TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI.--Amendments to the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005.--Nomination of member of the State Advisory Committee

Issued by Part VI - Section 2 · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document, published in the Tamil Nadu Government Gazette on July 30, 2025, details amendments to the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005. These amendments address part load operation of thermal generating stations and transit losses of coal. The amendments are effective upon publication in the Gazette. **Key Points / Main Content** * **Regulations Overview:** * The document amends the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005. * These amendments are referred to as the "Tamil Nadu Electricity Regulatory Commission (Terms and conditions for determination of Tariff) (Amendment) Regulations, 2025". * The effective date for these changes is upon publication in the Tamil Nadu Government Gazette. * **Amendment to Regulation 37:** * Clause (vii) of Regulation 37 is renumbered as clause (viii). * A new clause (viii) is substituted to address the "Impact of Part Load Operation on performance of Thermal Generating Stations." * Coal/lignite based thermal generating stations: * Sets out tables for unit heat rate degradation (%) for sub-critical and super-critical units for different unit loading (%). * Admissible % degradation in auxiliary energy consumption is laid out. * Additional specific oil consumption of 0.2 ml/kWh is provided for units operating in 40-55% average loading in view of capacity addition from Renewable sources. * Gas / liquid fuel based thermal generating stations: * Sets out tables for: * Increase in module / plant heat rate (%) at different module / plant loading as % of installed capacity in Combined Cycle Gas Turbine mode of operation and Open Cycle mode of operation. * Admissible % additional auxiliary energy consumption (%) at different module / plant loading as % of installed capacity. * A new clause (ix) is added to address “Transit Losses of coal.” * Transit and handling losses for coal and lignite are specified for: * Pit-head (using Rail/Road) * Non-pit head (All rail route) * Non-pit head (Road cum Rail or Sea Route) * A formula is provided for calculating transit and handling losses when using a combination of transportation modes. * For imported coal, the transit and handling losses applicable for pit-head stations shall apply. * **Nomination of member of the State Advisory Committee:** * Thiru. V. Govindan, Former State Treasurer, Electricity Board Workers' Progress Association, Assistant Account Officer (Retired), has been nominated as Member of the State Advisory Committee for the area of 'Labour' for the period of three years with immediate effect. * **Restructuring of Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO):** * Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) was restructured into separate Generating and Distribution Companies, post which it has been renamed as 'Tamil Nadu Power Distribution Corporation Limited' (TNPDCL). * The designation of Chairman & Managing Director/TANGEDCO has to be revised as Chairman & Managing Director/TNEB limited & TNPDCL, Chairman/TNPGCL, TANTRANSCO & TNGECL. * **Tamil Nadu Energy Development Agency (TEDA):** * Tamil Nadu Energy Development Agency (TEDA) has been merged with newly formed Tamil Nadu Green Energy Corporation Limited (TNGECL) under the Companies Act, 2013 by integrating Renewable Energy wing of TANGEDCO. **Impact Analysis** **Thermal Generating Stations (Coal/Lignite & Gas/Liquid fuel based)** * **Impact:** Amended regulations directly affect the financial compensation received by thermal generating stations, as it introduces mechanisms for compensating stations operating at part load and accounts for transit losses of coal. * **Action Required:** Analyze the new guidelines and operating parameters to optimize plant operations and ensure accurate compensation claims. File petition before the Commission for revision of parameters, if additional auxiliary consumption arises due to implementation of DeSOx system and/or DeNOx system. **State Load Despatch Centre (SLDC)** * **Impact:** The SLDC will need to incorporate the new part load compensation mechanisms when directing generating stations to operate below target plant availability. * **Action Required:** Update dispatch procedures and data collection methods to account for the factors outlined in the amended regulations, including verification of relevant data. **Tamil Nadu Electricity Regulatory Commission (TNERC)** * **Impact:** The TNERC is responsible for implementing and enforcing the amended regulations. * **Action Required:** Ensure that the tariff determination process aligns with the new regulations, and address any disputes or petitions arising from their application. **Tamil Nadu Power Distribution Corporation Limited' (TNPDCL):** * **Impact:** TNPDCL has been renamed post the restructuring of Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) into separate Generating and Distribution Companies. As such, the designation of Chairman & Managing Director/TANGEDCO has to be revised as Chairman & Managing Director/TNEB limited & TNPDCL, Chairman/TNPGCL, TANTRANSCO & TNGECL. * **Action Required:** Update the records accordingly. **Tamil Nadu Green Energy Corporation Limited (TNGECL):** * **Impact:** TNGECL has been created with the merger of Tamil Nadu Energy Development Agency (TEDA), under which Managing Director/TNGECL is entrusted with the functions of TNGECL. * **Action Required:** Update the records accordingly. **Tamil Nadu Energy Development Agency (TEDA):** * **Impact:** TEDA has been merged with newly formed Tamil Nadu Green Energy Corporation Limited (TNGECL) under the Companies Act, 2013 by integrating Renewable Energy wing of TANGEDCO. * **Action Required:** Chairman & Managing Director position has been vacated. **Electricity Board Workers' Progress Association:** * **Impact:** Thiru. V. Govindan, from the Electricity Board Workers' Progress Association, will be representing the labour interests. * **Action Required:** None.

Key Entities Referenced

Tamil Nadu Electricity Regulatory Commission (TNERC): The primary regulator issuing the amendments concerning electricity tariff determination. Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005: The core policy being amended, concerning how electricity tariffs are determined. Electricity Act, 2003: The central act empowering the TNERC to make tariff regulations. Tamil Nadu Green Energy Corporation Limited (TNGECL): An entity mentioned in the document related to renewable energy and its impact on the regulations. Chennai: Location of the regulatory commission and other entities mentioned in the document.
Official Source Record View Original Source →
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2025 [Price: Rs. 4.00 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 30] CHENNAI, WEDNESDAY, JULY 30, 2025 Aadi 14, Visuvaavasu, Thiruvalluvar Aandu–2056 Part VI—Section 2 Notifications of interest to a section of the public issued by Heads of Departments, etc. NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. CONTENTS Pages. TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI. Amendments to the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005. .. .. .. .. .. .. .. .. 80-85 Nomination of member of the State Advisory Committee. .. .. .. .. .. .. 86-88 DTP—VI-2 (30) [79]80 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 2 NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. TAMIL NADU ELECTRICITY REGULATORY COMMISSION, CHENNAI. Amendments to the Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2005. (Notification No. TNERC/TR/5-5/2025, dated 01-07-2025) (Lr.No. TNERC/Legal/1368/D.No.906/2025) No. VI(2)/16/2025. In exercise of the powers conferred by section 61 of the Electricity Act, 2003 (Central Act 36 of 2003) read with section 181 of the said Act and all other powers enabling it in this behalf, the Tamil Nadu Electricity Regulatory Commission hereby makes the following amendments to the Tamil Nadu Electricity Regulatory Commission (Terms and conditions for determination of Tariff) Regulations, 2005 (hereafter referred to as “the Principal Regulations”) and the draft of the same having been previously published as required by sub-section (3) of section 181 of the said Act. Amendments (i) These Regulations may be called the “Tamil Nadu Electricity Regulatory Commission (Terms and conditions for determination of Tariff) (Amendment) Regulations, 2025”. (ii) These Regulations shall come into force on the date of publication in the Tamil Nadu Government Gazette. 1. Amendment to Regulation 37 of the Principal Regulations: 1.1 The clause (vii) in Regulation 37 of the Principal Regulations notified vide Notification No. TNERC/TR/5/3, dated 26-05-2021 shall be read as clause (viii); 1.2. In Regulation 37 of the Principal Regulations, for the clause (viii), the following clause shall be substituted, namely: “(viii) Impact of Part Load Operation on performance of Thermal Generating Stations: where any of the Generating station is directed by the State Load Despatch centre to operate below Target plant availability factor but at or above technical minimum, such generating station may be compensated depending on the average unit loading duly taking into account the forced outages, planned outages, PLF, generation at generator terminal, energy sent out ex-bus, number of start-stop, secondary fuel oil consumption and auxiliary energy consumption, in due consideration of actual and normative operating parameters of station heat rate and auxiliary energy consumption on monthly basis duly supported by relevant data verified by SLDC. 1. Coal/lignite based thermal generating stations: i) Impact on the station heat rate: The applicable factors for unit heat rate degradation at part loading for sub-critical and super-critical units are as follows: Unit Heat Rate degradation (%) Sl. Unit loading (%) Sub-critical Super-critical No. units units 1 80 – 100 Nil Nil 2 75-<80 3.0 2.5 3 70-<75 4.0 3.3 4 65-<70 5.1 4.1 5 60-<65 6.1 4.9 6 55-<60 7.6 6.0 7 50-<55 9.2 7.1 8 45-<50 11.3 8.3 9 40-<45 13.8 9.9July 30, 2025] TAMIL NADU GOVERNMENT GAZETTE 81 ii) Impact on auxiliary energy consumption: The admissible additional auxiliary energy consumption values at part loading of coal / lignite based thermal generating stations are as follows: Sl. Module / Plant loading Admissible % degradation in No. as % of installed auxiliary energy consumption capacity (% point) 1 80 – 100 Nil 2 70-<80 1.1 3 60-<70 1.8 4 50-<60 2.5 5 40-<50 3.2 Provided that in case of additional auxiliary consumption arised due to implementation of DeSOx system and/or DeNOx system, the generation company concerned may file appropriate petition before the Commission for revision of parameters. iii) Impact on Specific Fuel Oil Consumption: Considering flexible operation requirement of coal based thermal stations in view of capacity addition from Renewable sources, additional specific oil consumption of 0.2 ml/kWh is provided for units operating in 40-55% average loading. 2. Gas / liquid fuel based thermal generating stations: i) Impact on station heat rate: The degradation of module / plant gross heat rate for gas / liquid fuel based thermal generating stations in Combined Cycle Gas Turbine mode of operation are as below: Sl. Module / Plant loading as % of Increase in Module/Plant heat No. installed capacity rate (%) 1 80-100 Nil 2 70-<80 5 3 60-<70 8 4 50-<60 12 ii) The degradation of module / plant heat rate for gas/liquid fuel based thermal generating stations in Open Cycle mode of operation are as below: Sl. Module / Plant loading as % of Increase in Module/Plant heat No. installed capacity rate (%) 1 80-100 Nil 2 70-<80 7 3 60-<70 11 4 50-<60 16 iii) Impact on auxiliary energy consumption: The additional auxiliary energy consumption admissible at part loading of gas / liquid fuel based thermal generating station is proposed to be considered as below: Sl. Module / Plant loading as % of Admissible % additional auxiliary No. installed capacity energy consumption (% point) 1 80-100 Nil 2 70-<80 0.50 3 60-<70 0.80 4 50-<60 1.2082 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 2 1.3. In Regulation 37 of the Principal Regulations, after the clause (viii), the following clause shall be added, namely: (ix) Transit losses of coal: For coal and lignite, the transit and handling losses shall be as per the following norms: Thermal Generating Station Transit and Handling losses (%) Pit-head (using Rail/Road) 0.20% Non-pit head (All rail route – where loading into railway rakes is done by coal company) 0.80% Non-pit head (Road cum Rail or Sea Route – where coal is lifted from mines, transported 1.00% to good shed / other siding by road and then loading into railway rakes/Sea is done by generating company or other multi-modal transportation system involving multiple transshipments) Provided that in the case of any combination of the above modes of transportation, the transit and handling losses shall be calculated on pro-rata basis using the formula given below: Transit loss of coal / lignite based stations (%) = 0.2% x (Percentage of coal transported through pit-head source) + 0.8% x (Percentage of coal transported through All Rail Route) + 1.0% x (Percentage of coal transported through Road cum Rail or Sea Route or other multi-modal transportation system involving multiple trans-shipments). Provided further that in case of imported coal, the transit and handling losses applicable for pit-head station shall apply. (By Order of the Tamil Nadu Electricity Regulatory Commission) Chennai - 600 032, S. JOHN SUNDARARAJ, 10th July 2025. Secretary (In-charge), Tamil Nadu Electricity Regulatory Commission. Explanatory Statement The amendment to the TNERC (Terms and conditions for determination of Tariff) Regulations, 2005 is made by including the new items namely “(ix) Impact of Part Load Operation on performance of Thermal Generating Stations and (x) Transit losses of coal” due to the following reasons: 1. Tamil Nadu being the RE rich state and further potential for development of RE power projects, has to further promote development of RE power within the State in line with the RPO trajectory notified by the Ministry of Power. Accordingly, the Commission had earlier notified the Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2023. 2. Further, it is noted that the power generation mix is rapidly shifting towards a more significant share of Renewable Energy in our country. Further, the Government of India’s vision is to achieve Net Zero emissions by 2070, in addition to attain the short-term target of achieving 500 GW capacity by the year 2030. 3. Tamil Nadu is being the RE rich state, the generated RE power should be absorbed into the grid without any curtailment. To absorb such RE power, which are infirm in nature, the existing State owned thermal power plants should be ramped up and down very frequently, which results in increased station heat rate, auxiliary consumption, specific fuel consumption, etc. Most of the State owned thermal power plants operate at lesser PLF than the normative PLF of 80%. Therefore, it is necessary either to compensate these State owned Power Plants or fixing some relaxed technical parameters to these power plants. 4. It is pertinent to note that the Central Electricity Authority (CEA) vide their letter dated 15-03-2024 addressed to the Hon’ble CERC suggested “relaxed operational parameters” for the thermal power stations being operated at part load. 5. The TANGEDCO in their recent true-up petitions filed before the Commission for the year 2022-23 has requested to consider the actual operating parameters since the same is exceeded the normative operating parameters. 6. In order to safeguard the interest of the State owned Thermal Power Plants, the Commission has made this amendment duly considering the parameters suggested by the CEA. (By Order of the Tamil Nadu Electricity Regulatory Commission) Chennai - 600 032, S. JOHN SUNDARARAJ, 10th July 2025. Secretary (In-charge), Tamil Nadu Electricity Regulatory Commission.July 30, 2025] TAMIL NADU GOVERNMENT GAZETTE 83 Statements showing existing provisions and provisions as amended Amendment to Tamil Nadu Electricity Regulatory Commission (Terms and conditions for determination of Tariff) Regulations, 2005 Sl. Existing Regulation Regulation as amended No. 1. 37. Norms of Operation 37. Norms of Operation (i) To (vii) xxx (i) To (vii) xxx "(vii) (a) where any of the Generating station is directed by (viii) Impact of Part Load Operation on performance the State Load Despatch centre to operate below Target of Thermal Generating Stations: plant availability factor but at or above technical minimum, where any of the Generating station is directed by the such generating station may be compensated depending State Load Despatch centre to operate below Target plant on the average unit loading duly taking into account the availability factor but at or above technical minimum, forced outages, planned outages, PLF, generation at such generating station may be compensated depending on the average unit loading duly taking into account the generator terminal, energy sent out ex-bus, number of forced outages, planned outages, PLF, generation at start-stop, secondary fuel oil consumption and auxiliary generator terminal, energy sent out ex-bus, number of energy consumption, in due consideration of actual and start-stop, secondary fuel oil consumption and auxiliary normative operating parameters of station heat rate and energy consumption, in due consideration of actual and auxiliary energy consumption on monthly basis duly normative operating parameters of station heat rate and supported by relevant data verified by SLDC. auxiliary energy consumption on monthly basis duly supported by relevant data verified by SLDC. Provided that; 1. Coal/lignite based thermal generating stations: (i) In case of coal / lignite based generating stations, i) Impact on the station heat rate: following station heat rate degradation or actual heat rate, whichever is lower, shall be considered for the purpose of The applicable factors for unit heat rate degradation at compensation: part loading for sub-critical and super-critical units are as follows: Sl. Unit loading as Increase in Increase in SHR No. a % of installed SHR (for (for sub-critical Unit Heat Rate degradation (%) capacity of the super- units) (%) Sl. Unit loading (%) Sub-critical Super- unit critical units) (%) No. units critical units 1 85-100 Nil Nil 1 80 – 100 Nil Nil 2 75-84.99 1.25 2.25 2 75-<80 3.0 2.5 3 65-74.99 2 4 3 70-<75 4.0 3.3 4 55-64.99 3 6 4 65-<70 5.1 4.1 (ii) In case of coal/lignite based generating stations, the 5 60-<65 6.1 4.9 following auxiliary energy consumption degradation or actual, whichever is lower, shall be considered for the 6 55-<60 7.6 6.0 purpose of compensation: 7 50-<55 9.2 7.1 8 45-<50 11.3 8.3 Sl. Unit loading as a % of % degradation in 9 40-<45 13.8 9.9 No. installed capacity of AEC admissible the unit 1 85-100 Nil ii) Impact on auxiliary energy consumption: 2 75-84.99 0.35 The admissible additional auxiliary energy 3 65-74.99 0.65 consumption values at part loading of coal / lignite 4 55-64.99 1 based thermal generating stations are as follows:84 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 2 (b) Compensation for the station Heat Rate and Sl.No. Module / Plant Admissible % Auxiliary Energy consumption shall be worked out in loading as % of degradation in terms of energy charges. installed capacity auxiliary energy consumption (% point) (c) The compensation so computed shall be borne by 1 80 – 100 Nil the entity which has caused the plant to be operated at 2 70-<80 1.1 schedule lower than corresponding to Normative Plant Availability Factor up to technical minimum. 3 60-<70 1.8 4 50-<60 2.5 (d) No compensation for heat rate degradation and 5 40-<50 3.2 auxiliary energy consumption shall be admissible if the actual heat rate and / or actual auxiliary energy Provided that in case of additional auxiliary consumption are lower than the normative station heat consumption arised due to implementation of DeSOx rate and / or normative auxiliary energy consumption system and/or DeNOx system, the generation company concerned may file appropriate petition before the applicable to the unit (or) the generating station. Commission for revision of parameters. (e) There shall be reconciliation of the compensation iii) Impact on Specific Fuel Oil Consumption: at the end of the financial year in due consideration of Considering flexible operation requirement of coal actual operational parameters of station heat rate and based thermal stations in view of capacity addition from auxiliary energy consumption. Renewable sources, additional specific oil consumption of 0.2 ml/kWh is provided for units operating in 40- (f) No compensation for heat rate degradation and 55% average loading. auxiliary energy consumption shall be admissible if 2. Gas / liquid fuel based thermal generating the actual heat rate and / or actual auxiliary energy stations: consumption are lower than the normative station heat i) Impact on station heat rate: rate and / or normative auxiliary energy consumption applicable to the unit or the generating station in a The degradation of module / plant gross heat month or after annual reconciliation at the end of the rate for gas / liquid fuel based thermal generating stations in Combined Cycle Gas Turbine mode of year. operation are as below: (ii) Impact on auxiliary energy consumption: Sl.No. Module / Plant loading Increase in Module/ The admissible additional auxiliary energy consumption as % of installed Plant heat rate (%) values at part loading of coal / lignite based thermal capacity generating stations are as follows. 1 80-100 Nil 2 70-<80 5 3 60-<70 8 4 50-<60 12 ii) The degradation of module / plant heat rate for gas/liquid fuel based thermal generating stations in Open Cycle mode of operation are as below: Sl.No. Module / Plant Increase in Module/ loading as % of Plant heat rate (%) installed capacity 1 80-100 Nil 2 70-<80 7 3 60-<70 11 4 50-<60 16July 30, 2025] TAMIL NADU GOVERNMENT GAZETTE 85 iii) Impact on auxiliary energy consumption: The additional auxiliary energy consumption admissible at part loading of gas / liquid fuel based thermal generating station is proposed to be considered as below: Sl.No. Module / Plant Admissible % loading as % of additional auxiliary installed capacity energy consumption (% point) 1 80-100 Nil 2 70-<80 0.50 3 60-<70 0.80 4 50-<60 1.20 2 37. 37. (ix) Transit losses of coal: For coal and lignite, the transit and handling losses shall be as per the following norms: Thermal Generating Station Transit and Handling losses (%) Pit-head (using Rail/Road) 0.20% Non-pit head (All rail route – where 0.80% loading into railway rakes is done by coal company) Non-pit head (Road cum Rail or Sea 1.00% Route – where coal is lifted from mines, transported to good shed / other siding by road and then load- ing into railway rakes/Sea is done by generating company or other multi-modal transportation system involving multiple transshipments) Provided that in the case of any combination of the above modes of transportation, the transit and handling losses shall be calculated on pro-rata basis using the formula given below: Transit loss of coal / lignite based stations (%) = 0.2% x (Percentage of coal transported through pit-head source) + 0.8% x (Percentage of coal transported through All Rail Route) + 1.0% x (Percentage of coal transported through Road cum Rail or Sea Route or other multi-modal transportation system involving multiple trans-shipments). Provided further that in case of imported coal, the transit and handling losses applicable for pit-head station shall apply. (By order of the Tamil Nadu Electricity Regulatory Commission) Chennai - 600 032, S. JOHN SUNDARARAJ, 10th July 2025. Secretary (In-charge), Tamil Nadu Electricity Regulatory Commission.86 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 2 Nomination of member of the State Advisory Committee (Notification No.TNERC/SACR/2-60 dated 08.07.2025) (Lr.No. TNERC/Legal/1369/D.No.907/2025) No. VI(2)/17/2025. In exercise of the powers conferred on it by sub-section (1) and (2) of Section 87 of the Electricity Act, 2003 (Central Act No.36 of 2003) and as per Regulation 7 of the TNERC State Advisory Committee Regulations, 2004 the Tamil Nadu Electricity Regulatory Commission hereby nominate the following person as Member of the State Advisory Committee for the area of ‘Labour’ for the period of three years with immediate effect: S. No. Name and address of Member Area of Interest Thiru.V. Govindan, 1 Former State Treasurer, Electricity Board Workers’ Progress Association, Assistant Account Officer (Retired), Labour No.106A, 9th Street, North Jekanath Nagar, Villivakkam – Chennai 600049. Further, consequent to issuance of G.O. (Ms.) No.6, Energy (B2) Department, dated 24.01.2024, the erstwhile Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) was restructured into separate Generating and Distribution Companies, under the Companies Act, 2013. Post this, it has been renamed as ‘Tamil Nadu Power Distribution Corporation Limited’ (TNPDCL). As such, the erstwhile designation of Chairman & Managing Director/TANGEDCO has to be revised as Chairman & Managing Director/TNEB limited & TNPDCL, Chairman/ TNPGCL, TANTRANSCO & TNGECL. Accordingly, the following existing designation is revised for the area of interest of ‘Distribution Licensee’ as follows: Existing designation and Address Revised designation and Address of Area of Interest of Member Member Chairman & Managing Director, Chairman & Managing Director, TNEB Limited TNEB Limited and TANGEDCO Limited, & TNPDCL, Distribution No.144, Anna Salai, Chairman, TNPGCL, TANTRANSCO & Licensee Chennai 600 002. TNGECL, No.144, Anna Salai, Chennai 600 002. Further, consequent to issuance of G.O. (Ms.) No.7, Energy (B2) Department, dated 24.01.2024, Tamil Nadu Energy Development Agency (TEDA) has been merged with newly formed Tamil Nadu Green Energy Corporation Limited (TNGECL) under the Companies Act, 2013 by integrating Renewable Energy wing of TANGEDCO. As such the erstwhile post of Chairman & Managing Director/TEDA cease to exist and Managing Director/TNGECL is entrusted with the functions of TNGECL. Accordingly, the following existing designation is revised for the area of interest of ‘New and Renewable Sources of Energy’ as follows:July 30, 2025] TAMIL NADU GOVERNMENT GAZETTE 87 Existing designation and Address of Revised designation and Address of Area of Interest Member Member Chairman and Managing Director, Managing Director, Tamil Nadu Energy Development Agency Tamil Nadu Green Energy Corporation New and (TEDA), Limited (TNGECL), Renewable 5th Floor, No.144, Anna Salai, Sources of EVK Sampath Maaligai, Chennai-600 002. Energy College Road, Chennai-600 006. (By Order of the Tamil Nadu Electricity Regulatory Commission) Chennai - 600 032, S. JOHN SUNDARARAJ, 9th July 2025. Secretary (In-charge), Tamil Nadu Electricity Regulatory Commission. ததமிமிழ்ழ்நாநாாாடுடு மிமின்ன்சாசாாாரர ஒஒழுழுங்ங்குகுமுமுறைறைைை ஆஆறைறை��யயம்ம்,, செசெசாசான்ன்றைறை�� (அறிவிக்றைை எண்.த.மி.ஒ.ஆ/மாா.ஆ.கு.ஒ/2-60, நாாள்: 08.07.2025) (Lr.No. TNERC/Legal/1369/D.No.907/2025) 2003 ஆம் ஆண்டு மின்சாாரச் சாட்டத்தின் (மாத்தியச் சாட்டம் 36/2003) 87 ஆம் பிரிவின் (1) மாற்றும் (2) ஆம் உட்பிரிவு மாற்றும் 2004 ஆம் ஆண்டு தமிழ்நாாடு மின்சாார ஒழுங்குமுறைை ஆறை�ய – மாாநில ஆலோலாசாறை�க் குழு ஒழுங்குமுறைை விதிைளின், ஒழுங்குமுறைை விதி 7 ஆகியவற்றி�ால் அதற்கு வழங்ைப்பட்ட அதிைாரங்ைறைையும் செசாலுத்தி, தமிழ்நாாடு மின்சாார ஒழுங்குமுறைை ஆறை�யம் பின்வரும் நாபறைர ‘செதாழிலாைர்’ பிரதிநிதித்துவத்திற்ைா� மாாநில ஆலோலாசாறை�க் குழுவின் உறுப்பி�ராை மூன்று ஆண்டு ைாலத்திற்கு உட�டியாை அமாலுக்கு வரும் வறைையில் நியமா�ம் செசாய்கிைது. வரிறைசா உறுப்பி�ர் செபயர் பிரதிநிதித்துவம் எண் மாற்றும் முைவரி செசாய்யும் துறைை 1 வ.லோைாவிந்தன், முன்�ாள் மாாநில செபாருைாைர், மின்ைழை செதாழிலாைர் முன்லோ�ற்ை சாங்ைம், உதவி ை�க்கு அலுவலர் (ஓய்வு), செதாழிலாைர் ை.எண். 106A, 9 வது செதரு, வடக்கு செ�ைநாாத நாைர், வில்லிவாக்ைம், செசான்றை�-600049. லோமாலும், 24.01.2024 லோததியிட்ட அரசாாறை� (Ms.) எண்.6, எரிசாக்தி (B2) துறைையின் செவளியீட்டின் விறைைவாை, 2013 ஆம் ஆண்டு நிறுவ�ங்ைள் சாட்டத்தின் கீழ் முந்றைதய தமிழ்நாாடு மின் உற்பத்தி மாற்றும் பகிர்மாா�க் ைழை லிமிசெடட் (TANGEDCO), தற்லோபாது மின்உற்பத்தி மாற்றும் பகிர்மாா� நிறுவ�மாாை தனித்தனியாைப் பிரிக்ைப்பட்டது. இதன் பின்�ர், ‘தமிழ்நாாடு மின் பகிர்மாா�க் ைழை லிமிசெடட்’ (TNPDCL) எ� மாறுசெபயரிடப்பட்டது. இதன் ைார�மாாை, முந்றைதய தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார்/TANGEDCO பதவிறைய, தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார், TNEB லிமிசெடட் & TNPDCL, தறைலவர்/TNPGCL, TANTRANSCO & TNGECL எ� திருத்தப்பட லோவண்டும். அதன்படி, ‘மின்பகிர்மாா� உரிமாதாரரின்’ பிரதிநிதித்துவத்திற்ைா� தற்லோபாறைதய பதவி பின்வருமாாறு திருத்தப்படுகிைது: தற்லோபாதுள்ை உறுப்பி�ரின் பதவி திருத்தப்பட்ட உறுப்பி�ரின் பதவி பிரதிநிதித்துவம் மாற்றும் முைவரி மாற்றும் முைவரி செசாய்யும் துறைை தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார், தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார், TNEB லிமிசெடட் மாற்றும் TANGEDCO லிமிசெடட், TNEB லிமிசெடட் & TNPDCL, தறைலவர்/ மின்பகிர்மாா� எண்.144, அண்�ா சாாறைல, TNPGCL, TANTRANSCO & TNGECL, உரிமாம்தாரர் செசான்றை�-600 002 . எண்.144, அண்�ா சாாறைல, செசான்றை�-600 002.88 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 2 லோமாலும், 24.01.2024 லோததியிட்ட அரசாாறை� (Ms.) எண்.7, எரிசாக்தி (B2) துறைையின் செவளியீட்டின் விறைைவாை, 2013 ஆம் ஆண்டு நிறுவ�ங்ைள் சாட்டத்தின் கீழ், ‘தமிழ்நாாடு எரிசாக்தி வைர்ச்சி முைறைமாயா�து’ (TEDA), தற்லோபாது TANGEDCO வின் புதுப்பிக்ைத்தக்ை எரிசாக்தி பிரிறைவ ஒருங்கிறை�த்து, புதிதாை உருவாக்ைப்பட்ட தமிழ்நாாடு பசுறைமா எரிசாக்தி நிறுவ�த்துடன் (TNGECL) ஒன்றிறை�க்ைப்பட்டுள்ைது. இதன் ைார�மாாை, முந்றைதய தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார்/TEDA பதவி நீக்ைப்பட்டு, தமிழ்நாாடு பசுறைமா எரிசாக்தி நிறுவ�த்தின் செசாயல்பாடுைள் லோமாலாண்றைமா இயக்குநார்/TNGECL-லிடம் ஒப்பறைடக்ைப்பட்டுள்ை�. அதன்படி, ‘புது மாற்றும் புதுப்பிக்ைத்தக்ை எரிசாக்தி ஆதாரங்ைள்’ என்ை பிரதிநிதித்துவத்திற்ைா� தற்லோபாதுள்ை பதவி பின்வருமாாறு திருத்தப்படுகிைது: தற்லோபாதுள்ை உறுப்பி�ரின் பதவி திருத்தப்பட்ட உறுப்பி�ரின் பதவி பிரதிநிதித்துவம் மாற்றும் முைவரி மாற்றும் முைவரி செசாய்யும் துறைை தறைலவர் மாற்றும் லோமாலாண்றைமா இயக்குநார், லோமாலாண்றைமா இயக்குநார், தமிழ்நாாடு பசுறைமா புது மாற்றும் தமிழ்நாாடு எரிசாக்தி வைர்ச்சி முைறைமா, எரிசாக்தி நிறுவ�ம், புதுப்பிக்ைத்தக்ை 5 வது தைம், ஈ.வி.லோை. சாம்பத் மாாளிறைை, எண்.144, அண்�ா சாாறைல, எரிசாக்தி ஆதாரங்ைள் ைல்லூரி சாாறைல, செசான்றை�-600 006. செசான்றை�-600 002. (தமிழ்நாாடு மின்சாார ஒழுங்குமுறைை ஆறை�யத்தின் ஆறை�ப்படி) செசான்றை� 600 032, எஎஸ்ஸ்..��ாான்ன் சுசுந்ந்ததரரரராாஜ்ஜ்,, 2025 �ூறைல 9. செசாயலாைர் (செபாறுப்பு), தமிழ்நாாடு மின்சாார ஒழுங்குமுறைை ஆறை�யம். PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI ON BEHALF OF THE GOVERNMENT OF TAMIL NADU