within60days of receiptoftheaward. A party may apply to the Tribunal within 60 days of receiving the award to make an additional award for claims presented in the arbitral proceedings but omitted from the arbitral award. 11.5.8 Savings TheArbitralTribunalshalldecideanymatterrelatedtoArbitrationnotcoveredunder this ArbitrationAgreementas per theprovisions ofThe ArbitrationAct. 11.5.9 CostofArbitrationandfeesoftheArbitrator(s) 1) The concerned parties shall bear the arbitration cost as per section 31 (A) of The Arbitration Act. The cost shall inter-alia include fees of the Arbitrator. Further, the fees payable to the Arbitrator shall be governed by instructions issued on the subject by the Procuring Entity and/ or the Government from time to time, in line with the Arbitration and Conciliation Act, irrespective of the fact whether the Arbitrator is appointed by the Procuring Entity or the Government under this clause or by any court of law unless directed explicitly by Hon'ble court otherwise on the matter. A sole arbitrator shall be entitledtoa25%extrafeeoversuchaprescribedfee. 2) Thearbitratorshallbeentitledtoa50percentextrafeeiftheawardismadewithin 6months as per provisions in section 29(A) (2) of The Arbitration Act. The Arbitrator shall also be entitled to this extra fee in cases where the Fast Track Procedure in section 29 (B) of The ArbitrationAct is followed. Defaults,Breaches,Termination,andclosureofContract 12.1. Termination due to Breach, Default, and Insolvency 12.1.1 DefaultsandBreachofContract In case the Consultant undergoes insolvency or receivership, neglects or defaults or expresses inability or disinclination to honour his obligations relating to the performance of the contract or ethicalstandards oranyotherobligationthatsubstantivelyaffectsthe ProcuringEntity’srights 86 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone and benefits under thecontract,itshallbetreated as abreach of contract. Such defaults could includeinter-alia: 1) Default in Performance and Obligations: if the Consultant fails to deliver any or all of the Services or fails to perform any other contractual obligations (including Code of Integrity or obligation to maintain eligibility and evaluation criteria based on which contract was awarded) within the period stipulated in the contract or within anyextension thereof granted by the Procuring Entity. In the case of a Joint Venture/Consortium, If the performance of any JV/C member is persistently un-satisfactory bytheProcuringEntityin respectoftheresponsibilitiesassignedtohimas perthe JVagreement,which ispart ofthis Contract. The lapse/ deficiencies in services as mentioned in ToR shall be treated as default inperformance and Obligations. 2) Insolvency: If the Consultant being an individualor if a firm, any partner thereof, shall at any time be adjudged insolvent or shall have a receiving order or order for the administrationofhisestatemadeagainst himorshalltakeanyproceedingfor composition under any Insolvency Act for the time being in force or make any conveyance or assignment of his effects or enterinto any assignmentor composition with his creditors or suspendpaymentorif thefirm bedissolvedunder thePartnershipAct, or 3) Liquidation: if the Consultant is a company being wound up voluntarily, or by order of a Court or a Receiver, Liquidator or Manager on behalf of the Debenture-holders is appointed, or circumstances shall have arisen which entitle the Court or Debenture- holders toappoint aReceiver,Liquidator orManager 12.1.2 NoticeforDefault: As soon as a breach of contract is noticed, a show-cause ‘Notice of Default’ shall be issued to the Consultant, giving two weeks' notice, reserving the right to invoke contractual remedies. After such a show-cause notice, all payments to the Consultant would be suspended as per GCCclause 10.6above tosafeguard neededrecoveries duetoinvokingcontractual remedies. 12.1.3 RemediesforBreaches/Default Intheeventofanunsatisfactoryresolutionof‘NoticeofDefault’withintwoweeksofitsissueas perthesub-clauseabove, theProcuring Entity, ifsodecided, shall 1) takeone;ormoreofthefollowingcontractualremedies. a) Recoverliquidateddamages andinvokeadenialclausefordelays. b) In the case of JV/C, Procuring Entity may call upon the Lead Member to assign the work of the defaulting member to any other equally competent party acceptable to theProcuringEntity. c) Temporarily withhold payments due to the Consultant till recoveries due to invocationofother contractual remedies are complete. d) Call back any loaned property or payment advances with a levy of interest at the prevailingrate (MIBID -Mumbai InterbankProposal Rate). e) Encashand/orForfeitperformanceorothercontractualsecurities. f) Preferclaimsagainsttheinsurance,ifany. g) Terminate the Contract for default, fully or partially, including its right for Risk-and- CostProcurement as per thefollowingsub-clause. 87 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone h) Initiate proceedings in a court of law for the transgression of a law, tort, and loss not addressablebytheother remedies above. 2) By written Notice of Termination for Default sent to the Consultant, terminate the contractinwhole orinpart,without compensationtotheConsultant. a) Suchterminationshall not prejudice oraffect the rightsandremedies,including under thesub-clausebelow, whichhave accruedand/ or mayaccruetotheProcuring Entity after that. b) Unless otherwise instructed by the Procuring Entity, the Consultant shall continue to perform thecontract totheextentnot terminated. c) AllDefectLiabilityobligations,ifany,shallsurvivedespitethetermination. 3) Risk and Cost Procurement: In addition to termination for default, the Procuring Entity shall be entitled, and it shall be lawful on his part, to procure Services similar to those terminated,with such terms and conditions and in such manneras it deems fit at the “Risk and Cost” of the Consultant. Such Risk and Cost Procurement must be contracted within nine months from the breach of contract. The Consultant shall be liable for any losswhich theProcuringEntitymaysustainonthataccountprovided the procurement,or, ifthere is an agreementtoprocure,suchagreementismade. The Consultant shall not be entitled to any gain on such procurement, and the mannerandmethodofsuchprocurementshallbeatthe discretion of the Procuring Entity. It shall not be necessary for the Procuring Entity to notify the Consultant of such procurement. It shall, however, be at the discretion of the Procuring Entity to collect or not the security deposit from the firm/ firms on whom the contractisplacedat the riskandcostofthedefaultedfirm. 12.1.4 LimitationofLiability Except in cases of criminal negligence or wilful misconduct, the aggregate liability of the Consultant to the Procuring Entity, whether under the contract, in tort or otherwise, shall not exceed the total Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the Consultant to indemnifytheProcuring Entityconcerning IPR infringement. 12.2. Terminationfor Default/Convenience of ProcuringEntityor Frustrationof Contract 12.2.1 NoticeforDetermination ofContract TheProcuringEntityreservestherighttoterminatethecontract,inwholeorin part,for its(theProcuringEntity’s)convenienceorfrustrationofContract as per thesub-clause below,byservingwritten‘NoticeforDeterminationofContract’ontheConsultantatany timeduringthecurrencyofthecontract.Thenoticeshall specify that thetermination is for the Procuring Entity's convenience or the contract'sfrustration.Thenoticeshallalso indicateinter-alia,theextenttowhich the Consultant’s performance under the contract isterminated, andthedate from whichsuch terminationshall become effective. Such termination shall not prejudice or affect the rights and remedies accrued and/ or shallaccrue after that totheParties. Unless otherwise instructed by the Procuring Entity, the Consultant shall continue to perform the contract totheextent notterminated. AllDefectLiabilityobligations,ifany,shallsurvivedespitethetermination. 88 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone The Services and incidental goods/ works that can be delivered or performed within thirtydays aftertheConsultant’s receiptof thenotice of terminationshallbeaccepted by the Procuring Entity as per the contract terms. For the remaining Services and incidental goods/works, theProcuringEntity maydecide: a) To get any portion of the balance completed and delivered at the contract terms, conditions,andprices; and/ or b) To cancel the remaining portion of the Services and incidental goods/ works and compensate the Consultant by paying an agreed amount for the cost incurred by the Consultant, if any, towards the remaining portion of the Services and incidental goods/ works. 12.2.2 FrustrationofContract 1) Notice of Frustration Event: Upon a supervening cause occurring after the effectivedate of the contract, including a change in law, beyond the control of either party,whether as a resultoftheForceMajeureclause(GCC9.6)orwithinthescope of section56oftheIndian Contract Act, 1872, that makes it impossible to perform the contract within a reasonable time frame, the affected party shall give a ‘Notice of Frustration Event’ to the other party giving justification. The parties shall use reasonable efforts to agree to amend the contract as necessary to complete its performance. However, if the parties cannot reach a mutual agreement within 60 days of the initial notice, the Procuring Entity shall issue a ‘Notice forDeterminingthecontract’andterminatethecontractduetoitsfrustration,asinthesub- clauseabove. 2) However,thefollowingshallnotbeconsideredassuchasuperveningcause a) Lackof commercial feasibilityorviabilityorprofitability oravailabilityoffunds b) ifcausedbyeitherparty'sbreachofobligationsunderthisContractorfailuretoactin goodfaithorusecommerciallyreasonableduediligencetoprevent suchan event. 12.3. Closureof Contract 12.3.1 Unless terminated earlier under GCC clauses 12.1 and 12.2 above, this Contract shall expire: At the end of such a period after the Effective Date as specified inthe Contract. Uponsuccessfulperformanceofall obligations bybothparties,including completionofDefectLiabilityobligationsandfinalpayment termination and settlements after that, if any, as per GCC clause 12.1 or 12.2 above. 12.3.2 CessationofRightsand Obligations UponterminationofthisContractunderClauses GCC12.1or12.2hereoforexpiration of this Contract under GCC clause 12.3.1, all rights and obligations of the Parties hereunder shall cease,except (i)suchrights andobligations as mayhaveaccrued onthe date of terminationor expiration, (ii) the obligation of confidentiality outlined in GCC clause 5.7. (iii) the Consultant’s obligation to permit inspection, copying and auditing of their accounts and recordsoutlined inGCCclause 5andtocooperateand assistinanyinspectionorinvestigation, 89 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone and(iv)anyrightaPartymayhaveundertheApplicable Law. 12.3.3 CessationofServices Upon termination of this Contract by notice under Clauses GCC 12.1 or GCC 12.2, the Consultant shall, immediately upon dispatch or receipt of such notice, take all necessary steps to bring the Services to a close in a prompt and orderly manner and shall make every reasonable effort to keep expenditures for this purpose to a minimum. Concerning documents prepared by the Consultant and equipment and materials furnished by the Procuring Entity, theConsultantshallproceedasprovidedbyClausesGCC 9.4andGCC 5.14. 12.3.4 PaymentsuponTermination Upon termination of this Contract, the Procuring Entity shall make the following payments to theConsultant: (a) payment for Services satisfactorily performed before the effective date of termination; and (b) in the case of termination under GCC clause 12.2, reimbursement of any reasonable cost incidental to the prompt and orderly termination of this Contract, including the cost of thereturntravel oftheExperts. CodeofIntegrityin PublicProcurement;Misdemeanorsand Penalties 13.1.Codeof Integrity Procuring authorities as well as Consultants, suppliers, contractors, and consultants - should observe the highest standard of ethics and should not indulge in following prohibited practices, either directly or indirectly, at any stage during the Procurement Process or during theexecutionof resultant contracts: 1) “Corrupt practice” - makingan offer,solicitationoracceptanceof abribe,rewardorgift or any material benefit in exchange for an unfair advantage in the Procurement Process or to otherwise influencethe Procurement Process; 2) “Fraudulent practice” - any omission or misrepresentation that may mislead or attempt to mislead so that financial or other benefits may be obtained or an obligation avoided. Such practices include a false declaration or false information forparticipationinaProcurement ProcessortosecureaContract,orintheexecutionof thecontract; 3) “Anti-competitive practice” - any collusion, Proposal-rigging or anti-competitive arrangement, or any other practice coming under the purview of the Competition Act, 2002, between two or more Consultants, with or without the knowledge of the Procuring Entity, that may impair the transparency, fairness, and the progress of the Procurement Process or toestablishProposal prices at artificial, non-competitivelevels; 4) “Coercive practice” - harming or threatening to harm persons or their property to influencetheirparticipationintheProcurementProcessoraffecttheexecutionofa contract; 5) “Conflictof interest” –participation byabiddingfirmoranyofitsaffiliates whoare either 90 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone involved in the Consultancy Contract to which this procurement is linked; if they are part of more than one Proposal in the procurement; or if their personnel havearelationshipor financial or business transactions with any official of procuring entity who are directly or indirectlyrelatedtotenderorexecutionprocess of contract; or improper use of information obtained by the (prospective) Consultant from the ProcuringEntitywith an intent togain unfairadvantageintheProcurementProcess or forpersonal gain; 6) “Obstructive practice” - materially impede procuring entity’s investigation into allegations of one or more of the above-mentioned prohibited practices either by deliberately destroying, falsifying, altering; or concealing evidence material to the investigation; or by making false statements to investigators and/ or by coercive practices mentioned above, to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation, or by impeding the Procuring Entity’s rights of anaudit oraccess toinformation; 13.1. ObligationsforProactiveDisclosures: 1) Procuring authorities, Consultants, suppliers, contractors, and consultants are obliged under this Code of Integrity to suo-moto proactively declare any violation of the Code of Integrity (pre-existing or as and as soon as these arise at any stage) in any Procurement Processorexecutionofthecontract.Failuretodososhallamounttoaviolationofthiscode of integrity. 2) Any Consultant must declare, whether asked or not in a Proposal-document, any previous transgressions of such code of integrity during the last three years or of being under any category of debarment by the Central Government or the Ministry/ Department of the Procuring Organisation from participation in Procurement Processes. Failure to do so shallamounttoaviolationof thiscode ofintegrity. 13.2. Misdemeanours The following shall be considered misdemeanours - if a Consultant, either directly or indirectly, at any stage during the Procurement Process or during the execution of resultant contracts: 1) Commitsanyofthefollowingmisdemeanours: (a) Violates the code of Integrity mentioned in GCC-clause 13.1 or the Integrity Pact if includedintheTender/Contract; (b) Any other misdemeanour, e.g., supply of sub-standard quality of material/ services/ work, non-performance or abandonment of contract, or violations of Bid/ performance Securityconditions. 2) Commitsanyofthefollowingmisdemeanours: (a) Hasbeenconvictedofanoffence: i) UnderthePreventionofCorruptionAct,1988;or ii) The Indian Penal Code or any other law is in force for causing any loss of life or property or causing a threat to public health as part of the execution of a publicprocurement contract. (b) It is determined by the Government of India to have doubtful loyalty to the country 91 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone ornational security considerations. (c) Employs a government servant who has been dismissed or removed on account of corruption or employs a non-official convicted for an offence involvingcorruptionor abetmentofsuchanoffenceinapositionwherehecouldcorrupt governmentservants or employs a government officer within one year (or any other period prescribed by the relevant authority) of his retirement, who has had business dealings with him in anofficial capacitybefore retirement. 13.3. PenaltiesforMisdemeanours Without prejudice to and in addition to the rights of the Procuring Entity to other remediesas perthe Tender-documents or the contract, If theProcuringEntityconcludes that a (prospective) Consultant directly or through an agent has committed a misdemeanour in competing for the tender or in executing a contract, the Procuring Entity shall be entitled, and it shall be lawful onhisparttotakeappropriatemeasures,includingthe following: 13.3.1 ifhisProposalsareunderconsiderationinanyprocurement 1) Enforcement of Bid Securing Declaration in lieu of forfeiture or encashment of Bid Security. 2) callingoffanypre-contractnegotiationsand; 3) rejectionandexclusionofConsultantsfromtheProcurementProcess 13.3.2 ifacontracthasalreadybeenawarded 1) TerminationofContract forDefault andavailing all remedies prescribedthereunder; 2) Encashment and/ or Forfeiture of any contractual security or bond relating to the procurement; 3) Recovery of payments, includingadvance payments,if any, made bythe Procuring Entity along with interest thereon at the prevailing rate (MIBID - Mumbai Interbank Proposal Rate); 13.3.3 Remediesinadditiontotheabove: In addition to the above penalties, the Procuring Entity shall be entitled, and it shall be lawful onhis part,to: 1) File information against Consultant or any of its successors with the Competition CommissionofIndia forfurther processingincase ofanti-competitive practices; 2) Initiate proceedings in a court of law against Consultant or any of its successors underthe Prevention of Corruption Act, 1988 or the Indian Penal Code or any other law for transgressionnotaddressablebyotherremedies listedinthis sub-clause. 3) Remove the Consultant or any of its successors from the list of registered suppliers for a period not exceeding two years. Suppliers removed from the list of registered vendors or their related entities may be allowed to apply afresh for registration after the expiry of the removal period. 4) Initiate suitable disciplinary or criminal proceedings against any individual or staff found responsible. 5) Debar, a Consultant, from participation in future procurements without prejudice to ProcuringEntity’s legalrights andremedies. Debarment shall automaticallyextendtoall the 92 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone alliedfirms ofthedebarredfirm. Inthecase ofaJoint Venture/consortium,all its members shall alsostand similarlydebarred: A Ministry/ Department (or any of its CPSUs, attached offices, autonomous bodies) may debar a Consultant or any of its successors from participating in any Procurement Process undertaken by all its procuring entities for a period not exceeding two years commencing from the date of debarment for misdemeanours listed in GCC sub- clause 13.3 -1) above. The Ministry/Department shall maintain such alist which shall also be displayed ontheirwebsite. CentralGovernment(DepartmentofExpenditure(DoE),Ministryof Finance)may debar a Consultant or any of its successors from participating in any Procurement Process undertaken by all its procuring entities for a period not exceeding three years commencing from the date of debarment for misdemeanours listed in GCC sub-clause 13.3 -above. DoE shall maintain such a list which shall be displayed on Central Public Procurement Portal (CPPP). 93 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Section V: Special Conditions of Contract (SCC) DocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices(Ref ITC-clause1.4) {Note for Procuring Entity: Text in grey italics font within square bracket [e.g., Mention…] are just suggestions/ directions and must be replaced by applicable text - remove brackets and convert the font to regular and black. Delete the rows not required. Clauses other than thosementioned below mayalsobe mentionedif theseneed tobe changed} Note for Consultants: Following Special Conditions of Contract (SCC) shall apply for this procurement. These Special Conditions shall modify/ substitute/ supplement the corresponding (GCC) clauses as indicated below. Whenever there is any conflict between the provisionintheGCC andthat intheSCC,the provisionintheSCCshall prevail GCC Topic Tobereadas Clause No. GCC 1, 2, 3 and 4: General, The Contract, Governing Laws and Jurisdiction, Communications 1.1, 1.2, General Nochange 1.3,1.4 2.1 LanguageofContract English 3.1 Governing Laws and The courts in Delhi shall have Jurisdiction jurisdiction 4.1,4.3 Communications and 4.1 Noticewillbedeemed tobeeffectiveasfollows: notices (a) inthecaseofpersonal deliveryorregisteredmail, ondelivery; (b) inthecaseoftelexes,24hoursfollowingconfirmed transmission; (c) in the case of telegrams, 24 hours following confirmed transmission;and (d) in the case of facsimiles, 24 hours following confirmed transmission. 4.3 Theaddressesare: Client:-AddressofEmployer Attention:-………… Telex:-………….. Facsimile:- ……………… Consultant:-Addressofconsultant 94 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Attention:- CableAddress:- ……………….Telex:- …………………Facsimile:- …………… (Note:- FillintheBlanks) 4.2 Persons SigningTheAuthorisedRepresentativeare: Communications For theClient:…………………… For theConsultants:…………….. GCC5and6:Consultant’sandProcuringEntity’s Obligations 5.7. ConfidentialityandSecrecy Nochange ofinformation 5.7.1 Property Rights Nochange 5.8 Performance Bond/ Theperformancesecurityshallbequotedbythebiddersubjected Security tominimumof5%ofcontractPrice 6.1, 6.2, Facilities, Utilities to beNil providedbyProcuringEntity 6.3 GCC7:Scopeof Services andPerformance Standards 7.1 ScopeofServices Asdefined inTOR 7.1 5(c ) Lapse/deficienciesin As per Annexure-I of SCC services 7.2 EligibleServices AspertheExtantGuidelinesofGovtofIndiafromtimeto time 95 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone GCC 8: Deployment of Resources 8.2.2 KeyPersonnel NoReplacementofTeamLeadershallbeallowed.Incaseof extensionofbidvalidity,theconsultantsshallsubmitthe replacementCValongwithExtensionrequest.Ifproposal alongwithextensionrequestnotsubmitted,theno replacementunderthisclauseshall beallowedwithout reductioninrenumeration. lnaddition,casual[eavefor12daysshallbepermittedina yeartoeachKey Personnel/Sub-Professionalwithprior intimationtotheAuthority.Outofthis,amaximumof3CLscan beavailedeitherseparatelyortogetherinaquarterandthe periodoftheCLswouldbecountedasKey Personnel I Sub Professional being on duty. GCC 9: Delivery of Services and Delays 9.1 Works plan NoChange 9.2 Commencement ofThetimeperiodshall be oneorsuchothertimeperiod Services asthePartiesmayagreeinwriting. GCC 10: Prices and Payments 10.1.3 Variations Nochange 10.2 TaxesandDuties Nochange 10.3 Terms and Mode ofPaymentshallbereleasedasperratesquotedinAppendixC1 Payment BreakupofLocalcurrencycosts.However,proofof remunerationpaidtoprofessionalstaffsinpreviousmonth submittedalongwithshallbecurrentmonth'sbill.Thequoted remunerationtoprofessionalstaffshallbepaidbytheAuthority's Engineerdirectlyintotheirrespectivebanaccount.The overheadchargesshallbepaidattherateasmentionedin AppendixC-1"Financial proposal submission form 10.5.2 PaymenttoConsultants An advance payment of 10% of the contract price in proportion to the quoted Indian currency (INR) in the bid shall be made within 60 days after receipt andverification of advance payment bank guarantee. The advance payment along with interest will be set off by the Client in equal instalments against the statements for the first 12 months of the Service until the advance payment has been fully set off. The advance paymentshall be inIndian Rupee. GCC 11 Resolution of Disputes 11.2 Excepted Matters Nochange 11.5 Arbitration 96 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone GCC 12 Defaults, Breaches, Termination and Closure of Contract 12.3.1 PeriodofContract Thetimeperiodshallbe…..months(…. constructionperiod oftheproject and….months for Maintenanceperiod as perEPCContract).In caseconstructionperiod ofEPCproject is extended bymore than1 year, noescalation shall bepaid totheAuthorityEngineer. Any period withinwhich aPartyshall,pursuant to thisContract, completeany actionortask, shall beextendedfor a periodequal tothetimeduring whichSuchParty was unable toperform such actionas aresult ofForce Majeure. Extensionof TimeforprovidingServices ofthe Authority’sEngineer may beextended concurrentlywiththeExtensionofTimegranted, ifany, totheEPCContractorfor theproject, subjecttosatisfactoryperformance ofthe Authority’sEngineerandlimitedtooriginal periodofconsultancyservices. 12.1.4-7) RiskandCostProcurement Nochange 97 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Annexure-I Type oflapses/deficiencies inservices andactiontobe takenagainstconsultant/firm andkeypersonnel engagedduringconstruction& Maintenance S. Typeofdeficiencies Actiontobetakenagainstconsultant engaged duringconstruction & No. Maintenance KeyPersonnel Firm 1 (a) Failuretodetectdesign/quality Forfirstthree,key i)For first three deficiencyinNon-key)Components* personnel maybe instances,tobekept kept on“ watchlist”. onwatchlist. 1 (b) Failuretoissuefollow-up notices _to Thereafter the contractor/concessionairefordelaysin ii.Thereafter,a concerned key closureoff/NCRs,delays infurnishing monetarypenaltyof Personnel &Team detail oftime& cost claims/COS/ 1%of the Leader tobe consultancyfee(the removed from the revisedworkprogrammes/work aggregateofsuch methodologies,etc. projectanddebarred penalties ina upto6months 1(c) Delayinsubmissionof proper MPRs, contract wouldnot improperreview ofmethodologies, exceedthe temporaryworks,QAplan/manual, performance O& Mplan/ Manualetc Guaranteeamount and/ordeclaringthe consultantas Non- Performer upto6 monthsortill rectificationof deficiencies and takingadequate measuresnot to repeat suchinstances infuture whicheverisearlier 2 (a) Failuretodetect design/quality The concernedkey Declaring the deficiency inKeyComponent **not personnel & Team Consultant as Non- leadertoberemoved Performer upto1 havingsubstantialcost(below 1%of from theproject and yearor till civilwork(cost)and/ortime debarredupto1 year rectificationof implication Deficiencies and taking adequate (below5%orprojectcompletion periods measures not to repeat such (b) Failuretodetectdeficiencyinquantity Instancesinfuture, executedvis-â-is designnot(having whicheverisearlier. substantialfinancial implication(below 1%ofcivilworkcost) (c) Failure toconduct/witness tests as prescribedintheconsultancycontract agreement 98 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone (d) DelayinprocessingEOT/COS proposals,inaccurateassessment of COSproposals,not issuingNCRs, delays/improperreview of designs/drawings/workprogrammeor failuretosubmit Completion/Provisional Completion Certificationasprescribedincontract 3(a) Failuretodetect deficiencyinquantity The concernedkey In additionto executedvis-à-vis designhaving personnel & team Rectification of substantialfinancialimplication{1%of leadertoberemoved deficiencies and from theproject and taking adequate civilworkcostormore) debarredupto2 measures not to (b) Failuretodetect design/quality years repeat such Instances deficiency inKeyComponent having infuture, the substantialcost (1% ofcivil workcost consultanttobe debarredupto2 ormore)and/ortimeimplication(5%of years. project completionperiodor more) (c) Failure to detect deficiency/not reviewingdesign(includingtemporary works)and construction(including methodology)ofstructuralcomponents of flyover/bridges/ underpasses/ overpasses/ROB/RUBetc. (d) Failuretopropose action(likecure periodnotice,levyof damages,etc.) oncontractor/concessionaireas per contract agreement for their default/poorprogress havingmaterial adverse effect onthe project implementationintermsofcost(1%of civilworkcost ormore) and/ time(5% ofprojectcompletionperiodormore). (e) Improper/wronginterpretationof provisionincontract agreement; or wrongcertificationofpayment/COS value/cost&timeclaims; orpoor performanceofservicesleadingtocost (1%ofcivil workcost) and/o‹time(5% ofproject completionperiod) claims againstMoRTH oritsexecuting agencies awardedby DRB/CCIE/Arbitration/Court. Note ‘” Key Components are specified as under: i) Foundation,sub-structure and super-structureofflyovers, road over bridges, road under bridges, vehicular under passes, vehicular over passes, major bridges,minorbridges,etc. ii) Tunnels iii) Expansionjointsandbear1ngs iv) REwalls/retainingwalls 99 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone v) Thecrustlayersofflexiblepavement vi) Thecrustlayersofrigidpavement vii) Embankment andslopeprotection viii) Issues affecting roadsafety ix) Any other work endangering/impacting/stability/ reliability/durability/ performance ofpavement/structures “TheitemsnotcoveredinabovelistshallbeinthecategoryofNon-key Components. # Excludingthedelaysolelyattributabletothecontractorbeyondstipulatedtime. 100 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone SectionVI:TermsofReference RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices(RefITC-clause 1.4) Note forConsultants:Regarding thisSection,Consultants mustfill followingforms: a) Form T-3: Comments and Suggestions on Terms of Reference, Counterpart Inputs tobe ProvidedbytheProcuringEntity b) Form T-4: Description of Approach, Methodology and Work Plan in RespondingtotheTerms ofReference c) Form T-5: WorkSchedule andPlanningforDeliverables TermofReference File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m12397404/2025/S&R Zone Note:Theterm “Agreement”andclausesthereofrefertotheEPCAgreementdated----- - entered between Authority and--------- (the Contractor) for the work offrom km----to----ofNHNo.-------intheStateof---------------------onEngineering, Procurement and Construction (EPC) basis]. 1. Scope 1.1 These Terms of Reference (the “TOR”) for the Authority’s Engineer are being specified pursuant to the EPC Agreement dated (the “Agreement”), which hasbeen entered intobetweentheAuthorityand (the “Contractor”) for [Two- Laning] of the **** section (km ** to km**) of National Highway No. ** in the State of *** on Engineering, Procurement, Construction (EPC) basis, and a copy of whichisannexed heretoand marked as Annex-Atoform part ofthis TOR. 1.2 The TOR shall apply to Development, construction and maintenance period of the Project Highway. 2 Definitionsand interpretation 2.1 The words and expressions beginning with or in capital letters and not defined herein but defined in the Agreement shall have, unless repugnant to the context, the meaningrespectively assigned to them in the Agreement. 2.2 References to Articles, Clauses and Schedules in this TOR shall, except where the context otherwise requires, be deemed to be reference to the Articles, Clauses and Schedules of the Agreement, and references to Paragraphs shall be deemed to be references to Paragraphs of this TOR. 2.3 The rules of interpretation stated in Clauses 1.2, 1.3 and 1.4 of the Agreement shall apply,mutatismutandis,tothisTOR. 3 General 3.1 The Authority’s Engineer shall discharge its duties in a fair, impartial and efficient manner, consistent with the highest standards of professional integrity and Good Industry Practice. 3.2 The Authority’s Engineer shall perform the duties and exercise the authority in accordance with the provisions of this Agreement, but subject to obtaining prior written approval of the Authority before determining. (a) anyTimeExtension. (b) AnyadditionalcosttobepaidbytheAuthoritytothe Contractor; (c) The Termination Payment; or (d) Any other matter which is not specified in (a), (b) or (c) above and which File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m22397404/2025/S&R Zone creates an obligation or liability on either Party for a sum exceeding Rs. 5,000,000 (Rs. Fiftylakh.) 3.3 The Authority’s Engineer shall submit regular periodic reports, once every month, to the Authority in respect of its duties and functions under this Agreement. Such reports shall be submitted by the Authority’s Engineer within 10 (ten) days of the beginning ofevery month. 3.4 The Authority’s Engineer shall inform the Contractor of any delegation of its duties and responsibilities to its suitably qualified and experienced personnel; provided, however, that it shall not delegate the authority to refer any matter for the Authority’s prior approval in accordance with the provisions of Clause 18.2 EPC Agreement. 3.5 The Authority’s Engineer shall aid and advise the Authority on any proposal for Change of Scope under Article 13. 3.6 In the event of any disagreement between the Parties regarding the meaning, scope andnature of Good Industry Practice, as set forth in any provision of the Agreement, the Authority’sEngineer shall specify such meaning, scope and nature by issuing a reasoned written statement relying on good industry practice and authentic literature. 3.7 Development/ Design Period 3.7.1 Authority will engage Authority Engineer at least 3 months before appointed date of the project. During design and development period of project or immediately after mobilization at site, the Authority Engineer shall review the Schedule-A, Schedule-B, Schedule-C, Schedule-D and Schedule-H of the contract agreement and DPR prepared by the Authority as per site conditions and project Requirements and submit a comprehensive review report, indicatingsuggestedmodificationinScopeofproject. 3.7.2 Authority Engineer will witness traffic census, Geotechnical Investigation and all other investigations being carried out by the contractor and certify the correctness ofthedata andmaintainthedetails inMPR. 4. RoleandresponsibilityofOfficersoftheAuthority The officer in-charge of the Authority (e.g. PD/ RO/ CGM/ Member in the case of NHAI;RO/CE/ADG in the case of MoRTH projects executed through the State PWDs; and PD/ED/Director in the case of NHIDCL) is responsible for the overall supervision and monitoring of the execution of project as the representative of the owner of the project. The Authority's Engineer is appointed to assist the Authority for carrying out the functions as detailed under clause 18.2 of the EPC Agreement. As such, an officer of theAuthority is vested with all such powers and responsibilities as are enjoined upon the Authority's Engineer and is fully competent to issue any instructions for proper monitoring and supervising project, either by himself or through the Authority's Engineer. Instructions issued by the concerned officer of the File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m32397404/2025/S&R Zone Authority shall have the same effect as that of the Authority's Engineer in terms of this Agreement. Wherever such concerned officer issues any instructions or notice to the Contractor, he shall endorse a copy thereof to the Authority's Engineer. 5 ConstructionPeriod 5.1 During the Construction Period, the Authority’s Engineer shall review and approve the Drawings furnished by the Contractor along with supporting data, including the geo- technical and hydrological investigations, characteristics of materials from borrow areas and quarry sites, topographical surveys, and the recommendations of the Safety Consultant in accordance with the provisions of Clause 10.1.6 of EPC Agreement. The Authority’s Engineer shall complete such review and approve and send its observations to the Authority and the Contractor within 15 (fifteen) days of receipt of such Drawings; provided, however that in case of a Major Bridge or Structure, the aforesaid period of 15 (fifteen) days may be extendedupto 30(thirty) days.In particular, such comments shallspecifythe conformity or otherwise of such Drawings with the Scope of the Projectand Specifications and Standards. 5.2 The Authority’s Engineer shall review and approve any revised Drawings sent to it by the Contractor and furnish its comments within 10 (ten) days of receiving such Drawings. The review/approval of drawing should be authenticated by Authority’s Engineer. 5.3 VerificationofMaterialanditsSourcesbyAuthorityEngineer:- 5.3.1 The Authority Engineer shall ensure that all materials used by the contractor are procured exclusively from sources approved by the Engineer in accordance with the contract specifications and standards. 5.3.2 The Authority Engineer shall verify and document the source of materials proposed by the contractor during the approval process and maintain a record of all approved material sources, including relevant test reports, certifications, and compliance documents. The Authority Engineer shall communicate any changes or updates regarding materialsourceapprovalstothecontractorin writing. 5.3.3 The Authority Engineer shall conduct periodic inspections to verify that the materials delivered to the site match the approved source. Authority Engineer shall ensure that the contractor provides evidence of procurement from the approved source (e.g., invoices, transport receipts, or certifications). 5.3.4 In the event of non-compliance, the Authority Engineer shall immediately notify the contractor in writing and Direct the removal of non-compliant materials from the site at the contractor's cost. He shall ensure that corrective actions are taken before work proceeds File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m42397404/2025/S&R Zone further. 5.3.5 In the Monthly Report the Authority Engineer shall submit Compliance status of materials used, any issues or deviations identified, along with corrective measures taken alongwith supporting documentation such as test reports, certificates, and inspection records. 5.3.6 The Authority Engineer shall be held accountable for any lapses in ensuring material compliance that result in deviations from approved standards or specifications and the suitable action under the agreement shall be taken against the Authority Engineer. 5.4 Quality Assurance Manual and Plan forms the basis of quality of the work. It is therefore to be ensured that the Quality Assurance Plan prepared by the contractor be checked and submitted by Authority Engineer to Authority within 15 days time period of its submission by contractor. The Authority shall approve the QAP within 15 days from date of submission by AE, Thus, the Authority’s Engineer shall ensure that contents of Quality Assurance Plan is as per requirements of IRC SP 112 and ISO : 9001. The copy of the approved Quality Assurance Plan will be sent by Authority’s Engineer to the contractor and the Authority. The Authority’s Engineer will after review and submit to the Authority the methodology within 10 days of its receipt from the contractor for approval of Authority. The Authority shall approve the methodology within 10 days of receiving from Authority Engineer. The Authority Engineer will ensure that the methodology of the different components of the work are prepared keeping in view the specifications & Standards and machinery deployed by the contractor. The Authority Engineer may also offer their comments for modifying/ improving either of the document. After receiving the corrected document, the Authority Engineer shall review and formally submit thesedocuments to Authority for approval of the same 5.5 The Authority’s Engineer shall grant written approval to the Contractor, where necessary, for interruption and diversion of the flow of traffic in the existing lane(s) of the Project Highway for purposes of maintenance during the Construction Period in accordance with the provisions of Clause 10.4 EPC Agreement. 5.6 The Authority Engineer shall approve the CV of Project Manager/ Dy. Project Manager/ other key personnel deployed by the contractor at site. If Authority Engineer, observed that qualified Key personnel have not been deployed by contractor at site, he will submit a report in this regard to the Authority. 5.7 The Authority’s Engineer shall review the monthly progress report furnished by the Contractor and send its comments thereon to the Authority andthecontractorwithin 7 (seven) days of receipt of such report. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m52397404/2025/S&R Zone 5.8 On a daily basis, the concerned key personnel of Authority Engineer shall inspect the Construction Works. Following activities need to be undertaken duringthe visits. • Review ofconstruction including progress,qualityand safety ofconstruction • Inspectionofdefects and deficiencies inconstructionworks • Witnessingqualityinspectiontestsatlabsestablished by Concessionaire on asample basis Review of quality of work shall be done in reference to Quality Assurance Plan(QAP)/Manual and ISO 9001:2008, IRC: SP: 47-1998 and IRC: SP: 57- 2000 for road bridges and roads respectively. The Authority’s Engineer also needs to capturefollowingdocuments andsendto<Agency> fieldoffice via email on a daily basis • ScannedcopyoffilledRFI(RequestforInspection)formincludingcommentary on‘Satisfactory/Unsatisfactory’natureofworkcompletedbyConcessionaire • DailyinspectionreportProformaasprovidedinAnnexureI • Readingsofqualityinspectiontestswitnessed bytheConsultant • Minimum6highresolutionphotographssupportingtheremarksmadebythe Authority’sEngineerinRFIform Team Leader will be responsible for sending daily emails to <Agency> office 5.9 On a monthly basis, the Authority Engineer shall prepare a Monthly Inspection Report in accordance with the format prescribed in Annexure V setting forth an overview of the status, progress, quality and safety of construction, including the work methodology adopted, the materials used and their sources, and conformity of Construction Works with the Scope of the Project and the Specifications and Standards. In a separate section of the Inspection Report, the Authority Engineer shall describe in reasonable detail the lapses, defects or deficiencies observed by it intheconstructionof the Project Highway. The Authority Engineer shall send a copy of its Inspection Report to the Authority and the Concessionaire latest by 7th of every month. Key sections of the Monthly Progress Report are as follows SNo. Section Sub-Sections 1.1 Construction progress in current month 1.2 Summary of strip plan 1 Executive Summary 1.3 Detailed strip plan 1.4 Current issues and recommended actions by AE 2.1 Salient Features of the Project 2.2 Project Milestones 2 Project Overview 2.3 Location Map 2.4KkeeyyPlan File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m62397404/2025/S&R Zone Critical issues and Action 3.1 Pending issues and action log 3 3.2 Obligations as per contract log 4 Physical Progress 4.1 Detailed physical progress by component 5.1LAsummary 5.2LAdetailbyCALA 5.3LAdetailbyvillage LandAcquisitionand Clearances 5.4 Manpower with each CALA 5 5.5 Clearances summary 5.6 Status of utility shifting 6 Change of Scope 6.1 Status of pending COS proposals 7 Mobilization of Resources 7.1 Resource mobilization by contractor/ concessionaire 8.1 Pen picture- Escrow 8 Financial Progress Details 8.2 Escrow details Summary of quality control 9.1 Tests witnessed by IE/AE 9 tests 9.2 Tests conducted by IE/AE Monitoring of maintenance 10.1 Critical issues and action log 10.2 Cumulative defects and deficiencies 10 obligationsduring construction phase 10.3 Status of damages 11.1 Pen picture on safety features at construction site 11.2 Accident report 11 Safety features Annex 1: Detailed list of physical components as per Schedule G 12 Annexures Annex 2 onwards: Additional details provided by AE 5.9.1 If at any time during the Construction Period, the Authority Engineer determines that the Concessionaire has not made adequate arrangements for the safety of workersandUsersinthezoneofconstructionorthatanyworkis beingcarriedoutin a manner thatthreatens the safety of the workers and the Users, it shall make a recommendation to the Authority forthwith, identifying the whole or part of the Construction Works that should be suspended forensuring safety inrespectthereof 5.9.2 The Authority Engineer shall prepare a Milestone Report setting forth an overview of the status, progress, quality and safety of construction, including the status of the milestone, the available resources and details of lack of resources, to achieve the milestone, if any. In a separate section of the Milestone Report, the Authority Engineer shall describe inreasonable detail the lapses, defects or deficiencies observed by it in the achievement of the Project Highway. The Authority Engineer shall send a copy of its Milestone Report to the Authority within 15 days of schedule Milestone File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m72397404/2025/S&R Zone Date. The Millstone report shall be approved by the Authority before making milestone payment. 5.10 The Authority’s Engineer shall conduct the pre-construction review of manufacturer’sreportsand standard samples of manufactured Materials, and such otherMaterials as theAuthority’s Engineer mayrequire. 5.11 For determining that the Works conform to Specifications and Standards, the Authority’s Engineer shall require the Contractor to carry out, or cause to be carried out, tests at such time and frequency and in such manner as specified in the Agreementand in accordance with Good Industry Practice for quality assurance. For purposes of this, the tests specified in the IRC Special Publication-11 (Handbook of Quality Controlfor Construction of Roads and Runways) and the Specifications for Road and Bridge Works issued by MORT&H (the “Quality Control Manuals”) or any modifications/substitution thereof shall be deemed to be tests conforming to Good Industry Practice for qualityassurance. 5.12 The Authority’s Engineer shall witness all the quality control tests and calibrations of plants and equipment carried out by the contractor at its site laboratory/ main laboratory/field/plants. Those include test for all material, mixes, products etc. Authority Engineer shall also witness all test of proprietary products like bearing in the manufacturer’s laboratory as mandated in respective standards. Authority Engineer will also conduct review of quality control documents in respect of factory manufactured materials/ proprietaryproducts etc as per IRC:SP:112. 5.13 The timingand location of tests referred to in Paragraph 5.10, and the criteria for acceptance/rejection of their results shall be determined by the Authority’s Engineer in accordance with MoRTH specifications for road & Bridge works and respective Indian Road Congress Standards/Guidelines/Manuals together with any other Indian/ International Standards, the methodology proposed by him at the time of bid submission referred thereto. Authority Engineer/Independent Auditors/ officers of Authority may also undertake minimum 1% random tests as directed by the Authority, on random sample basis at the locations to be decided by the Authority/Independent Auditors/ officers of Authority. These random tests shall be in addition to, and independent of, the tests that may be carried out by the Contractor for its own quality assurance in accordance with Good Industry Practice. These random tests shall be tested by the Authority Engineer in contractor’s laboratory or any third party NABL accredited laboratory as directed by the Authority. The payments of these test shall be made by the Authority separately if the result of these tests are as per specifications/ guidelines. If random sample/ test result is not as per the standards/ specifications, the cost of such testing shall be paid by the Contractor 5.14 The Authority Engineer shall witness collection of the all test samples including random samples collected by AE/Independent Auditors/ Authority officers from site and geotagged location of the collected sample shall be mentioned on the sample/ records. The details of the sample collected, and its geotag location data shall be uploaded on datalake or any other app developed by Authority for this purpose. 5.15 In the event that results of any tests conducted under Clause 11.10 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m82397404/2025/S&R Zone establish any Defects or deficiencies in the Works, the Authority’s Engineer shall require the Contractor to carry out remedial measures. 5.16 The Authority’s Engineer may instruct the Contractor to execute any work which is urgently required for the safety of the Project Highway, whether because of an accident, unforeseeable event or otherwise; provided that in case of any work required on account of a Force Majeure Event, the provisionsofClause21.6ofEPC Agreement shallapply. 5.17 In the event that the Contractor fails to achieve any of the Project Milestones, the Authority’s Engineer shall undertake a review of the progress of construction and identify potential delays, if any. If the Authority’s Engineer shall determine that completion of the Project Highway is not feasible within the time specified in the Agreement, it shall require the Contractor to indicte within 15 (fifteen) days the steps proposed to be take to expedite progress, and the period within which the Project Completion Date shall be achieved. Upon receipt of a report from the Contractor, the Authority’s Engineer shall review the same andsend its comments tothe Authority andtheContractor forthwith. 5.18 The Authority’s Engineer shall obtain from the Contractor a copy ofallthe Contractor’squalitycontrolrecords and documents before the Completion Certificate is issued pursuant to Clause 12.2 of EPC Agreement. 5.19 Authority’s Engineer may recommend to the Authority suspension of the whole or partof the Works if the work threatens the safety of the Users and pedestrians. After the Contractor has carried out remedial measure, the Authority’s Engineer shall inspect such remedial measures forthwith and make a report to the Authority recommending whether or not the suspension hereunder may be revoked. 5.20 In the event that the Contractor carries out any remedial measures to secure the safety of suspended works and users, and requires the Authority’s Engineer to inspect such works, the Authority’s Engineer shall inspect the suspended works within 3 (three) days of receiving such notice, and make a report to the Authority forthwith, recommending whether or not such suspension may be revoked by the Authority. 5.21 The Authority’s Engineer shall carry out, or cause to be carried out, all the Tests specifiedinSchedule-KandissueaCompletionCertificateor ProvisionalCertificate asthecasemaybe. Forcarrying outisfunctions underthisParagraph 4.18andall mattersincidental thereto, the Authority’s Engineer shall act under and in accordance with theprovisions of Article 12 and Schedule-K. The Authority’s Engineer shall use following equipment in carrying out the tests. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a0m92397404/2025/S&R Zone SNo Key metrics of Asset Equipment to be used 1 Surface defects of pavement Network Survey Vehicle (NSV) 2 Roughness of pavement Laser Profilometer 3 Strength of pavement Falling Weight Reflectometer (FWD) 4 Bridges Mobile Bridge Inspection Unit (MBIU) 5 Road signs and road markings Retro-reflectometer 6 Maintenance Period 6.1 The Authority’s Engineer shall aid and advise the Contractor in the preparation of itsmonthly MaintenanceProgrammeandforthispurpose carryoutajointmonthly inspection with Contractor. 6.2 The Authority’s Engineer shall undertake regular inspections, at least once every month to evaluate compliance with the Maintenance Requirements and submit a Maintenance Inspection Report to the Authority and the Contractor. 6.3 Visual Inspection of project highway 6.3.1 TheAuthorityEngineershallcarryoutvisualinspectionofentirehighway stretchas per the frequency defined in the following table Frequency Nature of defect or deficiency of inspection ROADS (a) Carriageway and paved shoulders (i) Breach or blockade Daily (ii) Potholes Daily (iii) Cracking Weekly (iv) Rutting Weekly (v) Bleeding/skidding Weekly (vi) Ravelling/Stripping of bitumen surface Weekly (vii) Damage to pavement edges Weekly (viii Removal of debris Daily ) (b) Hard/earth shoulders, side slopes, drains and culverts i) Variation by more than 2% in the prescribed slope of camber/cross fall Weekly File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m02397404/2025/S&R Zone (ii) Edge drop at shoulders Weekly (iii Variation by more than 15% in the prescribed side (embankment) Weekly ) slopes (iv Rain cuts/gullies in slope Weekly ) Damage to orsilting of culverts and side drains during and (v) immediately Weekly preceding the rainy season (vi Desilting of drains in urban/semi-urban areas Daily ) (c) Road side furniture including road signs and pavement marking Damage to shape or position; (i) Daily poor visibility or loss of retro-reflectivity (d) Street lighting and telecom (ATMS) (i) Any major failure of the system Daily (ii) Faults and minor failures Daily (iii Streetlight with Lux Meter Weekly ) (e) Trees and plantation Obstruction in a minimum head-room of 5 m above carriageway or (i) Daily obstruction in visibility of road signs (ii) Deterioration in health of trees and bushes Weekly (iii Replacement of trees and bushes Weekly ) (iv Removal of vegetation affecting sight line and road structures Weekly ) (f) Rest areas/Wayside amenities (i) Cleaning of toilets Daily (ii) Defects in electrical, water and sanitary installations Daily (g) Toll plaza[s] (i) Failure of toll collection equipment including ETC or lighting Daily (ii) Damage to toll plaza Weekly (h) Other Project Facilities and Approach roads Damage or deterioration in Approach Roads,-[pedestrian facilities, (i) trucklay-bys,bus-bays,bus-shelters,cattlecrossings,Traffic AidPosts, Daily MedicalAidPostsandotherworks] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m12397404/2025/S&R Zone (j) Incident Management Frequency Nature of defect or deficiency ofinspection Instances of Incident Management as reported including time of (i) call, Daily response time, services rendered and time of clearing of the Highway. (ii) List of the Incident Management Services rendered. Weekly BRIDGES (a) Superstructure of bridges (i) Cracks Weekly (ii) Spalling/scaling Weekly (b) Foundations of bridges (i) Scouring and/or cavitation Weekly (c) Piers, abutments, return walls and wing walls of bridges (i) Cracks and damages including settlement and tilting Weekly (d) Bearings (metallic) of bridges (i) Deformation Weekly (e) Joints in bridges (i) Loosening and malfunctioning of joints Weekly (f) Other items relating to bridges (i) Deforming of pads in elastomeric bearings Weekly Gathering of dirt inbearings and joints; or clogging of spouts, (ii) weep holes Weekly and vent-holes (iii) Damage or deterioration in parapets and handrails Weekly (iv) Rain-cuts or erosion of banks of the side slopes of approaches Weekly (v) Damage to wearing coat Weekly Damage or deterioration in approach slabs, pitching, apron, toes, (vi) floor or Weekly guide bunds (vii) Growth of vegetation affecting the structure or obstructing the Weekly waterway File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m22397404/2025/S&R Zone 6.3.2 All elements which have daily inspection frequency shall be inspected weekly as well. Similarly, all elements which have weekly inspection frequency shall be inspected monthly as well. 6.3.3 Daily inspection report format and weekly inspection report format has been provided in Annexure II and III of this document respectively. Manpower which needs to conduct visual inspection and mode of reporting is defined in the following table Frequency of inspection Inspection to be carried outby Mode of reporting Daily Sub-professional staff Softcopy by Email Weekly Keypersonnel Softcopy by Email Monthly Keypersonnel Hard copy and Softcopy 6.3.4 High resolution photographs and video of the highway stretches having defects and/or deficiencies shall be submitted along with Weekly Inspection Report and Monthly Status Report. Summary of key observations around defects and deficiencies in highway stretch shall be reported in Monthly Progress Report and detailed inspectionreport shall be providedas AnnexuretoMonthlyProgress Report. 6.3.5 The Authority’s Engineer shall also be responsible for inspection and monitoring of Wayside Amenities. ETC (Electronic Toll Collection) and ATMS(Advanced Traffic ManagementSystem) andincident management. 6.4 Road conditions surveys 6.4.1 The carrying out of condition surveys will be one of the most important and crucial field tasks under the project. The Authority Engineer shall carry out condition surveysusing equipment and following a frequency as defined under. Frequencyof SNo Key metrics of Asset Equipment to be used condition survey At least twice ayear (Asper Surfacedefectsof 1 Network Survey Vehicle (NSV) pavement surveymonthsdefinedforthe statebasisrainyseason) Atleasttwiceayear(As 2 Roughness of pavement LaserProfilometer per surveymonthsdefinedfor the statebasis rainy season) Falling Weight Reflectometer 3 Strength of pavement At least once a year (FWD) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m32397404/2025/S&R Zone Atleasttwiceayear(As MobileBridgeInspectionUnit persurveymonthsdefined (MBIU) 4 Bridges forthe state basis rainy season) Atleasttwiceayear(Asper surveymonthsdefinedfor 5 Road signs Retro-reflectometer the state basis rainy season) The first equipment based inspection shall be conducted at the time of completion testing.Theother inspections shall be conducted before and after the rainy seasons as per the schedule defined in Annexure IV, except for FWD testing which shall be conductedonce ayear. Calibration of equipment, wherever needed, is required to be done in presence of Competent Authority. Once approval of equipment, the settings and a sample data set is provided by Competent Authority, network level data for entire project stretch can be collected. Month of survey for each state has been defined in Annexure IV of thisdocument. 6.4.2 Measurementofpavement surfacedefects androughness i. The Authority Engineer shall use Network Survey Vehicles mounted with equipment such as Laser based automatic crack detection , high resolution digital cameras for RoW and pavement, high accuracy DGPS receiver and in vehicle data processing software or better technology to accurately measure following pavement surface properties Surface defect Dimensions to be reported • Length • Width Cracking • Depth • Area Potholes • Depth Raveling • Indicator • % • Area File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m42397404/2025/S&R Zone • Depth Rutting • Width Concrete Joint/ Faulting • Length Roughness • IRIin both wheel paths ii. Thefollowingcriteria shallbemetbytheprocessofdefectsdetection • Measurement of 3D road profile using such technologies as laser scanning orother proven technologies. • Ability to operate (collect data) at different speeds with a minimum speed of30km/hr and upto at least 75 km/ hr. • Profiledepthaccuracyof0.5mm • Capability for lane tracking to control driver wander’ and ensure high repeatability of data between surveys. • Measureatleast3.5mwidthofhighwaylane. • Transverse Profile including rut depth measurement of pavement surface widths of both carriageway and shoulders. The rut depth data must be convertible to different straightedge lengths (1.8m to 3.5m) and meet industrystandards (ASTM E1703 / E1703M). • Pavementimageswith capability toautomaticallyidentifyand ratedistresses • Roughness measurement with outputs of both raw longitudinal profiles and International Roughness Index (IRI) calculation shall be reported at least 100m referenced to the preceding Location Reference Post (LRP). The roughness must meet ASTM-E950 (equivalent to Class I road profiler). The IRI shall be determined in both wheel paths. • Abilitytorecordimagesatuser-definedintervals(e.g.every5,10m,etc.) • Minimum imagesresolutionof1600x1200 • OutputsmustincludeStandard JPEG image orsimilar industry standard • Distanceresolutionof<1mm, • Capable of achievingdistance accuracy of0.1% (i.e.within 1m over1km distance) • Alldataoutputsshould be in anon-proprietaryformat (e.g..CSV,.MDB, Excel)and notrequire specialistsoftware in ordertoview or format data • Data should also be capable of being easily formatted into data compatiblewith HDM-4 iii. The following are the set of deliverables which should be submitted after completion of survey as part of Monthly Progress Report • Raw data generated from the equipment which are part of Network Survey covering the parameters mentioned in above table. It should also include o SurveyID, Description,Date, Lane o GPSreferenceddataforGISmapping • Videologging o Pavement imagery (AVI/JPEG) o 360degreeimagery(JPEG) • Interpretation report covering summary of entire survey and analysisof defects and deficiencies File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m52397404/2025/S&R Zone 6.4.3 Measurementof pavement strength (i) The Authority Engineer shall carry out structural strength surveys for existing pavements using Falling Weight Deflectometer technique in accordance with the procedure given in IRC:115-2014 (Guidelines for Structural Evaluation and Strengthening of Flexible Road Pavements Using Falling Weight Deflectometer (FWD) Technique) and IRC: 117- 2015 (Guidelines for the Structural Evaluation of Rigid Pavement by Falling Weight Deflectometer) (ii) The interval at which deflection measurements are to be taken up are as per IRC:115- 2014 / IRC:117-2015. For flexible pavements, the sample size and the interval of the data to be collected depends on the length of the uniform section calculated and condition of the pavement section i.e. ‘good’, ‘fair’ and ‘poor’ for each lane, established on the pavement condition data based on the criterion given in IRC:115-2014. For rigidpavements, the deflection data may be collected at interiors, corners, transverse joints and longitudinal joints in the outer lanes at intervals as specified in IRC:117-2015. (iii) The following are the set of deliverables which should be submitted after completionof inspection test as part of Monthly Progress Report • Data reportcoveringfollowingparameters o DeflectionBowl(Transient Deflections atsevendifferentpoints) o Corrected Elastic Modulus Bituminous E1 o Corrected Elastic Modulus Granular E2 o Corrected Elastic Modulus Subgrade E3 o Subgrade CBR • Interpretationreport covering summaryofentire survey results and analysisof key parameters 6.4.4 The Authority Engineer shall carry out the condition and structural assessment survey of the bridges in accordance with IRC-SP; 35 with the useofMobileBridge Inspection unit (MBIU) or better technology. (i) Thefollowingcriteria shallbemetbytheprocessofbridgeconditionassessment • Automatic foldingand unfolding ofplatform • 90degreerotationofplatform • Sufficient safety featurestobe incorporated such asdedicatedpower supply, emergency cut off system, etc • Completeaccesstohiddenpartsofthebridgebytheraters (ii) Detailed bridge inspection report shall be submitted as per the Inspection Proforma provided in IRC-SP 35 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m62397404/2025/S&R Zone 6.4.5 Measurement of retro reflection of road signs (i) The Authority Engineer shall measure Coefficient of retro reflected luminance RA (night time retro reflection) of road traffic signs using a portableretroreflectometer. (ii) The following criteria shall be met by the process of road signs retro reflection measurement • Measurementofretroreflectivesigns shallbeconductedin accordance with ASTME1709 and ASTM E2540 • Measurementtimeafterpressingtriggershallbelessthanorequalto1sec • Observationangleadjustmentfrom 0.2degrees to2.0degrees • Entrance angleadjustmentfrom -45degrees to +45degrees • Self-contained commercially available battery • Inbuilt data storage of at least 2,000 measurements so that data transfer requirement is minimized while the survey is being conducted • Interface for transferringdata from device toComputer • BuiltinGPStocaptureGPScoordinatesofroadsign • Rangeshallbeatleast0-2000cd/lx/m2 (iii) The following are the set of deliverables which should be submitted after completionof survey as part of Monthly Progress Report • Systemgeneratedcoefficientofretro reflected luminance RA (nighttimeretro reflection) of all road signs • Interpretationreportcoveringanalysisofroadsignsfallingin differentrange ofRA and actions to be taken 6.5 TheAuthorityEngineershallcarryoutfollowinginspectionsofETC lanesattoll plazason a month basis: (i) Infrastructure: • AvailabilityofcivilinfrastructureattollplazasrequiredforinstallationofETCsystems • Adequacyofhardware,softwareandotherrelateditemsasper IHMCL/<Agency>technicalspecificationsandrequirements (ii) Operations: • Adherenceofvariousstakeholders(acquirerbank,systemintegrator,tolloperator, issuerbanketc)oftheETCsystemtotheservicelevelagreements • Efficacy of the ETC system (RFID tagging, AVC, WIM etc) in terms of accuracy File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m72397404/2025/S&R Zone anduptime • Trackingandreportingtollplazaexperiencemetricssuchasaveragewaitingtime, transactiontimesfordifferentmodesofpayment(RFID,cash,smartcards,QR codes etc)andcongestionlevels(eg.lengthofqueueindifferentlanes)across4differenttimes inaday • Robustnessofdisputeresolutionmechanismsinplaceforthetagholderandtoll operatorsbytheissuerandacquirerbanks 6.6 The AuthorityEngineer shall prepare a Monthly Status Report in O&M phase of project in respect of its duties and functions under this Agreement and in accordancewiththeformatprescribed inAnnexureVI.1st deliverableofthereport which is an executive summary to the main report (Section 1) shall be submitted to the Authority and updated on the PMIS and project specific website by 4th of every month. Main report (Section 2 onwards) shall be submitted to the Authority and updated on the PMIS and project specific website by 7thof every month. Key sections of the Monthly Status Report are as follows; S.No Sections Sub sections 1.1 Overall roadcondition 1.2 Key reporting metrics 1.3 Key maintenance activities undertaken 1 Executive Summary 1.4 Pending issues 1.5 Recommended actions by AE 1.6 Strip plan for maintenance 2.1 Key project details 2.2 Location map 2 Project Overview 2.3Key plan 2.4 Summary of project features 2.5 RoW availability 3.1 Issue and action log 3.2 Summary of deficiencies Criticalissuesand actiontaken 3 3.3 Obligations as per contract 3.4 Inspection schedule 4.1 Summary of NCR issued 4 Monthly Inspection Report 4.2 Equipment based inspection report File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m82397404/2025/S&R Zone 5.1 Monthly ETC Report 5 Monitoring of ETC Lanes 5.2 On-ground infrastructure report 5.3 On ground ETC operations & SLA adherence 6.1 Damages for non completion of project facilities 6.2 Damages for breach of maintenance activities 6 Status of damages 6.3Damagesfornoncompletionofmajormaintenance works ChangeofScope 7 7.1 Change of Scope proposals proposals 8 Statusofpending 8.1 Status of pending disputes disputes 9.1 Toll collection statement 9 Reports 9.2 Accident Report 9.3 Details of user complaints 9.4 Encroachment list 9.5 Lane closure report AnnexI-Detailedvisualinspectionreportofproject highway 10 Annexures Annex II onwards- Additional details provided by AE 6.7 The Authority’s Engineer shall specify the tests, if any, that the Contractor shall carry out, orcause to be carried out, forthe purpose of determining that the Project Highwayis in conformity with the Maintenance Requirements. It shall monitorandreview theresultsofsuch testsandremedialmeasures,ifany,taken by the Contractor in this behalf. 6.8 Inrespectofanydefectordeficiencyreferred toinParagraph 3of Schedule-E,the Authority’s Engineer shall, in conformity with Good Industry Practice, specify the permissible limit of deviation or deterioration with reference to the Specifications andStandardsandshall alsospecifythetime limitforrepairorrectificationofany deviationor deterioration beyond the permissible limit. 6.9 TheAuthority’sEngineershallexaminetherequestoftheContractorfor closureof anylane (s)of the Project Highway for undertakings maintenance/repair thereof, and shallgrant permission with such modifications, as it may deem necessary, within 5(five) days of receiving a request from the Contractor. Upon expiry of the permitted period of File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a1m92397404/2025/S&R Zone closure,theAuthority’sEngineershallmonitorthereopening of such lane (s),and in case of delay, determine the Damages payable bythe Contractor to the Authority underClause 14.5 of EPC Agreement 7 Determination of costs and time 7.1 TheAuthority’sEngineershalldeterminethecosts,and/ortheir reasonableness, that are required to be determined by it under the Agreement. 7.2 TheAuthority’s Engineer shall determine theperiod ofTimeExtension thatis requiredto be determined by it under the Agreement. 7.3 TheAuthority’sEngineershallconsulteachPartyineverycaseof determinationin accordance with the provisions of Clause 18.5 of EPC Agreement. 8 Payments 8.1 TheAuthority’sEngineershallwithholdpaymentsfortheaffectedworks forwhich the Contractor fails to revise and resubmit the Drawings to the Authority’s EngineerinaccordancewiththeprovisionofClause10.2.4(d) ofEPCAgreement. 8.2 Authority’s Engineer shall (a) within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor pursuant to Clause 19.4, determine the amount due to the Contractor and recommend the release of 90 (ninety) percent of the amount so determined as part payment, pending issue of the Interim Payment Certificate;and (b) within 15 (fifteen) days of the receipt of the Stage Payment Statement referredto in Clause 19.4, deliver to the Authority and the Contractor an Interim Payment Certificate certifying the amount due and payable to the Contractor, after adjustments in accordancewiththeprovisionsofClause 19.10 ofEPC Agreement. 8.3 The Authority’s Engineer shall, within 15 (fifteen) days of receipt of the First stage Maintenance Payment Statement from the Contractor pursuant to Clause 19.6 of EPC Agreement, verify the Contractor’s statement and certify the amount to be paid to the Contractor in accordance with the provisions of the Agreement. 8.4 The Authority’s Engineer shall certify final payment with 30 (thirty) days of the receipt of the final payment statement of Maintenance in accordancewiththe provisions of Clause 19.16 of EPC Agreement. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m02397404/2025/S&R Zone 9. Other duties and functions TheAuthority’s Engineershall perform all other dutiesandfunctions as specified intheAgreement. 10Miscellaneous 10.1 All key personnel and sub professional staff of the Authority Engineer shall use the fingerprint based (biometric) attendance system for marking their daily attendance. Attendance shall be marked at least once a day and anytime during the day. 1 Biometric Attendance System shall be installed by the Authority Engineer at its own cost at the site office in order to facilitate the attendance marking. More systems can be installed near the project highway upto a maximum of 1 system per 50 km in order to encourage frequent visits of project highway by key personnel and sub professional staff. A copy of monthly attendance records shall be attached with Monthly Status Report. Proper justification shall be provided for cases of absence of key personnel/ sub professional staff which do nothave prior approval from Project Director of concerned stretch 10.2 A copy of all communications, comments, instructions, Drawings or Documents sent bythe Authority’s Engineer to the Contractor pursuant to this TOR, and a copy of all the test results with comments of the Authority’s Engineer thereon, shall be furnished by the Authority’s Engineer to the Authority forthwith. 10.3 The Authority’s Engineer shall retain at least one copy each of all Drawings and Documentsreceivedbyit,including‘as–built’Drawings andkeepthem initssafe custody. 10.4 Within 90 (ninety) days of the Project Completion Date, the Authority’s Engineer shallobtainacompletesetofasbuiltDrawingsin2 (two)hardcopiesandinmicro film form or in such other medium as may be acceptable to the Authority, reflectingthe ProjectHighwayasactually designed,engineeredandconstructed, including anas-built survey illustrating the layout of the Project Highway and setback lines, if any, of the buildings and structures forming part of project Facilities; and shall hand them over to the Authority against receipt thereof. 10.5TheAuthority’sEngineer,ifcalleduponbytheAuthorityorthe Contractororboth, shallmediate and assistthe Parties in arriving atan amicable settlementofany Disputebetween the Parties. 10.6TheAuthority’sEngineershallinformtheAuthorityandtheContractorof anyevent ofContractor’s Default within one week of its occurrence. 11. PERFORMANCE CLAUSE File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m12397404/2025/S&R Zone Authority’s Engineers shall be expected to fully comply with all the provisions of the `Terms of Reference’, and shall be fully responsible for supervising the Designs, Construction and maintenance and operation of the facility takes place in accordance with the provisions of the EPC Agreement and other schedules.Any failure of the AuthorityEngineer innotifying to Employer and the Contractor on non-compliance of the provisions of the EPC Contract Agreement and other schedules by the EPC Contractor, non-adherence to the provision of ToR and non-adherence to the time schedule prescribed under ToRshall amount tonon-performance. The Authority Engineer shall appoint its authorized representative, who shall issueonbehalf of the AE, Completion Certificate along with the Team Leader and shall carry out any such task as may be decided by Employer. The AE shall take prior approval of Employer before issuing Completion Certificate. The proposal submitted shall also include the name of the authorized representativealong withtheauthorizationletter andpower ofattorney. 12. CONSULTANT’S PROPOSAL 12.1 List ofkey personnel tobefielded by theConsultants shall beas below: Normal Highway Project: i. TeamLeaderCumSeniorHighwayEngineer ii. Resident cum Highway Engineer iii. SeniorQuantitycum MaterialExpert iv. Bridge/Structural Engineer v. Senior Pavement Specialist vi. Planning Engineer vii. RoadSafetyExpert StandaloneBridgeProject: i. Team LeaderCum SeniorBridge Engineer ii. Resident cum Pavement Specialist iii. Bridge/Structural Engineer iv. Planning Engineer v. SeniorQuantitycum MaterialExpert vi. Road Safety Expert Standalone TunnelProject: i. TeamLeaderCumSeniorTunnelExpert ii. Resident cum Excavation Specialist iii. Senior Geotechnical Expert iv. TunnelDesign Engineer File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m22397404/2025/S&R Zone v. TunnelSafetyExpert vi. Planning Engineer vii. SeniorGeologist 12.2 Broad job-description and minimum qualification for key personnel mentioned in Section-VIA . However, higher marks shall be accorded to the Candidate with higher relevant qualification and experience. All the CV’s of the personals mentioned in Para5.3 (iii) of Data Sheet shall be evaluated at the time of evaluation of technical proposal. The age of the Key Personnel should not be more than 65 years on the date of submission of proposal. Consultants are advised in their owninterest to frame the technical proposal in an objective manner as far as possible so that these could be properly assessed inrespect ofpoints to begivenas partof evaluation criteria. The bio-data of the key personnel should be signed on every sheet by the personnel concerned and the last sheet of each bio-data should also be signed by the authorised signatory for the Consultant. The key personnel shall also certify at theendof their bio-data proforma that they have not left any of the Employer works without completing of their assignment and have not accepted any other offer at the time of signing of the bio-data and as such shall be available to work with the Authority Engineer, if the Project isawarded. In case the key personnel leaves the assignmentwithout approvalofEmployer,Employer would beatliberty totakeany appropriate action against that key personnel including debarment. The CV submitted by selected firm/JV shall be hoisted on official website of Employer. 12.3 In addition to above, consultants are required to propose other key personnel, sub-professional staff and other field engineers as detailed in Section- VIA and the minimum qualification requirements for the same is enclosed in Section VIA 13. PERIOD OF SERVICES 13.1 The services of an Authority’s Engineer will be in phases as per Contract Agreement. 13.1.1 The appointment of the Authority’s Engineer shall initially be as per details givenbelow. Periodofservice(in Construction Maintenance/DLP period Period months) (inmonths) (inmonths) Construction Period DLPPeriodasper CivilContract +DLPPeriodasper Agreement CivilContract Agreement File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m32397404/2025/S&R Zone The proposed manpower deployment for this period shall be matching the activities to be performed during the said period. The time frame for services during the deployment of key personnel during this period shall be as shown in Section VIA. Extension of Time for providing services of Engineer may the Authority’s be_- extended concurrently with the Extension of EPC Time granted, if any, to the Contractor for the project, Subject to satisfactory| performance of the Authority’s Engineer and limited to original period of consultancyservices. 14. ProjectCoordinator The Firm shall appoint a personnel from its head office to act as Project Coordinatorforthe assignment with approval of the Authority. The CV of the project coordinator shall be submitted to the Authority for approval and he shall full fill the eligibility criteria for Team Leader as per RFP. For the firms having rating score of more than 90, no approval of coordinators CV is required. He will be authorized to communicate with the Authority in respect of all matters pertaining to the project. If the performance of the project coordinator is found unsatisfactory, the Authority may direct replacement of the project coordinator. The cost of the Project Coordinator shall be incidental totheConsultancyAssignment. Annexure I- Daily Inspection Report in construction period Resultsoflab tests Description Nameofkey conducted ofinspection personnel (Test Componen Item Description work inspecting conducted, t carriedout thework Pass/Fail) 1.Roadworks Embankment/ Sub includingculverts, Grade/ GSB/ andminorbridges WMM/DBM/ BC Foundation/ Sub 2. Major Bridge structure/ Super works, Flyovers, structure ROB, RUB, VUP, PUP Foundation/ Sub 3. Approach to structure/ Super ROB/RUB/ structure Major Bridges/ Viaduct /REwall 4. Other Works File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m42397404/2025/S&R Zone Annexure II- Daily Inspection Report in O&M period Nature of defect/ deficiency Defect Ifdefect Complianceof AE found found, previousdefect Remarks (Yes/No) Chainage& (Yes/No/NA) side ROADS Carriageway and paved shoulders Breach or blockade Potholes Removal of debris Hard/earth shoulders, side slopes, drains and culverts Desilting of drains in urban/semi-urban areas Road side furniture including road signs and pavement marking Damage to shape or position; poor visibility or loss of retro-reflectivity Street lighting and telecom (ATMS) Any major failure of the system Faults and minor failures Trees and Plantation Obstruction in a minimum head-roomof5mabove carriagewayorobstructioninvisibilityofroadsigns Rest areas Cleaning of toilets Defects in electrical, water andsanitary installations Toll plaza[s] Failure of toll collection equipmentincluding ETC or lighting Other Project Facilities and Approach roads DamageordeteriorationinApproachRoads, - [pedestrianfacilities,trucklay-bys,bus-bays,bus- shelters,cattlecrossings,TrafficAidPosts,Medical AidPosts and other works] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m52397404/2025/S&R Zone Annexure III- Weekly Inspection Report in O&M period Defect Ifdefect Complianceof AERemarks found found, previousdefect (Yes/No) Chainage& (Yes/No/NA) Natureofdefectordeficiency side ROADS (a) Carriagewayandpavedshoulders (i) Breachorblockade Roughnessvalueexceeding2,500 mminastretchof1km(as measuredbyastandardised (ii) roughometer/bumpintegrator) (iii) Potholes (iv) Crackinginmorethan5%of roadsurfaceinastretchof1km Ruttingexceeding10mminmore than2%ofroadsurfaceina stretchof1km(measuredwith3m (v) straightedge) (vi) Bleeding/skidding (vii) Ravelling/Strippingofbitumen surfaceexceeding10sqm (viii) Damagetopavementedges exceeding10cm (ix) Removalofdebris (b) Hard/earthshoulders,sideslopes,drainsand culverts Variationbymorethan2%inthe prescribedslopeofcamber/cross (i) fall (ii) Edgedropatshouldersexceeding 40mm Variationbymorethan15%in theprescribedside(embankment) (iii) slopes (iv) Raincuts/gulliesinslope File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m62397404/2025/S&R Zone Defectfound Ifdefectfound, Complianceofprevious AE (Yes/No) Chainage& defect(Yes/No/NA) Remarks side Natureofdefectordeficiency Damagetoorsiltingofculvertsandsidedrains duringandimmediatelyprecedingtherainy (v) season (vi) Desiltingofdrainsinurban/semi-urbanareas (c) Roadsidefurnitureincludingroadsignsandpavementmarking Damagetoshapeorposition; (i) poorvisibilityorlossofretro-reflectivity (d) Streetlightingandtelecom(ATMS) (i) Anymajorfailureofthesystem (ii) Faultsandminorfailures (e) Treesandplantation Obstructioninaminimumhead-roomof5m abovecarriagewayorobstructioninvisibilityof (i) roadsigns (ii) Deteriorationinhealthoftreesandbushes (iii) Replacementoftreesandbushes (iv) Removalofvegetationaffectingsightlineand roadstructures (f) Restareas (i) Cleaningoftoilets (ii) Defectsinelectrical,waterandsanitary installations (g) Tollplaza[s] (i) Failureoftollcollectionequipmentincluding ETCorlighting (ii) Damagetotollplaza (h) OtherProjectFacilitiesandApproachroads File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m72397404/2025/S&R Zone Defect Ifdefect Complianceof AE found found, previousdefect Remarks (Yes/No) Chainage& (Yes/No/NA) Nature of defect or deficiency side DamageordeteriorationinApproachRoads, -[pedestrianfacilities,truck lay-bys,bus-bays,bus-shelters,cattle crossings,TrafficAidPosts,MedicalAidPosts (i) andotherworks] BRIDGES (a) Superstructure of bridges (i) Cracks (ii) Spalling/scaling (b) Foundations of bridges (i) Scouring and/or cavitation Piers,abutments,returnwallsand wingwallsofbridges (c) Cracksanddamagesincludingsettlement and (i) tilting (d) Bearings (metallic) of bridges (i) Deformation Jointsinbridges (e) Looseningandmalfunctioningofjoints (i) (f) Other items relating to bridges Deformingofpadsinelastomericbearings (i) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m82397404/2025/S&R Zone Gatheringofdirtinbearingsandjoints;or cloggingofspouts,weepholesand vent-holes (ii) Damageor deteriorationinparapetsand (iii) handrails Rain-cutsorerosionofbanksofthesideslopesof (iv) approaches (v) Damage to wearing coat Damageordeteriorationinapproachslabs, pitching,apron,toes,floororguidebunds (vi) Growthofvegetationaffectingthestructureor obstructingthewaterway (vii) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a2m92397404/2025/S&R Zone Annexure IV- Month of survey for equipment based road condition assessment Equipment based road inspection shall be done by the Authority’s Engineer twice a yearas per themonthof theyear defined inthefollowingtable. However, since the first survey shall be conducted at the time of completion testing, the following modification to the schedule shall be adopted. For example, if majority of highway length (>50%) passes through a state, where defined survey months are May and November, if completion testing is conducted in April, then the first equipment based survey shall be conducted in the month of April. This shall be considered as the equipment based survey to be conducted in the month of May. The 2nd equipment based survey shall be conducted in the month of November, the 3rd survey shall be conducted in the month of May and so on. As regards FWD, the first test/survey shall be conducted at the time of completion in April. The 2nd test/survey shall beconductedinApril ofnextyear andso on. Region State Surveybefore Survey after rains rains East Bihar May Nov East Chhattisgarh May Nov East Jharkhand May Nov East Orissa May Nov East West Bengal May Nov Central Madhya Pradesh May Nov NE Arunachal Pradesh Mar Oct NE Assam Mar Oct NE Manipur Mar Oct NE Meghalaya Mar Oct NE Mizoram Mar Oct NE Nagaland Mar Oct NE Sikkim Mar Oct NE Tripura Mar Oct North Chandigarh May Nov North Delhi May Nov File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m02397404/2025/S&R Zone North Haryana May Nov North Himachal May Nov North Jammu And Kashmir May Nov North Punjab May Nov North Uttar Pradesh May Nov Region State Surveybefore Survey after rains rains North Uttaranchal May Nov Andaman And Nicobar South Apr Nov Islands South Andhra Pradesh Apr Nov South Karnataka Apr Nov South Kerala Apr Nov South Pondicherry Jun Jan South Tamil Nadu Jun Jan West Dadar Nagar Haveli Apr Oct West Daman And Diu Apr Oct West Goa May Nov West Gujarat Apr Oct West Maharashtra May Nov West Rajasthan Apr Oct File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m12397404/2025/S&R Zone Annexure V- Monthly Progress Report in Construction Phase [NAME & LOGO OF IMPLEMENTING AGENCY] [PROJECT NAME] Authority Engineer [NAME OF CONSULTING FIRM] MONTHLY PROGRESS REPORT NO. [XX]FOR THE MONTH OF: [MONTH], [YEAR] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m22397404/2025/S&R Zone Table of content Contents Page Nos. 1 Executive Summary............................................................................................................ 1.1 Construction progress in current month 1.2 Current issues and recommended actions by IE / AE 1.3 Strip Plan (Summary) 1.4 Strip Plan (Details) 2 Project Overview................................................................................................................. 2.1 Salient Features of Project 2.2 Project Milestones 2.3 Location Map 2.4 Key Plan 3 Critical Issues & Action Log.............................................................................................. 3.1 Pending Issues & Action Log 3.2 Obligations as per Contract 4 Physical Progress................................................................................................................ 4.1 Detailed Scope of Work & Physical Progress by Component 4.2 Details of verification of source of material 5 Land Acquisition and Clearance....................................................................................... 5.1 LA Summary 5.2 LA Detail by CALA 5.3 LA Detail by Village for each CALA 5.4 Manpower details of CALA 5.5 Clearances Summary 5.6 Status of utilities shifting 6 Change of Scope................................................................................................................. 7 Mobilization of Resources.................................................................................................. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m32397404/2025/S&R Zone 8 Financial Progress Details (for PPP projects).......................................................... 8.1 Pen Picture - Escrow 8.2 Escrow details 9 Summary of quality control tests..................................................................................... 9.1 Tests witnessed by IE/ AE 9.2 Tests conducted by IE / AE 10 Monitoring of maintenance obligations during construction phase............... 10.1 Critical issues and action log 10.2 Summary of repair work 10.3 Status of damages 11 Safety features................................................................................................................. 11.1 Pen picture of safety features 11.2 Accident Report 12 Annexures.......................................................................................................................... File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m42397404/2025/S&R Zone 1 Executive Summary 1.1 Construction progress in current month Key reporting metrics Value/ %/ Amount Scheduled Physical Progress (%) Cumulative Physical Progress upto current month (%) Physical Progress during current month (%) Financial progress (%) Cumulative Expenditure till date (Rs Cr) Tests passed as % of total tests witnessed by IE Tests passed as % of total tests conducted by IE Number of pending COS proposals Amount for pending COS (Rs Cr) 1.2 Current issues and recommended actions by IE / AE 1. SlowProgressofStructures:Theprogressofstructures(especially, majorbridges,flyoversandROB’s)isveryslow. Overall progressis only XX%. Out of the total YY underpasses not even single underpass structure and its approaches is completed so far. No bridge is open to traffic sofar. a. Recommendation: Concessionaire should improve the progress of structures. Request for revised workplan from Concessionaire including specific activities on structures. 2. Statusof Change of Scope Proposals: Concessionaire has submitted Xx No. Change of Scope proposals. Yy No. of them are still pending for decision. Concessionaire has not submitted necessary clarifications /details for the following Changes of Scope in spite of severalreminders. a. Recommendation: Concessionaire to submit all pending clarifications to Authority. Authority and Concessionaire to expedite pending COS proposals. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m52397404/2025/S&R Zone 1.3 Strip Plan 1. Work Front Unavailable & reason 2.Length Completed by layer 3. Length Completed by for unavailability (MCW) layer ( Service Road) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m62397404/2025/S&R Zone 1.3 Strip Plan (Details) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m72397404/2025/S&R Zone Detailed report 2 Project Overview 2.1 Salient Features of Project Project Name NH No. (New/ Old) Scheme/ Phase ModeoftheExecution(BOTToll/BOTAnnuity/EPC/ HAM/ItemRate/Others) No. of Lanes/ Configuration Length of the Project (in Km) Total Project Cost (in Cr) No. of Bypasses (Name of Town, Length) No. of Major Bridges (Number and Location) No. of Toll Plazas (Number and Location) No. of Fly Overs (Number and Location) DPR Authority’s EngineerName Lead & Consortium Members of Banks Concessionaire Name (SPV & Parent Company) Date of Award (LOA Date) Appointed Date Concession Period Construction Period (in Days) O&M Period (in Days) Scheduled Date of Completion Authority Engineer IE / AE Agreement Date IE / AE Mobilization Date File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m82397404/2025/S&R Zone 2.2 Project Milestones Ac Pla tu Descripti n al on ned Dela Projec y(No. Curren t (Days Physical Physical of t Scheduled Milest from Progress Progress mont Status Date one Appoint Revised Date hs) ed (%) (%) Date) Mileston [Description 25 [DD/MM/YY 25 [DD/MM/YY 5 Achi ] YY YY eve eI d ] ] Started [Description 65 [DD/MM/YY [DD/MM/YY 22 ,not Milesto ] YY YY achiev ne II ed ] ] Schedule Not d start [DD/MM/YY [DD/MM/YY Com ed YY YY pleti [Description 100 21 ] ] ] on File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a3m92397404/2025/S&R Zone 2.3 Location Map File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m02397404/2025/S&R Zone 2.4 Key Plan [Above image is illustrative only. Please include chainage and name below the axisandlist offeaturesabove theaxis] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m12397404/2025/S&R Zone 3 Critical Issues & Action Log 3.1 Pending Issues & Action Log Ongoin Expected g/New date/ Chainage( Action(s Issue/ Lengt Action(s) ActualDate s) S.N Issue Type Resolve Concerned h takentill for affected ) Description d Authorit affect now resolving dueto o y e d theissue suggeste issue dby (km) theAE 1.Proposal submitted to MoEFLetter Diversionof Escalateto [DD/MM/Y sentbyRO Xxhaof higher YY toMoEF 1 forestLand Clearance Ongoin MoEF [Chainag 4kms level nodal gIssue e] officersat Y] officeron MoEF [DD/MM/YY Y Y] 1. Escalated tochief secretary 21 level Crcompensati [CALANa [DD/MM/Y throughDO on m YY from 2 disbursement Land Resolve [Chainag 2.4 Chairman/ pending Acquisition d e] e] km Y] Secretary, dated [DD/MM/YY Y Y] Project Directorto Slow callhigher progressby upsof concessionair Concession New [Concess concession [DD/MM/Y e aireIssue Issue . aire YY 3 [Chainag 57km None Name] e] Y] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m22397404/2025/S&R Zone 3.2 Obligations as per Contract 4 Physical Progress Physical Progress Physical (Cumulati % Progress(Duri ve,Upto Compone Weighta ng Current nt ge Month) Current Month ) Road Works 35.00% 5% 15.0% MajorBridge worksandROB/ 40.00% 1.20% 26.2% RUB Structures 21.00% 0.00% 0.8% Other Works 4.00% 0.00% 0.0% Physical 2 42.0% Progress % File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m32397404/2025/S&R Zone 4.1 Detailed Scope of Work & Physical Progress by Component Cost Cost Value of Weightag Weightag Planned in Physical ein ein Scope(As Progress %Physica Progress Component Project Item Componen per Scope till Date l (7X4) (%) Description t ofWork) Progress (%) 1 2 3 4 5 6 7 8 35.00% 1.C&G 5.00% 80km 45km 56% 2.8% 1.Roadworks including 2.Embankment 5.00% 80km 40km 50% 2.5% culverts,minor 3.SubGrade 5.00% 80km 35km 44% 2.2% bridges, underpasses, 4.GSB 5.00% 80km 33km 41% 2.1% overpasses, 5.WMM 5.00% 80km 30km 38% 1.9% approachesto ROB/RUB/Major 6.DBM 5.00% 80km 28km 35% 1.8% Bridges/ 7.BC 5.00% 80km 27km 34% 1.7% Structures(but excludingservice roads) 40.00% 1. Major Bridges 10.00% 6No 6No 100% 10.0% 2.MajorBridge works and 2. Minor Bridges 5.00% 23No 21No 91% 4.6% ROB/RUB 3.Flyovers 5.00% 2No 0 0% 0.0% 4.ROB 5.00% 228 No 121 No 53% 2.7% 5.VUP 5.00% 11No 6No 55% 2.7% 6.PUP 5.00% 15No 6No 40% 2.0% 7.RUB 5.00% 136 No 114 No 84% 4.2% 3.Structures 21.00% 1.Foundation 5.00% 35km 2.2km 6% 0.2% (elevated 2. Sub-structure 5.00% 35km 2.1km 6% 0.2% sections, reinforcedearth) 3. Super-structure 5.00% 35km 2.1km 6% 0.2% 4. Reinforced Earth 6.00% 35km 2.1km 6% 0.2% Wall 4.Other 4.00% 1.TollPlaza 4.00% 4No 0 0% 0.0% Works GRAND TOTAL 100% 42.0 % File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m42397404/2025/S&R Zone 4.2 DetailsofverificationofSourceofmaterialreceivedatyard/Plant/site Material Quantityreceivedat Approvedquantityand Quantityreceivedfrom Project Site source of material the approved source 1. Earth 3. Cement 4. Steel 5. Bitumen 6. Admixtures 7. Bearings 8. Othermaterials i) ii) iii) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m52397404/2025/S&R Zone 5 Land Acquisition and Clearance 5.1 LA Summary Total Total in Totaltobeacquired Descriptio (ha) n Required possessionat (ha) start(ha) Existing ROW 135.00 135.00 0.00 Pvt. Land To be Acquired 240.00 0.000 240.00 Public Land To be Transferred 52.00 50.35 1.65 Grand Total 427 185 242 5.2 LA Detail by CALA Amount 3G Amoun Amount Pendin Disburse TotalLand t Deposite g 3H 3DD 3ADo Pend dby lefttobe Awarde d(Crore Amount CALA 3HDo 3GD 3DPend 3APendi CALA(Cro Acquired Pend- o ne(h d Rs.) (Crore -ing ing ng(Ha (Ha) ing ne(h a (Crore Rs.) n (ha) o reRs.) (ha) (ha) a e(ha ne(ha ) ) Rs.) ) ) ) CALA1] 150 15 15 15 135 0 150 0 150 396 370 327 43 [CALA2 67 0 0 0 67 0 67 0 67 132 132 120 23 ] [CALA 23 23 23 23 0 14 9 0 23 0 0 0 0 3] Grand 240 38 20 38 20 14 226 0 240 528 502 447 66 Total 2 2 5.3 LADetail by Village for each CALACALA 1 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m62397404/2025/S&R Zone 5.4 Manpower details of CALA Provided Revenu Tehsilda Patwaris Compu by e rs/ ter Amins /Village Inspect Dep. Clerks operat <Agency CALA / account ors/ Tehsilda / Accounta ors Peons Chain Tota > ant Kanung rs nts l Survey Sahay man /State ors o aks Govt <Agency [CALA1] 4 1 0 0 3 0 3 1 0 12 > [CALA1] State Govt 2 0 2 0 0 0 1 0 0 5 <Agency [CALA2] > [CALA2] State Govt Grand Total 5.5 Clearances Summary Environmen t Length Proposal Description Status Current Stage Issues/ Comments Impacte d Approvalofconstructionincoastal Obtaine Nil Completed zone d Forest Land Length Proposal Description Status Current Stage Issues/ Comments Impacted DiversionofXxha([Chainage]) Pending [Lengthin Completed Stage1clearance km] pending DiversionofXxHa.([Chainage]) Obtaine Nil Ongoing d File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m72397404/2025/S&R Zone Wildlife Length Proposal Description Status Current Stage Issues/ Comments Impacted Diversion ofXxHa.of Pending [Lengthin Ongoing Queries sent to MoEF by forest land RO, compliance pending km] TreeCutting Proposal Description Status Length Current Issues/ Comments Impacted Stage N.A. N.A. N.A. N.A. N.A. Railway (ROBs/RUBs) Proposal Description Status Length Current Issues/ Comments Impacted Stage [GADNumber] Proposal [Chainage] Uploaded on N.A. Submitted, portal on Approval [DD/MM/YYY pending Y] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m82397404/2025/S&R Zone 5.6 Status of utilities shifting Date Date of when Certific Date of Date Date Prog Estimat at ion request of of re ss e was from Utilit Leng Esti by Appro Depos ofPh Receive Agency y th ma Authori val by it of ys Na Depar d from for Issue Categ affec te ty for Author ical m t concern Comple / o ry ted super- Amo e Statu estimat e it Shift tio Comm vision un t s ment e yRO/ i ng e nts charg ddept. HQ n e Estim [DD/M a te M [Leng [DEPA [DD/MM [DD/MM/ [DD/M Not Appr t h RT / M/ / start o Wate YYYY] TBD inkm] ed r MENT] YYYY] YYYY] YYYY] ved Estim [DD/M a te M Electri [Leng [DEPA [DD/MM [DD/MM/ [DD/M Not Appr c ity t h RT / M/ / start o YYYY] TBD inkm] ed MENT] YYYY] YYYY] YYYY] ved Estim a te [Leng [DEPA [DD/MM [DD/MM/ [DD/M [DD/M Appr t h RT / M/ M/ o ved Other YYYY] TBD inkm] s MENT] YYYY] YYYY] YYYY] 6 Change of Scope Dateof COS ed/Actual Date first SNo. Proposal Details submission Current Status Amoun ofApproval to t AE Construction of Approved in principle by [+/- [Flyover Authority. 1 [DD/MM/YYYY [DD/MM/YYYY] Amou Name] at ] Detailed quantities in nt] proper order yet to be File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a4m92397404/2025/S&R Zone [Chainage] submitted Clarifications to be Nallah diversion [+/- submitted by through box culvert [DD/MM/YYYY [DD/MM/YYYY] 2 Concessionaire , expected Amou at[Chainage] ] nt] date[DD/MM/YYYY] 1 MobilizationofResources:-Allcontractorequipmentshouldbemandatorilyfittedwith GPS and the tracking ofthe same shallbemaintained bythe AE and submitted as partofthe MPR. Vehicles without evidence of GPS history shall not be accepted as part of machinery deployment of the Contractor by the AE. The details of Mobilization of resource shall be submitted in the following format Details Expecte Deploy Reason(s) of dDelay ownershi ed for Ageof Planned due to S Equipment Ma Mod p/Hiring Actual During Under/Ove Remark Equipm Under- Name / Quantit the r s No ke el ent Mobilizat Require y Month Mobilizatio ion . d n Quantit y Excavator/ Poclain 5 Paver 2 Transit Meter 0 Plate Compactors 0 [ADD OTHERS ] 2. Financial Progress Details (for PPP projects) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m02397404/2025/S&R Zone 2.1 Pen Picture - Escrow Cumulative Cumulative Inflow to Outflow from inflowtoEscrow TPC (Cr) outflowfrom Escrowduring Escrow during tillprevious Escrowtill themonth(Cr) themonth(Cr) month (Cr) previous month(Cr) 1,206 1,033 900 30 35 Are the Escrow withdrawals in accordance with the order of withdrawal as specifiedin the Concession Agreement? Tick as applicable If not, details to be provided below: 2.2 Escrow details EscrowPlan Escrow Escrow tilldate- Actualtill Actualtill Cumulativ EscrowPlan EscrowPlan EscrowActual Equity date- date- eexp.till tilldate- till date- tilldate- TPC(Cr) (BOT)(Cr) Debt VGF date(Cr) Debt VGF (BOT) Equity(BOT) (BOT) (BOT) (BOT)(Cr) (Cr) (Cr) (Cr) (Cr) 1,206 1,033 900 306 - 769 264 - 3. Summary of quality control tests 3.1 Tests witnessed by IE/ AE Totaltestup toPrevious Frequenc TotaltestinThis Cumulative No. Month Month Descriptio yof Uni oftests Remar n tests t ks No. Conducte Pas Fai Conducte Pas Fai Conducte Pas Fai s d s l d s l d s l Qty. Subgrade 150 Procter test 1 m3 0 0 0 0 0 0 0 0 0 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m12397404/2025/S&R Zone 0 Atterberg 150 1 m3 0 0 0 0 0 0 0 0 0 Limits 0 FreeSwell 150 1 m3 0 0 0 0 0 0 0 0 0 Index 0 GrainSize 150 1 m3 0 0 0 0 0 0 0 0 0 Analysis 0 300 C.B.R 1 m3 0 0 0 0 0 0 0 0 0 0 Granular Sub Base Gradation 1 200 m3 151 151 0 5 5 0 156 156 0 Atterberg 1 200 m3 151 136 15 5 5 0 151 136 15 Limits 150 Procter test 1 m3 0 0 0 0 0 0 0 0 0 0 WetMix Macadam Filter materia l Concrete Cement Water Prim e Coat Tack coat Dense Bituminou File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m22397404/2025/S&R Zone Totaltestup toPrevious Frequenc TotaltestinThis Cumulative No. Month Month Descriptio yof Uni oftests Remar n t ks tests No. Conducte Pas Fai Conducte Pas Fai Conducte Pas Fai s d s l d s l d s l Qty. s Macadam Bituminou sConcrete Bitumen test DLC Steel 3.2 Tests conducted by IE / AE <Quality inspection test results to be reported in a table similar to the table provided inprevious section> File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m34. Monitoring of maintenance obligations during construction phase 4.1 Critical issues and action log 154 oNS noitpircseDeussI weN/gniognO eussI denrecnoC ytirohtuA )s(eganiahC euddetceffa eussiehtot htgneL detceffa nekat)s(noitcA wonllit )s(noitcA ybdetseggus CS etaDdetcepxE gnivloserrof 2397404/2025/S&R Zone 1 Dryingup Ongoing Concessionaire 325+200 2.6 Irregular Replacement NA ofplants watering ofplantsand to onmedian daily 327+800 watering 2 Large New Concessionaire 387+300 0.1 None Fillingof <DD/M potholes potholes M> LHS 4.2 Summary of repair work Work Work doneupto done previous during SNo Description Unit Total month reporting Balance Remarks month 1 Carriageway and paved shoulders (a) PotHoles Sqm 42 - - 42 (b) Roughnessvalue mm exceeding2,500mm (c) Crackinginmorethan5% Sqm 7179 - - 7179 of road surface (d) Rutting exceeding 10mm Sqm 5 - - 5 inmorethan2%ofroad surface (e) Bleeding/Skiding Sqm (f) Ravelling Sqm (g) Damagetopavement m edgesexceeding10cm 2 Hard/Earth Shoulders File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Work Work doneupto done previous during SNo Description Unit Total month reporting Balance Remarks month (a) Rain cuts/ gullies in slope Cum 650 25 - 625 (b) Edgedropatshoulders m exceeding40mm 3 Drains and culverts (a) Cleaning of Culvert Nos 1 - - 1 (b) Damagetoorsiltingof culverts (c) Siltingofdrainsin urban/semiurbanareas 4 Road furniture (a) Sign Boards Nos 456 - - 456 (b) Kilometer Stones (c) Metal Beam Crash Barrier (d) BusShelters Nos 72 4 - 68 (e) Junction signs Nos 26 8 - 18 (f) Median Grills Rmt 894 - - 894 (g) Studs Nos 5328 - - 5328 (h) Delinators Nos 8236 - - 8236 (i) Road Marking Sqm 1899 - - 1899 (j) KerbPainting Sqm 4575 - - 4575 (k) Guard Posts Nos 3657 - - 3657 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m52397404/2025/S&R Zone 5 Street lighting and telecom (ATMS) (a) Street lights Nos (b) Telecom Nos 6 Trees and plantation (a) Removal of vegetation Ha 77.42 - 3.57 73.85 affecting sight line and roadstructures (b) Replacementoftreesand Nos 15072 - - 15072 bushes File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m62397404/2025/S&R Zone Work Work doneupto done previous during SNo Description Unit Total month reporting Balance Remarks month 7 Buildings and bridges (a) Rest areas (b) Tollplazas (c) Bridges 4.3 Status of damages SNo Period Amount of damages (Rs) 1 Upto June 2016 2 Jul2016 3 Aug 2016 4 Sep 2016 Total 5. Safety features 5.1 Pen picture of safety features Details to be provided after assessment of the site requirement vis-à-vis provisions inthe Concession Agreement: SuggestedRemedial Financialimplicationsof Measures within additionalRemedial LocationofBlack provisionsof Additional Measures for Spots Remedial Concession Authority(Cr.) Measures(ifany) Agreement File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m75.2 Accident Report 158 oNS etaD on eganiahC tnediccafoemiT )F/M(xeS A B C D E F G H I J K No of affecte d persons noitacol tnediccA tnedicca fo erutaN fo noitacifissalC sesuaC fo snoitidnoc daoL noitidnoc daoR fo epyt noitcesretnI noitidnoc rehtaeW mitcivfoegA mitcivfo epyT elcihevfoepyT lataF rojaM roniM yb dedivorp pleH 2397404/2025/S&R Zone 382/050 05:25 1 1/1/17 RHS pm M 2 2 3 4 1 1 - 1 3 1 3 - 1 1 Ambu File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Mapping of report fields to responses A 1.Urban2.Rural 1. Overturned 2. Head On Collision 3. Hit from Back 4. Hit to Fix Object 5. Right turn Collision B 6. Left turn Collision 7. Veered Out off The Road 8. Hit Pedestrian 9. Unknown/Hit & Ran Away C 1. Fatal 2. Major injury 3. Minor injury 1. Drunken 2. Over Speeding3. Vehicle out of Control 4. Driven on wrong side 5. Mechanical D Problem6.Drowsiness/NotApplicable7.Faultof Driver E 1. Normally Loaded 2. Overloaded/Handing 3. Empty 4. Unknown F 1. Straight road 2. Slight Curve 3. Sharp Curve 4. Hump 5. Dip 1. T-Junction 2. Y-Junction 3. Four armJunction 4. Staggered Junction 5. Junction withmore G than6.Round about 1. Fine/Clear 2.Mist/Fog 3. Cloudy 4. Light Rain 5. Heavy Rain 6. Strong Wind 7. Dust Storm 8. H Cold 9. Hot I 1. 0-18 Years 2. 18-25 Years 3. 25-40 Years 4.40-60 Years 5. 60-80 Years J 1. Driver 2. Passenger 3. Pedestrian 4. Cyclist 5. Others 1. Two Wheeler 2. Auto Rickshaw 3. Car/Jeep 4. Bus 5. Light Truck 6. Heavy Truck 7. Tractor K 8. Bicycle 9. Cycle Rickshaw 10. Hand Drawn Cart 11. Animal Drawn Cart 6. Annexures Annex1. DetailedListofPhysicalComponentsasperScheduleG Physical Component Item A- Widening and strengthening of existing road (1) Earthwork up to top of the sub-grade (2)Granularwork (sub-base,base,shoulders) (a)GSB (b)WMM (3)Shoulders (4) Bituminous work (a)DBM File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a5m92397404/2025/S&R Zone (b) BC (5)RigidPavement Concrete work (6) Widening and repair of culverts (7) Widening and repair of minor bridges B-Newrealignment/bypass (1) Earthwork up to top of the sub-grade (2)Granularwork (sub-base,base,shoulders) (a)GSB (b)WMM (3)Shoulders (4) Bituminous work Roadworks (a)DBM includingculverts, (b) BC minorbridges, underpasses, (5)RigidPavement overpasses, Concrete work approachesto ROB/RUB/Major C-Newculverts,minorbridges,underpasses,overpassesonexisting Bridges/ road, Structures(but realignments, bypasses: excludingservice roads) (1)Culverts (2) Minor bridges (a)Foundation (b) Sub-structure (c) Super-structure (including crash barriers etc. complete) (3) Cattle/Pedestrian underpasses (a)Foundation (b) Sub-structure (c) Super-structure (including crash barriers etc. complete) (4) Pedestrian overpasses (a)Foundation (b) Sub-structure (c) Super-structure (including crash barriers etc. complete) (5) Grade separated structures (a)Underpasses File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m02397404/2025/S&R Zone Physical Component Item (i)Foundation (ii) Sub-structure (iii) Super-structure (including crash barriers etc.complete) (b)Overpass (i)Foundation (ii) Sub-structure (iii) Super-structure (including crash barriers etc. complete) (c)Flyover (i)Foundation (ii) Sub-structure (iii) Super-structure (including crash barriers etc. complete) (d) Foot over Bridge A- Widening and repairs of Major Bridges (1)Foundation (a)OpenFoundation (b) Pile Foundation/Well Foundation (2) Sub-structure (3) Super-structure (including crash barriers etc. complete) B- Widening and repair of (a)ROB (1)Foundation (2) Sub-structure (3) Super-structure (including crash barriers etc. complete) (b)RUB (1)Foundation (2) Sub-structure (3) Super-structure (including crash barriers etc. complete) C- New Major Bridges (1)Foundation (a) Open Foundation File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m12397404/2025/S&R Zone (b) Pile Foundation/Well Foundation MajorBridge works (2) Sub-structure andROB/RUB (3) Super-structure (including crash barriers etc. complete) D- New rail-road bridges (a)ROB (1)Foundation (2) Sub-structure (3) Super-structure (including crash barriers etc. complete) (b)RUB (1)Foundation (2) Sub-structure (3) Super-structure (including crash barriers etc. complete) Structures (1)Foundation (elevatedsections, (2) Sub-structure reinforced (3) Super-structure (including crash barriers etc. complete) earth) (4) Reinforced Earth Wall (includes Approaches of ROB, Underpasses, Overpasses, Flyover etc. (i) Service roads/ Slip Roads (ii)Toll Plaza (iii) Road side drains (iv) Road signs, markings, km stones, safety devices, …. (a)Road signs, markings, km stones, …. (b) Concrete Crash Barrier/ W-Beam Crash Barrier in Road work (v) Project facilities (a)Busbays (b) Truck lay-byes (c)Restareas (vi) Repairs to bridges/structures (vii) Road side plantation (viii) Protection works Other Works (a) Boulder Pitching on slopes (b) Toe/Retaining wall (ix) Tunnel File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m22397404/2025/S&R Zone (a)Excavation (b) Construction of support systemincluding rock bolting, lining etc. (c) On complete completion of tunnel (x)Miscellaneous * The above list is illustrative and may require modification as per the actual scopeof the work Annex 2. Onwards IE / AE should include comments, status update, data points and reports in followingannexures which have not been included elsewhere in the main report. Such reports may include but not limited to: • Review statusof drawings/ design reports • Reviewstatusofotherdocuments • Minutesofreviewmeeting • DetailedInspection reportof project highway • Correspondence details • Weather report • Organizational chart ofConcessionaire / Contractor and IE /AE • Listoflabequipment • Detailsofusercomplaints • Project photographs File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m32397404/2025/S&R Zone ANNEXURE-VI - FORMAT FOR MONTHLY PROGRESS REPORT DURING O&M PHASE [NAME & LOGO OF IMPLEMENTING AGENCY] [PROJECT NAME (O&M)] Authority Engineer [NAME OF CONSULTING FIRM] MONTHLY STATUS REPORT NO. [XX] FOR THE MONTH OF: [MONTH], [YEAR] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m42397404/2025/S&R Zone Table of content Contents PageNos. 1 Executive Summary............................................................................................................ 1.1 Overall road condition 1.2 Key reporting metrics 1.3 Key maintenance activities undertaken 1.4 Pending issues 1.5 Recommended actions by Authority Engineer 1.6 Strip Plan for maintenance 2 Project Overview................................................................................................................. 2.1 Key project details 2.2 Location Map 2.3 Key plan 2.4 RoW availability 2.5 Summary of project features 3 Critical Issues and Action taken....................................................................................... 3.1 Issue and action log 3.2 Summary of items (Cumulative Observations/ Deficiencies) 3.3 Obligations as per contract 3.4 Major maintenance and Inspection schedule 4 Inspection Report............................................................................................................... 4.1 Summary of NCR issued 4.2 Equipment based inspection report 5 Monitoring of ETC lanes.................................................................................................... 5.1 Monthly ETC Report 5.2 On-ground infrastructure report 5.3 On-ground ETC operations and SLA adherence 6 Status of Damages for breach of maintenance activities File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m52397404/2025/S&R Zone 6.1 Damages for non completion of project facilities 6.2 Damages for breach of maintenance activities 6.3 Damages for non completion of major maintenance/ periodic overlay 7 Change of Scope proposals 8 Status of pending disputes................................................................................................ 9 Reports................................................................................................................................. 10 Monthly Toll Collection Report (Applicable only if project highway is tolled) 10.1 Accident Report 10.2 Details of complaints 10.3 Encroachment list 10.4 Lane Closure Report 11 Annexures File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m62397404/2025/S&R Zone 1 Executive Summary 1.1 Overall road condition Road LHS RHS condition Satisfactory road condition 40km 20km Poor road condition 50km 70km Total length of project 90km 90 km 1.2 Key reporting metrics Key metrics Value/Amoun t No of pending NCRs 35 Damages amount recommended on Concessionaire (Rs Cr) Rs5.9Cr No of pending Change of Scope proposals 2 No of pending disputes 2 Monthly toll collection (Rs Cr)If(appcliable) Rs3.8Cr Noofaccidents 12 Noofencroachments 47 1.3 Key maintenance activities undertaken Asset Maintenanceactivities undertaken • Concessionaire has commenced the work forrenewal and repair of pavement Pavement ontheprojecthighwayw.e.f14thSeptember2016 Shoulder Drainage • Cleaning of drainage in built up areas n progress Median • ConcessionairehastakenuprepairsandmaintenanceofMBCBandelectric Roadfurniture poles,etconissuanceofNCPsfromAuthorityEngineer Bridges File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m72397404/2025/S&R Zone • AsperprovisionsofCAandpolicydecidedbyMoRTH/<Agency>,2ETClanes ateach tollplazahave been operationalised w.e.f.25thSeptember2016.The connectivityof ETC lanes with Central Clearing House(CCH) has beenachieved Buildings and presently ETC lanes are operationalized in Hybrid Mode due to less numberoftagspurchasedby highwayusers • Planting of new trees from Chainage 200+300 to 226+650 Horticulture • Trimming of plants which were causing obstruction to highway users File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m82397404/2025/S&R Zone 1.4 Pending issues • Overlayontheentirestretchofprojectlengthof252kmandserviceroadshasnot been taken upby Concessionaireyet since thedate ofcompletionofoverlay isdue innext 25 days • Over all progress is very slow regarding repair of potholes and rutting on Main Carriageway which is causing inconvenience to highway users and is also a concern from road safety point of view. • Street lighting in – Anantapurbypasscompleted on main carriageway and is energized but for service roads street lighting is pending on both sides – Kurnoolbypasserectionofpolesonlycompletedinmaincarriagewaynot yetenergized till to date, but for service roads not started 1.5 Recommended actions by Authority Engineer • In spite of the repeated requests, there is no material change in status of works pertaining to repairs/ rectifications of defects on the project highway. AE has recommended the damages of Rs 5.9 Cr on the Concessionaire on account of delay inrepairs of defects in road and bridge works in terms of the provision of Clause 15.8.1oftheConcessionAgreement. Concessionaire shall be liable for imposition of furtherdamages on similar lines till the date of completion • Concessionaire is requested totake at most care for completingthe overlay before 31.03.2017 since the existing road condition is getting deteriorated day by day causing much inconvenience to the traffic File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a6m92397404/2025/S&R Zone 1.6 Strip Plan for maintenance Satisfactory road condition (Maintenancenotrequired) Poorroadcondition (Maintenance required) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m02397404/2025/S&R Zone Main report 2 Project Overview 2.1 Key project details Project Name NHno(New/Old) Mode of the Project No.ofLanes Length of the Project Total Project Cost Concessionaire/ Contractor Date of Award (LOA date) Appointed Date Commercial Operation Date (COD) Concession Period O&M Period Authority Engineer AE Agreement Date AE Mobilization Date AE Scheduled Completion Date AE EOT (Extension Of Time) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m12.2 Location Map 2.3 Key plan 2.4 RoW availability Width of RoW available on both sides of the highway 172 elbaliava WoRfohtdiW-SHL >20m 20m 18m 16m 16 16 16 16 16 16 16 14m 12m 10m 8m 8.2 8.2 8.2 8.2 8.2 6m 4m 4.7 4.7 4.7 4.7 4.7 2m 1.8 1.8 Chainage elbaliavaWoR fohtdiW-SHR 2397404/2025/S&R Zone 2m 4m 6m 6.2 6.2 6.2 6.2 6.2 6.2 8m 10m 10 10 12m 14m 16m 18m 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 20m >20m 25 25 25 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 2.5 Summary of project features SNo Particular Value s 1 Noofflyovers 2 2 Service Road 45 3 ROBs 5 261.975, 299.606, 350.547, 4 ROB location (chainage) 396.135 & 420.302 5 RUBs 0 6 RUB location (chainage) NA 7 NoofBypass 7 8 Length of Bypass 43 9 NoofMajorBridges 7 10 NoofMinorBridges 67 11 NoofCulvert 640 12 NoofVUP 16 13 NoofPUP/CattleUnderpass 12 14 No of Major Intersection/ Junction 22 15 NoofTollPlaza 3 16 Location of Toll Plaza (chainage) 17 NoofTruckLaybye 30 18 NoofBusBays 122 19 No of Wayside Amenities 0 20 Location of Wayside Amenities (chainage) NA File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m33 Critical Issues and Action taken 3.1 Issue and action log 174 oNS noitpircseDeussI weN/gniognO eussI denrecnoC ytirohtuA )s(eganiahC eud detceffa eussi ehtot htgneL detceffa nekat)s(noitcA wonllit )s(noitcA ybdetseggus CS etaDdetcepxE gnivloserrof 2397404/2025/S&R Zone Replacement Dryingup ofplants ofplants on Concession 325+200to 2.6 Irregular anddaily NA 1 Ongoing waterin aire 327+800 g watering median 387+300 0.1 None Fillingof <DD/M Large Concession 2 New potholes M> potholes aire LHS 3.2 Summary of items (Cumulative Observations/ Deficiencies) Work Work doneupto done previous during SNo Description Unit Total Balance Remarks month reporting month 1 Carriageway and paved shoulders (a) PotHoles Sqm 42 - - 42 (b) Roughnessvalue mm exceeding2,500mm (c) Crackinginmorethan5% Sqm 7179 - - 7179 of road surface (d) Rutting exceeding 10mm Sqm 5 - - 5 inmorethan2%ofroad surface (e) Bleeding/Skiding Sqm (f) Ravelling Sqm (g) Damagetopavement m edgesexceeding10cm 2 Hard/Earth Shoulders (a) Rain cuts/ gullies in slope Cum 650 25 - 625 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone Work Work doneupto done previous during SNo Description Unit Total Balance Remarks month reporting month (b) Edgedropatshoulders m exceeding40mm 3 Drains and culverts (a) Cleaning of Culvert Nos 1 - - 1 (b) Damagetoorsiltingof culverts (c) Siltingofdrainsin urban/semiurbanareas 4 Road furniture (a) Sign Boards Nos 456 - - 456 (b) Kilometer Stones (c) Metal Beam Crash Barrier (d) BusShelters Nos 72 4 - 68 (e) Junction signs Nos 26 8 - 18 (f) Median Grills Rmt 894 - - 894 (g) Studs Nos 5328 - - 5328 (h) Delinators Nos 8236 - - 8236 (i) Road Marking Sqm 1899 - - 1899 (j) Kerb Painting Sqm 4575 - - 4575 (k) Guard Posts Nos 3657 - - 3657 5 Street lighting and telecom (ATMS) (a) Street lights Nos (b) Telecom Nos 6 Trees and plantation File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m52397404/2025/S&R Zone (a) Removal of vegetation Ha 77.42 - 3.57 73.85 affecting sight line and roadstructures (b) Replacementoftreesand Nos 15072 - - 15072 bushes 7 Buildings and bridges (a) Rest areas (b) Tollplazas (c) Bridges 3.3 Obligations as per contract Please write a summary ofcontractualobligations ofConcessionaire and non- compliances ofcritical obligations highlighting reasons for delay and stating pending actions • Critical obligations of Concessionaire as per contract • Non compliance of critical contractual obligations 3.4 Major maintenance and Inspection schedule Item Responsibility Lastcompleted Duedate on Majormaintenance Concessionaire [DD/MM/YY] [DD/MM/YY] Periodic overlay Concessionaire [DD/MM/YY] [DD/MM/YY] Pavement inspection usingNSV Authority Engineer [DD/MM/YY] [DD/MM/YY] Roughnessusing Authority Engineer [DD/MM/YY] [DD/MM/YY] Laser Profilometer Pavement Authority Engineer [DD/MM/YY] [DD/MM/YY] strengthusing FWD Bridgeinspection Authority Engineer [DD/MM/YY] [DD/MM/YY] using MBIU Roadsign inspection using Authority Engineer [DD/MM/YY] [DD/MM/YY] Reflectometer Other File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m64 Inspection Report 4.1 Summary of NCR issued Total NCR NCRissuedin NCRclosedin issuedtill reporting reporting previous BalanceNCR SNo Highway month(B) month(C) (A+B-C) asset month (A) 1 Pavement 48 12 25 35 2 Shoulder 7 0 3 4 3 Drainage 4 Median 5 Roadfurniture 6 Bridges 7 Buildings 8 Horticulture 9 [Otherassets] Total 4.2 Equipment based inspection report Pavement Surface Defects Roughness Pavement Strength 177 gnitratS eganiahC gnidnE eganiahC rebmunenaL )mc( skcarC )mc( selohtoP )mc( gnilevaR )mc( gnideelB htpedgnittuR )mm( htpederutxeT )mm( dikS ecnatsiseR IRI lanoitanretnI( citsalE suludoM citsalE suludoM citsalE suludoM 0.000 0.500 L1 2X10 20X35 2.5X1.2 4X12 25 1.4 4.23 7110 34 14 0.500 1.000 L1 3X5 10X15 1.5X0.8 3X10 24 1.8 2.68 7430 36 15 1.000 1.500 L1 Report of equipment based inspection needs be provided as an Annexure to monthly reportas per the defined frequency. Following documents/media to be submitted for equipment based inspection. • andpavement camera suonimutiB 2397404/2025/S&R Zone Video footage of all cameras installed on Network Survey Vehicle- ROW cameras File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone • NetworkSurveyVehiclereportcapturingdimensionsoffollowingkeymetrics ofpavement – Cracks – Potholes – Raveling – Bleeding – Rutting – Texture depth – Skid resistance – Roughness (IRI) • FallingWeightDeflectometer(FWD)reportcapturingfollowingkeymetrics ofpavement strength – Deflection Bowl (Transient Deflections at seven different points) – Corrected Elastic Modulus Bituminous E1 – Corrected Elastic Modulus Granular E2 – Corrected Elastic Modulus Subgrade E3 – Subgrade CBR – Bituminous layer coefficient A1 – Base layercoefficient A2 – Granular base layer coefficient A3 – Modified structural number • MobileBridge Inspection Report (MBIU) capturingfollowing keymetrics of bridges – Condition Approach – Condition Signs – Condition Debris – Condition Joint – Condition Deck – Condition Rails – Condition Protect – Condition Stream – Condition Superstructure – Condition Piers – Condition Abutment • Retro reflectometer reportcapturing following key metrics of road furniture – CoefficientofretroreflectedluminanceR A(nighttimeretroreflection)of roadtraffic signs File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m82397404/2025/S&R Zone 5 Monitoring of ETC lanes 5.1 Monthly ETC Report For Corresponding TYPE OF VEHICLE For Previous Month For Current Month monthofprevious year No of Fee Noof Fee Fee No of FeeCollected vehicles Collected vehicles Collected vehicles per vehicle A Car Total 3845 384500 4659 465,900.00 100 4289 428,900.00 B LCV Total 1521 243360 1312 209,920.00 160 1399 223,840.00 C Bus Total 2404 793386 2284 765,207.00 201 2349 786,915.00 D Truck Total 1603 528924 1523 510,138.00 134 1566 524,610.00 E 3Axle Total 18990 6836400 16310 5,953,150.00 365 15127 5,521,355.00 F MAV Total 16119 8381880 21111 11,188,830.00 530 18790 9,958,700.00 Over G Total 1 630 27 17,280.00 640 36 23,040.00 Size Totalforthe 49844 18,050,61 52963 19,898,834 49016 18,265,661 Month 8 5.2 On-ground infrastructure report Total number of plaza lanes = Total number of dedicated ETC lanes =Total number of hybrid lanes = Equipmentas Units Equipment per damaged owner/ Tota Units specifications SNo Description provider Remark l working (Y/N) / s unit missing s 1 Hardware (a) Over-head transceiver 4 3 1 ABC Co. Y File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a7m92397404/2025/S&R Zone (b) Hand-held reader (c) Lane controller (d) AVC (e) Camera (f) Weigh-in-motion (g) Static weigh bridge (h) Any other items 2 Softwares (a) Software–Lane/Plaza level (b) TMS (c) Any other items 5.3 On-ground ETC operations and SLA adherence Average Average Average queue queue transctio length length Average Average Average Average ntime during during Transactio transaction transactio transactio Lane (others) peaktime ntime time ntime ntime nonpeak (cash) (RFID) (cards) (wallet) time UPI–20 Lane 1 10vehicles 5vehicles 15seconds 10seconds 20seconds 25seconds seconds Lane 2 Lane 3 • Averagesystemuptime=80% • Transactionsuploaded(asperSLA)=80% • Blacklistsuploaded(asperSLA)=50% • Blacklistsdownloaded(asper SLA) = 85% File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m02397404/2025/S&R Zone 6 Status of Damages for breach of maintenance activities 6.1 Damages for non completion of project facilities SNo Period Amountofdamages (Rs) 1 Upto June 2016 15,00,35,000 2 Jul2016 2,00,88,000 3 Aug 2016 2,00,88,000 4 Sep2016 1,94,40,000 Total 20,96,51,000 Supporting Calculations for damages for Sep 2016 • Noof days in Sep = 30 • PerformancesecurityisRs64,80,00,000 • AsperCAClause12.3.2damagespayableis0.1% ofperformance security perday = Rs 6,48,000 • Totaldamages payable=30 X6,48,000=Rs1,94,40,000 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m16.2 Damages for breach of maintenance activities SNo Period Amount of damages (Rs) 1 Upto June 2016 1,00,35,000 2 Jul2016 6.63,196 3 Aug 2016 6,63,196 4 Sep 2016 52,22,444 Total 1,65,83,836 Supporting Calculations for damages for reporting month 182 oNS foerutaN tcefed tinU latoT ytitnauQ etaR riaperotsoC detamitsesa sasegamaD ACrep tasegamaD edisrehgih fo etaD noitcepsni sasyadfooN ACrep segamaD morf syadfooN segamad segamaD tnuoma 2397404/2025/S&R Zone 6.3 Damages for non completion of major maintenance/ periodic overlay SNo Period Amount of damages (Rs) 1 June 2016 6,48,000 2 Jul2016 2,00,88,000 3 Aug 2016 2,00,88,000 4 Sep 2016 1,94,40,000 Total 6,02,64,000 Supporting Calculations for damages for Sep 2016 • No of days in Sep = 30 • Performance security isRs 64,80,00,000 • AsperCAClause12.3.2damages payableis0.1%ofperformancesecurityper day =Rs 6,48,000 • Total damages payable = 30 X 6,48,000 = Rs 1,94,40,000 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 7 Change of Scope proposals Dateof Expected SN first o Proposal Details submission Current status COS Amount / Actual date of toAE approval Approvedinprincipleby Authority.Detailed Constructionof[Flyover [DD/MM/YYY [+/-Amount] [DD/MM/YYY 1 Name]at[Chainage] Y quantitSCsinproperorder yettobesubmitted Y] ] Nallahdiversion Clarificationstobe throughbox culvert at submittedby [Chainage] [DD/MM/YYY [+/-Amount] [DD/MM/YYY 2 Y Concessionaire,expected date[DD/MM/YYYY] Y] ] 8 Status of pending disputes Dateoffirst Dispute SN Curren submission Amount (if t Dispute Details toAE Suggested resolution by AE applicable) o stage Increased tollable Nomeritinincreasingtollable length to be lengthhencenoactionrequired applicableintollfee [DD/MM/YYYY] by<Agency> NA SAROD 1 calculations Fillingstations <Agency>toconsiderthe B/w energizedwithout Concessionaire'srequestfor Concession obtainingNOCfrom [DD/MM/YYYY] interventionandassistance [+/- aireand 2 ministry Amount] <Agency> 9 Reports 9.1 Monthly Toll Collection Report (Applicable only if project highway is tolled) For Corresponding TYPE OF VEHICLE For Previous Month For Current Month monthofprevious year Fee No of Fee No of Fee Noof Fee per vehicles Collected vehicles Collected vehicles Collected vehicl File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m32397404/2025/S&R Zone e Single 3845 384500 4659 465,900.00 100 4289 428,900.00 A Car Return 1506 218370 1972 295,800.00 150 1758 263,700.00 Local 769 38450 979 48,950.00 50 1029 51,450.00 Single 1521 243360 1312 209,920.00 160 1399 223,840.00 B LCV Return 134 31490 162 38,880.00 240 132 31,680.00 Local 1683 134640 1838 147,040.00 80 1461 116,880.00 Single 2404 793386 2284 765,207.00 201 2349 786,915.00 C Bus Return 359 177903 173 87,567.00 303 203 102,717.00 Local 277 45738 205 34,782.00 102 318 54,060.00 Single 1603 528924 1523 510,138.00 134 1566 524,610.00 D Truck Return 240 118602 116 58,378.00 202 136 68,478.00 Local 185 30492 136 23,188.00 68 212 36,040.00 Single 18990 6836400 163105,953,150.00 365 15127 5,521,355.00 E 3Axle Return 131 70740 34 18,700.00 550 37 20,350.00 Local 69 12420 84 15,540.00 185 131 24,235.00 Single 16119 8381880 21111 11,188,830.00 530 18790 9,958,700.00 F MAV Return 2 1550 20 15,800.00 790 35 27,650.00 Local 6 1560 18 4,770.00 265 8 2,120.00 Single 1 630 27 17,280.00 640 36 23,040.00 Over G Return 0 0 - 965 - Size Local 0 0 - 320 - Totalforthe 49844 18,050,61 52963 19,898,834 49016 18,265,66 Month 8 1 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m49.2 Accident Report 185 oNS etaD on eganiahC tnediccafo emiT )F/M(xeS A B C D E F G H I J K No of affecte d noitacol tnediccA tnedicca fo erutaN tnedicca fo noitacifissalC sesuaC elcihev fo snoitidnoc daoL noitidnoc daoR lortnoc fo epyt noitcesretnI noitidnoc rehtaeW mitcivfoegA mitcivfoepyT elcihevfo epyT lataF ojaM oniM yb dedivorp pleH 2397404/2025/S&R Zone 382/050 05:25 1 1/1/17 M 2 2 3 4 1 1 - 1 3 1 3 - 1 1 Ambu RHS pm Mapping of report fields to responses A 1.Urban2.Rural B 1. Overturned 2. Head On Collision 3. Hit from Back 4. Hit to Fix Object 5. Right turn Collision 6. Left turn Collision 7. Veered Out off The Road 8. Hit Pedestrian 9. Unknown/Hit & Ran Away C 1. Fatal 2. Major injury 3. Minor injury D 1. Drunken 2. Over Speeding3. Vehicle out of Control 4. Driven on wrong side 5. Mechanical Problem6.Drowsiness/NotApplicable7.Faultof Driver E 1. Normally Loaded 2. Overloaded/Handing 3. Empty 4. Unknown F 1. Straight road 2. Slight Curve 3. Sharp Curve 4. Hump 5. Dip G 1.T-Junction2.Y-Junction 3. Four armJunction 4.StaggeredJunction 5.Junctionwithmore than6.Round aboutJunction H 1. Fine/Clear 2.Mist/Fog 3. Cloudy 4. Light Rain 5. Heavy Rain 6. Strong Wind 7. Dust Storm 8. Cold 9. Hot I 1. 0-18 Years 2. 18-25 Years 3. 25-40 Years 4.40-60 Years 5. 60-80 Years J 1. Driver 2. Passenger 3. Pedestrian 4. Cyclist 5. Others K 1. Two Wheeler 2. Auto Rickshaw 3. Car/Jeep 4. Bus 5. Light Truck 6. Heavy Truck 7. Tractor 8. Bicycle 9. Cycle Rickshaw 10. Hand Drawn Cart 11. Animal Drawn Cart File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 9.3 Details of complaints Contact Toll Complaint Nameofthe Detailsof Compliancebythe details plaz No person complaint concessionaire SNo Date a of person Mr.Shailendra Mr. Shailendra Gurjar,LIG- Complaints 44,RSS regardingPotholes ontheHighway 1 81 8/9/2016 mohalla, maycause Potholesare ShivajiNagar, repaired Bhopal(M.P.) accidents. Dr.Diwakar Animalsare complaintsthat continuouslydriven Dr. Anil presenceof outfromtheRoad Diwakar,HIG Animalsand also bytheHighway Swarganga Potholesonroad Patrollingteamand ComplexBus are obstructing the 2 82 10/9/2016 Potholesare Stand Seoni repaired. (M.P.) drivingwhichmay causeaccidents. TheExemption underIndianToll (ArmyandAir force)Act1901,to armypersonnel travellinginprivate Maj.Sidharthwhile vehiclemaybe travellingin givenifonGovt. personalcarwants dutywithrequisite Exemptionfrom pass as specified Maj.Sidharth, TollFeeon intheIndianToll 238Fdwksp productionofI.D. (ArmyandAir 3 83 11/9/2016 Card C/o-56APO Force Rules, 1942) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m69.4 ncroachment list 187 oNS )mk( eganiahC hctertS )SHR/SHL(ediS tcirtsiD / egalliV epyttnemhcaorcnE )tnenamreP/yraropmeT( ,llats aeT( yrogetaC )cte,elpmeT /weN(tnemhsilbatsE )gnitsixe )m( egde daor morf ecnatsiD dnahtdiwtnemhcaorcnE htgnel rehcaorcnEfoemaN 2397404/2025/S&R Zone 212+50 Temporar Tea VijayKumar 1 LHS Kurnool Kurnool New 7 5mX3.5m y stall Reddy 0 213+20 Dinnedevara Permanen Godow 10.5m X 2 RHS Kurnool Existing 5 Buddana Padu t n 0 4m 9.5 Lane Closure Report S.No Date Chainage (Km) Side Time of Closure ReasonsforLane Remarks Closure&Approval From To Details 9/9/201 215+30 215+35 1 RHS 1pm-4pm Patch work 6 0 0 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am2397404/2025/S&R Zone 10 Annexures Annexure 1: Detailed visual inspection report of project highway Assets to be covered- Pavement, Shoulder, Drainage, Median, Bridges, Road furniture,Buildings, Horticulture, Service Road Description SNo NCP/ Dateof Chainage Side AERemarks issue ofdefect SNo 1 311 15.08.2016 Potholes 311+200 LHS Toberepaired Tobefilled 2 312 15.08.2016 Cracking 311+500 RHS immediately 3 4 Annexure 2 onwards: AE should include comments, status update, data points and reports in following annexures which have not been included elsewhere in the main report. Such reportsmay include but not limited to: • Minutesofreviewmeeting • Correspondence details • Weather report • Organizational chart of Concessionaire and AE • Project photographs File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m82397404/2025/S&R Zone Annexure VII-OUTPUT FORMAT FROM NETWORK SURVEY VEHICLE AND FWDTESTING [NAME & LOGO OF IMPLEMENTING AGENCY] [PROJECT NAME] Authority Engineer [NAME OF CONSULTING FIRM] OUTPUT FROM NETWORK SURVEY VEHICLE AND FWD TESTING File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a8m92397404/2025/S&R Zone Table of contents Contents Page Nos. SECTION ROAD INVENTORY DATA 1 161 1.1. Location Reference Post (LRP) Master 161 1.2. Carriageway Type 162 1.3. Road Type 162 1.4. Pavement Type 163 1.5. Pavement Width 164 1.6. Shoulder Type 165 1.7. Shoulder Width 166 1.8. Topography 166 1.9. Cross Section 167 1.10. Drain Type 168 1.11. Median Opening 169 1.12. Right Of Way 170 1.13. Pavement composition 171 1.14. Carriageway Furniture 173 1.15. Wayside Amenities 174 1.16. Land Use 175 SECTION ROAD CONDITION DATA 176 2 2.1. Visual condition 176 2.2. Roughness 179 2.3. Rutting 180 2.4. Texture Depth 181 2.5. Skid Resistance 182 2.6. Falling Weight Deflectometer (FWD) 183 2.7. Falling Weight Deflectometer (FWD) Rigid File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m02397404/2025/S&R Zone Annexure VII: OUTPUT FORMAT FROM NETWORK SURVEY VEHICLE AND FWDTESTING (SECTION 1: TESTING AT TIME OF COMPLETION, SECTION 2: FWD ATTRIBUTES - ANNUALLY, BALANCE PARAMETERS –BIANNUALLY AFTER CONSTRUCTION PHASE) In addition to the reports being submitted on equipment based inspection as specified in Section 4.2 of the Monthly Progress Report in the O&M phase, the Authority Engineer (AE) shall submit electronically in excel (.xls) format certain key parameters to the Project Director in thefollowing format. Worksheets under Section 1 (‘Road inventory data’) shall be updated from surveys conducted only once at the time of completion testing. Worksheets under Section 2 (‘Road condition data’) shall be updated from surveys carried out annually for FWD attributes and biannually for the remaining attributes. The fields to be updated in each of the worksheets are described below. Each description is followed by an example of data for a sample project. SECTION 1 - ROAD INVENTORY DATA Road inventory data consists of parameters which provide basic information about roads such as pavement type, number of lanes, topography, etc. These parameters are largely static in nature, and therefore a survey to update this dataset shall be conducted only once at the time of completion testing. The road inventory data shall be used to update specific worksheets listed below. 1.1 Location Reference Post (LRP) Master The following table lists the fields which need to be populated for the ‘LRP Master’ attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 LRP Name Name of location reference post (LRP) Kmstone 17 Chainage Chainage of the survey point (in km) 17 Direction Direction of survey Increasing • Increasing (chainage) • Decreasing (chainage) Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 OldNHNumber Old National Highway number NH0065 Section Code HYD-VIJ(Hyderabad- Codeindicatingstartingandendinglocations of section Vijayawada) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m12397404/2025/S&R Zone A sample output is shown below for reference NH Survey OldNH Section LRP Name Chainag Direction Latitud Longitude Altitude Date Numbe Code e e Numbe r r NH0xxx Road Start 1.230 Increasing 9.98897 78.02671 63.07767 23-12-15 NH0yyy ABC-DEF NH0xxx Km Stone 8 8.000 Increasing 9.98444 78.02934 68.60126 23-12-15 NH0yyy ABC-DEF NH0xxx Km Stone 8 8.030 Increasing 9.98341 78.03004 68.15520 23-12-15 NH0yyy ABC-DEF NH0xxx Km Stone 9.008 Increasing 9.98107 78.03078 65.17153 23-12-15 NH0yyy ABC-DEF NH0xxx Km Stone 12.012 Increasing 9.96328 78.04160 56.03436 23-12-15 NH0yyy ABC-DEF NH0xxx Km Stone 17 17.085 Increasing 9.95385 78.05255 56.24748 23-12-15 NH0yyy ABC-DEF 1.2 Carriageway Type The following table lists the fields which need to be populated for the ‘Carriageway Type’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 HYD-VIJ Section Code Code indicating starting and ending locations of section (Hyderabad- Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Typeofcarriageway,classifiedintooneofthebelow Divided categories: • Divided Carriageway Type • Undivided Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m22397404/2025/S&R Zone A sample output is shown below for reference Start End Carriagewa Dateof NHNumbe Section Latitude Longitude Chainage Chainage y Survey r Type NH00xx ABC-DEF 0.000 0.794 Undivided 06-05-17 9.98897 78.02671 NH00xx ABC-DEF 0.794 1.000 Undivided 06-05-17 9.98444 78.02934 NH00xx ABC-DEF 1.000 2.810 Undivided 06-05-17 9.98341 78.03004 NH00xx ABC-DEF 2.810 4.335 Undivided 06-05-17 9.98107 78.03078 NH00xx ABC-DEF 4.335 6.666 Undivided 06-05-17 9.96328 78.04160 NH00xx ABC-DEF 6.666 12.906 Undivided 06-05-17 9.95385 78.05255 1.3 Road Type The following table lists the fields which need to be populated for the ‘Road Type’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Classification of road on basis of number of lanes Four Lane • Single Lane • Two Lane Road Type • Intermediate Lane • Four Lane • SixLane Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m32397404/2025/S&R Zone A sample output is shown below for reference: Start End Dateof NHNumbe Section RoadType Latitud Longitude Chainage Chainage Survey r e NH00xx ABC-DEF 0.000 0.794 TwoLane 06-05-17 9.98897 78.02671 NH00xx ABC-DEF 0.794 1.000 TwoLane 06-05-17 9.98444 78.02934 NH00xx ABC-DEF 1.000 2.810 TwoLane 06-05-17 9.98341 78.03004 NH00xx ABC-DEF 2.810 4.335 TwoLane 06-05-17 9.98107 78.03078 NH00xx ABC-DEF 4.335 6.666 TwoLane 06-05-17 9.96328 78.04160 NH00xx ABC-DEF 6.666 12.906 TwoLane 06-05-17 9.95385 78.05255 1.4 Pavement Type The following table lists the fields which need to be populated for the ‘Pavement Type’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Pavement Type Classification of pavement based on type of surface: Asphalt File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m42397404/2025/S&R Zone Field Description Example • Asphalt • Cement concrete Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Start End Pavement Date NHNumbe Section Directio Latitud Longitude Chainage Chainage Type of r n e Survey ABC- NH00xx 0.000 0.804 Both Asphalt 06-05-17 9.98897 78.02671 DEF ABC- NH00xx 0.804 1.000 Both Asphalt 06-05-17 9.98444 78.02934 DEF ABC- NH00xx 1.000 1.172 Both Asphalt 06-05-17 9.98341 78.03004 DEF ABC- NH00xx 1.172 2.821 Both Asphalt 06-05-17 9.98107 78.03078 DEF ABC- NH00xx 2.821 4.350 Both Asphalt 06-05-17 9.96328 78.04160 DEF ABC- NH00xx 4.350 6.710 Both Asphalt 06-05-17 9.95385 78.05255 DEF ABC- NH00xx 6.710 12.925 Both Asphalt 06-05-17 9.93102 78.05648 DEF 1.5 Pavement Width The following table lists the fields which need to be populated for the ‘Pavement Width’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Start Chainage Chainage of the start point (in km) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m52397404/2025/S&R Zone EndChainage Chainage of the end point (inkm) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Widthofthepavementinmetres,classifiedintooneof >7m and <10.5m thebelow categories • >= 3.75m and < 5.5m • >5.5mand<7m Pavement Width • >=7mand<10.5m • >=10.5m and <=12.5m • >12.5m Widthof the pavement inmetres, rounded to two 7.0 Pavement Width Value placesafterdecimal Field Description Example Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Pavemen Section Start End Pavement Survey t Code Chainage Chainage Width Date NH Directio Latitud Longitud Widt n e h Number e Value NH00xx ABC-DEF 0.000 0.794 Both 7–10.5m 7.00 06-05-17 9.98897 78.02671 NH00xx ABC-DEF 0.794 1.000 Both 7–10.5m 7.00 06-05-17 9.98444 78.02934 NH00xx ABC-DEF 1.000 2.810 Both 7–10.5m 7.00 06-05-17 9.98341 78.03004 NH00xx ABC-DEF 2.810 4.335 Both 7–10.5m 7.00 06-05-17 9.98107 78.03078 NH00xx ABC-DEF 4.335 6.666 Both 7–10.5m 7.00 06-05-17 9.96328 78.04160 NH00xx ABC-DEF 6.666 12.906 Both 7–10.5m 7.00 06-05-17 9.95385 78.05255 1.6 Shoulder Type The following table lists the fields which need to be populated for the File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m62397404/2025/S&R Zone ‘Shoulder Type’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of thestart point (in km) 0.500 EndChainage Chainage ofthe end point (in km) 1.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Type of shoulder, classifiedinto one of the below Gravel categories: • None • Paved • Gravel • Earth Shoulder Type Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Section End NH Start Directio ShoulderType Survey Latitud Longitude Code Chainage Chainage n Date e Number NH00xx ABC-DEF 0.000 0.763 Increasing NoShoulder 09-01-16 9.98897 78.02671 NH00xx ABC-DEF 0.763 0.834 Increasing Gravel 09-01-16 9.98444 78.02934 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m72397404/2025/S&R Zone NH00xx ABC-DEF 0.834 1.254 Increasing Gravel 09-01-16 9.9834178.03004 NH00xx ABC-DEF 1.254 2.945 Increasing Gravel 05-01-16 9.9810778.03078 NH00xx ABC-DEF 2.945 4.327 Increasing Gravel 05-01-16 9.9632878.04160 NH00xx ABC-DEF 4.327 4.405 Increasing Gravel 05-01-16 9.9538578.05255 NH00xx ABC-DEF 4.405 6.844 Increasing Gravel 05-01-16 9.9310278.05648 NH00xx ABC-DEF 6.844 9.359 Increasing Gravel 05-01-16 9.9122978.04961 NH00xx ABC-DEF 9.359 12.966 Increasing Gravel 05-01-16 9.8904178.03458 1.7 Shoulder Width The following table lists the fields for the ‘Shoulder Width’ attribute, which need to bepopulated. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of the start point(in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Widthoftheshoulderinmetres,classifiedintooneof <1m thebelow categories • Noshoulder • <1m • >=1mand<=2m • >2m Shoulder Width Widthoftheshoulderinmetres,roundedtooneplace 0.5 afterdecimal Shoulder Width Value File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m82397404/2025/S&R Zone Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Shoulder Section Start End Shoulder Survey Width Code Chainage Chainage Width Date NH Direction Value Latitude Longitude Number No NH0xxx ABC-DEF 0.000 0.785 Increasing 0.0 03-01-16 9.98897 78.02671 Shoulder No NH0xxx ABC-DEF 0.785 2.612 Increasing 0.0 03-01-16 9.98444 78.02934 Shoulder NH0xxx ABC-DEF 2.612 3.170 Increasing 1-2m 2.0 03-01-16 9.98341 78.03004 NH0xxx ABC-DEF 3.170 5.194 Increasing 1-2m 2.0 03-01-16 9.98107 78.03078 NH0xxx ABC-DEF 5.194 6.793 Increasing 1-2m 2.0 03-01-16 9.96328 78.04160 NH0xxx ABC-DEF 6.793 11.404 Increasing 1-2m 2.0 03-01-16 9.95385 78.05255 1.8 Topography The following table lists the fields which need to be populated for the ‘Topography’ attribute.The descriptions of the fields are given below. Field Descriptio Example n NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code StartChainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Topographyoftheroad,classifiedintooneofthe Flat below categories • Flat • Rolling • Hilly Topography File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:341 a9m92397404/2025/S&R Zone Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Section Start End Survey NH Topography Latitud Longitude Code Chainage Chainage Date e Number NH0xxx ABC-DEF 0.000 0.808 Flat 05-01-16 9.98897 78.02671 NH0xxx ABC-DEF 0.808 1.254 Flat 05-01-16 9.98444 78.02934 NH0xxx ABC-DEF 1.254 2.828 Flat 05-01-16 9.98341 78.03004 NH0xxx ABC-DEF 2.828 4.363 Flat 05-01-16 9.98107 78.03078 NH0xxx ABC-DEF 4.363 6.724 Flat 05-01-16 9.96328 78.04160 NH0xxx ABC-DEF 6.724 12.933 Flat 05-01-16 9.95385 78.05255 1.9 Cross Section The following table lists the fields which need to be populated for the ‘Cross Section’ attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of thestart point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Crosssection type,classifiedintooneofthebelow Fill categories Cross Section File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m02397404/2025/S&R Zone Field Description Example • Cut • Fill • Cutand Fill • Level Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Section Start End NH Direction CrossSection Survey Latitud Longitude Code Chainage Chainage Date e Number NH0xxx ABC-DEF 0.000 0.822 Increasing Level 03-01-16 9.98897 78.02671 NH0xxx ABC-DEF 0.822 2.642 Increasing Level 03-01-16 9.98444 78.02934 NH0xxx ABC-DEF 2.642 3.199 Increasing Level 03-01-16 9.98341 78.03004 NH0xxx ABC-DEF 3.199 5.360 Increasing Level 03-01-16 9.98107 78.03078 NH0xxx ABC-DEF 5.360 5.715 Increasing Fill 03-01-16 9.96328 78.04160 NH0xxx ABC-DEF 5.715 6.941 Increasing Level 03-01-16 9.95385 78.05255 NH0xxx ABC-DEF 6.941 11.163 Increasing Level 03-01-16 9.93102 78.05648 1.10 Drain Type The following table lists the fields which need to be populated for the ‘Drain Type’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m12397404/2025/S&R Zone Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Type ofdrain, classified intoone of the below Open lined drain categories • Openunlined drain • Open lined drain • Covered line drain • Nodrain Drain Type Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Start End Direction DrainType Survey Latitud Longitud Code Chainage Chainage Date e e Number OpenUnlined NH0xxx ABC-DEF 0.000 0.069 Increasing 09-01-16 9.98897 78.02671 Drain NH0xxx ABC-DEF 0.069 0.782 Increasing OpenLinedDrain 09-01-16 9.98444 78.02934 OpenUnlined NH0xxx ABC-DEF 0.288 0.000 Decreasing 09-01-16 9.98341 78.03004 Drain OpenUnlined NH0xxx ABC-DEF 0.782 0.846 Increasing 09-01-16 9.98107 78.03078 Drain OpenUnlined NH0xxx ABC-DEF 0.846 1.254 Increasing 09-01-16 9.96328 78.04160 Drain OpenUnlined NH0xxx ABC-DEF 1.254 2.265 Increasing 05-01-16 9.95385 78.05255 Drain OpenUnlined NH0xxx ABC-DEF 1.929 0.288 Decreasing 09-01-16 9.93102 78.05648 Drain NH0xxx ABC-DEF 1.952 1.929 Decreasing NoDrain 09-01-16 9.91229 78.04961 OpenUnlined NH0xxx ABC-DEF 2.265 3.005 Increasing 05-01-16 9.89041 78.03458 Drain OpenUnlined NH0xxx ABC-DEF 2.680 1.952 Decreasing 09-01-16 9.88489 78.02995 Drain File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m22397404/2025/S&R Zone OpenUnlined NH0xxx ABC-DEF 3.005 4.424 Increasing 05-01-16 9.87474 78.02828 Drain OpenUnlined NH0xxx ABC-DEF 3.109 2.680 Decreasing 09-01-16 9.87363 78.02744 Drain CoveredLine NH0xxx ABC-DEF 3.320 3.109 Decreasing 09-01-16 9.84857 78.01535 Drain OpenUnlined NH0xxx ABC-DEF 3.917 3.320 Decreasing 09-01-16 9.83764 78.00392 Drain OpenUnlined NH0xxx ABC-DEF 4.424 4.601 Increasing 05-01-16 9.83711 77.98576 Drain OpenUnlined NH0xxx ABC-DEF 4.601 5.693 Increasing 05-01-16 9.83386 77.97729 Drain 1.11 Median Opening The following table lists the fields which need to be populated for the ‘Median Opening’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Typeofmedian,classifiedintooneofthebelow Raised categories • Raised; • Depressed; • Barrier; • None. Median Type File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m32397404/2025/S&R Zone Field Description Example Widthofthemedianinmetres,roundedtooneplace 0.5 afterdecimal Median Width Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Section Start End Median Median Survey NH Direction Latitud Longitud Code Chainage Chainage Type Width Date e e Number NH00xx ABC-DEF 0.000 0.794 Both Raised 0.5 05-01-16 9.98897 78.02671 NH00xx ABC-DEF 0.794 1.000 Both Raised 0.5 05-01-16 9.98444 78.02934 NH00xx ABC-DEF 1.000 2.810 Both NoMedian 0.0 05-01-16 9.98341 78.03004 NH00xx ABC-DEF 2.810 4.335 Both Raised 1.5 05-01-16 9.98107 78.03078 NH00xx ABC-DEF 4.335 6.666 Both NoMedian 0.0 05-01-16 9.96328 78.04160 NH00xx ABC-DEF 6.666 12.906 Both NoMedian 0.0 05-01-16 9.95385 78.05255 1.12 Right Of Way The following table lists the fields which need to be populated for the ‘Right of Way’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- section Vijayawada) Section Code Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m42397404/2025/S&R Zone Row Width WidthofRightofWay(inmetres) 24 Remarks Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Section Start End ROW Survey NH Direction Remark Latitud Longitude Code Chainage Chainage Date s e Width Number NH0xxx ABC-DEF 0.000 1.000 Increasing 28 05-05-15 9.98897 78.02671 NH0xxx ABC-DEF 1.000 2.000 Increasing 24 05-05-15 9.98444 78.02934 NH0xxx ABC-DEF 2.000 3.000 Increasing 30 05-05-15 9.98341 78.03004 NH0xxx ABC-DEF 3.000 4.000 Increasing 26 05-05-15 9.98107 78.03078 NH0xxx ABC-DEF 4.000 11.000 Increasing 24 05-05-15 9.96328 78.04160 1.13 Pavement composition The following table lists the fields which need to be populated for the ‘Pavement composition’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (inkm) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Typeofpavement Asphalt Pavement Type • Asphalt • Cement concrete BituminousSurface Type of bituminous surface course BC CourseType Bituminous Surface Thickness of BSC layer in mm 40 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m52397404/2025/S&R Zone Course Thickness MM BSC Construction Year Yearofconstruction of BSClayer inflexiblepavements 2015 Bituminous Base Type of bituminous base course DBM Course Type BituminousBase Thickness of BBC layerin mm 100 CourseThick—ness BBC Construction Year Yearofconstruction of BBClayerinflexiblepavements 2015 Granular Base Type Type of granular base WMM GranularBaseThick- Thickness of GBlayer in mm 250 ness GB Construction Year Year of construction of GB layerin flexible pavements 2015 PavementQuality Type of pavement quality concrete PQC ConcreteType Pavement Quality Thickness of PQC layerin mm 300 Concrete Thickness PQC Construction Year Yearof construction of PQC layer in rigid pavements 2015 DryLeanConcrete Thickness of DLC layerin mm 100 ThicknessMM DryLeanConcrete Type of dry lean concrete DLC Type DLC Construction Year Yearof construction of DLC layer in rigid pavements 2015 Granular Sub Base Type of granular sub base GSB Type GranularSubBase Thickness of GSB layer in mm 200 Thickness GSB Construction Year Year of construction of GSB layer 2014 Design CBR Design CBR of the subgrade, expressed in % 5% Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m62397404/2025/S&R Zone Field Description Example Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Bitumino Bitumino Bitumino BSC Bitumin BBC Granula usBase us us ous rBase Sec- Star End Course Granu NH Direc Pavem Surface Surface Constru Base Constru Thickne tion t Chai Thicknes l ar ent Course Course c-tion Course c-tion ss Code Chai nag s No. - Type Type Thickness Year Type Year e Base nag Type tion e NH00xABC- Both 0.0 5.0 Asphalt BC 40.0 2015 DBM 100 2015 WMM 250 DEF side x NH00xABC- Both 5.0 11.0 Asphalt BC 40.0 2015 DBM 80 2015 WMM 250 x DEF side NH00xABC- Both 11.0 20.0 Asphalt SDBC 25.0 2015 BM 115 2015 WMM 250 DEF side x NH00xABC- Both 20.0 22.0 Asphalt BC 40.0 2015 DBM 100 2015 WMM 250 x DEF side NH00xABC- Both 22.0 30.0 Asphalt SDBC 25.0 2015 BM 115 2015 WMM 250 DEF side x NH00xABC- Both 30.0 31.0 Asphalt BC 40.0 2015 DBM 100 2015 WMM 250 DEF side x (table continued…) Pavem Dry Pavem ent Granul Lean GB ent Quality PQC Concre Dry DLC Granul ar GSB Quality Concre te SubBas Desi Lean ar Const Concre te Const Thickn Const e Constr gn Surve Lati Longi Concre SubBa CBR r teType Thickn r ess te r se Thickn uction y t tude uctio e uctio uctio ess Year Date ude Type Type nYear n n ss Year Year 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.99 78.03 15 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.98 78.03 15 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.98 78.03 15 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m72397404/2025/S&R Zone 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.98 78.03 15 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.96 78.04 15 05-05- 2015 NA NA NA NA NA NA GSB 300 2015 5% 9.95 78.05 15 1.14 Carriageway Furniture The following table lists the fields which need to be populated for the ‘Carriageway Furniture’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Chainage Chainage of the point (in km) 0.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Field Description Example Waysideamenitiesclassifiedintooneofthebelow Road sign categories: • Crash barriers • Signs Wayside Amenity Type • Street Lights • Kmstone Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NHNumbe SectionCode Chainage Direction EventType SurveyDat Latitud Longitude r e e StreetLight NH00xx ABC-DEF 0.012 Increasing 03-01-16 9.98897 78.02671 Start StreetLight NH00xx ABC-DEF 0.287 Increasing 03-01-16 9.98444 78.02934 End File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m82397404/2025/S&R Zone NH00xx ABC-DEF 2.491 Decreasing Road Sign 03-01-16 9.98341 78.03004 NH00xx ABC-DEF 2.708 Decreasing Road Sign 03-01-16 9.98107 78.03078 NH00xx ABC-DEF 3.496 Increasing Road Sign 03-01-16 9.96328 78.04160 NH00xx ABC-DEF 5.160 Increasing Road Sign 03-01-16 9.95385 78.05255 NH00xx ABC-DEF 5.356 Decreasing Road Sign 03-01-16 9.93102 78.05648 NH00xx ABC-DEF 8.402 Decreasing Road Sign 03-01-16 9.91229 78.04961 NH00xx ABC-DEF 10.966 Decreasing Road Sign 03-01-16 9.89041 78.03458 1.15 Wayside Amenities The following table lists the fields which need to be populated for the ‘Wayside Amenities’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Chainage Chainage of the point (in km) 0.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Waysideamenitiesclassifiedintooneofthebelow Restaurant/Motel categories: • Busshelter; File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a0m92397404/2025/S&R Zone Field Description Example • Telephone booth; • Petrol pump/minor repair shop (optional); • Police Station; • Temple /Mosque; • Bridges. Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Data Source Remarks Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Survey Data ChainageDirection Wayside Remark Latitude Longitude Code Date Source Amenity s Number ABC- NH00xx 0.650 Increasing Restaurant/Motel 05-01-16 9.98897 78.02671 DEF ABC- NH00xx 1.998 Increasing Restaurant/Motel 05-01-16 9.98444 78.02934 DEF ABC- NH00xx 5.524 Increasing Petrol Pump 05-01-16 9.98341 78.03004 DEF ABC- NH00xx 11.413 Increasing Restaurant/Motel 05-01-16 9.98107 78.03078 DEF 1.16 Land Use The following table lists the fields which need to be populated for the ‘Land Use’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m02397404/2025/S&R Zone EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Land use classified into one of thebelow categories: Commercial • Residential; • Commercial; • Industrial; Land Use • Agricultural; • Water bodies; • Mixed. Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Field Description Example Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NHNumbe SectionCode StartChainag EndChainage Direction LandUse SurveyDat Latitude Longitud r e e e NH00xx ABC-DEF 0.000 0.797 Increasing Mixed 03-01-16 9.98897 78.02671 NH00xx ABC-DEF 0.511 0 Decreasing Mixed 03-01-16 9.98444 78.02934 NH00xx ABC-DEF 0.797 2.699 Increasing Mixed 03-01-16 9.98341 78.03004 NH00xx ABC-DEF 0.835 0.511 Decreasing Mixed 03-01-16 9.98107 78.03078 NH00xx ABC-DEF 0.987 0.835 Decreasing Mixed 03-01-16 9.96328 78.04160 NH00xx ABC-DEF 1.641 0.987 Decreasing Agriculture 03-01-16 9.95385 78.05255 Barren NH00xx ABC-DEF 2.081 1.641 Decreasing 03-01-16 9.93102 78.05648 Land NH00xx ABC-DEF 2.378 2.081 Decreasing Agriculture 03-01-16 9.91229 78.04961 NH00xx ABC-DEF 2.458 2.378 Decreasing Agriculture 03-01-16 9.89041 78.03458 NH00xx ABC-DEF 2.699 3.234 Increasing Agriculture 03-01-16 9.88489 78.02995 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m12397404/2025/S&R Zone SECTION 2 - ROAD CONDITION DATA Road condition data consists of parameters which directly affect maintenance requirements of the road. These parameters are dynamic in nature, and therefore a survey to update this dataset shall be conducted annually for FWD testing and every six months as per Annexure IV for network survey vehicle testing. The first survey shall be conducted at the time of completion testing and the remaining surveys shall be conducted as per the defined frequency. As an example, if majority of highway length (>50%) passes through a state, where defined survey months are May and November, if completion testing is conducted in April, then the first network survey shall be conducted in the month of April. This shall be considered as the network survey to be conducted in the month of May. The 2ndsurvey shall be conducted in the month of November, the 3rdsurvey shall be conducted in the month of May and so on. As regards FWD, the first test/survey shall be conducted at the time of completion in April. The 2nd test/survey shall be conducted in April of next year and so on. The road condition data shall be used to update specific worksheets, which are listed below. 2.1Visual condition The following table lists the fields which need to be populated for the ‘Visual Condition’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Field Description Example Codeindicatingstartingandendinglocationsofsection HYD-VIJ(Hyderabad- Section Code Vijayawada) Start Chainage Chainageof thestart point (in km) 0.500 EndChainage Chainage of the endpoint (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Numberofthelane:L1,L2,R1,R2,etc.,L1being1st laneontheleftfromcentreline of L1 carriageway,L2being Lane Number 2ndlane on theleftfromcenterline and soon File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m22397404/2025/S&R Zone Percentofpavementareaaffectedbyravelling,whichisconvertedtothefollowingrating 2 scale: • 1-VeryPoor(>30%) • 2-Poor(11-30%) Ravelling • 3-Fair(6-10%) • 4-Good(1-5%) • 5-VeryGood(0%) No.ofpotholes,whichisconvertedtothefollowing ratingscale: 1 • 1-VeryPoor(>5) • 2-Poor(3-5) • 3-Fair(2) PotHoles • 4-Good(1) • 5-VeryGood(0) Pavementareacontainingedgebreaks,whichisconvertedtothefollowingratingscale: 3 • 1-VeryPoor(>5m2) • 2-Poor(1-5m2) • 3-Fair(0.5-1m2) Edge Break • 4-Good(0-0.5m2) • 5-VeryGood(0m2) Percentofpavementareaaffectedbycracking,whichisconvertedtothefollowingrating 3 scale: • 1-VeryPoor(>30%) • 2-Poor(21-30%) Cracking • 3-Fair(11-20%) • 4-Good(5-10%) • 5-VeryGood(<5%) Percentofpavementareaaffectedbydisintegration,whichisconvertedtothefollowing 2 ratingscale: • 1-VeryPoor(>50%) • 2-Poor(20-50%) Disintegration • 3-Fair(10-20%) • 4-Good(1-10%) • 5-VeryGood(<1%) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m32397404/2025/S&R Zone Field Description Example Percentofpavementareaaffected bydepression, 5 whichisconvertedtothefollowingratingscale: • 1-VeryPoor(>5%) • 2-Poor(3-5%) Depression • 3-Fair(1-2%) • 4-Good(0-1%) • 5-VeryGood(0) Percentofpavementareaaffectedbybleeding,which 3 isconvertedtothefollowingratingscale: • 1-VeryPoor(>50%) • 2-Poor(20-50%) Bleeding • 3-Fair(10-20%) • 4-Good(1-10%) • 5-VeryGood(<1%) Percentofpavementareaaffectedbypatching,which 4 isconvertedtothefollowingratingscale: • 1-VeryPoor(>30%) • 2-Poor(16-30%) Patching • 3-Fair(6-15%) • 4-Good(2-5%) • 5-VeryGood(<2%) Conditionofthedrain,whichisconvertedto 2 thefollowingratingscale: • 1-Poor • 2-Fair Drain Condition • 3-Good Conditionoftheshoulder,whichisconvertedtothe Fair followingratingscale: • 1-Poor • 2-Fair Shoulder Condition • 3-Good File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m42397404/2025/S&R Zone Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude ofsurvey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Start End Lane NHNumbe Section Directio Ravelling PotHoles EdgeBreak Cracking Chainage Chainage Numbe r n r NH00xx ABC-DEF 0.000 0.500 Increasing L1 4 4 4 4 NH00xx ABC-DEF 0.500 1.000 Increasing L1 4 4 4 5 NH00xx ABC-DEF 1.000 1.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 1.500 2.000 Increasing L1 5 5 5 5 NH00xx ABC-DEF 2.000 2.500 Increasing L1 5 5 5 5 NH00xx ABC-DEF 2.500 3.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 3.000 3.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 3.500 4.000 Increasing L1 5 4 3 5 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m52397404/2025/S&R Zone Start End Lane NHNumbe Section Direction Ravelling PotHoles EdgeBreak Cracking Chainage Chainage Numbe r r NH00xx ABC-DEF 4.000 4.500 Increasing L1 4 4 4 5 NH00xx ABC-DEF 4.500 5.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 5.000 5.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 5.500 6.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 6.000 6.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 6.500 7.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 7.000 7.500 Increasing L1 5 5 5 5 NH00xx ABC-DEF 7.500 8.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 8.000 8.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 8.500 9.000 Increasing L1 5 5 4 5 NH00xx ABC-DEF 9.000 9.500 Increasing L1 5 5 4 5 NH00xx ABC-DEF 9.500 10.000 Increasing L1 5 5 3 5 (tablecontinued…) Drain Dateof Disintegratio Depression Bleeding Patching ShoulderConditio Latitude Longitude Condition Survey n n 4 4 4 4 2 2 06-05-17 9.98897 78.02671 4 4 4 4 2 2 06-05-17 9.98444 78.02934 5 5 5 4 2 2 06-05-17 9.98341 78.03004 5 5 5 5 2 2 06-05-17 9.98107 78.03078 5 5 5 5 2 2 06-05-17 9.96328 78.04160 5 5 5 5 2 2 06-05-17 9.95385 78.05255 5 5 5 5 2 3 06-05-17 9.93102 78.05648 4 4 4 4 2 3 06-05-17 9.91229 78.04961 4 4 4 4 2 2 06-05-17 9.89041 78.03458 5 5 5 5 2 2 06-05-17 9.88489 78.02995 5 5 5 5 2 2 06-05-17 9.87474 78.02828 5 5 5 5 2 2 06-05-17 9.87363 78.02744 5 5 5 5 2 2 06-05-17 9.84857 78.01535 5 5 5 5 2 2 06-05-17 9.83764 78.00392 5 5 5 5 2 2 06-05-17 9.83711 77.98576 5 5 5 5 1 2 06-05-17 9.83386 77.97729 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m62397404/2025/S&R Zone 5 5 5 5 2 2 06-05-17 9.81804 77.97875 5 5 5 5 2 2 06-05-17 9.77426 77.98129 5 4 4 4 2 2 06-05-17 9.73071 77.97999 5 5 5 3 2 2 06-05-17 9.68686 77.97017 2.2 Roughness The following table lists the fields which need to be populated for the ‘Roughness’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Codeindicatingstartingandendinglocationsof HYD-VIJ(Hyderabad- Section Code section Vijayawada) Field Description Example Start Chainage Chainage of the start point (inkm) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) LwpIri Internationalroughnessindex(IRI)ofleftwheelpath 2.33 measuredfromlaserprofilometer RwpIri Internationalroughnessindex(IRI)ofrightwheelpath 1.97 measuredfromlaserprofilometer LaneIri AverageoftheInternationalroughnessindex(IRI) 2.15 ofleftandrightwheelpaths Speed Speed of vehicle in km/h 42 Survey Date Date of survey in the format <DD-MM-YYYY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Start End Lane Survey Directio LwpIr RwpIr LaneIr Speed Latitud Longitude Code Chainage Chainage Date Numbe n Numbe i i i e r r File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m72397404/2025/S&R Zone ABC- 06-05- NH00xx 0.0 0.1 Increasing L1 3.31 5.16 4.24 20 9.98897 78.02671 DEF 17 ABC- 06-05- NH00xx 0.1 0.2 Increasing L1 2.81 3.54 3.18 37 9.98444 78.02934 DEF 17 ABC- 06-05- NH00xx 0.2 0.3 Increasing L1 2.31 1.92 2.12 42 9.98341 78.03004 DEF 17 ABC- 06-05- NH00xx 0.3 0.4 Increasing L1 2.17 2.37 2.27 46 9.98107 78.03078 DEF 17 ABC- 06-05- NH00xx 0.4 0.5 Increasing L1 2.11 1.72 1.92 42 9.96328 78.04160 DEF 17 ABC- 06-05- NH00xx 0.5 0.6 Increasing L1 2.33 1.97 2.15 49 9.95385 78.05255 DEF 17 ABC- 06-05- NH00xx 0.6 0.7 Increasing L1 2.37 2.00 2.19 42 9.93102 78.05648 DEF 17 ABC- 06-05- NH00xx 0.7 0.8 Increasing L1 2.15 2.17 2.16 33 9.91229 78.04961 DEF 17 ABC- 06-05- NH00xx 0.8 0.9 Increasing L1 2.45 2.05 2.25 32 9.89041 78.03458 DEF 17 ABC- 06-05- NH00xx 0.9 1.0 Increasing L1 2.18 2.51 2.35 48 9.88489 78.02995 DEF 17 2.3 Rutting The following table lists the fields which need to be populated for the ‘Rutting’ attribute. Thedescriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 HYD-VIJ (Hyderabad- Section Code Codeindicatingstartingandendinglocationsof section Vijayawada) Start Chainage Chainage of thestart point (in km) 0.500 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m82397404/2025/S&R Zone Field Description Example EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Numberofthelane:L1,L2,R1,R2,etc.,L1being1st L1 laneontheleftfromcentrelineofcarriageway,L2being Lane Number 2ndlane on theleftfrom centerline andso on Rutting Left Rut depth in mm, measured from left wheel path 20 Rutting Right Rut depth in mm, measured from left wheel path 18 Rutting Avg Averagerutdepthmeasuredfromleftandrightwheel 19 paths Speed Speed of vehicle in km/h 42 Survey Date Date of survey in the format <DD-MM-YYYY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Start End Lane Ruttin Ruttin Ruttin Survey Directio Speed Latitud Longitud Code Chainage Chainage Numbe g g g Date Numbe n e e r r Left Right Avg ABC- 06-05- NH00xx 0.0 0.5 Increasing L1 15 14 15 20 9.98897 78.02671 DEF 17 ABC- 06-05- NH00xx 0.5 1.0 Increasing L1 20 18 19 37 9.98444 78.02934 DEF 17 ABC- 06-05- NH00xx 1.0 1.5 Increasing L1 10 8 9 42 9.98341 78.03004 DEF 17 ABC- 06-05- NH00xx 1.5 2.0 Increasing L1 5 6 6 46 9.98107 78.03078 DEF 17 ABC- 06-05- NH00xx 2.0 2.5 Increasing L1 10 10 10 42 9.96328 78.04160 DEF 17 ABC- 06-05- NH00xx 2.5 3.0 Increasing L1 7 9.95385 78.05255 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a1m92397404/2025/S&R Zone DEF 17 ABC- 06-05- NH00xx 3.0 3.5 Increasing L1 20 18 19 42 9.93102 78.05648 DEF 17 ABC- 06-05- NH00xx 3.5 4.5 Increasing L1 5 5 5 33 9.91229 78.04961 DEF 17 ABC- 06-05- NH00xx 4.5 5.0 Increasing L1 5 5 5 32 9.89041 78.03458 DEF 17 2.4 Texture Depth The following table lists the fields which need to be populated for the ‘Texture Depth’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 HYD-VIJ (Hyderabad- Section Code Codeindicatingstartingandendinglocations of section Vijayawada) Start Chainage Chainage of the start point (in km) 0.500 Field Description Example EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Numberofthelane:L1,L2,R1,R2,etc.,L1being1st L1 laneontheleftfromcentrelineofcarriageway,L2being Lane Number 2ndlane on theleftfromcenterline andsoon Texture Left Texturedepthofpavementinmm,measuredfromleft 0.40 wheelpath Texture Right Texturedepthofpavementinmm,measuredfromleft 0.30 wheelpath Texture Average Averagetexturedepthmeasuredfromleftandright 0.35 wheelpaths Speed Speed of vehicle in km/h 42 Survey Date Date of survey in the format <DD-MM-YYYY> 06-05-17 Latitude Latitude of survey point 9.98897 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m02397404/2025/S&R Zone Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Start End Lane Textur Textur Texture Survey Direction Speed Latitud Longitud Code Chainage e e Average Date Numbe Chainag Numbe e e r e r Left Right ABC- 06-05- NH00xx 0.0 0.5 Increasing L1 0.40 0.30 0.35 20 9.98897 78.02671 DEF 17 ABC- 06-05- NH00xx 0.5 1.0 Increasing L1 0.60 0.50 0.55 37 9.98444 78.02934 DEF 17 ABC- 06-05- NH00xx 1.0 1.5 Increasing L1 0.80 0.90 0.85 42 9.98341 78.03004 DEF 17 ABC- 06-05- NH00xx 1.5 2.0 Increasing L1 0.40 0.40 0.4 46 9.98107 78.03078 DEF 17 ABC- 06-05- NH00xx 2.0 2.5 Increasing L1 0.30 0.30 0.3 42 9.96328 78.04160 DEF 17 ABC- 06-05- NH00xx 2.5 3.0 Increasing L1 0.70 0.60 0.65 49 9.95385 78.05255 DEF 17 ABC- 06-05- NH00xx 3.0 3.5 Increasing L1 0.40 0.50 0.45 42 9.93102 78.05648 DEF 17 ABC- 06-05- NH00xx 3.5 4.5 Increasing L1 0.90 0.80 0.85 33 9.91229 78.04961 DEF 17 ABC- 06-05- NH00xx 4.5 5.0 Increasing L1 0.40 0.30 0.35 32 9.89041 78.03458 DEF 17 2.5 Skid Resistance The following table lists the fields which need to be populated for the ‘Skid Resistance’attribute. The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 HYD-VIJ (Hyderabad- Section Code Codeindicatingstartingandendinglocations of section Vijayawada) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m12397404/2025/S&R Zone Field Description Example Start Chainage Chainage of the start point (in km) 0.500 EndChainage Chainage of the end point (in km) 1.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Numberofthelane:L1,L2,R1,R2,etc.,L1being1st L1 laneontheleftfromcentrelineofcarriageway,L2 being Lane Number 2ndlane ontheleftfrom centerline andsoon SkidLeft Skidresistanceofpavementmeasuredasskid 25 number,measuredfromleftwheelpath Skid Right Skidresistanceofpavementmeasuredasskidnumber, 24 measuredfromleftwheelpath SkidAverage Averageskidresistancemeasuredfromleftandright 24.5 wheelpaths Speed Speed of vehicle in km/h 42 Survey Date Date of survey in the format <DD-MM-YYYY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: NH Section Start End Lane Skid Skid Skid Surve Directio Speed Latitud Longitud Code Chainage Chainag Number Left Right Averag y Numbe e n e e e r Date ABC- 06-05- NH00xx 0.0 0.5 Increasing L1 25.0 24.0 24.5 20 9.98897 78.02671 DEF 17 ABC- 06-05- NH00xx 0.5 1.0 Increasing L1 23.0 23.0 23.0 37 9.98444 78.02934 DEF 17 ABC- 06-05- NH00xx 1.0 1.5 Increasing L1 23.0 24.0 23.5 42 9.98341 78.03004 DEF 17 ABC- 06-05- NH00xx 1.5 2.0 Increasing L1 22.0 22.0 22.0 46 9.98107 78.03078 DEF 17 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m22397404/2025/S&R Zone ABC- 06-05- NH00xx 2.0 2.5 Increasing L1 20.0 21.0 20.5 42 9.96328 78.04160 DEF 17 ABC- 06-05- NH00xx 2.5 3.0 Increasing L1 24.0 24.0 24.0 49 9.95385 78.05255 DEF 17 ABC- 06-05- NH00xx 3.0 3.5 Increasing L1 28.0 28.0 28.0 42 9.93102 78.05648 DEF 17 ABC- 06-05- NH00xx 3.5 4.5 Increasing L1 21.0 21.0 21.0 33 9.91229 78.04961 DEF 17 ABC- 06-05- NH00xx 4.5 5.0 Increasing L1 25.0 24.0 24.5 32 9.89041 78.03458 DEF 17 2.6 Falling Weight Deflectometer (FWD) The following table lists the fields which need to be populated for the ‘FWD’ attribute. Thedescriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 Field Description Example HYD-VIJ(Hyderabad- Section Code Code indicating starting and ending locations of section Vijayawada) Chainage Chainage of survey point (in km) 0.500 Direction of survey Increasing Direction • Increasing (chainage) • Decreasing (chainage) Numberofthelane:L1,L2,R1,R2,etc.,L1being1stlaneonthe L1 leftfromcentrelineofcarriageway,L2being2ndlaneontheleft Lane Number from centerlineandso on AirTemperature Air temperature recorded in °C 33 Surface Temperature Temperature of the pavement surface, recorded in °C 39.3 PeakLoad Peak impulse load, measured in kN 45.7 Deflection0 Surface deflection at the test load center, measured in micron 246 Surfacedeflectionatlocation1fromthetestloadcenter, Deflection1 measuredinmicron 110 Distance1 Distance oflocation 1 from the test load center 300 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m32397404/2025/S&R Zone Surfacedeflectionatlocation2fromthetestloadcenter, Deflection2 measuredinmicron 153 Distance2 Distance oflocation 2 from the test load center 600 Surfacedeflectionatlocation3fromthetestloadcenter, Deflection3 measuredinmicron 110 Distance3 Distance oflocation 3 from the test load center 900 Surfacedeflectionatlocation4fromthetestloadcenter, Deflection4 measuredinmicron 76 Distance4 Distance oflocation 4 from the test load center 1200 Surfacedeflectionatlocation5fromthetestloadcenter, Deflection5 measuredinmicron 59 Distance5 Distance oflocation 5 from the test load center 1500 Surfacedeflectionatlocation6fromthetestloadcenter, Deflection6 measuredinmicron 44 Distance6 Distance oflocation 6 from the test load center 1800 Surfacedeflectionatlocation7fromthetestloadcenter, Deflection7 measuredinmicron 35 Distance7 Distance oflocation 7 from the test load center 2100 Surfacedeflectionatlocation8fromthetestloadcenter, Deflection8 measuredinmicron 28 Distance8 Distance oflocation 8 from the test load center 2400 ElasticModulus Elastic modulus of bituminous layer, back calculated in MPa 3359 BituminousE1 ElasticModulus Elastic modulus of granular layer, backcalculated in MPa 396 GranularE2 ElasticModulus SubGradeE3 Elastic modulus of subgrade, back calculated in MPa 90 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m42397404/2025/S&R Zone Field Description Example CorrectedElastic Corrected elastic modulus of bituminous layer in MPa 3424 ModulusBituminousE1 CorrectedElastic ModulusGranularE2 Corrected elastic modulus of granular layer in MPa 300 CorrectedElasticModul Corrected elastic modulus of subgrade in MPa 69 usSubGradeE3 Bituminous Layer Thickness of bituminous layer in mm 105 Base Layer Thickness of base layer in mm 230 GSBLayer Thickness of GSB layerin mm 200 Subgrade CBR CBRofsubgrade 0.08 BituminousLayerCoeffic Layer coefficient of the bituminous layer ientA1 0.36 BaseLayerCoefficientA2 Layer coefficient of the baselayer 0.17 GranularBaseLayerCoe Layercoefficient of the GSBlayer fficientA3 0.17 Structural Number Structural number of the pavement 3.86 ModifiedStructural Modified structural number including contribution from subgrade Number 4.85 Survey Date Date of survey in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Pe NH Lane Air Surface ak Numb Temperatu Temperatu Sectio Chainag Directi Deflectio Deflectio Locatio Deflectio Numb er re re nCode e on Loa n0 n1 n1 n2 er d ABC- NH00xx 0.500 RHS R2 32.6 43.7 45.7 333 188 300 243 DEF ABC- NH00xx 1.000 LHS L1 29.9 32.6 45.4 317 163 300 217 DEF ABC- NH00xx 1.499 RHS R1 33.0 3399..33 45.7 246 110 300 153 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m52397404/2025/S&R Zone DEF ABC- NH00xx 2.000 LHS L2 28.7 32.4 46.0 293 130 300 187 DEF ABC- NH00xx 2.500 RHS R2 33.7 45.8 45.3 429 232 300 316 DEF ABC- NH00xx 3.000 LHS L1 29.0 33.0 45.7 343 204 300 252 DEF ABC- NH00xx 3.500 RHS R1 33.5 45.4 44.5 373 194 300 268 DEF ABC- NH00xx 4.010 LHS L2 28.9 33.5 45.0 348 201 300 254 DEF ABC- NH00xx 4.500 RHS R2 33.3 40.3 46.0 393 241 300 301 DEF (tablecontinued…) ocatio Deflectio Locatio Deflectio Locatio Deflectio Locatio Deflectio Locatio Deflectio Locatio Deflectio n2 n3 n3 n4 n4 n5 n5 n6 n6 n7 n7 n8 600 180 900 128 1200 102 1500 75 1800 58 2100 42 600 158 900 104 1200 70 1500 48 1800 38 2100 28 600 110 900 76 1200 59 1500 44 1800 35 2100 28 600 126 900 81 1200 62 1500 44 1800 32 2100 23 600 227 900 152 1200 116 1500 86 1800 71 2100 58 600 196 900 144 1200 117 1500 85 1800 65 2100 48 600 187 900 118 1200 83 1500 47 1800 31 2100 22 600 198 900 135 1200 105 1500 64 1800 42 2100 26 600 231 900 162 1200 123 1500 82 1800 62 2100 46 (table continued…) Sub gra LocaElasticMod ElasticMod ElasticMod CorrectedElasti CorrectedElast CorrectedElast Bitum Bas GS de tionulusBitumi ulusGranul ulusSubGra c i i i eLa CB 8 nousE1 arE2 deE3 ModulusBitumi cModulusGran cModulusSubGr nousL yer BLa R yer nousE1 ularE2 adeE3 ayer 2400 6213 185 100 6447 135 78 105 230 2000.08 2400 5356 195 100 5295 143 78 105 230 2000.08 2400 3359 396 90 3424 300 69 105 230 2000.08 2400 4830 226 100 4770 169 78 105 230 2000.08 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m62397404/2025/S&R Zone 2400 4570 137 97 4781 93 75 105 230 2000.08 2400 8454 135 100 8374 91 78 105 230 2000.08 2400 4394 165 100 4590 117 78 105 230 2000.08 2400 7817 139 96 7762 95 74 105 230 2000.08 2400 7666 123 95 7847 81 73 105 230 2000.08 (tablecontinued…) GranularBase Modifie BituminousLayer BaseLayer Structura Survey Layer d CoefficientA1 CoefficientA2 l Date CoefficientA3 Structura LatitudeLongitud Number e l Number 0.45 0.13 0.13 3.68 4.82 01-07-16 9.98897 78.02671 0.42 0.13 0.13 3.56 4.70 23-06-16 9.98444 78.02934 0.36 0.17 0.17 3.86 4.85 01-07-16 9.98341 78.03004 0.41 0.14 0.14 3.65 4.79 23-06-16 9.98107 78.03078 0.41 0.11 0.11 3.24 4.34 01-07-16 9.96328 78.04160 0.49 0.11 0.11 3.58 4.72 23-06-16 9.95385 78.05255 0.40 0.12 0.12 3.34 4.48 01-07-16 9.93102 78.05648 0.48 0.12 0.12 3.67 4.75 23-06-16 9.91229 78.04961 0.48 0.11 0.11 3.53 4.59 01-07-16 9.89041 78.03458 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m72397404/2025/S&R Zone 2.7Falling Weight Deflectometer (FWD) Rigid The following table lists the fields which need to be populated for the ‘FWD Rigid’ attribute.The descriptions of the fields are given below. Field Description Example NHNumber New National Highway number NH0065 HYD-VIJ(Hyderabad- Code indicating starting and ending locations of section Vijayawada) Section Code Chainage Chainage of the point (inkm) 0.500 Direction of survey Increasing • Increasing (chainage) Direction • Decreasing (chainage) Lane Number Numberof thelane: L1,L2, R1, R2,etc. L2 AirTemperature Air temperature recorded in °C 30.1 Surface Temperature Temperature of the pavement surface, recorded in °C 39.4 Peak Load Peak impulse load, measured in kN 103.7 Deflection1 Surface deflection at the test load center, measured in micron 140 Surfacedeflectionat300mmfromthetestloadcenter,measured inmicron Deflection2 121 Surfacedeflectionat600mmfromthetestloadcenter,measured inmicron Deflection3 108 Surfacedeflectionat900mmfromthetestloadcenter,measured inmicron Deflection4 101 ConcreteSlab Thicknessh Thickness of concrete slab, measured in mm 300 Areaofdeflectionbasin,calculatedfrom measureddeflections,in AreaofDeflection Basin cm2 761 RadiusofRelative Stiffness Radius of relative stiffness, calculated in mm 823 NormalizedDeflectiond Normalized deflection at location 1, in mm 3.1 1 NormalizedDeflectiond2 Normalized deflection at location 2, in mm 2.9 NormalizedDeflectiond Normalized deflection at location 3, in mm 2.4 3 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m82397404/2025/S&R Zone NormalizedDeflectiond Normalized deflection at location 4, in mm 1.9 4 ModulusofSubgrade Modulus of subgrade reaction, measured in MPa/m 131 Reactionk ElasticModulusof Elastic modulus of concrete, calculated in MPa 26118 ConcreteEc Cube Strength of Cube strength of concrete, calculated inMPa 27 Concrete fck Flexuralstrengthof Flexural strength of concrete, calculated in MPa 3.7 concretefmr DateOfTesting Date of testing in the format <DD-MM-YY> 06-05-17 Latitude Latitude of survey point 9.98897 Longitude Longitude of survey point 78.02671 A sample output is shown below for reference: Pea Concrete Sectio Chain Lan Air Surface k Slab n e Temperatu Temperatu NH Code - Directi No. re re Loa Deflecti Deflecti Deflecti Deflecti Thickness on on1 on2 on3 on4 -age d h No NH00x ABC- 104. 0.0 LHS L2 29.0 34.9 167 143 130 119 300 DEF x 1 NH00x ABC- 104. 0.5 RHS R2 30.5 38.1 141 130 122 115 300 x DEF 4 NH00x ABC- 105. 1.0 LHS L1 30.0 35.6 147 111 100 91 300 DEF x 2 NH00x ABC- 102. 1.5 RHS R1 28.9 38.3 140 126 116 107 300 DEF x 4 NH00x ABC- 103. 2.0 LHS L2 30.1 39.4 140 121 108 101 300 DEF x 7 NH00x ABC- 104. 2.5 RHS R2 29.0 37.5 150 134 126 117 300 DEF x 6 NH00x ABC- 102. 3.0 LHS L1 30.6 38.9 124 109 104 92 300 DEF x 7 NH00x ABC- 105. 3.5 RHS R1 29.3 39.1 149 136 128 119 300 DEF x 9 NH00x ABC- 104. 4.5 RHS R2 30.3 41.0 138 127 121 114 300 DEF x 9 (table continued…) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a2m92397404/2025/S&R Zone Modul Flexur Radius Elastic Cube usof al of Modul Streng Areaof Normali Normali Normali Normali Subgra streng Date Relativ usof thof Deflect zed zed zed zed de thof Of eS Concre Concre ion Deflecti Deflecti Deflecti Deflecti Reacti concre Testin Latit Longit tiffnes teEc tefck Basin ond1 ond2 ond3 ond4 onk tefmr g s ude ude 25-06-9.988978.0267 759 816 3 3 2 2 112 21590 19 3 16 7 1 28-06-9.984478.0293 821 1214 3 3 3 2 62 58161 135 8 16 4 4 25-06-9.983478.0300 684 580 3 3 2 1 246 12051 6 2 16 1 4 28-06-9.981078.0307 796 1014 3 3 3 2 87 39783 63 6 16 7 8 25-06-9.963278.0416 761 823 3 3 2 2 131 26118 27 4 16 8 0 28-06-9.953878.0525 800 1040 3 3 3 2 79 39908 64 6 16 5 5 25-06-9.931078.0564 789 971 3 3 3 2 107 41290 68 6 16 2 8 28-06-9.912278.0496 814 1150 3 3 3 2 66 50086 100 7 16 9 1 28-06-9.890478.0345 826 1257 3 3 3 2 59 64082 164 9 16 1 8 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m02397404/2025/S&R Zone RFPDocument-RFPNo./xxxx Section VI-A: List of Key Experts and Required Qualifications:- Consultancy Services(Ref ITC-clause 1.4) Notefor Consultants: Regarding this Section, Consultants must fill following forms:- a)Form T-6: Team Composition, Assignment, and Key Experts’ Inputs b)Annex to Form T-6:Key Expert Curriculum Vitae(CV) The total estimated inputs of the Key Experts and their breakup is given below File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m12397404/2025/S&R Zone MAN MONTHS INPUT FOR KEY PROFESSIONAL STAFF AUTHORITY ENGINEER Normal Highway Project (For projects with length 0-60 km) S. Key Personnel Man-month in Man-month in No. Construction Defect Period of 18 LiabilityPeriod A: Key Personnel months of 60 months Team Leader Cum Senior Highway Engineer 18 15 Resident cum Highway Engineer 18 60 Bridge/Structural Engineer 18 10 Senior Pavement Specialist 6 0 Senior Quality cum Material Expert 18 0 Planning Engineer 5 3 Road Safety Expert 6 10 Sub Total 89 98 Total for Construction and Maintenance 187 B: Sub Professional Staff Survey Engineer 18 10 Assistant Highway Engineer(2 Nos) 2 x 18 1 X 60 CAD Expert 4 4 Environmental Engineer 4 0 Assistant Bridge Engineer 18 60 Assistant Quality cum Material Engineer (2 nos) 2 x 18 0 Electrical Engineer 4 3 HTMS/Toll Expert 2 0 Quantity Surveyor 18 8 Horticulture cum Landscaping Expert 6 18 Lab technician 2x18 0 Document/ Data entry Operator 18 0 Sub Total 200 163 Total for Construction and Maintenance 363 Grand Total 550 Note: 1. The other inputslike supportstaff shallbeprovided by theConsultantof an acceptable type commensurate with the roles and responsibilities of each position 2. In case of project having different construction period, Man Month Input shall be adjusted proportionately 3. The Contract Specialist, Financial Expert or Legal expert or any other expert as per project requirement may be required for the project for specific needs. Their deployment shall be arrangedbytheConsultanton specific requisition from the Authority and the payment shall be made as per the actual deployment. The Financial Expert or Legal expert or Contract Specialist shall be paid at the rates quoted for Senior Pavement Specialist. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m22397404/2025/S&R Zone MAN -MONTHS INPUT FOR KEY PROFESSIONAL STAFF AUTHORITY ENGINEER Normal Highway Project (For projects with length more than 60 km) S.No. Key Personnel Man-month in Man-month in Construction DefectLiability periodof 24 Period of 60 A:KeyPersonnel months months Team Leader Cum Senior Highway Engineer 24 15 Resident cum Highway Engineer (2 nos) 2x24 1x60 Bridge/Structural Engineer 24 15 Senior Pavement Specialist 8 0 Senior Quality cum Material Expert 24 0 Planning Engineer 6 3 Road Safety Expert 8 15 Sub Total 142 108 Total for Construction and Maintenance 250 B: Sub Professional Staff Survey Engineer (3 nos) 3x24 1x10 Assistant Highway Engineer(3 nos) 3x24 1x60 CAD Expert 8 4 Environmental Engineer 6 0 Assistant Bridge Engineer (2 nos) 2x24 1x60 Assistant Quality cum Material Engineer (3 nos) 3x24 0 Electrical Engineer 4 3 HTMS/Toll Expert 3 0 Quantity Surveyor 24 8 Horticulture cum Landscaping Expert 8 28 Lab technician 4x24 0 Document/ Data Entry Operator 24 0 Sub Total 437 173 Total for Construction and Maintenance 646 Grand Total 896 Note: 1. The other inputslikesupportstaffshallbeprovided bytheConsultantofanacceptable type commensurate with the roles and responsibilities of each position 2. In case of project having different construction period, Man Month Input shall be adjusted proportionately 3. The Financial Expert or Legal expert or Contract Specialist may be required for the project forspecific needs. Their deployment shall be arranged bythe Consultant onspecific requisition fromthe Authority and the payment shall be made as per the actual deployment. The Financial Expert or Legal expert or Contract Specialist shall be paid at the rates quoted for Senior PavementSpecialist. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m32397404/2025/S&R Zone MAN -MONTHS INPUT FOR KEY PROFESSIONAL STAFF AUTHORITY ENGINEER Standalone Bridge Project Man-month in S.No. Key Personnel Defect Man-month in Liability A:KeyPersonnel Constructionperiodof36 Period of months 120months 1. Team Leader Cum Senior Bridge 36 30 Engineer 2. Resident cum Pavement Specialist 36 30 3. Bridge/Structural Engineer 36 120 4. PlanningEngineer 10 0 5. Senior Quality cum Material Expert 36 0 6. Road Safety Expert 12 10 SubTotal 166 190 356 Totalfor Constructionand Maintenance B: Sub Professional Staff (TobedecidedbytheAuthorityasper requirementoftheProjectatthetime of preparationofRFP) (a) (b) (c) d) Lab technician 36 3 SubTotal Sub Total TotalforConstructionand Maintenance Grand Total Note: The number of key personnel may be modified as per the requirement with the approval of Competent Authority. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m42397404/2025/S&R Zone MAN - MONTHS INPUT FOR KEY PROFESSIONAL STAFF AUTHORITY ENGINEER Standalone Tunnel Project Man-month Man-monthin S.No. Key Personnel inDefect Construction Liability periodof A:KeyPersonnel Periodof60 60months months 1. Team Leader Cum Senior Tunnel Expert 60 15 2. Resident cum Excavation Specialist 60 60 3. Senior Geotechnical Expert 60 0 4. Tunnel Design Engineer 60 0 5. Tunnel Safety Expert 60 5 6. Planning Engineer 10 0 7. Senior Geologist 20 0 SubTotal 33 80 0 Total for Construction and Maintenance 410 B: Sub Professional Staff (Tobe decidedby theAuthorityas per requirement ofthe Project at thetime ofpreparationofRFP) Lab technician SubTotal (Tobe decidedbythe Authorityasperrequirementofthe Projectat the time of preparation of RFP) Total for Construction and Maintenance GrandTotal Note: The number of key personnel may be modified as per the requirement with the approval of Competent Authority. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m52397404/2025/S&R Zone QUALIFICATIONOFKEY PERSONNEL TEAMLEADERCUM SENIORHIGHWAY ENGINEER This is the senior most position and the expert engaged as the team leader shall be responsible for reviewing the entire Project preparation and implementation activities of the Concessionaire. He shall check all the Designs being prepared by the Concessionaire, ensure execution of works on site as per specification and standards, and continuously interact with the <Agency> and the Concessionaire. He shall undertake Project site visits and shall guide, supervise, coordinate and monitor the work of other experts in his team as well as those of the Concessionaire. The candidate is required to be a Senior Highway Engineer, who should have a proven record of supervising, organising and managing of construction of highway projects and also of Project preparation of large magnitudes projects, as defined below, financed by international lending agencies and others. Knowledge of Project management shallbe anaddedadvantage. EssentialQualifications: a)GraduateinCivilEngineering from recognizeduniversity. b)Total Professional Experience ofat least 12years inhandlingHighway Projects. c) At least 5 years experience as Team Leader/Project Manager or similar capacity in HighwayDevelopment Project. d) He should have handled as Team Leader/Project Manager or similar capacity of at least two projects in Construction Supervision / IC (of length 40% of project length or more of similarconfiguration(2/4/6laning)). e) He should have handled as Team Leader or similar capacity of at least two Projects of project Preparation of major highway Project (of length 40% of project length or more of similarconfiguration(2/4/6laning)). f) Experience as Team Leader/Project Manager or similar capacity in Operation and Maintenance of Major Highway Projects (of length 40% of project length or more of similar configuration(2/4/6laning)). g) Medical certificateof fitness as per Appendix-B-1. PreferentialQualifications: a) Post Graduate Degree in Construction Management/Transportation/Highway Engineering/Structural Engineering/any specialisedstream of Civil Engineering. b) Highway Development Projects (of length 40% of project length or more of similar configuration(2/4/6laning))taken upunder EPC. c) Degree/Diploma/Certificate in Project Management/Training programme in Highways Engineeringfrom IAHE. Note: Similar Capacity includes the following positions – On behalf of Consultant: Team Leader / Resident Engineer (Construction Supervision/IE/AE); On behalf of Contractor: Project Manager (Construction/Construction Supervision); In Government Organizations: Superintending Engineer (or equivalent) and above. Only those projects will be considered for evaluation at Sl. No. 1(d), 1(e) & 1(f), where the input of the personnel is 12 months, 9 monthsand12months respectively. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m62397404/2025/S&R Zone RESIDENTCUM HIGHWAYENGINEER The Resident cum Highway Engineer shall be responsible for supervising the works of highway to be constructed by the Concessionaire for this project. He shall also inspect the pavementrehabilitationand repair works tobeundertaken bytheConcessionaire. EssentialQualifications: a)GraduateinCivilEngineering from arecognized University. b)Professional Experience ofat least12years inHighway Projects. c)At least5years experience insimilarcapacityinHighway Development Project. d) Should have handled at least 2 major projects (of length 40% of project length or more of similarconfiguration(2/4/6laning) and above). e)Medical certificateof fitness as per Appendix-B-1. PreferentialQualifications: a) Post Graduate Degree in Transportation/Highway Engineering/Structural Engineering/GeotechnicalEngineering/any specialisedstream ofCivilEngineering. b) Attended Minimum 5 days training programme in field related to Design and supervision ofHighways relatedtopicfrom IAHE. c) Experience of Highway Project (of length 40% of project length or more of similar configuration (2/4/6 laning) and above) of Construction / Construction Supervision / IC of Highwayprojects, Interchange /any otherstructures. d)Experience insimilarcapacityinsupervisionofat least 2MajorHighway Bridges. e)Experience insupervisionofRehabilitationand repairof2nos Major Bridges. SENIORPAVEMENT SPECIALIST The expert shall be continuously interacting with the Concessionaire, for the review of highway designs and drawings using sophisticated computer software and also construction and O&M works and to ensure life cycle cost effectiveness and viable design of pavement including appropriate rehabilitation / strengthening of the existing two lane pavement which is significantly distressed. He shall also be responsible for ensuring complete adherence to maintenancestandards duringConstructionand Operationperiod. EssentialQualifications: a)GraduateinCivilEngineering from arecognized University. b)Professional Experience of at least 10years inPavement Design / Pavement Construction/ Pavement MaintenanceofHighways / Roads / AirfieldRunways. c) Experience of at least 5 years in similar capacity in Construction / Construction Supervisionof2/4/6laningofmajor highway projects. d) Experience as Pavement / Geotechnical Engineer in Construction/Construction Supervision of at least 2 major highway projects (of length 40% of project length or more of similarconfiguration). e)Medical certificateof fitness as per Appendix-B-1. PreferentialQualifications: a) Post Graduate Degree in Highway Engineering / Pavement Engineering / Transportation Engineering. b)Experience as aPavement Specialist/PavementEngineer inHighway projects ofsimilar File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m72397404/2025/S&R Zone configuration. c)Attended residential trainingprogramme relatedtopavement/highwaydesignfrom IAHE. SENIORQUALITY/MATERIALEXPERT The Quality/Material Expert shall review the test results of bore holes, quarry and borrow area material to find out their strength characteristics and suitability for using them in construction. He shall inspect the Concessionaire’s field laboratories to ensure adequacy and capability. Heshall supervise qualityassuranceaspects includingcrushers and mixingplants. EssentialQualifications: a)GraduateinCivilEngineering from arecognized University. b)Professional Experience ofat least10years inhandlingHighway projects. c) Experience of at least 5 years as Senior Quality/Material Expert or similar capacity in Construction/ ConstructionSupervision/ majorhighway projects. d) Experience as Senior Quality/Material Expert or similar capacity in handling of at least 2 similarhighway projects (of length 40%ofproject lengthormore). e)Medical certificateof fitness as per Appendix-B-1. PreferentialQualifications: a) Post Graduate Degree in Geotechnical Engineering / Foundation Engineering / Soil Mechanics. b)Trained in16days material testingprocess course from IAHE orCRRI. ROADSAFETYEXPERT Responsible for the overall Road Safety Aspect of the Project. He shall ensure that safety provisions as per relevant codes are strictly followed at site during Construction of Road and alsoduring theMaintenancePeriod. EssentialQualifications: a)GraduateinCivilEngineering from arecognized University. b)Professional Experience ofat least10years inhandlingHighway projects. c) Minimum 5 years experience in Road Safety works of Major Highway Projects (4/6 laning projects). d) Experience in Road Safety Audit of at least 2 highway/expressway projects including 1 at designstage. e)Experience inRoadSafetyManagementPlan. f)Medical certificateof fitness as per Appendix-B-1. PreferentialQualifications: a)Post Graduate Degree inTraffic Transportation/SafetyEngineering. b)Experience inidentificationand improvement ofblack spotsonMajor Highway Projects. c)Experience inpreparationofRoadSafety Management Planforinter urbanHighways. d)15days Certificate course onRoadSafetyAudit from IAHE/CRRI. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m82397404/2025/S&R Zone TEAMLEADERCUM SENIORBRIDGE ENGINEER Responsible for reviewing the Project preparation and implementation activities for bridges. Shall check designs and drawings, ensure execution per standards, track progress, recommendonEOT, CoS,Force Majeure,disputes,anduploadprogress ondata portals. EssentialQualifications: a)GraduateinCivilEngineering. b)Professional Experience ofat least12years inhandlingBridge Projects. c) At least 5 years as Team Leader/Project Manager or similar in Highway Development Project. d)Handledat least 2projects inConstructionSupervision/IC (length criteria 40%ormore). e) Handled at least 2 projects involving at least one Major Bridge (minimum 300 m length withoutapproaches). f)Experience inO&M ofMajorBridge (minimum 300mlength). g) Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a)Post Graduate Degree inStructural Engineeringor equivalent. b)HighwayDevelopment Projects (length40% ormore). c)Degree/Diploma/Certificate inProject Management. d)Residentialtrainingprogramme onCollapse/failureof bridges/structures. Note: Similar capacity includes TL/RE (Consultant), Project Manager (Contractor), SuperintendingEngineer (Govt). Input criteria: 12months,9months,12monthsrespectively. TEAMLEADERCUM SENIORTUNNEL ENGINEER Overall in-charge of the project supervision of tunneling works. Duties include monitoring, guiding, supervising construction supervision of tunnel packages, interacting with Authority, trackingresources,delays,EOT proposals. EssentialQualifications: a)GraduateinCivil/MiningEngineering. b)Total Professional Experience ofat least 20years. c)At least15years inmajor tunnelingprojects. d)At least 10years inconstruction/constructionsupervisionofRoad/Rail/Metrotunnels. e)At least5years as Team Leader/RE/PM insupervision oftunnel projects of length ≥4km. f)Handled at leasttwoprojects inConstructionSupervisionoftunnels ≥4km length. g) Not morethan65years of age. h)Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a) Post Graduate or chartered engineer in Mining/Geotechnical/Structural Engineering/Rock Mechanics. b)Project preparation/designexperience oftunnel projects. c)At leastone trainingcourse inpast2years from IAHE. RESIDENTENGINEERCUM TUNNEL EXCAVATIONEXPERT Responsible for overseeing tunnel excavation, methodology, lining, waterproofing, blasting. Coordinates withTeam Leader. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a3m92397404/2025/S&R Zone EssentialQualifications: a)GraduateinCivil/MiningEngineering. b)Total Professional Experience ofat least 15years. c)At least10years insimilarcapacityfor majortunnel projects. d) At least 7 years in construction supervision of major transportation tunnel construction projects. e)Handledat least 2tunnel projects oflength≥4km. f)Experience intunnel design/DPR/feasibility/design review of tunnel projects ≥4km. g) Not morethan65years. h)Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a)Post Graduate orcharteredengineer incivil/mining. b)At least onetrainingcourse inpast 2years from IAHE. TUNNELDESIGN ENGINEER Responsible for checking tunnel designs, detailed calculations, structural condition assessments. EssentialQualifications: a)GraduateinCivilEngineering. b)Professional Experience ofat least20years. c)At least12years inmajor tunnelprojects. d)At least 12years intunnel design(Road/Rail/Metro). e)Experience insupervisionof2tunnel projects ≥4km. f)Experience indesign of3tunnel projects ≥4km. g) Not morethan65years. h)Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a)Post Graduate inStructural Engineering. b)Experience ininnovativetunnel design(immersed, sub-sea bored). c)At leastone trainingcourse inpast2years from IAHE. SENIORGEO-TECHNICALEXPERT Responsiblefor geotechnicalinvestigations,supervisingtests,assistingtunnel design. EssentialQualifications: a)GraduateinCivilEngineering/Masters inEngineering Geology. b)Professional Experience ofat least20years. c) At least 10 years in Construction/Construction Supervision of transportation tunnel projects indeveloped countries. d)Experience as GeotechnicalEngineer inat least 4tunnelprojects ≥4km. e)Specific experience invertical shaft sinking≥200m. f)Project preparation ofat least2tunnel projects ≥4km. g) Not morethan65years. h) Medical certificate of fitness as per Appendix-B-1. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m02397404/2025/S&R Zone PreferentialQualifications: a)Post Graduate inRockMechanics/FoundationEngineering/Tunnel Engineering. b)At least onetrainingcourse inpast 2years from IAHE. TUNNELSAFETY EXPERT Responsiblefor tunnel safety management andaudits. EssentialQualifications: a)Post Graduate inCivil/MiningEngineering. b)Total Professional Experience ofat least 20years. c)At least7years intunnel safety management indevelopedcountries. d)At least 10years intunnel safetyworks. e)Safety auditsinat least 2tunnel projects ≥4km. f)Not morethan 65years. g) Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a)Certification insafety/health/shotfirer/Explosives. b)At least onetrainingcourse inpast 2years from IAHE. SENIORGEOLOGIST Responsiblefor geological verification,assistingtunnel design,andmonitoringtunnel works. EssentialQualifications: a)Masters inGeology/AppliedGeology. b)Professional Experience ofat least20years. c)At least7years insimilarcapacityintunnel construction/supervision. d)At least 5years ofsupervisionof majortunnel projects inHimalayanregionusingNATM. e)Handledat least 2highway tunnelprojects ≥4km inlength. f)Not morethan 65years. g) Medicalcertificateoffitness as perAppendix-B-1. PreferentialQualifications: a)Handledat least 2major tunnel projects inproject preparation/DPR. b)Training/certificate courseinrelevant field. RESIDENTCUM PAVEMENTSPECIALIST Responsible for reviewing pavement designs, ensuring adherence to standards during constructionandO&M. EssentialQualifications: a)GraduateinCivilEngineering. b)Professional Experience ofat least12years. c) At least 5 years in similar capacity in Construction/Construction Supervision of major highwayprojects. d)Experience inat least2major highwayprojects (length≥40%of project length). e)Medical certificateof fitness as per Appendix-B-1. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m12397404/2025/S&R Zone PreferentialQualifications: a)Post Graduate Degree inHighway/Geotechnical/Transportation/Structural Engineering. b) Experience in Highway project construction/supervision on EPC mode (length ≥40% of project length). c)At leastone trainingcourse inpast2years from IAHE. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m22397404/2025/S&R Zone SUB PROFESSIONAL SURVEYENGINEER The candidate should be Graduate in Civil Engineering at least 5 years experience or diploma in civil Engineering with 10 years experience in the field of surveying in highway projects and they should have also dealt with at least 2 project of similar nature. This position requires thorough understanding of modern computer based methodof surveyingwithtotal stationdigital level etc. ASSISTANT HIGHWAY ENGINEER The Candidate should be Graduate in Civil Engineering with minimum 5 year experience or diploma in Civil Engineering with 10 years experience in highway Projects.He shouldhave dealt withatleast2project ofsimilarnature. CADEXPERT He should be Graduate in Civil Engineering/Computer Science having experience 3 yearexperience incomputerrelateddesignmethodfor highwayengineering. ENVIRONMENTAL ENGINEER The Candidate should be Graduate in Civil Engineering/Environmental Engineering or other relevant qualification. He should have at least 6 years experience out of which 2 years in highway projects. He should have good knowledge of MOEF guidelines/requirements formitigationmeasures. ASSISTANT BRIDGE ENGINEER The Candidate should be Graduate in Civil Engineering with minimum 5 year experience or diploma in civil Engineering with 10 years experience in highway Projects. He shouldhavehandledat least 2majorbridge project. ASSISTANT QUALITY CUM MATERIAL ENGINEER The Candidate should be Graduate in Civil Engineering with minimum 5 year experience or diploma in civil Engineering with 10 years experience in highway Projects. Heshouldhavehandledat least2project. ELECTRICAL ENGINEER The Candidate shouldbe Graduate in Electrical Engineering from recognisedinstitute. Heshouldhaveat least 5years experience. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m32397404/2025/S&R Zone HTMS/TOLLING SYSTEM EXPERT ThecandidateshouldbeaSystems Engineerhavingexperienceof atleast5Years. He should be well versed either in preparation of standards or in implementation of projects of electronic toll collection and ATMS/ITS/HTMS. He should have bachelor’s degreeinElectronics/Computer Science/IT.He shouldhave knowledge of international latest practices in the field of electronic toll collection (ETC) and ATMS/ITS/HTMS. He should have work experience of either design or implementation on at least 1 ATMS/ITS/HTMS project and at least 1 ETC project in similarcapacity. QUANTITYSURVEYOR He should be Graduate or equivalent in Civil Engineering having Min. 5 years of professional experience or diploma in civil Engineering with 10 years experience in preparation of highway project estimates. He should have Min. 3 years experience in Preparation of Bill of Quantities/estimates for major highway projects costing Rs.300Croreor above. HORTICULTURE CUM LANDSCAPING SPECIALIST He should be a Graduate in Agriculture with specialization in Horticulture/Arboriculture having minimum 5 year of field experience in Horticulture/Arboriculture and landscaping. He should have minimum 5 years field experience. Lab Technician: - Graduate in Civil Engineering with one year experience or Diploma in Civil Engineering or B.Sc. with 3 year experience. Note:- All sub-professionals shall submit medical certificate of fitness before joining File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m42397404/2025/S&R Zone SectionVII:Evaluation/ Scoring Criteria RFP Document No. RFPNo./ xxxx; Tender Title: ConsultancyServices (RefITC-clause 1.4) Consultantsmust fillupthefollowingForms regardingthisSection: a)Form T-2: Consultant’s OrganisationandExperience b)Form T-2A Technical Capacity c)Form T-3: Commentsand Suggestions onTerms ofReference,Counterpart Staff,and Inputs tobe ProvidedbytheProcuringEntity d)Form T-4: Descriptionof Approach, MethodologyandWorkPlaninRespondingtothe Terms of Reference e)Form T-5: WorkScheduleand Planningfor Deliverables f)Form T-6: Team Composition,Assignment,and KeyExperts’Inputs g) AnnextoForm T-6: Key Experts’ Curriculum Vitae(CV) The eligibilityand evaluationcriteria shall be as follows as giveninthis sectionbelow:- The points assigned to Technical Evaluation criteria are: S. Descriptio Mark n s No. 1 Relevant experience for the assignment 25 2 RatingoftheFirm 40 2 Experience in use of technology for road inspection 10 4 Qualifications and competence of the key staff for the assignment 25 Total 100 1. SubcriteriaforRelevantExperienceofthefirmfortheassignment AverageAnnualTurnover(last3years)fromconsultancybusinessofcivil Engineering 5 Projects (Min3% oftheEPCofProjectfor whichAE hasbeeninvited) No of Highway Professionals withthe Firm 5 Experience as Independent Engineer/Authority Engineer/Construction Supervision in 7 Number of Similar AE bids are requested for highway projects that have the same length as the project length. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m52397404/2025/S&R Zone categoryforwhichRFPinvitedof2/4/6**-laningormoreinlast7years* Experience in DPR preparation for Number of Highway Projects (of length equalto 3 project length ofsimilarcategoryforwhichRFPinvitedof2/4/6**-laningormore)in last7years* ExperienceinConstructionSupervisionasAE/IE/PMC ofMajor structures having 3 lengthofmorethan500meterinlast7years. ExperiencepreparationofDPRofMajor structures having lengthofmorethan500 2 meterinlast 7years. ** Additional requirement in case of specialized projects*** * * Consultants should give details of the experience of the firm considering the completedand the on-going highway assignments, separately for PPP and non-PPP Projects along with experience certificates from clients. This list of the completed works should also include those assignments which are substantially (90% of Contract value) completed. No Qualification/Experience etc. shall be considered withoutproof ofexperience. Experience of Authority’s Engineer for having offered consultancy services to a private organization shall not be considered as relevant experience for current assignment. ** Similar projects means 2/4/6 lane as applicable for the project for which RFP is invited. For 2-lane projects experience of 4/6 lane also to be considered with a multiplication factor of 1.5. Experience of 4/6 lane shall be considered interchangeablyfor4/6laningprojects. For 4/6laningprojects,experience of 2lane will be considered with a multiplication factor of 0.4, but only for those 2 lane projects whosecost ofconsultancyservices was more thanRs.3.0crores. *** In case the project includes any specialized nature of work such as tunnels, specialized structures etc. in substantial quantum, this requirement/Marks may be includedbysuitablyadjustingmarks of otherattributes. In caseofJVtheturnover and experiencedetails ofLead andJVEmployer’s certificateshouldbesubmittedsubstantiatingtheexperience claimedbythefirm. 2. Sub- Criteria for assessment of rating of the Firm S. Rating of the Marks leadPartner No 1. 100-90 40 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m62397404/2025/S&R Zone 2. 90-80 30 3. 80-70 20 4. 70-60 10 5. Less than 60 5 For evaluation purpose Rating of the firm published by NHAI shall be considered. The rating shall be calculated for both JV Members and weighted average shall be used forcalculatingthemarks oftheJVfor thepurposes of tender evaluationas under: Shareof Lead PartnerinJV=S1 Shareof OtherPartner inJV=S2 RatingofLead Partner =R1 RatingofOther JV Partner= R2 WeightedAverage RatingofbothJVPartners =S1xR1+ S2xR2 Note: 1. For projects with tentative project <= 500 Cr, in case of new entrants as part of JV i.e. JV members with no historical rating, the rating of only the other partner shall be considered as theweighted Average Ratingof bothJVPartners. 2. Ratingof non-substantial partner ofJVwill not beconsideredfor evaluation 3. Sub criteria for Ownership of technology/ Equipment for road inspection Sr. Maximu Description Sub- m No. Points Points Ownershipof NetworkSurveyvehicletechnology 1 2.0 forpavement inspection Ownership of Mobile Quality Control Unit having 2. 3.0 Soil Testing, Asphat Testing, Concrete testing, Aggregate Testing and pavement testing equipment onboard along with sufficient IT and communication systems Ownership of NABLAcerbated Lab by the firm 3. 1.5 Ownership of Mobile Bridge Inspection Unit or 4. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m72397404/2025/S&R Zone bettertechnologyforbridgeinspection Ownershipof FallingWeightReflectometer(FWD)or 5. 1.0 better technology for pavement strength measurement 6. Ownership of Retro reflectometer technology 1.0 Total 10 Note: A. TheAuthority’s Engineer owningtheequipment’s shallbe requiredtosubmit proofofownership. B. The experience of the JV firms in use of technology shall also be counted in the evaluation. The experience of firm or JV firm in NSV or equivalent technology, FWD or equivalent technology, MBIU or equivalent technology and Retro reflectometer or equivalent technology shall be supported by experience certificate. The experience of a firm/ JV firm for a private concessionaire/ contractor (client) shall be considered certificate by the Govt Department. Any false certification shall attract penal provisions as per contract 4. Qualification and competence of following professional/sub-professionalstaff forthe assignment shall be evaluated. The weightage for various key staff are as under:- Normal Highway Project: S. Staff Marks. No Position 1 Team Leader Cum Senior Highway Engineer 7 2 Resident cum Highway Engineer 4 3 Bridge/Structural Engineer 3 4 Pavement Specialist 3 5 Quality cum Material Expert 3 6 Planning Engineer 2 7 Road safety Expert 3 Total 25 Standalone Bridge Project: S. Staff Marks. No Position 1 Team Leader Cum Senior Bridge Engineer 7 2 Resident cum Pavement Specialist 5 3 Bridge/Structural Engineer 5 5 Road Safety Expert 3 6 Planning Engineer 2 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m82397404/2025/S&R Zone 7 Quality cum Material Expert 3 Total 25 Standalone Tunnel Project: S. Staff Marks. No Position 1 Team Leader Cum Senior Tunnel Expert 7 2 Resident Engineer cum Excavation Specialist 4 3 Geotechnical Expert 4 4 Tunnel Design Engineer 3 5 Tunnel Safety Expert 3 6 Geologist 2 7 Planning Engineer 2 Total 25 Sub criteria for qualification of Key Personnel (i.e. Professional staff) General qualifications 25 Adequacy for the project 70 Employment with firm 5 Total 100 Thetechnical proposal shouldscore at least 75pointstobe consideredresponsive for financialevaluation. v) Detailed evaluation criteria which is to be used for evaluation of technical bids is as indicated below as Appendix-EC. vi) The Bidder should carryout self-evaluation based on the evaluation criteria at Appendix-EC. While submitting the self-evaluation along with bid, Bidder shall make references to the documents which has been relied upon in his self-evaluation. vii) Detailed/complete technical evaluation of a bidder shall be made available to that bidder only giving opportunity to the bidder to respond within 7 days in case they have any objection on their evaluation. viii) The single currency for price conversion is INR. For evaluation of bid proposals, the foreign currency conversation rate of 1US Dollar = Rs. And 1 Euro =Rs. – shallbe used. ix) The weightage given to technical proposal is 60%.The weightage to the PerformanceSecurityQuotedbybiddershallbe20%andTheweightage givento financial quote is 20%. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a4m92397404/2025/S&R Zone Remarks: Based on experience andtheConsultingIndustry’s Capacity, Project specificrequirement etc., <Agency> maymodifytheabove criteriafor Selectionof AE. Appendix-EC 1. Evaluation Criteria for Assessment of Experience of the Firm. Reference/Details Marksself- Max. ofprojectsClaimed assessed Marks S.No. Descriptio forself- bythe n assessment bidder 1 AverageAnnualTurnover(last3years) 5 from consultancybusinessofcivil EngineeringProjects <3%ofTPC–0 marks3%ofTPC– 3.0marks Add for additional turnover 0.50 (Zero point five) marksforevery1% ofTPCabove3%ofTPC subjecttomaximum 2.0marks. 2. Nos of Highways Professional with Firm 5 2.1 <10 0 2.2 10-20 3 2.3 >20 but ≤30 4 2.5 >30 5 *TheprofessionalswhopossessdegreeinCivilEngineering/TransportPlanning /Transport Economics/Traffic Management / Geology/ Environment Science or Engineering and 8 years experience in highway/bridge /tunnel with employment in the firm for more than oneyear.ThecurrentEmploymentCertificate not more than 15 days oldshallbe uploadedbyKeyPersonnelon INFRACON. The Form 26AS/TCS/TDS certificate of such processionals with the firm shall also be provided in the bid. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m02397404/2025/S&R Zone 3. Experience as Independent 7 Engineer/Authority Engineer/Construction Supervision/PMCinNumberof HighwayProjects of length equal to project length for which AE bids are invited of similar category for which RFP invited of 2/ 4/6**-laning or more in last 7 years* 1 project – 3 marks Add 0.5(one) mark extraforcompleted assignmentsubjecttomaximum4 (Four) 4. ExperienceinDPRpreparationforNumberof 3 HighwayProjects(oflength40%ofproject lengthofsimilarcategoryforwhichRFPinvited of2/4/6**-laningormore)inlast7years* 2 project – 2 marks Add 0.5 (Zero point five) marks extra for each additional project subject to maximum1mark. 5 ExperienceinConstructionSupervisionas 3 AE/IE/PMCofMajorstructureshavinglength ofmorethan500meterinlast7years. 2project–1.0marksAdd0.5 (Zeropointfive) marksextraforeachadditionalprojectsubjectto maximum 2.0marks 6 ExperienceinPreparationofDPR ofMajor 2 structureshaving length of morethan 500meterin last 7 years. 2project–1.0marksAdd0.5(Zeropoint twofive)marksextraforeachadditionalproject subjecttomaximum 1.0marks 7 Additionalrequirementincaseofspecialized *** projects*** Note 1:In case of JV the turnover and experience details of Lead and JV partners to beadded. Note 2: Employer’s certificate/ certificate from Statutory Auditor should be File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m12397404/2025/S&R Zone submittedsubstantiatingthe experience/turnover claimedbythefirm. Note 3: ** For 4/6 laning projects, experience of 2 lane will be considered with amultiplicationfactor of 0.4, but only for those 2 lane projects whose cost of consultancyservices was morethanRs.3.0crores. *** In case the project includes any specialized nature of work such as tunnels, specializedstructures etc. in substantial quantum, this requirement/Marks may beincludedbysuitablyadjustingmarks ofother attributes. 1A. Evaluation Criteria for assessment of rating of the Lead Firm S.No. Rating of the Marks leadPartner 1. 100-90 40 2. 90-80 30 3. 80-70 20 4. 70-60 10 5. Less than 60 5 For evaluation purpose Rating of the firm published by NHAI shall be considered.Theratingshall be calculatedforbothJV Members and weighted average shallbe usedfor calculatingthemarks oftheJVfor thepurposes of tenderevaluation as under: Shareof Lead PartnerinJV=S1 Shareof OtherPartner inJV=S2 RatingofLead Partner =R1 RatingofOther JV Partner= R2 WeightedAverage RatingofbothJVPartners =S1xR1+ S2xR2 Note: For projects withtentativeproject <= 500Cr,incase ofnew entrants as part of JVi.e.JV members with no historical rating, the rating of onlythe other partner shall be consideredas the weightedAverage Ratingof bothJVPartners. 2. EvaluationCriteriaforassessmentofexperience inuseof technologyforroad inspection File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m22397404/2025/S&R Zone S.No. Description Maximum Referen Mark Point ce/ sself- details assess of edby projects the Notes: Claimed bidde for self- r assessme nt Ownership of Network Survey 1 2.0 vehicle technology for pavement inspection Ownership of Mobile Quality Control 2. 3.0 Unit having Soil Testing, Asphat Testing, Concrete testing, Aggregate Testing and pavement testing equipment onboard along with sufficientITandcommunicationsystems Ownershipof NABLAcerbated Lab bythe firm 3. 1.5 Ownershipof MobileBridgeInspectionUnitor 4. 1.5 bettertechnologyforbridgeinspection Ownershipof FallingWeightReflectometer 5. 1.0 (FWD)or better technologyforpavementstrength measurement 6. Ownership of Retro reflectometer technology 1.0 Total 10 (i) TheConsultantsowningtheequipmentshallberequired tosubmitproof ofownership. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m32397404/2025/S&R Zone 3 EvaluationCriteriaforassessmentofscoreofKeyStaffforadequacyoftheAssignment. 3.1 Team Leader cum Senior Highway Engineer Reference/Details Marks Max. ofprojects self- Points S.No. Description Claimedforself- assessed by thebidder assessment 1 General Qualification 25 i) Graduate in Civil Engineering 17 ii) Post-GraduationinManagement/ 03 Construction/Transportation/Highway Engineering/StructuralEngineering or equivalentspecializedstreamofcivil engineering iii) Minimum 15days training course 03 from IAHE/CRRI/Govtinstituteinany filedrelatedtoHighway development iv) EssentialSoftware 2 Experience-(MS Roads/ Projects,PrimaVeraor other relevant software ) 2 Adequacy for the Project 70 a) ProfessionalExperienceinHighway Projects: i) TotalProfessionalExperienceinhandling 15 Highwayprojects < 15years -0 15years-8marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum 7(seven) marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m42397404/2025/S&R Zone ii) ExperienceasTeamLeaderorsimilarcapacity 15 inHighwayDevelopmentProjects(similar configuration(2/4/6laning**)andabove) <5 years-0 5years -11 marks Add1marksextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. iii) ExperienceasTeamLeaderorsimilar 5 capacityinHighwayDevelopment projects(of length40%ofprojectlengthormoreofsimilar configuration(2/4/6laning**)andabove)on EPC 1project-3marksadd1markextrafor additionalprojectssubjecttomaximum2 (two)mark b) ExperienceasTeamLeaderorsimilar 10 capacityofprojectPreparationincluding designofmajorhighwayProject(of length40%projectlength ormoreofsimilar configuration(2/4/6laning**)andabove). <2 projects -0 2 Projects -8 marks Add1marksforeachadditionalprojectsubject tomaximum 2marks. c) ExperienceinpositionofTeam 20 Leader/ProjectManagerorsimilarcapacityin ConstructionSupervision/ICinvolvinglength 40%projectlengthormoreofsimilar configuration(2/4/6**laning)andabove < 2projects– 0 2Projects–16marks Add2marks extraforeachadditionalproject subjecttomaximum4(four)marks File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m52397404/2025/S&R Zone d) ExperienceasTeamLeaderorsimilar 5 capacityinOperationandMaintenanceof MajorHighway(oflength40%projectlength ormoreofsimilarconfiguration(2/4/6 laning**)andabove). 1project–4marks Add1markextraforeachadditionalproject subjecttomaximum1(one)mark Employment with the Firm 3 5 <1year-0 1year–3marks Add0.5marksforeachsubsequentyear subjecttomaximum 2marks Total : 100 Note: (1) Similar Capacity includes the following positions i) On behalf of Consultant: Team Leader/Resident Engineer (Construction Supervision/IE/AE/DPR). ii) On behalf of Contractor: Project Manager (Construction/Construction Supervision) iii) In Government Organizations: Superintending Engineer (or equivalent) and above (2) Only those projects will be considered for evaluation at S. No. 2(b) where the input of the personnel is not < 9 months. (3) Only those projects will be considered for evaluation at S. No. 2(c ) and 2 (d) where the input of the personnel is not < 12 months. (4) In case of experience on behalf of Authority’s Engineer or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of non-availability of endorsement from Govt. Agency, the experience uploaded on INFRACON Portal will be taken into consideration. However, the key personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m62397404/2025/S&R Zone 3.2 Resident cum Highway Engineer Reference/Details Marks Max. ofprojects self- Points S.No. Description Claimedforself- assessed by thebidder assessment 1 General Qualification 25 i) Graduate in Civil Engineering 17 ii) Post-GraduationinConstruction 03 management/ Transportation/HighwayEngineering/ StructuralEngineering/Geotechnical Engineeringorequivalentspecialized streamofcivilengineering iii) Minimum 15 days training 03 certificates fromIAHE/CRRIoranyGovt Institute iv) Essential 2 Softwar e Experience- (MS Roads/ Projects, Prima Vera or other relevantsoftware) 2 Adequacy for the Project 70 Professional Experience i) TotalProfessionalExperienceinhandlingHighway 15 projects <12 years -0 12 years -12 marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum 3(three)marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m72397404/2025/S&R Zone ii) ExperienceasResidentEngineer/Highway 20 Engineer/ProjectDirector/Project Manager/SuperintendingEngineeror equivalent/ExecutiveEngineerorequivalenton constructionworks/AuthorityEngineer/Independent EngineerProjects(similarconfiguration(2/4/6 laning*)andabove). < 5 years-0; 5years-15 marks Add1marksextraforeachadditionalyearof experiencesubjecttomaximum5(five)marks. iii) Experienceinsimilarcapacityinhandlingmajor 25 2/4/6-laning**projects(oflength40%ofproject lengthormoreofsimilarconfiguration(2/4/6 laning**)andabove) <2nos.-0 1 nos. -19 marks Addthreemarksextraforeachadditionalproject subjecttomaximum 6(Six) marks. iv) ExperienceinsimilarcapacityofHighwayProjectof 5 Construction/ConstructionSupervision/IConEPC Mode(oflength40%ofprojectlengthormoreof similarconfiguration(2/4/6laning**)andabove) 1Project-4marks Add1(one)markextraforeachadditionalproject subjecttomaximum1(one)mark v) Experienceas REorsimilarcapacityinOperationand 5 MaintenanceofMajorHighway(oflength40%of projectlength ormoreofsimilarconfiguration(2/4/6 laning**)andabove). 1project–4marks Add 1 mark extra for each additional projectsubject to maximum 1 (one) mark 3 Employment with the Firm 5 <1year -0 1year–3marks File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m82397404/2025/S&R Zone Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 Note: (1) Similar Capacity includes the following positions i) OnbehalfofConsultant:Resident/HighwayEngineer ii) On behalf of Contractor: Resident Engineer/ Highway Engineer / Project Manager (Construction/Construction Supervision) iii) In Government Organizations: Executive Engineer (or equivalent) and above (2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 12 months (3) In case of experience on behalf of Authority’s Engineer or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of non-availability of endorsement from Govt. Agency, the experienceuploadedonINFRACONPortalwillbetaken intoconsideration. However, the key personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment. 3.3 Bridge/Structural Engineer Reference/Details Marks self- Max. ofprojects assessed by Points S.No. Descriptio Claimedforself- thebidder n assessment 1 General Qualification 25 i) Graduate in Civil Engineering 18 ii) Post-Graduation in Structural Engineering 04 iii) training in residential training 03 programme on Collapse/failure of bridges/structuresfrom IAHE/CRRI/any other Govt Institute 2 Adequacy for the Project 70 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a5m92397404/2025/S&R Zone i) TotalProfessionalExperienceinhandling 15 Highway/Bridgeprojects <10 years -0 10 years -11marks Addonemark extraforeachadditional2year subjecttomaximum4(four)marks ii) Experienceinsimilarcapacityin 20 Design/Construction/ConstructionSupervision ofBridges/ROB/Flyover/Interchanges/anyother suchstructures(similarconfiguration(2/4/6 laning**)andabove) < 5 years -0; 5years -15marks Add1(one)markextraforeachadditional completedyear ofexperiencesubjecttomaximum 5(five)marks iii) Experienceinsimilar capacityinsupervisionof 20 MajorHighwayBridges/ROB/Flyover/ Interchanges/anyotherstructures < 2Bridges -0 02 Bridge -15 marks Add2.5markextraforeachadditionalbridge subjecttomaximum 5marks iv) Experienceinsimilarcapacityinsupervisionof 10 RehabilitationandrepairofMajor Bridges/ROB/Flyover/Interchanges/anyother structures <2nos.–0 2nos.-8marks >3nos.-10 v) Experienceinsimilarcapacityofmodern 5 bridgeconstructiontechnologyviz.,Precast Segmental,BalancedCantileverConstruction, ExtradosedBridge,FullSpanLaunching, IncrementalLaunching. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m02397404/2025/S&R Zone Experience in1 project – 4 marks Morethan oneproject – 5 marks 3 Employment with the Firm 5 <1year-0 1year-3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 Note: (1) Similar Capacity includes the following positions i) On behalf of Consultant/Contractor: Bridge Engineer/Project Manager (Bridges)/ ResidentEngineer(Bridge) ii) OnbehalfofGovernment:ExecutiveEngineer (2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 12 months (3) In case of experience on behalf of Authority’s Engineer or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of non-availability of endorsement from Govt. Agency, the experienceuploadedonINFRACONPortalwillbetaken intoconsideration. However, the key personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment. 3.4 Senior Pavement Specialist Reference/Detailsof Marks Max. projects Claimed for self- Points S.No. Description assessed by self-assessment the bidder 1 General Qualification 25 I) Graduate in Civil Engineering 18 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m12397404/2025/S&R Zone II Post-Graduation in Transportation/Highway 04 Engineering/Pavementengineeringor ) equivalent iii TrainingcertificatefromIAHE/CRRIorany 03 otherGovtInstituteindesign/maintainedof ) pavement 2 Adequacy for the Project 70 Professional Experience i) TotalProfessionalExperienceofPavement 20 Design/ConstructionandMaintenanceof Highways/Roads/AirFieldRunway < 10 years -0 10 years -15marks Addonemarkextraforeachadditionalyearof experience subject to maximum 5 (five) marks. ii) ExperienceinSimilarcapacityin 20 Construction/ConstructionSupervisionof2/4/6- laning**ofmajorHighwayProjects(similar configuration(2/4/6laning**)andabove) <5years -0; 5years-15marks Addonemarkextraforeachadditionalyearof experience subject to maximum 5 (five) marks. iii) Experienceinsimilarcapacityas 25 Pavement/Geo-technicalEngineerin construction/constructionsupervisionofMajor Highway projects (of length40%ofproject lengthormoreofsimilarconfiguration(2/4/6 laning**)andabove) <2nos.-0 2nos.-20marks Add2.5marksextrafor eachadditionalproject subjecttomaximum5marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m22397404/2025/S&R Zone iv) ExperienceinsimilarcapacityonEPCProjects(of 5 length40%ofprojectlengthormoreofsimilar configuration(2/4/6laning**)andabove) 1Project-4marks Add1(one)markextraforeachadditionalproject subjecttomaximum1(one)mark 3 Employment with the Firm 5 <1year-0 1year–3marks Add0.5marksforeachsubsequentyear subjectto maximum 2marks Total : 100 Note: (1) Similar Capacity includes the following positions i) On behalf of Consultant/Contractor: Pavement Specialist/ PavementEngineer/ Pavement Expert / Highway Engineer ii) OnbehalfofGovernment:Executive Engineer (2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 6 months (3) In case of experience on behalf of Authority’s Engineer or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of non-availability of endorsement from Govt. Agency, the experience uploaded on INFRACON Portal will be taken into consideration. However, the key personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment. 3.5 Senior Quality/Material Expert Reference/Details Marks Max. ofprojectsClaimed self- Points S.No. Descriptio forself- assessed by n thebidder assessment 1 General Qualification 25 I) Graduate in Civil Engineering 18 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m32397404/2025/S&R Zone II) Post Graduation in Geotechnical Engineering/FoundationEngineering/Soil 04 Mechanics/RockMechanics 16 days material testing process 03 courseimpartedbyIndian Academy ofHighwayEngineersor CRRI or any other GovtInstitute 2 Adequacy for the Project 70 Professional Experience i) TotalProfessionalExperienceinhandling 15 Highway/Bridgeprojects < 10 years -0 10 years -11 Addonemarkextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. ii) Experienceinsimilarcapacityin 25 Construction/ConstructionSupervisionofmajor HighwayProjects((similarconfiguration(2/4/6 laning**)andabove)) <5years-0;5years-19 Add2.0(two)marksextraforeachadditionalyear ofexperiencesubjecttomaximum6(Six)marks. iii) Experienceinsimilarcapacityinhandling 30 SimilarHighwayprojects(oflength40%ofproject lengthormoreofsimilarconfiguration(2/4/6 laning**)andabove) <2nos.-0 2nos.-25 Add2.5marksextraforeach additionalproject subjecttomaximum5(five)marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m42397404/2025/S&R Zone 3 Employment with the Firm 5 <1year–0 1year–3 Add0.5marksforeachsubsequentyear subjectto maximum 2marks Total : 100 Note: (1) Similar Capacity includes the following positions i) On behalf of Consultant/Contractor: Quality Expert/ Material Engineer/Material Expert/ Quality Engineer/ Geo-Technical Expert. ii) OnbehalfofGovernment:Executive Engineer (2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 12 months (3) In case of experience on behalf of Authority’s Engineer or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of non-availability of endorsement from Govt. Agency, the experience uploaded on Infracon Portal will be taken into consideration. However, the key personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment. 3.6 Road Safety Expert S. Descriptio Max. Reference/ Marks n Points Details of self- No. projects assesse Claimedfor dbythe bidder self- assessment 1 General Qualification 25 I) Graduate in Civil Engineering 18 II) Post-GraduationinTraffic/Transportation/ 04 SafetyEngineeringorequivalent 15daysCertificatecourseonRoad 03 Safety Audit from IAHE/CRRI/ or any other Govt institute 2 Adequacy for the Project 70 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m52397404/2025/S&R Zone Professional Experience i) TotalProfessionalExperience inhandling 15 Highway/Bridgeprojects <10 years -0 10 years -11 marks Addonemarkextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. ii) Experience in similar capacity in Road Safety 15 works on Major Highway Project (similar configuration (2/4/6laning**)and above). <5years-0 5years-11marks Addonemarkextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. iii) Experience in similar capacity in Road Safety Audits of 20 2/4/6-laning** Highway projects at different stages includingatleastoneatdesignstage <2nos.-0 2nos.-15marks Add 2.5 marks extra for each additional project subjecttomaximum 5marks. iv) Experience in similar capacity in identification 10 and improvement of black spots on Major Highway Project (similar configuration (2/4/6 laning**)andabove) <2nos.-0 2nos.-8marks Add2marksextraforeachadditionalimprovementof blackspotssubjecttomaximum2marks. v) ExperienceinsimilarcapacityofpreparingRoadSafety 5 ManagementPlansforInterUrbanHighway 1 project -4 marks 2ormore-5marks File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m62397404/2025/S&R Zone vi) ExperienceinsimilarcapacityinfieldofRoadSafety 5 ManagementPlan 1 project -4 marks 2ormore-5marks 3 Employment with the Firm 5 <1year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum2marks Total : 100 Note: (1) SimilarCapacityincludesthefollowingpositions i) On behalf of Consultant/Contractor: Road Safety Expert ii) In Government Organizations: Executive Engineer (or equivalent) and above (2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 6 months (3) For claiming experience of Sr. No. 2 (iv)- Experience in similar capacity in identification and improvement of black spots on Major Highway Project, the blackspot ids rectified may be provided on the INFRACON. 3.7 Team Leader cum SeniorBridgeEngineer: Reference/Detail Marks Max. sofprojects self- Points S.No. Description Claimedfor assessed by self- thebidder assessment 1 General Qualification 25 i) Graduate in Civil Engineering 17 ii) PostGraduationin/Structural 03 Engineeringorequivalentspecialised streamofcivilengineering iii) training programme on 03 Collapse/failure of bridges/structuresorbridge File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m72397404/2025/S&R Zone designfrom IAHE/anyother GovtInstitute iv) EssentialSoftware 02 Experience-(MS Roads/ Projects,Prima Veraor otherrelevantsoftware ) 2 Adequacy for the Project 70 a) ProfessionalExperience inBridge Projects: i) TotalProfessionalExperienceinhandling 15 Bridgeprojects < 15 years -0 15 years -12marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum3(three) marks. ii) ExperienceasTeamLeaderorsimilar 10 capacityinHighwayDevelopment projectsof(similarconfiguration(2/4/6 laning**)andabove) <5 years-0 5years-8marks Add1marksextraforeachadditionalyear ofexperiencesubjecttomaximum2 (two)marks. iii) Experienceas Team Leaderorsimilar 5 capacity inHighwayDevelopment projects(oflength40%ofprojectlength ormoreofsimilarconfiguration(2/4/6 laning**)andabove) 1project -4 marks add 1 markextra for additionalprojectssubjecttomaximum1 (one)mark File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m82397404/2025/S&R Zone b) ExperienceasTeamLeaderorsimilar 30 capacityofatleastTwoprojectsin ConstructionSupervision/AE/IE/ Projectpreparationinvolvingatleastone MajorBridge(minimum300mlength withoutapproaches)intheProject(40%of projectlengthormore of similar configuration(2/4/6 laning**) < 2 projects -0 2 Projects -20 marks Add5marksforeachadditional projectsubjecttomaximum 10marks. c) ExperienceasTeamLeader/Project 10 Manager orsimilarcapacityin OperationandMaintenanceofMajor Bridge(minimum300mlengthwithout approaches)intheProject(of40%of projectlengthormoreofsimilar configuration(2/4/6laning**) 1project–8marks Add1markextraforeachadditional projectsubjecttomaximum2(two) mark 3 Employment with the Firm 5 <1year-0 1year–3marks Add0.5marksforeachsubsequentyear subjecttomaximum2marks Total : 100 (5) Similar Capacity includes the following positions i) On behalf of Consultant: Team Leader( Bridge)/ Resident Engineer (Bridge) (Construction Supervision/IE/AE/DPR). ii) On behalf of Contractor: Project Manager( Bridge) (Construction/Construction Supervision) iii) In Government Organizations: Superintending Engineer (or equivalent) and above File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a6m92397404/2025/S&R Zone 3.8 Resident cum Pavement Specialist Reference/Detailsof Mark Max. projects Claimed for s Points S.No. Description self- self-assessment assessed bythe bidder 1 General Qualification 25 i) Graduate in Civil Engineering 17 ii) PostGraduationin 03 Transportation/Highway Engineering/Structural Engineering/Geotechnical Engineering iii) Trainingprogrammefrom 03 IAHE/CRRIoranyotherGovt InstituteinHighway/Pavement iv) EssentialSoftware 02 Experience-(MS Roads/ Projects,Prima Veraor otherrelevantsoftware) 2 Adequacy for the Project 70 Professional Experience i) TotalProfessionalExperienceinhandling 20 Highwayprojects < 12 years -0 12 years -16marks Add2markextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m02397404/2025/S&R Zone ii) ExperienceasResidentEngineer/Project 20 Director/Project Manager/Superintending Engineerorequivalent/ExecutiveEngineeror equivalentonconstructionworks/Authority Engineer/IndependentEngineerProjects (similarconfiguration(2/4/6laning*)and above). < 5 years -0; 5years-15marks Add1marksextraforeachadditionalyearof experiencesubjecttomaximum5(five)marks. iii) Experienceinsimilarcapacityinhandling 25 major2/4/6-laning**projects(oflength40% ofprojectlengthormore ofsimilar configuration (2/4/6 laning**) andabove) <2nos. -0 2nos.-19marks Addthreemarksextraforeachadditionalproject subjecttomaximum6(Six)marks. iv) ExperienceinsimilarcapacityofHighway 5 ProjectofConstruction/Construction SupervisiononEPCMode(oflength40%of projectlengthormoreofsimilar configuration(2/4/6laning**)andabove) 1Project-4marks Add1(one)markextraforeachadditional projectsubjecttomaximum1(one)mark 3 Employment with the Firm 5 <1year-0 1year–3marks Add0.5marksforeachsubsequentyear subjecttomaximum2marks Total : 100 Note: (1)Similar Capacityincludes thefollowingpositions i)Onbehalf ofConsultant:Resident/ Pavement specialist/Pavement Engineer. iii) In Government Organizations: Executive Engineer (or equivalent) and above. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m12397404/2025/S&R Zone 3.9 PlanningEngineer S.No. Descriptio Max. Reference Marks n Points self- /Detailsof assessed projects bythe Claimed bidder forself- assessment 1 General Qualification 25 I) Graduate in Civil Engineering 17 II) PGIn construction Management/Project 03 Management/Infrastructure Development & Management iii) Training programme on Project 03 Management/projectplanningfrom IAHE/CCRI/anyotherGovtInstitute iv) Essential Software Experience- (MS 02 Roads/ Projects, Prima Vera or otherrelevant software ) 2 Adequacy for the Project 70 Professional Experience i) TotalProfessionalExperienceofProjectManagement/ 20 planningEnginner. < 15 years -0 15 years -15marks Addonemarkextraforeachadditionalyearof experiencesubjecttomaximum 5(five)marks. ii) ExperienceasProjectManager/PlanningEngineeron 20 anyNational/StateHighwayproject. < 4 years-0 4years-15marks Addonemarkextraforeachadditionalyearof experiencesubjecttomaximum 5(five)marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m22397404/2025/S&R Zone iii) ProjectManagement/PlanningEngineerofalarge 15 HighwaycontractsayoverRs.150croreincluding experienceofhandlingvariationorders,claimsof thecontractorandthereappropriatedisposal <2nos. -0 2 nos.-10 Add2.5marksextraforeachadditionalprojectsubjectto maximum5(five)marks. iii) Planning Engineer of a large Highway Project 10 sayover Rs.150 crore including experience of handling variation orders, EOT and there appropriatedisposal <2nos. -0 2 nos.-50 Add 2.5 marks extra for each additional project subjecttomaximum 5(five)marks. v) ExperienceofHandlingArbitrationcasesinrespectof 5 anyHighway project. 1project -4 marks 2 or more projects-5 marks 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 Note: (1)Similar Capacityincludes thefollowingpositions i)Onbehalf ofConsultant/Contractor: ConstructionManager/PlanningEngineer. iii)In Government Organizations:ExecutiveEngineer (or equivalent)and above. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m32397404/2025/S&R Zone 3.10 TeamLeadercumSeniorTunnelExpert: S. Description Max. Reference Marks No. Points self- /Detailsof assessed projects bythe Claimed bidder forself- assessment 1 General Qualification 25 I) Graduate in Civil/Mining Engineering or equivalent 18 II) Post-Graduate or chartered engineer in Mining 04 Engineering/ Geotechnical Engineering /Structural Engineering/RockMechanicsorequivalent AttendedMinimum 5daystrainingontunnelfrom 03 IAHE/ITA/ any otherGovtinstitute 2 Adequacy for the Project 70 Total Professional Experience <20 years -0 7 20years -5 marks Addonemarkextraforeachadditionalyearofexperiencesubjectto maximum2(Two)marks. aTotalprofessionalexperienceinhandlingmajortunnellingprojects 8 i <15years–0marks i ) 15years–6marks Add1markextraforeachadditionalyearofexperiencesubjectto maximum2(two)marks. a Experienceinmajortunnelconstruction/constructionsupervision 10 projects(Road/Rail/Metro) i i <10years–0marks i ) 10years–7marks Add1.5marksextraforeachadditionalyearofexperiencesubject tomaximum3marks. b Experience in Similar Capacity File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m42397404/2025/S&R Zone Experienceas Team Leader or similar capacityin 10 construction supervisionofmajortunnelprojects(Road/Rail/Metro)of length40%ofProject length ormorethan1.5km,whicheveris more <5years–0marks 5years–7marks Add1.5marksextraforeachadditionalyearofexperiencesubjectto maximum3marks b Experience as Team Leader or similar capacity of project 10 ii) Preparation/Design of tunnel projects(Road/Rail/Metro) of length 40% ofprojectlength or1.5km whicheverismore 1Project–8marks Add 1 mark extra for each additional projects subject to maximum 2marks. b ExperienceasTeamLeaderorsimilarcapacityinconstruction 20 iii) supervisionoftunnels(Road/Rail/Metro)of40% ofprojectlenth or 1.5km whicheverismore <2 project -0 marks 2Projects–15marks Add1.25markextraforeachadditionalprojectssubjecttomaximum 5(five)marks. C) Experienceinprojectpreparation/designofmajortunnelprojectsapart 5 fromthoseunder2(b)(ii) (Road/Rail/Metro)1project-4 marks 2ormore-5marks 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjecttomaximum 2marks Total : 100 Note: As per RFP, Definition of Team Leader includes Team Leader includes Project Manager(tunnels)/Resident Engineer( Tunnel)/ TunnelEngineer/ orany equivalent position. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m52397404/2025/S&R Zone ** tunnel projects, unless specifically mentioned, to be considered for evaluation has to be majortunnels of length equal to or more than 1.5 Km. For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. 3.11 Resident cum Tunnel Excavation Expert: S.No. Description Max. Reference Markself- Points assessed /Details of bythe projects Claimed bidder forself- assessment 1 General Qualification 25 I) Graduate in Civil/Mining Engineering or 18 equivalent II) Post-Graduateorcharteredengineerin 04 civil/MiningEngineeringorequivalent AttendedMinimum5daystrainingontunnels 03 fromIAHE/ITA/ anyotherGovt institute 2 Adequacy for the Project 70 Total Experience ai) <15 years– 0 15 15years–12marks Add1markextraforeachadditionalyearofexperience subjecttomaximum3(three)marks. Aii) Totalprofessionalexperienceinhandlingmajortunneling 10 projects <10years–0 10years–7marks Add1.5marksextraforeachadditionalyearof experiencesubjecttomaximum3(three)marks. b Experience in Similar Capacity File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m62397404/2025/S&R Zone bi) Experienceas Tunnel Engineer/TunnelExcavation 10 Expertorsimilarcapacity inconstructionsupervisionof majortunnelingprojects (Road/Rail/Metro) <7years–0 7years–7marks Add1.5marksextraforeachadditionalyearofexperience subjecttomaximum3(three)marks. bii) ExperienceasTunnelEngineer/TunnelExcavationExpertor 20 similar capacity in construction supervision of tunnel projects (Road/Rail/Metro) of minimum length of 40% of Projectlengthor 1.5 km whichever ismore (Minimum oneyear supervisioninaproject) <2 projects– 0 2 projects– 15 marks Add 2.5 marks extra for each additional projects subject to 5(five) marks. biii) Experienceintunneldesign/DPR/preparation/feasibility 10 study/designreviewinvolvingmajortunnelprojects (Road/Rail/Metro)of40%ofProjectlengthor1.5km whicheverismore(minimum1year experienceina project) 1project–7marks Add1markextraforeachadditionalprojectssubjectto maximum 3(three)marks C) Experienceinconstructionofmajortunnelprojects 5 (Road/Rail/Metro) apart from those under 2 (b) (ii) 1project–3marks Add1markextraforeachadditionalprojectssubjectto maximum 2(two) marks. 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m72397404/2025/S&R Zone Note:- Max Age = 65Years ** tunnel projects,unless specificallymentioned,has tobe majortunnels oflengthequal toor more than1.5Km tobeconsideredforevaluation. For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. 3.12 TUNNEL DESIGN ENGINEER: S.No. Description Max. Reference Marks Points self-assessed /Detailsof bythe projects bidder Claimed forself- assessment 1 General Qualification 25 I) Graduate in Civil Engineering or equivalent 18 II) Post-Graduate in Engineering (Structural) 04 AttendedMinimum5daystrainingontunnel 03 fromIAHE/ITA/anyotherGovtinstitute 2 Adequacy for the Project 70 Total Professional Experience ai) <20 years – 0 15 20years–11marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. ii) TotalProfessionalExperienceinhandlingmajor 10 Tunnelprojects <12 years – 0 12years-7marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum3(three)marks. b Experience in Similar Capacity bi) Experienceintunneldesign(Road/Rail/Metro) 10 worksinsimilarcapacity <12 years – 0 12years–7marks Add1markextraforeachadditionalyearof experince File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m82397404/2025/S&R Zone experiencesubjecttomaximum3(three)marks. bii) Experience in similar capacity in Project 15 Preparation/DPR involving design of tunnels (Road/Rail/Metro)of 40% of project length or 1.5 km whichever is more (Min. 1 year experience in aproject) <3 projects– 0 3 projects– 11 marks Add1markextraforeachadditionalprojects subjecttomaximum4(four)marks. biii) Experience in similar capacity in 10 construction/construction supervision projects involving design/design review of tunnels of 40% of project length or 1.5 km whichever is more(Min.1yearexperienceinproject) <2 projects – 0 2projects–7marks Add 1.5 mark extra for each additional projects subjecttomaximum3(three)marks. ci) Experience in innovation tunnel design 5 (Road/Rail/Metro) like immersed tunnel and sub- sea bored tunnel 1 projects –4marks 2 or more projects -5 marks cii) Experienceindesigntunnel 5 projects(Road/Rail/Metro)apartfromthose under2(b)(ii) 1project–4marks 2 ormore projects – 5 marks 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a7m92397404/2025/S&R Zone Total : 100 Note: Max Age =65Years ** tunnel projects,unless specificallymentioned,has tobe majortunnels oflengthequal toor more than1.5Km tobeconsideredforevaluation. For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. 3.13 TUNNEL SAFETY EXPERT S.No. Descriptio Max. Reference Marks n Points self- /Detailsof assessedby projects the Claimed bidder for self- assessment 1 General Qualification 25 I) Graduate in Civil/Mining Engineering or 18 equivalent II) Any professional Certification from a 04 recognized/statutorybodyonsafety/health/shot firer AttendedMinimum5daystrainingontunnel 03 safetyfrom IAHE/ITA/any otherGovt institute 2 Adequacy for the Project 70 Total Professional Experience ai) <20 years – 0 15 20years–11marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. Aii) Experience Tunnel (Road/Rail/Metro) Safety Works 15 <10 years – 0 10years–11marks Add1markextraforeachadditionalyearof experiencesubjecttomaximum4(four)marks. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a8m02397404/2025/S&R Zone aiii) Internationalexposureintunnelsafetyworksin 10 developedcountries <7 years – 0 7years–7marks Add1markextraforeachadditionalprojectssubjectto maximum3(three)marks. b Experience in Similar Capacity bi) Experience in similar capacity of Tunnel Safety 20 Audits during construction stage of tunnel projects(Road/Rail/Metro) of 40% of project length or1.5kmwhicheverismore <2projects– 0 2 projects – 15 marks Add1.25markextraforeachadditionalprojectssubject tomaximum 5 (five) marks. bii) ExperienceinsimilarcapacityofTunnelSafety 10 Auditsindesignstageontunnelprojects (Road/Rail/Metro) 1project–8marks 2ormore–10marks C) Experienceinconstructionofmajortunnelprojects 5 (Road/Rail/Metro)using 1project–3marks Add1markextraforeachadditionalprojectssubjectto maximum 2(two) marks. 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 Note: Max Age =65 Years ** tunnel projects, unless specifically mentioned, has to be major tunnels of length equal to or more than 1.5Km to beconsidered for evaluation. For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a8m12397404/2025/S&R Zone 3.14 SeniorGeotechnicalExpert: S. Description Max. Reference Marks No. Points /Details of self- projects assessed Claimed bythe 1 General Qualification 25 I) Graduate in Civil Engineering / 18 Masters in Engineering Geology or equivalent from a recognized II) PuonsitvGerrsadituyateinRockMechanics 04 /FoundationEngineering/Tunnel iii) Engineering 03 AttendedMinimum5daystrainingon tunnels/GeotechnicalfromIAHE/ITA/any otherGovtinstitute 2 Adequacy for the Project 70 Total Professional Experience ai) <20 years – 0 15 20years–11marks Add1markextraforeachadditionalyearof Aii) e Ex xp pe er ri ie en nc ce es iu nb Cje oc nt st to rum cta ix oi nm /u Cm on4 st( rf uo cu tir o) nmarks. 10 Supervision ofmajor tunnel projects(Road/Rail/Metro <10years–0 10years–7marks b AExdpder1iemncaerkinexStirmaifloarreCaacphacaidtyditionalyearof bi) Experience as Geotechnical engineer or 25 similar capacity in construction/ construction supervision of at least 4 tunnel projects(Road/Rail/Metro) of length 40% of projectlengthor1.5kmwhicheverismore <4 projects– 0 4 projects -17 marks add 2 marks for each additional project bii) Experience as Geotechnical engineer or 5 similar capacity in Construction/ Construction Supervision of major tunnel projects involving verticalshaft sinking ofatleast200m vertical depth 1 project – 4 marks more than 2 project- 5 marks File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:342 a8m22397404/2025/S&R Zone S. Descriptio Max. Reference Marks n Points self- No. /Detailsof assessed projects bythe Claimed bidder forself- assessment Biii) Experience as Geotechnical engineer or 15 similar capacity in design/project preparation of tunnel projects(Road/Rail/Metro) of 40% of project lengthor1.5kmwhicheverismore < 2 projects– 0 2projects–11marks Add2marksextraforeach additionalprojects subjecttomaximum4(four)marks. 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubjectto maximum 2marks Total : 100 Note:-Max Age =65 Years ** tunnel projects, unless specificallymentioned,has tobemajortunnels of lengthequal toormore than1.5Km tobeconsideredfor evaluation.For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. 3.15 Senior GEOLOGIST: S. Descriptio Max. Reference Marks No. n Points /Details of self- projects assessed Claimed bythe forself- bidder assessment 289 1 General Qualification 25 mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am832397404/2025/S&R Zone I) Masters in Geology /Applied 22 Geology fromrecognized iii) AttendedMuninivimerusmity5.daystrainingforgeologist 03 fromIAHE/ITA/anyotherGovtinstitute 2 Adequacy for the Project 70 Total Professional Experience ai) <<20 years – 0 20 20years–15marks Add1markextraforeachadditionalyearofexperience Aii) Esu xb pj ee rc iet nt co em ina mxi am jou rm Tu5 nn( ef liv coe n) sm trua cr tk ios. n/construction 15 supervisionProjects(Road/Rail/Metro)usingNATM technology <5years–0 Add1.5marksextraforeachadditionalyearsubjectto maximum3(three)marks. b Experience in Similar Capacity bi) ExperienceinmajorTunnel(Road/Rail/Metro) 15 Constructionworksinsimilarcapacity <7years–0 7years–12marks Add1markextra foreach additionalyearof experiencesubjecttomaximum3(three)marks. bii) Experience in similar capacity in project 10 preparation/DPR involving of major tunnel projects (Road/Rail/Metro). (Min 1year experience in a project) <2 projects – 0 2 projects -7 marks Add 1.5 marks extra for each additional projects subjecttomaximum3(three)marks. biii) Experience in similar capacity in highway tunnel 10 construction/construction supervisionof project having 40%ofprojectlengthor1.5kmwhicheverismore < 2 projects– 0 2project–7marks mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am842397404/2025/S&R Zone Add1.5marksextraforeachadditionalprojectssubject tomaximum3(three)marks. 3 Employment with the Firm 5 <1 year- 0 1year–3marks Add0.5marksforeachsubsequentyearsubject tomaximum 2marks Total : 100 Note: Max Age = 65 Years ** tunnel projects, unless specificallymentioned,has tobemajor tunnelsof length equaltoormore than1.5Km tobeconsidered for evaluation.For project having length less than 1.5 km, the requirement of length of tunnel project may be changed to 40% of project length or min 500 m whichever is more. For all theaboveKey-Positions thefollowing shallbenoted: 1. AICTE ( Major/Core Branch of Engineering/Technology and their relevant/ appropriatecourse leading to degree in Engineering/Technology), 2017 shall be considered for equivalenceof disciplines.. 2. For gaps not addressed in the above notification, the same shall be decided by a committee of the Authority with atleast one educationalist as acommittee member. 3. Self-Certified Undertakings on INFRACON if not supplemented with Client Issued Certificates, shall not be considered for Evaluation. 4. Retired Govt. Officers shall upload the promotion orders to equivalent/similar capacity posts on INFRACON. 5. If a key personnel has worked in next lower category to the similar mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am852397404/2025/S&R Zone capacity, the marks allotted to key personnel in the category ‘experience in similar capacity’ shall be reduced To two thirds of marks in this category. This shall be applicable for evaluation of all key personnel. . 6. Similarprojects means 2/4/6laneas applicablefor theproject for whichRFP is invited.For 2-lane projects experience of4/6lanealso to beconsidered withamultiplicationfactorof 1.5. Experience of4/6 laneshallbeconsidered interchangeablyfor4/6laningprojects. For 4/6laning projects, experience of 2 lane will be considered with a multiplication factor of 0.4. 6. EssentialSoftware Experience- (MSRoads/Projects,PrimaVera or otherrelevant software, thecertificate from any Govt traininginstitute/ Educational instituteonlywillbe considered. 7. CVsubmittedwithoutMedical certificateof fitness as per Appendix-B shallnot beevaluatedand willbe assignedzero(0) marks. 4.0 Requirements with respect to Technical Capacity Provision for maximum number of consultancy services to be awarded to one consultant: (i) The maximum number of consultancy services to be awarded to one consultant willbe governed bythefollowingprovisions: • ResidualAE/IE BidCapacityviz.,“R”shall bemore thanthetentativelength of theProject ForNormal HighwayProjects • R=CL xTF-RP Wherein: CompletedLength(CL)=LengthofAE/IEcompletedNHs/Expresswaysinlast5 FY.Turnover Factor (TF)= Multiplicationfactor basedonTurnover Average AnnualTurnoverof Last5Financialyears TurnOver Factor“TF” Upto50cr 1.00 50to250cr 1.50 >250 crores 2.00 RunningProjects(RP)=LengthofAE/IEProjectsinHandwherein provisionalCompletionCertificate/completioncertificate not issued,Includes projects for whichfirm has emergedas H-1 bidderbut LOA havenot been issued. RtobecalculatedforeachJVmember& weightedaverageasperShareinJV be considered. Theapplicantsshallsubmittherequisitedetailsfordeterminationoftechnical capacity in the prescribed format Technical Capacity (Form T-11) enclosed. mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am862397404/2025/S&R Zone BIDDING FORMS mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am872397404/2025/S&R Zone Technical Proposal mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am882397404/2025/S&R Zone Form T-1: Proposal Form (Covering Letter) (Ref ITC-clause9.2) (Tobe submittedas part ofTechnical Proposal,alongwithsupportingdocuments, if any) (onConsultant’s Letter-head) (Strike out alternative phrases not relevanttoyou) Consultant’s Name [Address and ContactDetails] Consultant’s ReferenceNo.__________ Date…….. To The President ofIndia,through Head ofProcurement ProcuringOrganisation [Completeaddress of theProcuringEntity] Ref: YourRFP Document No.RFP No./ xxxx; Tender Title:ConsultancyServices Sir/Madam 1. We, the undersigned, offer to provide consulting services in accordance with your above-referenced Request for Proposals (RFP) and our Proposal. We are hereby submitting our Proposal, which includes this Technical Proposal and a separately uploaded Financial Proposal. Commercial information about our organisationisenclosedinForm T-1A.  Weare submittingourProposal without anySub-consultants orJV. Or  Weare submittingourproposal as ajoint venture with{Insert a listwitheach rdiedednthban'rligeamseacfeulnaad leadmember}.Wehave attachedacopy of thefollowingdocument signedbyevery participatingmember, whichdetails the (likely) legal structure andthe confirmationofjoint andseverableliabilityof the members ofthesaid jointventure.  ourletter ofintent toform a jointventure  theJVagreement 2) OurEligibilityand Qualifications to participate a) We confirm that we continue to comply with all the eligibility (including the absence of conflict of interest and debarment) and qualification criteria stipulatedinthis RFP. We shall be dutybound to proactively inform you of any change in our compliance with these criteria as soonas it occurs. b) We confirm that we don’t have any Conflict of Interest as stipulated in this RFP. We shall be duty bound to proactively inform you of any change in our compliance with Conflict-of- Interest stipulationsas soonas it occurs. 3) OurProposaltodeliverServices: We offer to deliver the subject Services of requisite Performance Standards and mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am892397404/2025/S&R Zone within Delivery Schedules in conformity with the RFP Document. The relevant details are submitted in ‘Form T-4: Description of Approach, Methodology and Work Plan in responding to Terms of Reference’; Form T-5: Work Schedule and Planning of Deliverables and Form T-6: Team Composition,AssignmentandKeyExperts’Inputs’. 4) Prices: We hereby offer to perform the Services at our lowest prices and rates mentioned in the separately uploaded Financial Proposal. It is hereby confirmed that theprices quotedthereinbyus are: (a) Based on the terms of delivery and delivery schedule confirmed by us; and (b) Cost break-up of the quoted cost, showing inter-alia costs (including taxes and duties thereon) of all the included incidental Goods/ Works considerednecessarytomake theproposal self-contained and complete, hasbeen indicatedtherein,and (c) based on the terms and mode of payment as stipulated in the RFP Document.Wehave understood that if we quote any deviationfrom the terms and mode of payment, our Proposal is liable to be rejected as nonresponsive,and (d) have been arrived at independently, without restricting competition, any consultation, communication, or agreement with any other Consultantorcompetitor relatingto: i) thoseprices;or ii) theintentiontosubmitanoffer;or iii) themethodsorfactorsusedtocalculatethepricesoffered. (e) Have neither been nor shall be knowingly disclosed by us, directly or indirectly, to any other Consultant or competitor before the Proposal openingunless otherwise requiredbylaw. 5) We declare regarding commissions or fees paid or are to be paid to agents, representatives, or commission agents concerning the selection process or executionand performance ofthisContract, that:  Nosuchcommissionsorgratuitiesorfeeshavebeenpaidaretobe paidbyus toanythirdparty Or  Wehavepaid/areduetopaythefollowingcommissions/gratuities/ fees: (indicatethenameandaddressoftheagent,representative,orcommissionagent, theamount andcurrency,andthepurposeofthecommissionorfee.) mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am902397404/2025/S&R Zone 6) NochangeintheKeyExperts ExceptasstatedintheRFPDocument,weundertaketonegotiateaContract based on the proposed Key Experts. We accept that substituting Key Experts for reasons other than thosestated in ITC-Clause 12.3may lead to theterminationofcontract negotiations. 7) AffirmationoftermsandconditionsoftheRFPDocument: We have understood the complete terms and conditions of the RFP Document.We acceptandcomplywiththesetermsandconditionswithout reservations, although we are not signing and submitting some of the RFP document'ssections.Deviations, if any, are submitted by us in Form T-7: ‘Terms and Conditions - Compliance’. We also explicitly confirm acceptanceoftheArbitrationAgreementasgivenintheRFP Document. 8) BidSecurity:WehavesubmittedtheBidSecurityas a) Earnest Money Deposit (EMD) for the amount of Rs. (Rupees……………………………….) valid upto in favour of …...........................intheform ofInsurance SuretyBonds/ Account Payee DemandDraft/FixedDepositReceipt/Banker’scheque/Paymentonline/ BankGuarantee inForm T-9A, withreference number dated ,issuedby .as per b) Bid Securing Declaration (BSD, in lieu of Bid Security, if permitted in TIS) instipulatedformat videForm T-9B. 9) AbidingbytheProposal'sValidity Weagree tokeep ourProposal validforacceptancefor aperiodupto-------, as required in the RFP Document, or for a subsequently extended period, if any,agreedtobyus,andareawareofpenaltiesinthisregardstipulatedinthe RFPDocumentincase we fail todoso. 10)Non-tempering of Downloaded RFP Documents and Uploaded Scanned Copies We confirm that we have not changed/ edited the contents of the downloaded RFP Document. We realise that any change noticed at any stage,including after the contractaward,shallbeliableto punitiveaction in this regard stipulated in the RFP Document. We also confirm that scanned copies of documents/ affidavits/ undertakings uploaded during the shortlisting process and this RFP are valid, true, and correct to the best of our knowledge and belief. We shall be responsible if any dispute arises regarding the validity and truthfulness of such documents/ affidavits/ undertakings. We undertake to submit for scrutiny, on-demand by the Procuring Entity, originals and self-certified copies of all such certificates, documents,affidavits/undertakings. 11) ABindingContract: mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am912397404/2025/S&R Zone We further confirm that if our proposal is accepted, all such terms and conditions shall continue to be acceptable and applicable to the resultant contract, even though some of these documents may not be included in the contract Documents submitted by us. We do hereby undertake that until a formal contract is signed or issued, this Proposal and your writtenLetterof Awardshallconstituteabindingcontractbetweenus. 12) PerformanceGuaranteeandSigningthecontract We further confirm that if our proposal is accepted, we shall provide you with performance security of the required amount stipulated in the RFP Document forthe due performance of the contract. We are fully aware that in the event of our failure to deposit the required security amount and/ or execute the agreement, the Procuring Entity has the right to avail of any or all punitiveactions stipulatedintheRFP Document. 13) Penaltiesformisinterpretationormisrepresentation: Weherebyconfirmthattheparticularsgivenaboveare factuallycorrectand nothing is concealed and undertake to advise any future changes to the above details. We understand that any misinterpretation or misrepresentation would violate the Code of Integrity and attract penalties, as this RFPDocument mentions. 14) Consultant’s Authorized Signatory: a) Full Name: b) Designation: c) Signingas: A sole proprietorship firm. The person signing the Proposal is the sole proprietor/constitutedattorney ofthesoleproprietor, A partnershipfirm. Theperson signing the Proposal is dulyauthorised being a partner to do so under the partnership agreement or the general powerofattorney, A company. The person signing the Proposal is the constituted attorney by a resolutionpassedbythe Boardof Directors or in pursuanceof theAuthorityconferredbytheMemorandum of Association. ASociety.ThepersonsigningtheProposalistheconstitutedattorney. We confirm that we are duly authorized to submit this Proposal and make commitments on behalf of the Consultant. We acknowledge that our digital/digitized signatureisvalidandlegallybinding.Supportingdocuments aresubmittedherewith. Documentstobesubmitted:RegistrationCertificate/MemorandumofAssociation/Partnership Agreement/ Power of Attorney/ Board Resolution mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am922397404/2025/S&R Zone 15) Rights of the Procuring Entity to Reject Proposal(s): Wefurtherunderstandthatyouarenotboundtoacceptthelowestorany Proposal you mayreceiveagainst your above-referredRFP Document. …………………….. (Signaturewithdate) ……………………….. (Nameanddesignation) DulyauthorizedtosignProposalforandonbehalfof[name,address,andseal ofConsultant] mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am932397404/2025/S&R Zone Form T-1A: Consultant’s Commercial Information Note: Consultant shall fill in the following information and enclose certified copies of the documentaryproof/ evidenceto substantiatethecorresponding statement wherever necessary andapplicable. (Pleasetickappropriateboxesorstrikeoutsentences/phrasesnotapplicabletoyou) Consultantparticulars: a) NameoftheConsultant:………………. b) Corporate Identity No. (CIN): …………………………………….. c) Registration, if any, with The Procuring Entity:………………………………….. d) Place of Registration/ Principal place of business” ………………………………. e) Complete Postal Address: ………………………………………….. f) Pin code/ ZIP code: …………………………………………………. g) Telephone nos. (with country/ area codes): ……………………… h) Mobile Nos.: (with country/ area codes): …………………….. i) Contact persons/ Designation: ……………………………………. j) Email IDs: ……………………………………………………… ……. Submit a self-certified copy of the registration certificate – in case of a partnership firm –Deedof Partnership; in case of a Company–Notarized and certified copy of its Registration;andincaseofSociety–itsByelawsandregistrationcertificateofthefirm.All these documents shouldbeNotarized. Taxation: PAN number: ………………………………………………. TypeofGSTRegistrationaspertheAct(NormalTaxpayer,Composition, CasualTaxable Person, SEZ, etc.): …………………………. GSTIN number..............................................................inConsultantand ServiceSite States Registered/ CertifiedOffices from where theServices wouldbe supportedand PlaceofService Sitefor GSTPurpose: ………………. ContactNames,Nos.&emailIDsforGSTmatters(Pleasemention primaryandsecondary contacts): ………………………………… Comments onTaxliabilityandthe breakup ofCGST,SGST,IGSTand Cessinthisassignment: Documents tobesubmitted:Self-attested Copies ofPANcardand GSTIN Registration. mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am942397404/2025/S&R Zone TradeRegistrationsandLicences Wehavethefollowingregistrations/licencesrequiredfortheperformance ofthisService(tickasapplicable).Authenticatedcopiesoftheseare enclosedherewith:  EPF  ESI  LabourLicence  Anyotherrequired . Consultant’s Authorized Representative Information Name: Address: Telephone/ Mobilenumbers: Email Address: (Signature with date) ……………………….. (Nameanddesignation) DulyauthorizedtosignProposalforandonbehalfof[name,address andseal of Consultant] DA:As above mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am952397404/2025/S&R Zone Form 1.2: Eligibility Declarations (On Consultant’s Letter-head) (Along with supporting documents, if any) REOI document No. REOI/ xxxx; Tender Title: Consultancy Services Consultant’s Name [Address and ContactDetails] Consultant's ReferenceNo. Date………. [Note:The listbelow isindicativeonly. Youmayattach more documents as required toconfirm your eligibilitycriteria.] Eligibility Declarations (Please tick appropriate boxes or cross out any declaration not applicable to the consultant) Wehereby confirm that we complywithallthe stipulationsofREOIClause4.1of the REOIdocument anddeclare as under and shall provideevidence of our continued eligibility to the ProcuringEntity as and whenit mayberequested: 1) Legal Entity of Consultant: We are: a) : relevant documents enclosed) b) We are a Consultancy Services provider with valid registration regarding GSTIN, PAN, EPF, ESI, Labour, or equivalent registration certificate as applicable to the subjectServices. 2) Eligibility: We solemnly declare that we (including our affiliates or subsidiaries, or constituents): (a) are not insolvent,in receivership,bankrupt or beingwound up,not have our affairs administered by a court or a judicial officer, not have our business activities suspendedand are not thesubject oflegal proceedings forany ofthese reasons; (b) (including our affiliates or subsidiaries, or constituents for any part of the assignment): i) Do not stand declared ineligible/ blacklisted/ banned/ debarred by the Procuring Organisation or its Ministry/ Department from participation in its procurement processes;and/ or ii) Are not convicted(withinthree years preceding thelast date of EOIsubmission) or stand declared ineligible/ suspended/ blacklisted/ banned/ debarred by appropriate agencies of the Government of India from participation in procurement processes of all itsentities for offences mentionedinREOI document inthisregard. iii) We have neither changed our name nor created a new "Allied Entity", consequent totheabovedisqualifications. (c) Do not have any association (as consultant/ partner/ Director/ employee in any capacity) with such retired public official or near relations of such officials of ProcuringEntity, as counter-indicated,inthe REOIdocument. (d) We have no conflict of interest, which substantially affects fair competition. The quoted prices are competitive without adopting unfair/ unethical/ anti competitive means. No attempt has been made or shall be made by us to induce any other consultant tosubmitornot tosubmitanEOI torestrict competition. (e) We certify that we fulfil other additional eligibility conditions if prescribed in the mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am962397404/2025/S&R Zone RFP document. 3) Wecertify that we are not an entity from a country identified to restrict Consultants from India from participation in their Government Procurements as per EOI clause 4.2.1 4) Restrictions on procurement from consultants from a country or countries or aclass ofcountries underRule144(xi) oftheGeneral FinancialRules 2017: "We have read the clause regarding restrictions on procurement from a consultant of a country which shares alandborder withIndiaand onsub-contractingtocontractors from such countries,and solemnlycertify that we fulfil all requirements inthis regard and are eligible to be considered. Wecertify that: a) we are not from such a country or, if from such a country, we are registered with theCompetent Authority(copy enclosed).and; b) we shall not subcontract any assignment to a contractor from such countries unless sucha contractor is registered withtheCompetent Authority. 5) Startup Status: We confirm that we are (Certificate of Recognition issued by the Department for Promotion of Industry and Internal Trade (DPIIT) enclosed herewith)/ are not a Startup entity as per the Department of Promotion of Industrial and Internal Trade –DPIIT. 6) Penalties for false or misleading declarations: We hereby confirm that the particulars given above are factuallycorrect and nothingis concealedand undertake to advise any future changes to the above details. We understand that any wrong or misleadingself-declarationwouldviolate theCodeofIntegrityand attract penalties. …………………….. ……………… ……….. (Signature with date) (Name and designation) Duly authorised to sign EOI for and on behalf of ………………………………………. …...........................................Name, address, and seal of the Consultant] DA: As in Sr 1 to 5 above, as applicable mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am972397404/2025/S&R Zone Form T-2: Consultant’s Organisation and Experience (RefITC-clause9.2) (TobesubmittedaspartofTechnical Proposal)(on Consultant’s Letter-head) (Alongwithsupportingdocuments,ifany) Consultant’s Name [Addressand ContactDetails] Consultant’sReference No. Date………. RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices Form-2: Please fill out this form to briefly describe the Consultant’s organization andoutline the recent consultant experience most relevant to the assignment. In the case ofa joint venture, information on similar assignments shall be provided for each partner.For each assignment, the outline should indicate the names of the Consultant’s KeyExperts and Sub-consultants who participated, the duration of the assignment, the contract amount (total and, if it was done in the form of a joint venture or a Sub- consultant, the amount paid to the Consultant), and the Consultant’srole/involvement. A - Consultant’s Organization :- The proposal should contain the followinginformationinenclosedformat attached • Yearof Establishment ofFirm • Averageannualturnover(last threeyears) Note: The Firm shall submit Certificate of Incorporation and audited balance sheet for the last three years [FY 2014-2015, FY 2015-2016 and FY 2016-2017]*. For claiming experience of Highway projects, completion certificate from employer should be enclosed. The proposal should also contain the details of the key personnel viz. their name, qualification, expertise area, experience and years of association with the firm. *To bemodified appropriately. The following information related to the firm should be provided in the proposal. i. Nameofthepackageappliedfor:- ii. Yearofestablishmentoffirm* Consultant Year of Countr TypeofOrganization y Establishmen Individua Partnership Corporatio Other t l n mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am982397404/2025/S&R Zone Individual/ LeadPartner (of JV)/ MinorPartner of JV/Associat e NOTE:- Year ofEstablishment ofLead Partner ofJV shallbe considered. *CopyofCertificate ofincorporationshallbesubmitted. iii. Office/ Business Address/Telephone nos. /Cable Address. iv. Narrative description offirm (Notmorethan 2sheets) v. Name of two (2) principals who may be contacted with titleand telephonenumber/fax number/e- mail. vi. FinancialStatementofthelastthreeyears. ** Sl. No. Particul <2014- <2015- <2016- ar 15> 16> 17> i. Annual turnover from Consulting business of civil Engineering Projects ii. Total Assets iii. Current Assets Balance Sheet/ Auditor Certificate of last 3years <2014-15, 2015-16 and 2016-17> shall be submitted as evidence of Annual Turnover. Annual financial statement turnover duly certified by the Statutory Auditor with UDIN certifying turnover from consulting buissness of civil Engineering Projects mayalsobe Provided. ** a) The amount shall bestatedinINR. (Consider 1US Dollar = Rs. And 1Euro = Rs.) (This will be the exchange rates as per Reserve Bank of India rounded off to nearest Rupee applicable at the time of RFP invitation). b) The currency conversion rate for the respective years shall be mentioned for other International currencies. B-Consultant’sExperience mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 2am992397404/2025/S&R Zone 1. Listonlyprevioussimilarassignmentscompletedinthelast[ 7 ]years. i) List only those assignments for which the Consultant was legally contracted bythe client directly or was one of the joint venture members. Assignments completedbythe Consultant’s individual experts working privately or through other consulting firms cannot be claimed as the relevant experience of the Consultant or that of the Consultant’s partners or Sub-consultants - but can be claimed in their CVs. The Consultant should be prepared to substantiate the claimed experience by presenting copies of relevant documents and references, as requested by the Procuring Entity. Experience as Authority Engineer/Independent Consultant/Construction supervision of Highway projects, separately forPPPand non-PPPProjects duringthelast 7years. *** S Projects Type of Description Client(with Total Fee Fee received %ageof Approx. Period Services ofHighway complete forthe byApplicant(in totalfee Costof No Name /Year rendered Project/ address, Consultancy caseof received Highway Length contact Assignment JV/Association) bythe Project Sole (kms) person, (INR) firm Consultant/ Telephone Prime Nos.and Consultantof FaxNos.) JV/minor Authority’s Engineerof JV//as associate consultant 1 2 3 4 5 6 7 8 9 10 A. Completed/ Substantiallycompletedprojects: 1. 2. 3. B.Projectsinprogress: 1. 2. 3. ii) Experience in DPR/ Feasibility Study cum Preliminary Design Report preparation of 2/4/6 laning / Bridge Highway Projects separately for thePPPandnon-PPPprojectsduring thelast 7 years. *** SNo Projects Name / Type Length Client Total Fee Feereceivedby %age of Period mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am002397404/2025/S&R Zone Year of (with forthe Applicant total fee Project Complete Consultancy (incaseof received of Sole (kms) address, Assignment bythefirm Consultant/ Services contact (INR) JV/Association) Rendered Prime person, ca telephone ConsultantofJV/ Nos.and seofJV) minorAuthority’s Fax Nos.) EngineerofJV//as associate consultant 1 2 3 4 5 6 7 8 9 ***a) 2/4/6 lane/Bridge work as applicable for the project for which RFP is invited. For 2-lane projects experience of 4/6 lane also to be considered with amultiplication factor of 1.5. Experience of 4/6 lane shall be considered interchangeably for 4/6 laning projects. For 4/6 lane projects, experience of 2 lane will be considered with a multiplication factor of 0.4, but only for those 2-lane projects whose cost of consultancy services was more than Rs.3.0 crores. For standalone bridge projects, experience in bridge work (either standalone project or as a part of road project)onlybe considered. b) Only those projects, to be included in the table which are Highways Projects and for which clients certificates from the concerned Government agencies are enclosedwiththe proposal. c) The details of bridges having length more than 200m (500m in case the project consist of bridges of length more than 500m) in the listed projects is to be specificallymentioned. d) The weightage given for experience of a firm would depend on the role of the firm in the respective assignments. The firm’s experience would get full credit if it was the sole firm in the respective assignment. If the applicant firm has completed projects asJV with some other firms, weightage shall be given as per the JV share***. However if the applicant firm has executed the project as associate with some other firms, 25% weightage shall be given to the applicant firm for the projects completed under such association The weightage given for experience of a firm would depend on the role of the firm in the respective assignments. The firm’s experience would get full creditif it wasthesolefirm intherespectiveassignment. If the applicant firm has completed projectsas JV with some other firms, weightage shall be given as per the JV share***. However if the applicant firm has executed the project as associate/ non substantial partner with some other firms, weightage shall be given as per the Actual share subjected to maximum of 25% to the applicant firm for the projects completed under such associationAssignments on hand including those for which the Letter of Acceptance from the clients received as on 7 days prior to due date for submission of proposals: The details shall be given in the following format. mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am012397404/2025/S&R Zone S. Nameof Client Roleofthe Date of Dateof Present TeamMembersprovided Assignment firm letter of Agreemen statusof bythefirm No Sole,Lead/ Acceptance tifsigned Assignment OtherinJVor sub- Name DOB Position (1) (2) (3) cons(u4lt)ant (5) (6) (7) (8) (9) (10) Key Personnel Number of key personnel employed Sole Applicant JV(1) (Lead Member in case of JV) Team Leader cum Senior Highway Engineer Resident cum Highway Engineer Bridge/Structural Engineer Senior Pavement Specialist Senior Quality cum Material Expert Road Safety Expert 2. FACILITY FOR FIELD INVESTIGATION AND TESTING 1. State whether applicant has in-house (created in house at site)/ outsourced/ not available facilityfor  Surface defects detection and roughness measurement using Network Survey Vehicle  Mobile Quality Control Unit having Soil Testing, Asphat Testing, Concrete testing, Aggregate Testing and pavement testing equipment onboardalongwithsufficient IT andcommunicationsystems  OwnershipofNABLaccreditedLab bythefirm  Pavement strength measurement usingFWD  Bridge inspectionusingMobileBridge InspectionUnit mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am022397404/2025/S&R Zone  Roadsigns inspectionusingRetro Reflectometer REFERENCES Relevant Services Carried Which Best Illustrate Qualifications Thefollowing information should be provided in the format below for each reference assignment for which your firm, either individually as a corporate entity or as one of the majorcompanies withinaconsortium,was legallycontracted bytheclient: Assignment Name: Country: Location within Country: Professional Staff Provided by your firm: Name of Client : No.of Staff: Address : No. of Staff Months : Technology Used: Start Date Completion Date Approx. Value of Services in INR/current USD): (Month / Year) (Month/Year) Name of JV/Association Firm(s)if any: No. of Months of Professional Staff provided by Associated Firm(s) Status of your Company in the Assignment i.e., Sole/Lead Member/Other Member/Associate Narrative Description of Project : Description of Actual Services Provided by your Company: Signature of Authorised Representative (Certificate from Employer regarding experience should be furnished) mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am032397404/2025/S&R Zone Format for Technical Capacity of Applicants (TOBEFILLEDBYTHESOLECONSULTANT&INCASEOFJV, SEPARATELYBYJVMEMBERSBIDDING FOR THE ASSIGNMENT) (i) Detailsofallin-handAE/IE/SCprojectsorAE/IE/ SC awardedbyMoRTHor its executingagencies forNH works and centrally sponsoredroadworks: Sl. Project AE/IE/SC Star Scheduled Whether Incase Descriptio works t Completion awarded in ofJV, No . n Provisional Dat Current share ly e Financial Year of completed Contra or ctFee (%) Original assignment period+ one year lapsed (Yes/ No) (Yes/ No) 1 2 3 4 5 6 7 Format for undertaking by the firm for in-hand AE/ IE/ SC Projects: The undersigned on behalf of----------------------(name of consulting firm) certify that the firm do not haveanyother in-hand/awardedAE/IE/SCprojectotherthanthoselistedabove. Date (dd/mm/yyyy) [SignatureofauthorizedrepresentativeoftheFirm] Note 1: ThefiguresinCol7beroundedofftothenearestintegeri.e.incase remaining bid-capacity comes to 0.5or more then it willbe considered as 1, in case less than 0.5 then it will be considered as 0 (Zero). Note 2: mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am042397404/2025/S&R Zone Clarificationfortechnical capacityutilised incase ofJVwith other firm thanproposed in current assignment. IncaseFirm-1proposesfornew JVwithotherpartner,thencapacity utilisationwillbecalculated on the basis of JV share in existing assignments e.g. JVinoneprojectwith30%share:-One projectX0.3=0.3JV inoneprojectwith 70% share:-One projectX0.7=0.7 JV in one project with 50% share:-One projectX0.5=0.5 JVintwo projectswith 80%share:-Two projectX0.8=1.6The weighted utilization of the Capacity of Firm-1=3.1 Note 3: TheConsultantshallre-submit thebid capacitydetailsasperaboveformatatthetimeof opening ofFinancial Bid. mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am052397404/2025/S&R Zone Form T-3: Comments and Suggestions on the Terms of Reference, Counterpart Staff, and Facilities to be provided by the Procuring Entity (Ref ITC-clause 9.2) (Tobe submittedas part ofTechnical Proposal) (Alongwithsupportingdocuments,ifany) (onConsultant’s Letter-head) RFP Document No. RFP No./ xxxx; Tender Title: ConsultancyServices Consultant’s Name [Address and ContactDetails] Consultant’s ReferenceNo. Date………. Form T-3: Commentsand Suggestions ontheareas thathave notbeen providedor anychanges*to theexistingprovisions oftheTerms ofReference,Counterpart Staff,and Facilities tobeprovided bytheProcuring Entitythat couldimprove thequality/effectivenessofthe assignment.Specifically mentionwhere your proposal deviates from SectionVI: Terms ofReference.A-ONTHE TERMS OF REFERENCE Note: Suggest andjustifyanymodifications or improvements totheScopeofWorkyou are proposingtoimproveperformance incarryingout theassignment(such as deletingsomeactivity you consider unnecessary,adding another,or proposingadifferent phasingof theactivities).Such suggestions shouldbeconcise, tothepoint,and incorporatedintoyour proposal.Consultants must maintainthesame numberingandstructure as inSectionVI:‘Terms of Reference’andSectionVI-A: List ofKey Experts andRequired Qualifications. B -ONCOUNTERPARTSTAFF AND FACILITIES& OTHER AREAS {Comments oncounterpartstaffand facilities tobeprovided bytheProcuringEntity. For example,administrativesupport,office space,etc., ifany} mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am062397404/2025/S&R Zone Form T-4: Description of Approach, Methodology and Work Plan in Responding to the Terms of Reference (RefITC-clause9.2) (TobesubmittedaspartofTechnicalProposal)(onConsultant’sLetter-head) RFP Document No.RFP No./ xxxx; Tender Title: ConsultancyServices Consultant’s Name [AddressandContactDetails] Consultant’sReferenceNo. nceDate………. Form T-4: a descriptionofthe approach,methodology for qualitycontrol andwork planfor performing the assignment, including a detailed description of the proposed methodology and staffing for training iftheTerms ofReferencespecify trainingas a specific component ofthe assignment. {SuggestedstructureofyourResponse: a) Technical Approach and Methodology b) WorkPlan c) Organization and Staffing} A) Technical Approach and Methodology {Please explain your understanding of the objectives of the assignment as outlined in the ‘Terms of Reference’ (TORs), the technical approach, and the methodology you wouldadoptforimplementingthe taskstodelivertheexpectedoutput(s),andthedegree of detail of such output. Please do not repeat/copy theTORs here.} B) WorkPlan. {Please outline the plan for implementing the main activities/tasks of the assignment, their content and duration, phasing and interrelations, milestones (including interim approvals by the Procuring Entity), and tentative delivery dates of the reports. The proposed work plan should be consistent with the technical approach and methodology, showing your understanding of the TOR and ability to translate them into a feasible working plan. A list of the final documents (including reports) to be delivered as final output(s) should be included here. The work plan should be consistent with Form T-5: ‘Work Schedule andPlanningofDeliverables’.} C) Organization and Staffing. {Please describe the structure and compositionof your team, includingthe list of the Key Experts, Non- Key Experts, and relevant technical and administrative support staff. The Organization and staffing shouldbeconsistent withForm T-6: ‘Team Composition,Assignment,and KeyExperts’Inputs.} …………………….. (Signaturewithdate) ……………………….. (Name anddesignation) DulyauthorizedtosignProposalforandonbehalfof ……………………………………. [name,address,andsealofConsultant] DA: Relevant documents like technical data, literature, drawings, and other documents mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am072397404/2025/S&R Zone Form T-5: Work Schedule and Planning for Deliverables3 (RefITC-clause 9.2) (To be submitted as part of Technical Proposal)(on Consultant’s Letter-head) RFP Document No. RFP No./ xxxx; Tender Title: Consultancy ServicesConsultant’s Name [Address and Contact Details] Consultant’s Reference No. Date………. {Please outline the Plan for implementing the main activities/ tasks of the assignment, their content and duration, phasing and interrelations, milestones (including interim approvals by the Procuring Entity), and tentative delivery dates of the deliverables. Theproposed work plan should be consistent with the technical approach and methodology, showing your understanding of the ToR, anychallenges likely to be encountered during the programmatic implementation, the mitigations proposed and the ability to translate them into afeasible working plan. A list of the final documents (including reports) to be delivered as final output(s) should be includedhere. The work plan should be consistent with the Work Schedule Form.} A. Activity Schedule Month wise Program(information of Bar Chart) [1st,2nd,etc.aremonthsfromthestartof assignment] S ItemofActivity 1 2 3 4 5 6 7 8 9 1 1 1 (Works) r s n r t t t t t t 0 1 2 t d d h h h h h h . t t t h h h N o . 1 ......................... ....................... 2 ......................... ....................... 3 ......................... ....................... 4 ......................... ....................... mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am082397404/2025/S&R Zone - ......................... ....................... - ......................... ....................... B. Completion and Submission of Reports S Reports : Program meDate) r . N o 1 Monthly reports (Design and Construction) 2 Quarterly Reports 3 Various others reports as provided in the Concession Agreement such as Completion Report mFile No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am092397404/2025/S&R Zone Form T-6: Team Composition, Assignment, and Key Experts’ Inputs (RefITC-clause 9.2) (To be submitted as part of Technical Proposal)(on Consultant’s Letter-head) RFPDocumentNo.RFPNo./xxxx; Tender Title: Consultancy Services Consultant’s Name [Address and Contact Details] Consultant’s Reference No. Date………. Note toConsultants:RFP indicates keyPersonnel (Managers/ Supervisors/ Executives/ Specialists/Technicians)andthenumber ofnon-keystaffrequired toperformthe servicestothe required performancestandardsandquality.Theconsultantshall quotethecostofthesepersonnel in theFinancialProposal. TIMESCHEDULEFORPROFESSIONAL PERSONNEL 1. Technical/Managerial Staff Sl.No. Name Position Task 1 2 3 4 … … i. Support Staff File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3102397404/2025/S&R Zone Sl.No. Name Position Task 1 2 3 4 … … File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3112397404/2025/S&R Zone Annex to Form T-6: Key Expert Curriculum Vitae (CV) (As per theinfracon format withfollowingcertifications) CertificationbytheCandidate I, the undersigned,(Name and Address) undertake that this CV correctly describes myself, my qualifications and my experience and Employer would be at liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have neither been debarred by <Agency> or any other central/stage government organization nor left any assignment with theconsultants engaged by Employer / contracting firm (firm to be supervised now) for any continuing work of Employer without completing my assignment. I will be available for the entire duration of the current project (named… ).If I leave this assignment in the middle of the work, Employer would be at liberty to debar me from taking any assignment in any of the Employer works for an appropriate period of time to be decid ed by the Employer. I have no objection if my services are extendedbythe Employer for thiswork infuture. Ifurther undertake that myCVisbeing proposedforthis project by(theapplicantfirm)and I have not given consentto any otherconsultant(s) to proposemy CV for any position forthis project. I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to which consultant’s firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake any employment in Employer projects during the period of assignmentofthis project andEmployer shall considermyCVinvalidtill suchtime. I undertake that I have no objection in uploading/hosting of my credentials byEmployer in publicdomain. For Key Personnel having intermittent inputs, add the following: I further certify that I am associatedwith thefollowing assignments as on date (as on 7days prior to due date for submission of proposal) including those for which LOA has been receivedby the firm andtheinputs intheseassignmentsshall noteffect thework ofthecurrent assignment. NameofAssignment Client Dateof Likelystart Likelyend Total input ofthe LOA (Month/Year) (Month/ person(man- Year) months) AdequacyfortheAssignment: File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3122397404/2025/S&R Zone Detailed Tasks Assigned on Consultant’s Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the TeamofExperts: AssignedTasks {Listalldeliverables/tasksasinFORMT-5in whichtheExpertshallbeinvolved) Expert’s contact information: (e-mail …………………., phone.............) Date(Signature of Key Personnel) (Day/Month/Year) The Bidder should carryout self-evaluation based on the evaluation criteria at Appendix-EC and furnish the same here. While submitting the self-evaluation along with bid, Bidder shall make references tothedocuments whichhave been relieduponinhis self-evaluation. Certificationbythefirm The undersigned on behalf of ----------( name of consulting firm) certify that Shri (name of proposedpersonnel) tothebestof ourknowledge has neither beendebarredby <Agency> or any other Central/State Government organization nor left his assignment with any other consulting firm engaged by the Employer /Contracting firm(firm to be supervised now) for theongoing projects. We understand that if the information about leaving the past assignment is known to the Employer, Employer would be at liberty to remove the personnel from the present assignmentand debar himfor an appropriate period tobe decidedbythe Employer. …………………………………………………………..Date (Day/Month/Year) [SignatureofauthorizedrepresentativeoftheFirm] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3132397404/2025/S&R Zone Form T-7: Terms and Conditions - Compliance (RefITC-clause9.2) (TobesubmittedaspartofTechnicalProposal)(on Consultant’s Letter-head) Consultant’s Name [Address andContact Details] Consultant’s Reference No. Date……….RFP DocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices Note to Consultants: Fill up this Form regarding Terms and Conditions in the RFP Document, maintaining the same numberingandstructure.AddadditionaldetailsnotcoveredelsewhereinyourProposalinthisregard. Sl.No. Ref of RFP Document Subject Confirmation/ Justification/ Section,Clause Deviation/ Reason Exception/ Section Clause/ reservation sub-clause We shall comply with, abide by, and accept without variation, deviation, or reservation all terms and conditions of the RFP Document, except those mentioned above. If mentioned elsewhere in our Proposal, contraryterms and conditionsshall not berecognised andshall benull andvoid. …………………….. (Signaturewithdate) ……………………….. (Nameand designation) DulyauthorizedtosignProposalforandonbehalfof ………………………………………. ………………………………………. [name,address,andseal ofConsultant]DA:Ifany,atthe optionoftheConsultant. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3142397404/2025/S&R Zone Form T-8: Checklist for Consultants (Ref ITC-clause 9.2) (TobesubmittedaspartofTechnicalProposal)(onConsultant’s Letter-head) Consultant’s Name [Address andContact Details] Consultant’s Reference No. Date………. RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices NotetoConsultants:ThischecklistismerelytohelptheConsultantspreparetheirProposals;itdoesnotoverrideormodifythe tenderrequirement.Consultantsmustdotheirownduediligencealso. Sr Documentssubmitted,dulyfilled,signed Yes/No/ NA 1. Form T-1.- Proposal Form (to serve as covering letter and declarations applicable for both the Techno-commercial and Financial Proposal) 2. Form T-1A: Consultant’s Commercial Information, Power of attorney, RegistrationCertificates,etc. 3. FormT-2:Consultant’sOrganisationandExperience 4. FormT-3:CommentsandSuggestionsonTermsofReference… 5. Form T-4: Description of Approach, Methodology and Work Plan… 6. FormT-5:WorkScheduleandPlanningofDeliverables 7. Form T-6: Team Composition, Assignment and Key Experts’ Inputs.Annexcontaining all CVs 8. Form T-7:Terms andConditions -Compliance 9. FormT-8:ThisChecklist–wastickedappropriately 10. FormT-9A: BankGuaranteeFormatforEarnest MoneyDeposit or Form T-9B: BidSecuring Declaration–as applicable 11. FormT-10:DulysignedIntegrityPact,IfstipulatedinAITC. 12. FinancialProposal was separatelyuploaded File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3152397404/2025/S&R Zone 13. Anyotherrequirements,ifstipulatedinTIS/AITC;orifconsidered relevant bytheConsultant File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3162397404/2025/S&R Zone Form T-9A: Bank Guarantee Format for Earnest Money Deposit (TheBankGuaranteeshallbeonaStampPaperofappropriatevalueinaccordancewithStampActandshallbepurchased inthenameoftheguaranteeissuingBankorthePartyonwhosebehalftheBGisbeingissued.) (Ref ITC-clause 13.1.2 and GCC-clause 5.8) Ref Bank Guarantee No…………… Date……………………………... To ThePresidentofIndia,throughHeadof Procurement ProcuringOrganisation [CompleteaddressoftheProcuringEntity] Whereas M/s……………………………………………………with its Registered/ Head Office at…………………………. (name and address of the Consultant, hereinafter called “the Consultant”, which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) has undertaken to submit a proposal, in pursuance of Tender no………..date…………….(hereinaftercalled“theTender”). And Whereas you (unless repugnant to the context or meaning thereof, including your successors, administrators, executors, and assigns) have stipulated in the said Tender that the Consultant shall furnish you with a bank guarantee by a Commercial bank for thesumspecifiedthereinas Earnest MoneyDeposit forcompliancewithitsobligations as per theTender; And Whereas we …………………… with our Head Office at…………………………. (name andaddressoftheBank,hereinafterreferredtoasthe‘Bank’,whichexpressionshall, unless repugnant to the context or meaning thereof, include its successors,administrators,executors andassigns) have agreedtogivetheConsultantsuchabankguarantee. Now,Therefore, we hereby affirm thatwe are guarantors and responsibletoyou, onbehalf of the Consultant, up to a total of …………………………………………………….(amount of the guarantee in words and figures), and we undertake to pay you, upon your first written demand declaring the Consultant to be in default under the Tender and without cavil or argument,any sum or sums within the limits of (amount of guarantee) as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein, notwithstanding any difference between you and the Consultant or any dispute pendingbefore anyCourt,Tribunal,Arbitrator orany other authority. We hereby waive the necessity of your demanding the said debt from the Consultant before presenting us withthedemand. The Bank undertakes not to revoke this guarantee during its currency without your previousconsentand further agrees that the guarantee herein contained shall continue to be enforceable till you discharge this guarantee. This guarantee will not be discharged due to a change in the constitution of the Bank or the Consultant’s. Wefurtheragreethatnochangeoradditiontoorothermodificationofthetermsofthe Tendermadebyyou shallinanywayreleaseusfromanyliabilityunderthisguarantee, and we hereby waive notice of any such change,addition,ormodification. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3172397404/2025/S&R Zone This guarantee shall be valid until the ………….day of …….20…… Our………………………………….branch at………………*(Name & Address of the ………….…………..*(branch)is liabletopay theguaranteedamount depending onthefilingof aclaim andany part thereof under thisBankGuarantee onlyandonlyif you serveuponusatour....................* branchawrittenclaimordemandandreceivedbyus at our…………………..*branchonor before Dt…..........otherwise,the bankshall bedischargedofall liabilities under thisguarantee after that. (SignatureoftheauthorizedofficeroftheBank) …………………………………………. …………………………………………. Name anddesignationofthe officer ………………………………………… Seal, name & address of the Bank Branch *Preferably at the authority's headquarters competent to sanction the expenditure for procurement of goods/services orat theconcerned district headquartersor thestateheadquarters. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3182397404/2025/S&R Zone Form T-9B: Bid Securing Declaration Consultantsexempted fromsubmissionofBid Securityarealsorequiredtosubmitthis. (on Consultant’s Letter-head) Consultant’s Name [Address andContact Details] Consultant’s ReferenceNo. To ThePresidentofIndia,throughHeadof Procurement ProcuringOrganisation [CompleteaddressoftheProcuringEntity] Date………. Ref:RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServicesSir/ Madam We,theundersigned,solemnlydeclarethat: WeunderstandthataccordingtothisRFPdocument'sconditions,theProposalmustbe supported by a Bid SecuringDeclaration inlieuofBidSecurity. We unconditionally accept the conditions of this Bid Securing Declaration. We understand we (all members individuallyand jointlyincaseofJV/C) shall standautomatically suspendedfrom beingeligible for bidding in any tender in Procuring Organisation for 2 years from the date of opening of this Proposal ifwe breachourobligation(s) under thetender conditions ifwe: Withdraw/ amend/ impair/ derogate, in any respect, from our Proposal, within the Proposal validity; or Being notified within the Proposal validity of the acceptance of our Proposal by the Procuring Entity: (a) Refused or failed to produce the original documents for scrutiny or the required PerformanceSecuritywithinthestipulatedtimeundertheRFPdocument's conditions. (b) Failorrefusetosignthecontract. WeknowthatthisProposal-SecuringDeclarationshallexpire 1) If the contract is not decided - forty-five days after the expiration of the Proposal validity, any extensiontoit. 2) Ifthecontractisnotawardedtous-notlaterthanthirtydaysaftertheconclusionofthe resultant contract, or 3) ifthecontractisawardedtous-afterreceiptofperformancesecurityfromthem (Signature with date) ……………………….. (Nameand designation) Duly authorized to sign Proposal for and on behalf of……………………….[name,address, andseal ofConsultant] Dated on …………. day of.....................[insertdateofsigning] Place…...........................................[insertplaceofsigning] DA:………………………………………………… File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3192397404/2025/S&R Zone Form T-10: Integrity Pact (IfstipulatedinTIS,refClaus9.2.1ofITC)(TobesignedonPlainPaper) (TobesubmittedaspartofTechnicalProposal) RFPDocumentNo.RFPNo./xxxx;TenderTitle:ConsultancyServices This Agreement(hereinafter called theIntegrityPact) ismade on dayofthemonthof 202 at ,India. BETWEEN Procuring Organisation, ----------------------------------- through Head of the Procuring Organisation, for and on behalf of President of India (hereinafter called the “The Principal”, which expression shall meanand include unless thecontext otherwise requires,his successorsinoffice andassigns)of theFirst Part AND M/ s. (hereinafter called the “The Consultant”, which expression shall mean and include unless the context otherwise requires, his successors and permittedassigns)ofthe SecondPart. PREAMBLE ‘The Principal’ intends to award, under laid down organizational procedures, contract/s for , ‘The Principal’ values full compliance with all relevant laws of the land, rules, regulations, economical use of resources and fairness/transparency in its relations with itsConsultant(s)and/ or Consultant(s). In order to achieve these goals, the Principal shall appoint Independent External Monitors (IEMs) who shall monitor the Procurement Process and the execution of the contract for compliance with theabove mentionedprinciples. Section1-Commitmentsofthe‘ThePrincipal’ (1) ‘The Principal’ commits itself to take all measures necessary to prevent corruption and to observe thefollowingprinciples: - a. No employee of the Principal, personally or through family members, shall, in connection with the tender for, or the execution of a contract, demand, take a promise for or accept, for self or thirdperson,any material orimmaterial benefit which theperson isnot legallyentitledto. b. The Principal shall, during the Procurement Process, treat all Consultant(s) with equity and reason. The Principal shall, in particular, before and during the Procurement Process, provide to all Consultant(s)thesameinformationandshallnotprovidetoany Consultant(s)confidential/additional informationthroughwhichtheConsultant(s)couldobtain anadvantage inrelation totheProcurement Process orthecontract execution. c. ThePrincipalshallexcludefromtheprocessallknownprejudicedpersons. (2) IfthePrincipalobtainsinformationontheconductofanyofitsemployees,which isacriminal offenceundertheIPC/PCAct,oriftherebeasubstantivesuspicioninthis regard,thePrincipalshall informtheChiefVigilanceOfficerandinaddition,caninitiatedisciplinaryactions. Section2-Commitmentsofthe‘Consultant’ (1) The ‘Consultant’ commit themselves to take all measures necessary to prevent corruption. The ‘Consultant’ commit themselves to observe the following principles during participation in the File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3202397404/2025/S&R Zone Procurement Process and duringthecontract execution. a. The ‘Consultant’ shall not, directly or through any other person or firm, offer, promise, or giveto any ofthe Principal’s employeesinvolved in the Procurement Processor theexecutionofthecontract ortoanythirdpersonanymaterialorotherbenefitwhichheis not legally entitled to, in order to obtain in exchange any advantage of any kind whatsoever during the Procurement Process or during the executionofthecontract. b. The ‘Consultant’ shall not enter any undisclosed agreement or understanding with other Consultants, whether formal or informal. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of Proposals or any other actions torestrictcompetitivenessortointroducecartelisationintheProcurement Process. c. The ‘Consultant’ shall not commit any offence under the relevant IPC/ PC Act; further, the ‘Consultant’ shall not use improperly, for purposes of competition or personal gain, or pass on to others, any information or document provided by the Principal as part of the business relationship, regarding plans, technical proposals, and business details, including information contained or transmittedelectronically. d. The ‘Consultant’ of foreign origin shall disclose the name and address of the Agents/ representatives in India, if any. Similarly, the Consultant/ Contractors of Indian Nationality shall furnish the name and address of the foreign principals, if any. Further details, as mentioned in the “Guidelines on Indian Agents of Foreign Suppliers”, shall be disclosed by the Consultant. Further, as mentioned in the Guidelines, all the payments madetotheIndianagent/ representative must be in Indian Rupees only. A copy ofthe “Guidelines onIndianAgents of ForeignSuppliers” is placed inthe Appendixtothisagreement. e. The ‘Consultant’ shall, when presenting their Proposal, disclose any and all paymentsmade, are committed to, or intends to make to agents, brokers, or any other intermediaries in connection withthecontract award. f. Consultant whohas signed the IntegrityPact shall not approachthe Courts while representing themattertoIEMs andshallwait fortheirdecisioninthematter. (2) The‘Consultant’ shall not instigate third persons to commit offences outlinedabove or be an accessorytosuch offences. Section 3-Disqualification fromProcurement Process andexclusion fromfuturecontracts If the ‘Consultant’, before award or during execution, has committed a transgression through a violationofSection2,aboveorinanyotherformsuchastoputtheirreliabilityorcredibilityinquestion, thePrincipalisentitledtodisqualifythe‘Consultant’fromthe ProcurementProcessortakeactionasper theprocedurementionedinthe“GuidelinesonBanning ofbusiness dealings”. Section 4- Compensation forDamages (1) If the Principal has disqualified the ‘Consultant’ from the Procurement Process prior to the awardaccordingtoSection3,thePrincipalisentitledtodemandandrecover fromthe‘Consultant’the damagesequivalenttoEarnestMoneyDeposit/BidSecurity. (2) If the Principal has terminated the contract according to Section 3, or if the Principal is entitledtoterminatethecontractaccordingtoSection3,thePrincipalshall be entitledto demand and recover from the Consultant liquidated damages of the contract value or the amount equivalent to Performance BankGuarantee. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3212397404/2025/S&R Zone Section5-Previoustransgression (1) Consultant declares that no previous transgressions occurred in the last three years with any otherCompany inanycountry conforming totheanti-corruptionapproach orwithany PublicSector Enterprise inIndia that couldjustifyhisexclusionfrom theProcurement Process. (2) If the Consultant makes an incorrect statement on this subject, he can be disqualified from the Procurement Process, or action can be taken as per the procedure mentioned in “Guidelines on Banningofbusinessdealings”. Section6-EqualtreatmentofallConsultants/Contractors/Subcontractors (1) In the case of Sub-contracting, the Principal Consultant shall take responsibility for the adoptionoftheIntegrity Pact bytheSub-contractor. (2) The Principal shall enter into agreements with identical conditions as this one with all ConsultantsandContractors. (3) ThePrincipal shall disqualify from the Procurement Process all Consultants who do not sign thisPact or violateitsprovisions. Section 7-Criminal charges againstviolating Consultant(s)/ Consultant(s)/ Subcontractor(s) If the Principal obtains knowledge of the conduct of a Consultant, Consultant or Subcontractor, or of an employee or a representative or an associate of a Consultant, Consultant or Subcontractor, which constitutes corruption, or if the Principal has substantive suspicion in this regard, the Principal shall inform thesame tothe ChiefVigilanceOfficer. Section8-IndependentExternalMonitor (1) The Principal appoints a competent and credible Independent External Monitor for this Pact after approval byCentral VigilanceCommission. Thetaskof theMonitoris toreviewindependently and objectively whether and to what extent the parties comply with the obligations under this agreement. (2) The Monitoris notsubjecttoinstructionsbytherepresentativesofthe parties and performs his functions neutrally and independently. The Monitor would have access to all Contract documents whenever required. It shall be obligatory for him/ her to treat the information and documents of the Consultants/Contractorsasconfidential.He/shereports totheHead oftheProcuring Organisation. (3) The Consultant(s)/ Consultant(s) accepts that the Monitor has the right to access, without restriction,all Project documentationof the Principal, includingthat providedby the Consultant. The Consultant shall also grant the Monitor, upon his request and demonstration of a valid interest, unrestrictedandunconditionalaccesstotheirproject documentation. The same is applicable to Sub- contractors. (4) The Monitor is under contractual obligation to treat the information and documents of the Consultant(s)/ Sub-contractor(s) with confidentiality. The Monitor has also signed declarations on ‘Non-Disclosure of Confidential Information’ and ofAbsence of Conflict of Interest. In case of any conflict of interest arising at a later date,theIEM shallinformtheHeadoftheProcuringOrganisation andrecusehimself/herselffromthatcase. (5) The Principal shall provide to the Monitor sufficient information about all meetings among the parties related to the Project, provided such meetings could have an impact on the contractual relations between the Principal and the Consultant. The parties offer the Monitor the option to participate insuchmeetings. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3222397404/2025/S&R Zone (6) As soon as the Monitor notices, or believes to have noticed, a violation of this agreement, he shall so inform the Management of the Principal and request the Managementtodiscontinueor take corrective action, orto takeother relevant action. Themonitorcan,inthisregard,submitnon-binding recommendations.Beyondthis,theMonitorhas no right to demand from the parties that they act in a specific manner,refrain from action, ortolerate action. (7) TheMonitorshall submita written report tothe Head of theProcuring Organisation within8 to 10 weeks from the date of reference or intimation to him by thePrincipaland,shouldtheoccasion arise,submitproposalsforcorrectingproblematicsituations. (8) If the Monitor has reported to the Head of the Procuring Organisation a substantiated suspicion of an offence under the relevant IPC/ PC Act, and the Head of the Procuring Organisation has not, within the reasonable time, taken visible action to proceed against such offence or reported it to the Chief Vigilance Officer, the Monitor may also transmit this information directly to the Central Vigilance Commissioner. (9) Theword‘Monitor’wouldincludebothsingularandplural.Section 9-Pact Duration This Pact begins when both parties have legally signed it. It expires for the Consultant 12 months after the last payment under the contract and for all other Consultants 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the Consultants and exclusionfrom futurebusiness dealings. If any claim is made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above unless it is discharged/ determined by the Head of theProcuringOrganisation. Section10-Otherprovisions (1) This agreement is subject to Indian Law. The place of performance and jurisdiction is the RegisteredOffice ofthePrincipal,i.e., NewDelhi. (2) Changes and supplements, as well as termination notices, need to be made in writing. Side agreements have not beenmade. (3) IftheConsultantisapartnershiporaconsortium,thisagreementmustbesigned by all partners orconsortium members. (4) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid.In this case,theparties shallstrivetocome to an agreement with their original intentions. (5) IssueslikeWarranty/Guaranteeetc.,shallbeoutsidethepurviewofIEMs. (6) IntheeventofanycontradictionbetweentheIntegrityPactanditsAppendix,the Clause in the IntegrityPact shall prevail. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3232397404/2025/S&R Zone ForandonbehalfofthePrincipal (NameoftheOfficerandDesignation) (OfficeSeal) Forandonbehalfof‘Consultant.’ (NameoftheOfficerandDesignation)(OfficeSeal) ForandonbehalfofthePrincipal Place DateWitness1: (Name&Address)Witness 2: (Name&Address) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3242397404/2025/S&R Zone Appendix to Integrity Pact Guidelines for Indian Agents of Foreign Suppliers 1.0 There shall becompulsory registrationofagents forall Global (Open) Tender andLimited Tender.An agent who is not registered with ‘The Principal’ shall apply for registration in the registration form withthe appropriateunit. 1.1 Registered agents shall file an authenticated Photostat copy duly attested by a Notary Public/ Original certificate of the Principal confirming the agency agreement. It should cover - the precise relationship, servicestoberendered,andmutualinterests inbusiness -generallyand/orspecificallyforthetender. Any commission/ remuneration/ salary/ retainership, which the agent or associate receives in India or abroad fromthePrincipal,whethershouldbebroughtonrecordintheAgreementandbemadeexplicit. 1.2 Wherever the Indian representatives have communicated on behalf of their principals and the foreign parties have stated that they are not paying any commission to the Indian agents, and the Indian representative is working onthe basis of salary, or a retainer, a written declarationto this effect should be submittedbytheparty (i.e., Principal)before finalizingthe order. 2.0 Disclosureofparticularsofagents/representativesinIndia,ifany. 2.1 ConsultantsofForeignnationalityshallfurnishthefollowingdetailsintheiroffers: 2.1.1 The ‘Consultant’ of foreign origin shall disclose the name and address of the agents/ representatives in India, if any and the extent of authorization and authority given to commit the Principals. In case the agent/ representative be a foreign Company, it shall be confirmed whether it is an existing Company and details ofthesame shall befurnished. 2.1.2 The amount of commission/ remuneration included in the quoted price(s) for such agents/ representatives inIndia. 2.1.3 Confirmation of Consultant that the commission/ remuneration, if any, payable to his agents/ representativesinIndia,maybepaidby‘ThePrincipal’inIndianRupeesonly. 2.2 ConsultantsofIndianNationalityshallfurnishthefollowingdetailsintheiroffers: 2.2.1 The ‘Consultant’ of Indian Nationality shall furnish the name and address of the foreign principals,if any, indicating their nationality as well as their status, i.e., whether manufacturer or agents of manufacturer holding the Letter of Authority of the Principal authorizing the agent specifically to make an offer inIndia inresponsetotendereither directlyor throughtheagents/ representatives. 2.2.2 Theamountofcommission/remunerationincludedintheprice(s)quotedbyConsultantforhimself. 2.2.3 Confirmation of the foreign principals of Consultant that the commission/ remuneration, if any, reserved for Consultant in the quoted price(s), may be paid by ‘The Principal’ in India in equivalent Indian Rupeesonsatisfactory completionoftheProject orsupplies ofServices. 2.3 Ineithercase,intheeventofcontractmaterializing,thetermsofpayment shall provide forpayment of thecommission/remuneration,ifany,payabletotheagents/representativesinIndiainIndianRupeesonexpiry of90days after thedischargeoftheobligations under thecontract. 2.4 Failure to furnish correct and detailed information as called for in clauses above shall render the concerned Proposal liable to rejection or, in the event of a contract materializing, the same liable to termination by ‘The Principal’. Besides this, there would be a penalty of banning business dealings with ‘The Principal’ordamage orpayment ofa namedsum. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3252397404/2025/S&R Zone FORMATS File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3262397404/2025/S&R Zone Format 1: Contract Form (RefITC-clause13) ThePresidentofIndia,throughHeadof Procurement ProcuringOrganisation [CompleteaddressoftheProcuringEntity]Contract No…………. dated……………. To Consultant[WriteName] [CompleteaddressoftheConsultant]Subject: Ref:1.Thisoffice’sLetterofAwardNo……………..…..dated…….. 2.This officeRFP Document No. RFP No./ xxxx; Tender Title:Consultancy Services, dated………….and subsequent AmendmentNo.…………., dated...............(Ifany).(Hereinafterreferredtoas‘theRFPDocument’) 3 YourTender No………dated……..and subsequentcommunication(s)/ Revised OfferNo………… dated……..(If any), exchanged betweenyou andthisoffice inconnectionwiththistender. (Hereinafter referredtoas ‘Your Offer’) DearSir/ Madam, YourProposal referredabove, readwithsubsequentletters mentioned above,for theServices stipulated intheSchedules annexedherewith,havebeenaccepted.Termsandconditions inthis Contractandthedocumentslistedintheclausebelowshall apply. Note: The words, expressions, definitions, and abbreviations used in this Contractshall have thesamemeanings as those assigned intheGeneralConditionofContractenclosed. 2) Thefollowingdocumentsattachedheretoshallbedeemedtoformanintegralpartofthis Contract: a) TheGeneralConditions oftheContract; b) TheSpecialConditionsoftheContract; c) Appendices: i) AppendixA: TermsofReference ii) AppendixB: KeyExperts iii) AppendixC:RemunerationCostEstimates iv) AppendixD:ReimbursableCostEstimates v) AppendixE-1: BankGuaranteeFormatforPerformanceSecurity vi) AppendixE-2: BankGuaranteeFormatforAdvancePayments In the event of any inconsistencybetweenthe documents,thefollowing order of precedence shall prevail: this Contract Form; the Special Conditions of Contract; the General Conditions of Contract; Appendix A; Appendix B; Appendix C and Appendix D; AppendixE-1; and Appendix E-2. Any reference to this Contract shall include, where the contextpermits,areference toitsAppendices. 3) KeyInformation a) SummaryofCosts File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3272397404/2025/S&R Zone Name of Work: ProcurementofConsultancyServices TenderNo: TendNo./xxxx Nameofthe Bidder/Bidding Firm/ Company: Remuner CGST SGST IGST% Cess %a Reimbursab TotalCost ationas %ag age ge les %age Cotract per e And And And And per with Amou Amou Appendi Amou Amount Appendi Taxes nt nt x C nt xD 1 2 3 4 5 6 7 8 %ageof GST CostinFigs Costin Words B) Timelines i) EffectiveDateofTheContractasperWorkPlaninAppendixA ii) CompletionDateoftheServicesasperWorkPlaninAppendixA 4) ThemutualrightsandobligationsoftheProcuringEntityandtheConsultantshallbeas outlinedintheContract,inparticular: a) the Consultant shall carry out the Services in accordance with the provisions of the Contract;and b) the Procuring Entity shall make payments to the Consultant in accordance with the provisionsoftheContract. (Signature,nameandaddressof[ProcuringEntity]’sauthorized,official)Forandon behalfof thePresident ofIndia Received and accepted this Contract …………………………………………………….. (Signature, name, and address of the Consultant’s executive duly authorized to sign on behalf oftheConsultant.Forajointventure, either all members shall sign oronly the lead member, in which case a power of attorney to sign on behalf of all members shall be attached.) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3282397404/2025/S&R Zone Forand onbehalf of……………………… (Nameand address oftheConsultant) ……………………. ……………………. (SealoftheConsultant)Place: Date: File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3292397404/2025/S&R Zone Appendix A: Description of Services RFP Document No. RFP No./ xxxx;Tender Title: ConsultancyServices Contract No ;Date Consultant’s Name [ThisAppendixshall includethe final Terms of Reference (TORs),approach,Methodology and WorkSchedule andPlanningofDeliverables,worked out bytheProcuringEntityand the Consultantduringthenegotiations; dates for completionofvarious tasks; locationof performance fordifferent tasks;detailed reportingrequirements; Procuring Entity’s input,includingcounterpart personnelassignedbytheProcuringEntitytowork ontheConsultant’s team; specific tasks that require priorapproval bytheProcuringEntity.] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3302397404/2025/S&R Zone 1. Terms of Reference Insert thetext basedonSectionVI (Terms ofReference)of theRFP andmodifyitbasedonForms T-1throughForm T-7intheConsultant’sProposal.Highlight thechanges toSectionVIof the RFP] File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3312397404/2025/S&R Zone Approach, Methodology and Quality Control plan Insert the text based on Form T-4 in the Consultant’s Proposal as negotiated between the Procuring Entity and the Consultant. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3322397404/2025/S&R Zone 3.Work Schedule and Planning for Deliverables Insert the text based on Form T-5 in the Consultant’s Proposal as negotiated between the Procuring Entity and the Consultant. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3332397404/2025/S&R Zone Appendix B: Key Experts RFP Document No. RFP No./ xxxx;Tender Title: ConsultancyServices Contract No; Date Consultant’s Name [Insert a table based on Form T-6 of the Consultant’s Technical Proposal and finalized at the Contract’s negotiations. Attach the CVs (updated and signed by the respective Key Experts) demonstratingthequalifications ofKey Experts.] The Consultants Key personnel and all other Professional / Sub Professional / Support Staff/Sub- Consultancy personnel shall work 6 days (Mondays through Saturday) every week and observe the GazettedHolidays of Government of India as Holidays. The Consultant shall work as per the work program of the EPC Contractor. In this context in case the work plan of the Consultant needs suitable modifications, the same shall be carried out and submitted to the client for consideration. The Consultants hours of work normally shall match withthat of Contractor’s activities on the site. No extra remuneration shall be claimed or paid for extra hours of work required in the interest of Project completion. ln addition, total Leave for 12 days CL shall be permitted in a year to each Key Personnel/ Sub- Professional with prior intimation to the Authority. Out of this,a maximum of 3 Cls can be availed in a quarter and the period of the Cls would be counted as Key Personnel /Sub Professional being on duty. In respect of foreign personnel, one day per trip as travel time from and to the country of theGovernment shall beallowed File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3342397404/2025/S&R Zone Appendix B-1 :MEDICAL CERTIFICATE OF FITNESS Ihave examinedShri /Kumari / Smt.………………………………………………………………..…. Son/ Daughter of Shri …………………………………………………………………………………………………aged …………………………….Years,of village: …………..……..……………………………………… P.O.…………..…………………………………………..P.S………….……………….……………… ………………..Dist.………………….………State.…..…..…………….PIN …………………… and certifythat,he / sheis free from deafness,defectivevision(includingcolourvision)orany other infirmity, mental orphysical, likelytointerferewiththeefficiency of his/ her workandfoundhim /her possessinggood health. This certificate is being given to him /her for the purpose of……………………………………………………………………………………. Signature of Candidate (To besignedinpresence oftheMedical Officer) Signature ofMedical Officer: ………………………………………….. Name ofMedical Officer: Dr. ………………....………………………. RegistrationNo.…………………………………………………………. Dated: Seal Note: 1. Medical certificate granted byaqualified medical practitioner holdingatleast M.B.B.S. Degreeandregistered with Medical Councilof India,shallonlybevalid.Thedateof issueofthe medical certificate should bewithin3month fromthe dateofapplication. 2. Thismedical Certificateshall besubmitted with the Proposalforallthe keypersonnelwhose CV areto beevaluated.ThekeypersonnelwithoutMedical fitness certificate willnot be evaluated. 3. Forall otherSubProfessional/SupportStaff/Sub-Consultancy personnel the same shallbe submitted atthe timeof joiningatproject. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3352397404/2025/S&R Zone APPENDIX C-: FINANCIALPROPOSALSUBMISSIONFORM FROM: (Name of Firm) Subject: We,theundersigned,offer toprovidetheconsultingservices forthe aboveinaccordance with your Request for Proposal dated[Date],andour proposal.Ourattachedfinancial proposal isfor thesum of[Amountinwords andfigures]. Thisamount is exclusiveof thelocal taxes whichwe have estimatedat (Amount inWordsand Figures). Thepercentage of overheadcharges shallbe [Amountinwords andfigures] Our financial proposal shall be binding upon us upto the expiration of the validity period of the proposal,i.e.,[Date]. We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in India namely “Preventionof CorruptionAct 1988”. Commissionand gratuities,ifany, paidor tobepaidbyus toagents relating tothis proposal and contract execution,if weare awardedthecontract,are listedbelow: Name and Address of Agents..........................................................................Amount and Currency ........................... ........................... Purpose of Commission or Gratuity ……..………………… ………………………. Weunderstandyou are not boundtoaccept anyproposal you receive.We remain, Yours sincerely, Managing Director/Head of the firm/ Authorised Representative of the firm* Name of the firm Address *Lead Member incaseofJV File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3362397404/2025/S&R Zone APPENDIX C-1 Remuneration Cost Estimates (To be filled by the Authority before inviting Bid and amount to Be quoted by bidder) RFP Document No. RFP No./ xxxx; Tender Title: Consultancy Services Contract No ;Date Consultant’s Name S.No. Description Amount (Rs.) I Remuneration for Local Professional Staff II Supporting Staff III Transportation IV Duty Travel to Site V Office Rent VI Office Supplies, Utilities and Communication VII Office Furniture and Equipment VIII Reports and Document Printing IX RoadSurveyEquipment X Contingencies Xi %Overhead of the firm on S.No. I to IX above. (The % overhead cannot be quote@ less than 10%. If remuneration quote @ less than 10%, the financial proposal willbenon-responsive andwillnotbeconsideredfor furtherevaluation. SubTotal Goods and Services Tax Payable in India Total Costs (Including Tax) Note: Payments will be made as per stipulations of the Conditions of Contract. We,theundersigned,offer toprovidetheconsultingservices forthe abovein accordancewithyour Requestfor Proposal dated [Date],andour proposal.Our attached financial proposal is forthesum of File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3372397404/2025/S&R Zone Annexto Appendix C-1: BREAKDOWN OF LOCAL CURRENCY COSTS (To be quoted by the bidder ) II. REMUNERATION FOR LOCAL PROFESSIONAL STAFF Normal Highway Project For Project with Construction Period of 18 months No. Position Name Construction Period 18 months + DLP60 months Rate No.ofman- Amount months* Professional Staff Team Leader cum SeniorHighway 1. Engineer 2. Resident cum Highway Engineer 3. Bridge/Structural Engineer 4. Senior Pavement Specialist 5. Senior Quality cum Material Expert 6. Contract Specilist cum planning Engineer 7. Road Safety Expert Sub –Total Sub-professional 1. Survey Engineer 2. Highway Design Engineer 3. Assistant Highway Engineer 4. CAD Expert 5. Environmental Engineer 6. Bridge Design Engineer 7 Assistant Bridge Engineer 8. Assistant Quality cum Material Engineer File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3382397404/2025/S&R Zone 9. Electrical Engineer 10. HTMS/Toll Expert 11. Quantity Surveyor 12. Horticulture cum Landscaping Expert 13 Lab Technician SubTotal Total 354 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3392397404/2025/S&R Zone For Project with Construction Period of 24 months No. Position Name Construction Period 24 months + DLP60 months Rate No.ofman- Amount months* Professional Staff Team Leader cum SeniorHighway 1. Engineer 2. Resident cum Highway Engineer 3. Bridge/Structural Engineer 4. Senior Pavement Specialist 5. Senior Quality cum Material Expert 6. Contract specialist cum Planning Engineer 7. Road Safety Expert Sub – Total Sub-professional 1. Survey Engineer 2 Highway Design Engineer 3 Assistant Highway Engineer 4 CAD Expert 5 Environmental Engineer 6 Bridge Design Engineer 7 Assistant Bridge Engineer 8 Assistant Quality cum Material Engineer 9 Electrical Engineer 10 HTMS/Toll Expert 11 Quantity Surveyor File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3402397404/2025/S&R Zone 12. Horticulture cum Landscaping Expert 13 Lab Technician SubTotal Total *Theman-monthagainsteachkeypersonnel/sub–professionalshallbesame as specified in Enclosure A of TOR. 355 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am 3412397404/2025/S&R Zone For Standalone Bridge Project: No. Position Name Construction Period 36 months + DLP60 months Rate No.ofman- Amount months* Professional Staff Team Leader cum SeniorBridge 1. Engineer 2. Resident cum Pavement Specialist 3. Bridge/Structural Engineer 4. Senior Contract Specialist 5. Senior Quality cum Material Expert 6. Contract Specilist cum Planning Engineer 7. Road Safety Expert Sub– Total Sub-professional (TobedecidedbytheAuthorityasper requirementofthe Projectatthetime of preparationofRFP) SubTotal Total For Standalone Tunnel Project: No. Position Name Construction Period 60 months + DLP60 months Rate No.of man- Amount months* Professional Staff Team Leader cum SeniorTunnel 1. Expert 2. Resident Engineer cum Excavation Specialist 3. Senior Geotechnical Expert 4. Tunnel Design Engineer 5. Tunnel Safety Expert 6. Senior Geologist 7. Contract Specialist cum planning Engineer File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3422397404/2025/S&R Zone Sub– Total Sub Proffesional Staff No. Position Name Construction Period 60 months + DLP60 months Rate No.ofman- Amount months* Sub-professional (TobedecidedbytheAuthorityasper requirementoftheProjectatthetime of preparationofRFP) SubTotal Total II.Support Staff No. Position Name Staff Months Billing Amount( ) Rate( ) 1. Office Manager TBN 2. Accountant cum Cashier TBN 3. StenocumComputer TBN Operator 4. Office Boy ( 1no) TBN Total : III. Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run Sr. No Descriptionof Qty. Total Rate/ Amount Vehicles Vehicle (No.ofvehicle- month) - DuringConstruction During Month Period Developmentand O&M Period 1 1Innovaor equivalent 4000 km/ month 2 2Baleroor equivalent 4000 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3432397404/2025/S&R Zone km/month 3. 1PickupVan 4000 km/month Total Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professionaland Sub- Professional Staff Trips Number of Trips Rate* Amount * Rate quoted includes Hotel charges, travel cost etc. complete. IV.Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc.complete. Nos. of Months Rate/month Amount 48 The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete. V. Office Supplies, Utilities and Communication (Fixed Costs) No Ite Months Monthly Amountin m Rate Rs. 1. Office Supplies 2. Drafting Supplies 3. Computer Running Costs 4. DomesticandInternational Communication VI.Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. Nos. of Months Rate/month Amount 48 File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3442397404/2025/S&R Zone VIA ReportsandDocumentPrinting No. Description No. of No. of Total Rateper Amount Report Copiesper Nos.of Copy() s Report copies 1 Monthly reports 84 3 252 (Design and Construction) 2 Half yearly Reports 8 3 24 3 Variousothersreportsasprovidedin theConcessionAgreementsuchas CompletionReport Total VII. RoadSurveyEquipment The cost shall include carrying out survey using equipment, manpower, software and reportprocessing. Item Kms Rate Nooftimes Amount (INR) perkm surveytobe (INR) conducted Surface defects detection and roughness measurement 8 using Network Survey Vehicle Pavement strength measurement using FWD 4 Bridge inspection using Mobile Bridge Inspection Unit 8 Road signs inspection using Retro Refractometer 8 Total VIII.Overhead in % of total cost Overhead .….% The consultant shall quote a fixed percentage of overhead, which may include overhead charges over the salary of key personnel, sub professional staff and other parts of financial proposal except contingencies , cost of the coordinator/ other support staff and profits. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3452397404/2025/S&R Zone APPENDIX C-2 Amount of performance Security Quoted by Bidder (To be quoted by Bidder) RFPDocumentNo.RFPNo./xxxx; Tender Title: ConsultancyServices Contract No ; Date Consultant’s Name AmountofPerformancesecuritytobe submittedby Rs…………..(Minimumamounttobe5%ofthe financialquote) bidder File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3462397404/2025/S&R Zone Appendix D-1: Bank Guarantee Format for Performance Security (TheBankGuaranteeshallbeonaStampPaperofappropriatevalueinaccordancewithStampActandshall bepurchasedinthenameoftheguaranteeissuingBankorthePartyonwhosebehalftheBGisbeingissued.) (Ref ITC-clause 13.1.2 and GCC-clause 5.8) Ref Bank Guarantee No…………… Date……………………………... To ThePresidentofIndia,through Head ofProcurement Procuring Organisation [CompleteaddressoftheProcuringEntity] Whereas M/s……………………………………………………with its Registered/ Head Office at…………………………. (name and address of the Consultant, hereinafter called “the Consultant”,whichexpressionshall,unlessrepugnanttothecontextor meaning thereof, include its successors, administrators, executors and assigns) has undertaken, in pursuance of contract no ……….. date……………. to delivery …................(descriptionofServices)(hereinaftercalled“thecontract”). And Whereas you (unless repugnant to the context or meaning thereof, including your successors, administrators, executors and assigns) have stipulated in the said contract that the Consultant shall furnish you with a bank guarantee by a Commercial bank for the sum specified thereinas security for compliance withits obligations as perthecontract; And Whereas we …………………… with our Head Office at………………………….(nameand addressoftheBank,hereinafterreferredtoasthe‘Bank’, whichexpressionshall, unless repugnant to the context or meaning thereof, include its successors,administrators,executors andassigns)haveagreed togive theConsultantsuchabank guarantee. Now,Therefore,we hereby affirm thatwe are guarantors and responsibletoyou, onbehalf of the Consultant, up to a total of …………………………………………………….(amount of the guarantee in words and figures), and we undertake to pay you, upon your first written demand declaring the Consultant to be in default under the contract and without cavil or argument, any sumor sums within the limits of (amount of guarantee) as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein,notwithstanding any differencebetweenyouandtheConsultantoranydispute pending before any Court, Tribunal, Arbitratoror anyother authority. We hereby waive the necessity of your demanding the said debt from the Consultant before presentingus withthedemand. The Bank undertakes not to revoke this guarantee during its currency without your previous consent and further agrees that the guarantee herein contained shall continue to be enforceable till you discharge this guarantee. This guarantee will not be discharged due to a change in the constitutionof theBankorthe Consultant’s. Wefurtheragreethatnochangeoradditiontoorothermodificationofthetermsofthe contract to be performed thereunder or of any of the contract documents which may be made between you and the Consultant shall in any way release us from any liabilityunder this guarantee, and weherebywaive noticeof anysuchchange, addition,ormodification. This guarantee shall be valid until the ………….day of …….20…… Our………………………………….branch at………………*(Name & Address File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3472397404/2025/S&R Zone ofthe………….…………..*(branch) is liabletopay the guaranteedamount depending onthe filing of a claim and any part thereof under this Bank Guarantee only and only if you serve upon us at our.................... * branch a written claim or demand and received by us at our…………………..*branch onorbefore Dt otherwise, the bank shall be discharged of allliabilitiesunderthisguaranteeafterthat. (SignatureoftheauthorizedofficeroftheBank) …………………………………… ……. …………………………………… ……. Nameanddesignationoftheofficer ………………………………………… Seal, name & address of the Bank and address of theBranch *Preferably at the authority's headquarters competent to sanction the expenditure for procurement of goods/services or at the concerned district headquarters or the state headquarters. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3482397404/2025/S&R Zone Appendix D-2: Bank Guarantee Format for Advance Payment (The BankGuarantee shall be on a Stamp Paper of appropriatevalue in accordance with Stamp Act and shall be purchased in the name of the guarantee issuing Bank or the Party on whose behalf the BG is being issued.) (Ref GCC-clause 10.5.2) Ref Bank Guarantee No…………… Date……………………………... To ThePresidentofIndia,through Head of Procurement Procuring Organisation [Complete address of the Procuring Entity] Whereas M/s……………………………………………………with its Registered/ Head Office at…………………………. (name and address of the Consultant, hereinafter called “the Consultant”, which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) has undertaken, in pursuance of contract no ……….. date……………. to delivery …..................(description of Services)(hereinafter called “thecontract”). And Whereas you (unless repugnant to the context or meaning thereof, including your successors, administrators, executors, and assigns) have agreed in pursuance of the said terms and conditions of thecontract to make an advance payment of Rs......................... (Rupees...............................................only) to the Contractor on the Contractor furnishing a Bank Guarantee in the manner herein contained.; And Whereas we …………………… with our Head Office at…………………………. (name and address of the Bank, hereinafter referred to as the ‘Bank’, which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) do hereby affirm that we are guarantors and responsible to you, on behalf of the Consultant, up to a total of …………………………………………………….(amount of the guarantee in words and figures), and we undertake to pay you, upon your first written demand declaring the Consultant to be in default under the contract and without cavil or argument, any sumor sums within the limits of (amount of guarantee) as aforesaid, without your needingto prove or to show grounds or reasons for your demand or the sum specified therein,notwithstanding any difference between you and the Consultant or any dispute pending before any Court, Tribunal, Arbitrator or any other authority. We hereby waive the necessity of your demanding the said debt from the Consultant before presenting us with the demand. The Bank undertakes not to revoke this guarantee during its currency without your previousconsentandfurtheragreesthat theguarantee hereincontainedshallcontinue tobeenforceabletillyoudischargethisguarantee.Thisguaranteewillnotbedischarged due to a change in the constitution of the Bank or the Consultant’s. Wefurtheragreethat nochangeoraddition toorothermodificationof the terms of the contracttobeperformedthereunderorofany ofthecontract documentswhichmay be made between you and the Consultant shall in any way release us from any liability under this guarantee, and we hereby waive notice of any such change, addition, or modification. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3492397404/2025/S&R Zone This guarantee shall be valid until the ………….day of …….20…… Our………………………………….branch at………………*(Name & Address of the ………….…………..*(branch) is liable to pay the guaranteed amount depending on the filing of a claim and any part thereof under this Bank Guarantee only and only if you serveuponusatour....................*branchawritten claim or demand and received by us at our …………………..* branch on or before Dt…..........otherwise, the bank shall be discharged of all liabilities under this guarantee after that. (SignatureoftheauthorizedofficeroftheBank) …………………………………………. …………………………………………. Name and designation of the officer ………………………………………… Seal, name & address of the Bank and address of the Branch *Preferably at the authority's headquarters competent to sanction the expenditure for procurement of goods/services or at the concerned district headquarters or the state headquarters. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3502397404/2025/S&R Zone Format 2: Authorization To attend Pre-Proposal (Refer to ITC-clause 7) (on Company Official Letter Head) Consultant’s Name [Address and Contact Details] Consultant’s Reference No. Date………. To Head of Procurement ProcuringOrganisation [Complete address of the ProcuringEntity] Ref:RFP DocumentNo.RFPNo./xxxx; Tender Title:ConsultancyServices Subject: Authorization to attend Pre-Proposal Conference on (date). Following persons are hereby authorized to attend the Pre-Proposal Conference for the tender mentioned above on behalf of (Consult ant) in the order of preference given below. Sr. Name Government Photo ID Type/ Number I. II. Alternate Representative Note: 1. Maximum of two representatives (carrying valid Government photo IDs) shall be permitted to attend the Pre-Proposal opening. An alternate representative shall be permitted when regular representatives cannot attend. 2. Permission to enter the hall where the pre-Proposal conference is conducted may be refused if authorization as prescribed above is not submitted. Signaturesof Consultant or Theofficerauthorized tosign theProposal. Documents on behalf of the Consultant [name & address of Consultant and seal of company] Format3:AuthorizationtoAttendPre-ProposalConference File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 am3512397404/2025/S&R Zone Format 3: Format of Insurance Surety Bond FORM OF SURETY BOND [Performance Security] To, <Agency> WHEREAS: (A) I (the "Consultant") and The President of India, through the Secretary (RT&H)/ Chairman NHAI/ MD NHIDCL, in the MoRTH/NHAI/NHIDCL (the "Authority") have to execute and enter into a consultancy agreement (the "Agreement")inpursuance of theLOAissuedtothe Consultant vide ref no. dated _____ whereby the Authority has agreed to the Consultant rendering consultancy services for _______2, subject to and in accordance with the provision of the Agreement. (B) The Consultant is required to furnish a performance security to the Authority for a sum of Rs. ___________/- (Rupees _________only) (the "Surety Bond Amount") as security for due and faithful performance of its obligations, under and in accordance with the Agreement, during the Agreement Period (as defined in the Agreement). (C) We, 3 having registered office at ______________4 through our branch at ____________________5 (hereinafter referred to as the ‘Surety Insurer’), which expression shall, unless repugnant to the context or meaning thereof, include its successors, administrators, executors and assigns) have agreed to furnish this Surety Bond by wayof performance security. NOW, THEREFORE, the Surety Insurer hereby, unconditionally and irrevocably guarantees and affirms asfollows: 1. The Surety Insurer hereby unconditionally and irrevocably guarantees the due and faithful performance of the Consultant's obligations during the Agreement Period under and in accordance with the Agreement, and agrees and undertakes to pay to the Authority, upon its mere first written demand, and without any demur, reservation, recourse, contest or protest, and without any reference to the Consultant, such sum or sums up to an aggregate sum of the Surety Bond Amount as the Authority shall claim, without the Authority being required to prove or to show grounds or reasons for its demand and/ orforthe sumspecified therein. 2. A letter from the Authority, under the hand of an officer not below the rank of General Manager/Superintending Engineer in the <Agency>, that the Consultant has committed default in the due and faithful performance of all or any of its obligations under and in accordance with the Agreement shall be conclusive, final and binding on the Surety Insurer. The Surety Insurer further agrees that the Authority shall be the sole judge as to whether the Consultant is in default in due and faithful performance of its obligations during the Agreement Period under the Agreement and its decision that the Consultant is in default shall be final, and binding on the Surety Insurer, notwithstanding any differences between the Authority and the Consultant, or any dispute between them pending before any court. tribunal, arbitrators or any other authority or body, or by the discharge of the Consultant for any reason whatsoever. 1 Name and registered address of the Consultant to be mentioned. 2Nameoftheprojecttobementioned. 3NameoftheSuretyInsurertobementioned. 4Registered Address of the Surety Insurer to be provided. 5 Address of the issuing branch of the Surety Insurer to be mentioned. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am522397404/2025/S&R Zone 3. In order to give effect to this Surety Bond, the Authority shall be entitled to act as if the Surety Insurer were the principal debtor and any change in the constitution or winding up of the Consultant or the Surety insurer, whether by their absorption, merger or amalgamation with any other entity or otherwise, shall not in any way or manner affect the liability or obligation of the Surety Insurer under this Surety Bond. 4. It shall not be necessary, and the Surety Insurer hereby waives any necessity, for the Authority to proceed against the Consultant before presenting to the Surety Insurer its demand under this Surety Bond. 5. The Authority shall have the liberty, without affecting in any manner the liability of the Surety Insurer under this Surety Bond, to vary at any time, the terms and conditions of the Agreement or to extend the time or period for the compliance with, fulfillment and/ or performance of all or any of the obligations of the Consultant contained in the Agreement or to postpone for any time, and from time to time, any of the rights and powers exercisable by the Authority against the Consultant, and either to enforce or forbear from enforcing any of the terms and conditions contained in the Agreement and/or the securities available to the Authority, and the Surety Insurer shall not be released from its liability and obligation under these presents by any exercise by the Authority of the liberty with reference to the matters aforesaid or by reason of time being given to the Consultant or any other forbearance, indulgence, act or omission on the part of the Authority or of any other matter or thing whatsoever which under any law relating to sureties and guarantors would but for this provision have the effect of releasing the Surety Insurer from its liability and obligation under this Surety Bond and the Surety Insurer hereby waives all of its rights under any such law. 6. This Surety bond is issued by the Insurer and held by the Authority towards performance security of the Consultant as required under clause ________of the Agreement6 and is in addition to and not in substitution of any other surety bond or security which may hereafter be held by the Authority in respect of or relating to this Agreement. 7. Notwithstanding anything contained herein before, the liability of the Surety Insurer under the Surety Bond is restricted to the Surety Bond Amount, and this Surety Bond will remain in force for the period specified in paragraph 8 below and unless a demand or claim in writing is made by the Authority on the Surety Insurer under this Surety Bond, all rights of the Authority under this Surety Bond shall be forfeited, and the Surety Insurer shall be relieved from its liabilities hereunder. 8. The Surety Bond shall cease to be in force and effect on "____________"7. Unless a demand or claim under this Surety Bond is made in writing before the expiry of the Surety Bond, the Surety insurer shall be discharged from its liabilities hereunder. 9. The Surety Insurer undertakes not to revoke this Surety Bond during its currency, except with the previous express consent of the Authority in writing and declares and warrants that it has the power to issue this Surety Bond and the undersigned is duly authorised and has full powers to do so on behalf of the Surety Insurer. 10. The Surety Insurer agrees that it will not assign its obligation under this Surety Bond without the prior written consent of the Authority. The Authority will not unreasonably withhold its consent if the proposed assignee is of at least equal financial standing to the Surety Insurer and the assignee assumes in writing the obligations of the Surety Insurer under this Surety Bond at the same time or before the assignment. 6Reference of RFP clause can be mentioned here as the issuance of Insurance Surety Bond is a pre-condition for execution of the Agreement. 7(Dateofissue)+________________________ ]months(AsperAgreement) File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am532397404/2025/S&R Zone 11. Any notice by way of request, demand or otherwise hereunder may be sent by post addressed to the Surety Insurer at its above referred branch, which shall be deemed to have been duly authorized to receive such notice and to effect payment thereof forthwith, and if sent by post it shall be deemed to have been given at the time when it ought to have been delivered in due course of post and in proving such notice, when given by post, it shall be sufficient to prove that the envelope containing the notice was posted and a certificate signed by an officer of the Authority that the envelope was so posted shall be conclusive. 12. The Surety Bond shall cover all the liabilities arising out of the Agreement from the date of its commencement and shall remain in force and effect for up to the date specified in paragraph 8 above or until it is released earlier by the Authority pursuant to the provisions of the Agreement. 13. This Surety Bond is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision. ICC Publication No.758, except that the supporting statement under Article 15(a) is hereby excluded. 14. This Surety Bond shall also be operatable at our ______________8 Branch at New Delhi, from whom, confirmation regarding the issue of this bond or extension/ renewal thereof shall be made available on demand. In the contingency of this bond being invoked and payment thereunder claimed, the said branch shall also accept such invocation on letter and make payment of amounts so demanded under the said invocation. 2. The Insurance Surety Bond shall be verified from the specific portal created for this purpose. Signed and Sealed this _______Day of SIGNED, SEALED AND DELIVERD Forandon behalfoftheSuretyinsurerby: (Signature) (Name)________________________ (Designation)___________________ (Code Number)_________________ (Address)______________________ 8IfSuretyBondisbeingissuedfromanyotherbranch,anybranchfromNewDelhitobementionedfor operationalpurpose. File No. RW/NH-33044/02/2023-S&R (Computer No. 218375) Generated from eOffice by Akil Ahmad, SE (S&R Zone), SE, MORTH on 24/10/2025 10:34 3am54