Home India Ministry of Railways ROB7A...
Date: 2025-05-22 Category: Extra Ordinary State: Union Government Country: India

ROB7A

Issued by Ministry of Railways · West Central Railway

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

## Policy Analysis Report: Notification Regarding Special Railway Projects in Madhya Pradesh **1. Executive Summary:** This report analyzes a notification (S.O. 2301E) issued by the Ministry of Railways, West Central Railway, published in the Gazette of India on May 22, 2025. The notification, acting as a new policy, designates Competent Authorities for specific railway projects related to the construction of Road Over Bridges (ROBs) in lieu of Level Crossings across several districts in Madhya Pradesh. This analysis details the scope, responsible parties, and likely impact of this authorization. **2. Introduction:** The purpose of this report is to provide an informative analysis of the Ministry of Railways notification (S.O. 2301E) concerning the authorization of Competent Authorities for Special Railway Projects in Madhya Pradesh. This analysis is based solely on the information presented within the provided text of the notification. **3. Policy Overview:** * **Core Objective(s):** The core objective of this policy, as inferred from the text, is to facilitate the execution, maintenance, management, and operation of Special Railway Projects, specifically the construction of Road Over Bridges (ROBs) in lieu of Level Crossings. This is achieved by designating specific officers as Competent Authorities. **4. Background and Rationale:** * **New Policy:** The notification addresses the need for efficient execution of railway infrastructure projects by empowering designated authorities. The construction of ROBs in place of level crossings likely aims to improve safety, reduce traffic congestion, and enhance the overall efficiency of the railway network in the specified regions. The Railway Amendment Act, 2008, granting the power to designate these authorities further supports this interpretation. **5. Key Provisions / Changes:** * **New Policy:** This policy establishes the following: * **Designation of Competent Authorities:** It authorizes specific Sub-Divisional Magistrates (SDMs) in various tehsils and districts of Madhya Pradesh as Competent Authorities. * **Scope of Authority:** These authorities are empowered to perform functions under the Railway Act, 1989, specifically related to the execution, maintenance, management, and operation of the listed Special Railway Projects. * **Project Specificity:** The authorization is project-specific, applying only to the construction of Road Over Bridges (ROBs) in lieu of Level Crossings at specified locations (Level Crossing Numbers) within the Itarsi-Nagpur and Bhopal-Bina sections. * **Geographical Scope:** The policy applies to specific tehsils, sub-divisions, and districts within the state of Madhya Pradesh, as explicitly outlined in the table. **6. Target Audience and Stakeholders:** Based on the provided text, the directly affected stakeholders include: * **Ministry of Railways:** As the issuing authority and responsible for railway infrastructure development. * **West Central Railway:** Specifically, the Gati Shakti Unit, Bhopal, responsible for implementing and overseeing these projects. * **Designated SDMs:** As the Competent Authorities, they are responsible for performing functions related to the projects. * **Residents and Commuters in Narmadapuram, Bhopal, Raisen, and Vidisha Districts:** Who will be affected by construction activities and who will ultimately benefit from the improved infrastructure and safety. * **Contractors and Construction Companies:** Involved in the execution of the Road Over Bridge projects. **7. Implementation Aspects (Inferred):** * **Responsible Agency/Bodies:** The West Central Railway, Gati Shakti Unit, Bhopal, appears to be the primary implementing body. The designated SDMs are responsible for carrying out specific functions within their jurisdictions. * **Timelines/Procedures:** The notification takes effect from the date of its publication in the official Gazette (May 22, 2025). The text does not specify detailed procedures for implementation, but it implies that the SDMs will act according to the Railway Act, 1989, and related regulations. **8. Expected Outcomes / Impact of Changes:** * **New Policy:** The likely intended outcomes of this policy include: * **Expedited Project Execution:** By designating Competent Authorities, the notification aims to streamline decision-making and accelerate the construction of the ROBs. * **Improved Safety:** Replacing level crossings with ROBs will reduce the risk of accidents and improve overall safety for both railway and road users. * **Reduced Traffic Congestion:** The ROBs will eliminate delays caused by level crossings, leading to smoother traffic flow and reduced congestion. * **Enhanced Railway Infrastructure:** The construction of ROBs will contribute to the overall modernization and improvement of the railway network in Madhya Pradesh. **9. Conclusion:** The Ministry of Railways notification (S.O. 2301E) is a significant step towards improving railway infrastructure and safety in Madhya Pradesh. By designating Competent Authorities for specific Road Over Bridge projects, the notification aims to expedite project execution, reduce traffic congestion, and enhance the overall efficiency of the railway network. This policy demonstrates a commitment to modernization and improved connectivity in the region.

Key Entities Referenced

MINISTRY OF RAILWAYS: Government organization responsible for railways. West Central Railway: Name of a railway zone. Gati Shakti Unit, Bhopal: A unit within the West Central Railway, located in Bhopal. Bhopal: City in Madhya Pradesh and location of the notification. 22nd May, 2025: Date of the notification. S.O. 2301E: Notification number. Railway Act, 1989: The original act being amended. Railway Amendment Act, 2008: Amendment to the Railway Act, 1989. Central Government: The government authorizing the officer. Madhya Pradesh: State where the Special Railway Project is located. Special Railway Project: The railway project being executed. Construction of Road Over Bridge in lieu of Level Crossing No. 225 in Nagpur Itarsi Section: Specific Railway Project under consideration. SDM, Itarsi: Competent Authority for the project mentioned. Itarsi: Tehsil, Sub Division, part of project location. Narmadapuram: District related to the project. Construction of Road Over Bridge in lieu of Level Crossing No. 227 in ItarsiBhopal Section: Specific Railway Project under consideration. Construction of Road Over Bridge in lieu of Level Crossing No. 228 in ItarsiBhopal Section: Specific Railway Project under consideration. Construction of Road Over Bridge in lieu of Level Crossing No. 230 in ItarsiBhopal Section: Specific Railway Project under consideration. SDM, Narmadapuram: Competent Authority for the project mentioned. Construction of Road Over Bridge in lieu of Level Crossing No. 246 in ItarsiBhopal Section: Specific Railway Project under consideration. SDM, Kolar: Competent Authority for the project mentioned. Kolar: Tehsil, Sub Division, part of project location. Construction of Road Over Bridge in lieu of Level Crossing No. 259 in BhopalBina Section: Specific Railway Project under consideration. Construction of Road Over Bridge in lieu of Level Crossing No. 262 in BhopalBina Section: Specific Railway Project under consideration. SDM, Raisen: Competent Authority for the project mentioned. Sanchi: Tehsil related to project location. Raisen: Sub Division and District related to the project. Construction of Road Over Bridge in lieu of Level Crossing No. 291 in BhopalBina Section: Specific Railway Project under consideration. SDM, Ganj Basoda: Competent Authority for the project mentioned. Ganj Basoda: Tehsil and Sub Division related to the project. Vidisha: District related to the project. BhopalBina Section: Name of a railway section ItarsiBhopal Section: Name of a railway section Nagpur Itarsi Section: Name of a railway section KISHAN LAL MEENA: Chief Project Manager Gati Shakti Government of India Press, Ring Road, Mayapuri, New Delhi110064: Location of the printing press. Controller of Publications, Delhi110054: Publisher of the document.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-एम.पी.-अ.-23052025-263314 CG-MxPx-xEG-I2D3H0x5x2x0 25-263314 xxxGIDExxx असाधारण EXTRAORDINARY भाग II—खण्‍ड 3—उप-खण्ड‍ (ii) PART II—Section 3—Sub-section (ii) प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 2247] िई ददल्ली, बृहस्ट्प‍ जतवार, मई 22, 2025/ज्य‍ ष्े ठ‍ 1, 1947 No. 2247] NEW DELHI, THURSDAY, MAY 22, 2025/JYAISTHA 1, 1947 रेल मत्रं ालय [पजिम मध्य रेलव े(गजतिजि यजू िट, भोपाल)] अजधसचू िा भोपाल, 22 मई, 2025 का.आ. 2301(अ).—केंद्रीय सरकार, रेल अजधजियम, 1989 ( रेल संिोजधत अजधजियम, 2008), की धारा 2 के खण्‍ड (7 क) द्वारा प्रदत्‍त िजियों का प्रयोग करते हुए, इस अजधसूचिा के रािपत्र म ें प्रकािि की तारीख स े मध्‍यप्रदेि राज्‍य के, िीच े दी गयी सारणी के स्ट्तम्भ (4) म ें उल्ल‍ ेजखत तहसील, स्ट्तम्भ (5) म ें उल्‍लेजखत उप खंड, स्ट्‍तम्‍भ (6) म ें उल्‍लेजखत जिल े म,ें स्ट्तम्भ (2) म ें उल्ल‍ ेजखत मध्य प्रदेि राज्य म ें जविेष रेल पररयोििाओं के सम्‍बंध म ें ऐस े जविेष रेल पररयोििा के जिष्‍पादि, अिरु क्षण, प्रबंधि और प्रचालि के लोक प्रयोिि के जलए स्ट्‍तम्‍भ (3) म ें उल्‍लेजखत अजधकारी को उक्‍त अजधजियम के अधीि ऐस े प्राजधकारी के रूप म ें कृत्‍यों का जिववहि करिे के जलए सक्षम अजधकारी के रूप म ें जियुक्त‍ करती ह।ै 3376 GI/2025 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] सारणी क्रम. स ं. जविषे रेल पररयोििा का िाम सक्षम अजधकारी तहसील उप खडं जिला )1( )2( ( 3) ( 4) ( 5) ( 6) 1. िागपुर इटारसी-खडं म ें रेलवे अिुजवभागीय इटारसी इटारसी िमवदापुरम फाटक क्रमांक के 225 बदले अजधकारीइटारसी , ऊपरी पुल का जिमावण काय व . 2 इटारसी भोपाल -खंड म ें रेलवे अिुजवभागीय इटारसी इटारसी िमवदापुरम फाटक क्रमांक के 227 बदले अजधकारी ,इटारसी ऊपरी पुल का जिमावण काय व अिुजवभागीय िमवदापुरम िमवदापुरम िमवदापुरम अजधकारी, िमवदापुरम . 3 इटारसी भोपाल -खंड म ें रेलवे अिुजवभागीय इटारसी इटारसी िमवदापुरम फाटक क्रमांक के 228 बदले अजधकारीइटारसी , ऊपरी पुल का जिमावण काय व अिुजवभागीय िमवदापुरम िमवदापुरम िमवदापुरम अजधकारी, िमवदापुरम . 4 इटारसी-भोपाल खंड म ें रेलवे अिुजवभागीय िमवदापुरम िमवदापुरम िमवदापुरम फाटक क्रमांक के बदले 230 अजधकारी , ऊपरी पुल का जिमावण काय व िमवदापुरम 5. इटारसी-भोपाल खंड म ें रेलवे अिुजवभागीय कोलार कोलार भोपाल फाटक क्रमांक के बदले 246 अजधकारीकोलार , ऊपरी पुल का जिमावण काय व . 6 भोपाल-बीिा खंड म ेंरेलव े फाटक अिुजवभागीय सााँची रायसेि रायसेि अजधकारीरायसेि , क्रमांक2 59 के बदले ऊपरी पलु का जिमावण काय व . 7 भोपाल-बीिा खंड म ेंरेलव े फाटक अिुजवभागीय सााँची रायसेि रायसेि अजधकारीरायसेि , क्रमांक के बदले 262 ऊपरी पलु का जिमावण काय व . 8 भोपाल-बीिा खंड म ेंरेलव े फाटक अिुजवभागीय गंि बासोदा गंि बासोदा जवददिा अजधकारी , क्रमांक के बदले 291 ऊपरी पलु गंि बासोदा का जिमावण काय व [फा. स.ं WCR. BPL 0 GSU (GSMS)/6/2024] दकिि लाल मीिा, मुख्य पररयोििा प्रबंधक (गजत िजि) MINISTRY OF RAILWAYS [West Central Railway (Gati Shakti Unit, Bhopal)] NOTIFICATION Bhopal, the 22nd May, 2025 S.O. 2301(E).—In exercise of the powers conferred by clause (7A) of section 2 of the Railway Act, 1989 (Railway Amendment Act, 2008), the Central Government, hereby authorizes the officer mentioned in column (3) of the table below as “Competent Authority” to perform the functions as such authority under the said Act, with effect from the date of publication of this notification in the official Gazette in respect of the Special Railway Project[भाग II—खण्‍ड 3(ii)] भारत का रािपत्र : असाधारण 3 mentioned in column (2) in the state of Madhya Pradesh, relating to Tehsil mentioned in column (4), Sub Division mentioned in column (5), District mentioned in column (6) of the table below for the public purpose of execution, maintenance, management and operation of such Special Railway Project. TABLE Sr. Name of Special Railway Competent Tehsil Sub Division District No. Project Authority (1) (2) (3) (4) (5) (6) 1. Construction of Road SDM, Itarsi Itarsi Itarsi Narmadapuram Over Bridge in lieu of Level Crossing No. 225 in Nagpur - Itarsi Section. 2. Construction of Road SDM, Itarsi Itarsi Itarsi Narmadapuram Over Bridge in lieu of Level Crossing No. 227 in SDM, Narmadapuram Narmadapuram Narmadapuram Itarsi-Bhopal Section. Narmadapuram 3. Construction of Road SDM, Itarsi Itarsi Itarsi Narmadapuram Over Bridge in lieu of Level Crossing No. 228 in SDM, Narmadapuram Narmadapuram Narmadapuram Itarsi-Bhopal Section. Narmadapuram 4. Construction of Road SDM, Narmadapuram Narmadapuram Narmadapuram Over Bridge in lieu of Narmadapuram Level Crossing No. 230 in Itarsi-Bhopal Section. 5. Construction of Road SDM, Kolar Kolar Kolar Bhopal Over Bridge in lieu of Level Crossing No. 246 in Itarsi-Bhopal Section. 6. Construction of Road SDM, Raisen Sanchi Raisen Raisen Over Bridge in lieu of Level Crossing No. 259 in Bhopal-Bina Section. 7. Construction of Road SDM, Raisen Sanchi Raisen Raisen Over Bridge in lieu of Level Crossing No. 262 in Bhopal-Bina Section. 8. Construction of Road SDM, Ganj Ganj Basoda Ganj Basoda Vidisha Over Bridge in lieu of Basoda Level Crossing No. 291 in Bhopal-Bina Section. [F. No. WCR. BPL 0 GSU (GSMS)/6/2024] KISHAN LAL MEENA, Chief Project Manager (Gati Shakti) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research