**Executive Summary** This document is a notification from the Tamil Nadu Government Gazette, dated December 30, 2020, regarding the erection of transmission lines and sub-stations by the Tamil Nadu Transmission Corporation Limited (TANTRANSCO). The notifications originate from the General Construction Circles of Coimbatore, Trichy and Madurai, outlining specific projects and soliciting public representation on the proposed schemes within one or two months of the publication date, as per the Electricity Act 2003. **Key Points / Main Content** * **General - TNTRANSCO Sanction**: TANTRANSCO has sanctioned the erection of transmission lines to transmit and distribute power to meet additional demands. * **General - Work Timeline**: The work on these projects will be taken up shortly. * **Coimbatore - Erection of Transmission Lines (Item 1)**: * Erection of a 110 KV DC line on DC towers with Panther conductor to make a LILO of the existing Pykara-Thudiyalur 110KV feeder at the proposed Malarbettu 110/11KV SS. * Route Length: 0.625 Km. * Revenue Village: Kadanadu. * District: Nilgris. * Reference CH TANTRANSCO Proceedings No.58, dt, 03.03.2020 * **Trichy - Erection of Transmission Lines (Item 2)**: * Proposed new SUB Stations: Thennilai/Karur, Nellithoppu/Cuddalore, Irumbai/Villupuram * Erection of 110 KV DC lines: * LILO of 110 KV Pugalur Ayyarmalai feeder to the Proposed Othakadai 110/33-11KV SS (18 km). * LILO of the 110 KV Pugalur - Renganathapuram feeder at the proposed Thennilai 110 KV SS (16 km). * LILO of existing 110 KV Kumbakonam KGTPS feeder at the proposed Thirunageswaram 110/33-11 KV SS (10 km). * LILO of existing 110 KV Neyveli – Villupuram feeder I at the proposed Nellithoppu 110/22 KV SS at Palapattu (15 km). * LILO of the existing Villupuram - Madhurapakkam feeder - I at the proposed Irumbai 110 KV SS (6 km). * LILO of the existing Thiruvarambur - K.Sathanur feeder for a distance of 2.16 Kms and laying of DC 110 KV, 1X630 sq.mm XLPE AL UG cable to the sanctioned Mannarpuram 110 KV SS (4.86 km). * **Madurai - Erection of Transmission Lines (Item 3)**: * Erection of 110 KV DC lines: * New 110 KV double-circuit towers in single-circuit transmission lines with Panther conductors. From Velayuthapuram 110 KV substation to Vilathikulam 110 KV substation (35 km). * New 110 KV double-circuit towers in single-circuit transmission lines with Panther conductors. From Udankudi 110 KV substation to Udankudi Super Critical Thermal Power Project 110 KV substation (10.5 km). * From existing 110 kV Kavaanur-Keelakarai RKCPP transmission line to new Theriruveli 110 kV substation 110 kV double circuit transmission line, install Panther electric conductor and construct indoor and outdoor transmission line (0.09 km). **Impact Analysis** **Interested Parties (Coimbatore and Trichy)** * **Impact**: Potentially affected by the erection of transmission lines and related infrastructure. * **Action Required**: Can submit representations or objections to the Superintending Engineer of the General Construction Circle within 1 month from the date of the document's publication. **Residents/Businesses in Madurai, Dindigul, Ramanathapuram, Sivaganga, Theni, Nagercoil, Tirunelveli, Tuticorin, and Virudhunagar districts** * **Impact**: May experience improved power supply and potential disruption during the construction phase. * **Action Required**: Can submit objections or suggestions to the Superintending Engineer of the General Construction Circle within 2 months from the date of the document's publication.

Key Entities Referenced

Tamil Nadu Transmission Corporation Limited: State owned electricity transmission company. Electricity Act, 2003: Indian law governing the electricity sector. Tamil Nadu Government Gazette: Official gazette publishing government notifications. Chennai: Location where the Tamil Nadu Government Gazette is published.
Official Source Record View Original Source →
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2020 [Price : Rs. 2.40 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 53] CHENNAI, WEDNESDAY, DECEMBER 30, 2020 Margazhi 15, Saarvari, Thiruvalluvar Aandu–2051 Part VI—Section 3(b) Notifications issued by Quasi - Government bodies and Public Sector undertakings. NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. CONTENTS Pages. TAMIL NADU TRANSMISSION CORPORATION LIMITED General Construction Circle, Coimbatore—Erection of Transmission Lines .. 60-61 General Construction Circle, Trichy—Erection of Transmission Lines .. 61-62 ªð£¶ G˜ñ£í õ†ì‹, ñ¶¬ó .. .. .. .. .. 63 [59] DTP—VI-3(b) (53)6 0 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. TAMIL NADU TRANSMISSION CORPORATION LIMITED GENERAL CONSTRUCTION CIRCLE, COIMBATORE. Erection of Transmission Lines [Lr.No.SE/GCC/CBE/AEE/Moni/F.Malarbettu/D.No.973/20.] No.VI-3(b)/20/2020. TANTRANSCO has accorded sanction for erection of the following Transmission line to Transmit and Distribute Power so as to meet out additional demands. The work will be taken up shortly. Route Name of the Revenue Name of the Sub-station Name of the Sl. No B.P. No. Length Villages through which the / Details of EHT lines District (Km) line will be passing (1) (2) (3) (4) (5) (6) 1 Erection of 110 KV DC line (Per) CH 0.625 Kadanadu Nilgris District on DC towers with Panther TANTRANSCO conductor for making LILO Proceedings of the existing Pykara- No.58, Thudiyalur 110KV feeder dt, 03.03.2020 at the proposed Malarbettu 110/ 11KV SS. The Revenue Village through which the line passing through is only a tentative and not exhaustive. Any person interested may make representation on the above scheme within 1 month from the date of issue of this publication to the undersigned as per the Electricity Act, 2003. E(cid:3482). K.N. SANTHINI, Coimbatore-12, Superintending Engineer, 26th December 2020. General Construction Circle. îI›ï£´ I¡ªî£ìó¬ñй‚ èöè‹ LIªì† ªð£¶‚ 膴ñ£ù õ†ì‹, «è£ò‹¹ˆÉ˜. ÜPM‚¬è [Lr.No.SE/GCC/CBE/AEE/Moni/F.Malarbettu/DNo.973/20.] Ã´î™ I¡ «î¬õ¬ò G¬ø¾ ªêŒFì îI›ï£´ I¡ªî£ìó¬ñй èöè‹ LIªì† W›è‡ì ÞìƒèO™ Iè àòó¿ˆî I¡ð£¬î ܬñˆ¶ M¬óM™ ðE ¶õƒè àœ÷¶. ¶¬í I¡G¬ôò‹/ î.I. õ£Kò‹ I¡ð£¬î I¡ð£¬î ªê™½‹ õ¼õ£Œ õ.⇠àòó¿ˆî I¡ð£¬î ñ£õ†ì‹ â‡. c÷‹ (A.e) Aó£ñƒèO¡ ªðò˜èœ Mõó‹ (1) (2) (3) (4) (5) (6) 1. 110A.«õ£ (Per) CH 0.625 èì côAK ¬ð‚è£ó£- ¶®òÖ˜- TANTRANSCO I¡Û†®JL¼‰¶ Proceedings ñô˜ªð†´ 110/11 A«õ£ No.58, ¶¬íI¡ G¬ôò‹ õ¬ó dt 03-03-2020 ªê™½‹ Þó†¬ì ²ŸÁ 110 A«õ£ I¡ «è£¹óˆF™ Þó†¬ì ²ŸÁ 110 A«õ£ I¡ ð£¬î ܬñˆî™Dec. 30, 2020] TAMIL NADU GOVERNMENT GAZETTE 61 «ñŸ°PŠHìŠð†´œ÷ I¡ð£¬î ªê™½‹ õ¼õ£Œ Aó£ñ‹ àˆ«îêñ£ù‹. MKõ£ù¶ Ü™ô. «ñŸ°PŠH†ì ðEèœ °Pˆ¶ âõ«ó‹ º¬øf´èœ ªîKM‚è M¼‹Hù£™ Þ‰î ÜP‚¬è ªõOJìŠð†ì ï£OL¼‰¶ å¼ ñ£îˆFŸ°œ W«ö °PŠH†´œ÷ ÜFè£K‚° I¡ê£ó ê†ì‹ 2003-¡ ð® º¬øf´ ªêŒòô£‹. «è£ò‹¹ˆÉ˜&12, E(cid:3482). K.N. SANTHINI, 2020, ®ê‹ð˜ 26. «ñŸð£˜¬õŠ ªð£Pò£÷˜, ªð£¶‚膴ñ£ù õ†ì‹. TAMIL NADU TRANSMISSION CORPORATION GENERAL CONSTRUCTION CIRCLE, TRICHY. Erection of Transmission Lines [Lr.No.SE/GCC/TRY/AEE/GL/DB/F.Press Gazette Publication/D.1039/20.] No.VI-3(b)/21/2020. The Tamil Nadu Electricity Board has sanctioned the following Transmission lines an SUB Stations to transit and distribute power to various load centres and the works are to be taken up shorty under T&D Scheme. Discription of work I.SUB - STATIONS:- Sl. No Name of the Sub-Station / District Ratio 1 Thennilai/Karur 110 2 Nellithoppu/Cuddalore 110 3 Irumbai/Villupuram 110 II. TRANSMISSION LINES :- Sl. No. Name of the Line Route length in km 1 Erection of 110 KV DC line on DC towers with panther conductor making LILO of 110 KV 18 Pugalur - Ayyarmalai feeder to the Proposed Othakadai 110/33-11KV SS 2 Erection of 110 KV DC line on DC towers with panther conductor by making LILO of the 16 110 KV Pugalur - Renganathapuram feeder at the proposed Thennilai 110 KV SS 3 Erection of 110 KV DC line on DC tower with Panther conductor for making LILO of existing 10 110 KV Kumbakonam – KGTPS feeder at the proposed Thirunageswaram 110/33-11 KV SS 4 Erection of 110 KV DC line on DC towers with Panther conductor by making LILO of 15 existing 110 KV Neyveli – Villupuram feeder I at the proposed Nellithoppu 110/22 KV SS at Palapattu 5 Erection of 110 KV DC line on DC towers with panther conductor for making LILO of the 6 existing Villupuram - Madhurapakkam feeder - I at the proposed Irumbai 110 KV SS 6 Erection of 110 KV DC line on DC towers with panther conductor for making LILO of the 4.86 existing Thiruvarambur - K.Sathanur feeder for a distance of 2.16 Kms. (ie) from loc. 1 to 16 and laying of DC 110 KV, 1X630 sq.mm XLPE AL UG cable from loc. 16 to the sanctioned Mannarpuram 110 KV SS. This notifi cation is published for general information to the public. If any objection regarding the above schemes, that may be appealed to the undersigned within one month from the date of issued of publication as requested in Section 164 of Electricity Act, 2003. Trichy, E(cid:3482). K. RAJAGUNASEELAN, 26th December 2020. Superintending Engineer, General Construction Circle.6 2 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) îI›ï£´ I¡ ªî£ìó¬ñй èöè‹ ªð£¶ G˜ñ£í õ†ì‹, F¼„C ÜPM‚¬è [Lr.No.SE/GCC/TRY/AEE/GL/DB/F.Press Gazette Publication/D.1039/20.] gytifkpd;jpwd; nfhz;l Jizkpd; epiyaq;fs; kw;Wk; cah; mOj;jkpd; ghijfs; mikj;jy; jkpo;;ehL kpd;rhu thhpak; $Ljy; kpd; Rikia epiwT nra;tjw;fhf fPo;f;fz;l Jizkpd; epiyaq;fs; kw;Wk; cah; mOj;jkpd;ghijfs; mikf;f xg;Gjy; toq;fpAs;sJ. mjw;fhd fl ;Lkhdg;gzpfs; tpiutpy; $Ljy; jiyik nghwpahsh; / nghJeph;khztl;lk; /jpUr;rp mth;fshy; vLj;Jf; nfhs;sg;glTs;sJ. Ntiyapd; tpguk;:- I. JJiizz kkppdd;; eeppiiyyaa‹ kpd; thpir Jizkpd; epiyaj;jpd; ngah; / khtl;lk; mOj;jk; vz;. fp.Nth. 1. njd;dpiy / f&h; 110 2. ney;ypj;Njhg;G / fl Yhh; 110 3. ,Uk;ig / tpOg;Guk; 110 II. àò˜I¡ Ü¿ˆîð£¬îèœ thpir Ntiyapd; ngah; fp.kP. vz;. f&h; khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; GfYhh; - ma;ah;kiy 110 fp.Nth kpd;ghijapypUe;J 1. 18.00 xj;jf;fi l 110/33–11 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W kpd;ghij mikj;jy.; f&h; khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; GfYhh; - uq;fehjh;Guk; 110 fp.Nth kpd;ghijapypUe;J 2. 16.00 njd;dpiy 110 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W kpd;ghij mikj;jy; jQ;rht+h; khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; Fk;gNfhzk; - KGTPS 110 fp.Nth kpd;ghijapypUe;J 3. 10.00 jpUehNf];tuk; 110/33–11 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W kpd;ghij mikj;jy.; fl Yhh; khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; nea;Ntyp - tpOg;Guk; 110 fp.Nth kpd;ghijapypUe;J 4. ghyg;gl;by; mikaTs;s ney;ypj;Njhg;G 110 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W 15.00 kpd;ghij mikj;jy.; tpOg;Guk; khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; tpOg;Guk; - kJug;ghf;fk; 110 fp.Nth 5. kpd;ghijapypUe;J ,Uk;ig 110 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W kpd;ghij 6.00 mikj;jy.; jpUr;rp khtl;lk; - Vw;fdNt nrd;Wnfhz;bUf;Fk; jpUntwk;g+h; - Nf.rhj;jDhh; 110 fp.Nth 4.86 6. kpd;ghijapypUe;J kd;dhh;Guk; 110 fp.Nth J.kp.ep tiuapyhd 110 fp.Nth ,ul;ilr;Rw;W kpd;ghij 2.16 fp.kPl;lh; tiu mikj;jJ kPjKs;s gFjp Gjtil 110 fp.Nth kpd;ghij mikf;Fk;gzp. Nkw;fz;l jpl;lq;fs; Fwpj;j VNjDk; KiwaPLfs; ,Ug;gpd; ,t;twpf;if ntspaplg;gl;l ehspypUe;J xU khjj;jpw;Fs; fPNo ifnahg;gkpl;l mYtyhplk; 2003 k; Mz;L kpd;rhurl;lk;> gphpT 164 kw;Wk; 168 d; gb KiwaPLnra;ayhk; vd Nfl ;Lf;nfhs;sg;gLfpwJ. F¼„C, E(cid:3482). K. RAJAGUNASEELAN, 2020, ®ê‹ð˜ 26. «ñŸð£˜¬õŠ ªð£Pò£÷˜, ªð£¶ G˜ñ£z õ†ì‹.Dec. 30, 2020] TAMIL NADU GOVERNMENT GAZETTE 63 îI›ï£´ I¡ ªî£ìó¬ñй‚ èöè‹ ªð£¶ G˜ñ£í õ†ì‹, ñ¶¬ó. ÜPM‚¬è [Lr.No.SE/GCC/MDU/AEE/MONI/D.No.1089/20.] No.VI-3(b)/22/2020. ÞšõP‚¬è ªð£¶ ñ‚èO¡ ïô¡ è¼F 2003-Ý‹ ݇®¡ I¡ê£ó ê†ì‹ HK¾ 185-¡ W› à†HK¾ (2)(a) - M¡ð® ãŸèù«õ î‰F ¶¬ø‚° õöƒèŠð†´œ÷ ÜFè£óˆF¡ð® I¡ê£óˆ¬î ªè£‡´ ªê™ô 2003-‹ ݇´ I¡ê£ó HK¾ 164-¡W› õ£KòˆFŸ° Þ‰Fò I¡ê£ó ê†ìˆF¡ W› ÜÂñF õöƒA»œ÷¶. îI›ï£´ ñ£Gô‹, ñ¶¬ó, F‡´‚è™, Þó£ñï£î¹ó‹, Cõ胬è, «îQ, ï£è˜«è£M™, F¼ªï™«õL, Ɉ¶‚°®, M¼¶ïè˜ ñ£õ†ìƒèO¡ Ã´î™ I¡²¬ñ¬ò G¬ø¾ ªêŒõîŸè£è W›‚è‡ì ÞìƒèO™ ¹Fî£è ¶¬í I¡ G¬ôò‹ ܬñ‚辋, ÜõŸ«ø£´ «ê˜‰î I¡ð£¬îè¬÷»‹ õ¼‹ 2020-2021 ݇´èO™ GÁ¾õ îI›ï£´ I¡ê£ó õ£KòˆFì‹ ÜÂñF ªðŸÁ‹ àœ÷¶. õK¬ê ⇠¶¬í I¡G¬ôò‹ ñŸÁ‹ I¡ð£¬î I¡ð£¬î c÷‹ I¡ð£¬î ªñ£ˆî ñFŠd´ A.e. Ü¿ˆî‹ (ô†êˆF™) (1) (2) (3) (4) (5) 1. ¹Fî£è 110 A«õ£ Þó†¬ì„²ŸÁ I¡«è£¹óˆF™ 35.00 110 A.«õ£ 2135.70 埬ø„²ŸÁ I¡ð£¬îJ™ ð£¡î˜ èìˆF¬ò ªð£¼ˆF «õô£»î¹ó‹ 110 A«õ£ ¶¬íI¡ G¬ôòˆF™ Þ¼‰¶ M÷£ˆF°÷‹ 110 A«õ£ ¶¬íI¡ G¬ôò‹ õ¬ó I¡ð£¬î ܬñˆî™. 2. ¹Fî£è 110 A«õ£ Þó†¬ì„²ŸÁ I¡«è£¹óˆF™ 10.50 110 A.«õ£. 640.710 埬ø„²ŸÁ I¡ð£¬îJ™ ð£¡î˜ èìˆF¬ò ªð£¼ˆF àì¡°® 110 A«õ£ ¶¬íI¡ G¬ôòˆF™ Þ¼‰¶ àì¡°® ÅŠð˜ AK†®‚è™ ªî˜ñ™ ðõ˜ Šó£ü‚† 110 A«õ£ ¶¬íI¡ G¬ôò‹ õ¬ó I¡ð£¬î ܬñˆî™. 3. ãŸèù«õ àœ÷ 110 A.«õ£. è£õÛ˜- Wö‚è¬ó RKCPP 0.09 110 A.«õ£ 6.204 I¡ð£¬îJ™ Þ¼‰¶ ¹Fî£è ܬñ‚èŠð쾜÷ ªîK¼«õL 110 A.«õ£. ¶¬í I¡ G¬ôòˆFŸ° 110 A.«õ£. Þó†¬ì„²ŸÁ I¡«è£¹óˆF™ Þó†¬ì„ ²ŸÁ I¡ð£¬îJ™ ð£¡î˜ I¡ èìˆF¬ò ªð£¼ˆF àœªõO I¡ð£¬î ܬñˆî™. «ñŸ°PŠH†ì F†ìƒèO™ àò˜ Ü¿ˆî I¡ð£¬î ªê™½‹ õNJ™ ã«î‹ º¬øf´èœ Þ¼‰î£™, M¼Šð‹ àœ÷õ˜èœ ÞšõP‚¬è ªõOJ†ì ï£OL¼‰¶ Þó‡´ ñ£îˆFŸ°œ W›‚ ¬èªò£ŠðI†ì ÜFè£KJì‹ 2003-‹ ݇®¡ I¡ê£ó‹ ê†ìŠ HKM¡ð® ªîKM‚è«õ‡´‹. ñ¶¬ó, Ü. î£ó£, 2020, ®ê‹ð˜ 26. «ñŸð£˜¬õŠ ªð£Pò£÷˜, ªð£¶ G˜ñ£í õ†ì‹. PRINTED AND PUBLISHED BY THE COMMISSIONER OF STATIONERY AND PRINTING, CHENNAI ON BEHALF OF THE GOVERNMENT OF TAMIL NADU