Date: 2015-06-22Category: Extra OrdinaryState: Union GovernmentCountry: India
The brief description of which is given in the Schedule below, is required for building (widening/four laning, etc), maintenance, management and operation of National Highway No. 18 on the stretch of land from Km. 224/360 to Km. 350/450 (Kadapa-Kurnool Section) in Kurnool District, in the State of Andhra Pradesh, hereby declares its intention to acquire such land
**Executive Summary:**
This notification, issued by the Ministry of Road Transport and Highways, declares the Central Government's intention to acquire land in the Kurnool district of Andhra Pradesh for the building, widening, and maintenance of National Highway No. 18. The affected land spans from Km 224.360 to Km 350.450 of the Kadapa-Kurnool section. Individuals with interest in the land have 21 days from the notification's publication date (June 22, 2015) to object to the land acquisition.
**Key Points / Main Content:**
* **Purpose of Notification:** Declaration of intent to acquire land for National Highway No. 18 improvements.
* **Legal Basis:** The notification is issued under Section 3A(1) of the National Highways Act, 1956.
* **Geographic Location:** The land acquisition affects the Kurnool district in Andhra Pradesh.
* **Highway Section:** National Highway No. 18, Kadapa-Kurnool section, Km 224.360 to Km 350.450.
**Objection Process:**
* **Objection Period:** 21 days from the publication date (June 22, 2015).
* **Competent Authority:** Objections must be submitted in writing to the Joint Collector, Kurnool District, Andhra Pradesh.
* **Objection Requirements:** Objections must include the grounds for the objection.
* **Hearing:** Objectors have the opportunity to be heard in person or through a legal representative.
* **Authority Decision:** The competent authority can either allow or disallow the objections, with the order being final.
**Land Details:**
* **Availability:** Land plans and other details are available for inspection at the office of the competent authority.
* **Description:** The schedule provides a brief description of the land with or without structure.
**Impact Analysis:**
**Landowners/Interested Parties:**
* Impact: Potential loss of land due to acquisition for highway construction.
* Action Required: If desired, submit objections to the Joint Collector within 21 days of the notification, including the grounds for objection.
**Competent Authority (Joint Collector, Kurnool):**
* Impact: Responsible for receiving, reviewing, and addressing objections related to land acquisition.
* Action Required: Provide a hearing to objectors, conduct necessary inquiries, and issue orders either allowing or disallowing objections.
**Central Government (Ministry of Road Transport and Highways):**
* Impact: Responsible for the land acquisition process for the building, widening, maintenance, management and operation of National Highway No. 18.
* Action Required: Ensure that the acquisition process adheres to the National Highways Act, 1956 and take note of any order made by the competent authority.
Key Entities Referenced
National Highways Act, 1956: A law enacted by the Central Government of India concerning national highways.
Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of road transport and national highways.
National Highway No. 18: A national highway in India that is subject to widening and construction as described in the notification.
Andhra Pradesh: A state in India where the land acquisition for the highway project is taking place.
Kurnool District, Andhra Pradesh: A district in Andhra Pradesh where the specified section of National Highway 18 is located.
Kadapa Kurnool Section: A specific section of National Highway No. 18 between Kadapa and Kurnool that is subject to the notification.
Joint Collector, Kurnool: The competent authority in Kurnool District, Andhra Pradesh, responsible for handling objections related to the land acquisition.
New Delhi: The location where the notification was issued.
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 1297] ubZ fnYyh] lkseokj] twu 22] 2015@vk"kk<+ 1] 1937
No. 1297] NEW DELHI, MONDAY, JUNE 22, 2015/ ASADHA 1, 1937
lM+d ifjogu vkSj jktekxZ ea=ky;
vf/klwpuk
ubZ fnYyh] 22 tuw ] 2015
dk- vk- 1656¼v½-& dUs nzh; ljdkj] jk"Vªh; jktekxZ vf/kfu;e] 1956 ¼1956 dk 48½ ¼ftl s ble sa bld s i”pkr~
mDr vf/kfu;e dgk x;k gS½ dh /kkjk 3d dh mi/kkjk ¼1½ }kjk iznRr ”kfDr;k sa dk iz;kxs djr s gq,] ;g lek/kku gk s tku s d s
i”pkr~ fd vk/a kz izns”k jkT; d s dqjuyw fty s e sa jk"Vªh; jktekxZ l[a ;k 18 d s 224@360 fd-eh- l s 350@450 fd-eh- rd
¼dMkik&dqjuyw lDs ”ku½ ds fuekZ.k ¼pkSM+k dju@s pkj ysu dk cuku]s vkfn½] vuqj{k.k] izc/a k vkSj izpkyu d s ykds iz;kts u d s
fy, og Hkfwe vifs{kr gS] ftldk lfa{kIr o.kZu uhp s vuqlpw h e sa fn;k x;k gS] ,slh Hkfwe dk vtZu dju s d s viu s vk”k; dh
?kk"sk.kk djrh gS (
dkbs Z O;fDr] tk s mDr Hkfwe e sa fgrc) gS] mDr vf/kfu;e dh /kkjk 3x dh mi/kkjk ¼1½ d s v/khu iwoksZDr iz;kts u
d s fy, ,slh Hkfwe d s mi;kxs ij jkti= e sa bl vf/klpw uk d s izdk”ku dh rkjh[k l s bDdhl fnu d s Hkhrj vk{kis dj
ldxs k (
,slk izR;ds vk{kis l{ke izkf/kdkjh] vFkkZr ~ l;aa qDr dyDVj] dqjuyw ] ftyk dqjuyw ] vk/a kz inz ’sk] dk s fyf[kr :i e sa
fd;k tk,xk vkSj mle sa mld s vk/kkj vf/kdfFkr fd, tk,xa s vkSj l{ke izkf/kdkjh vk{kis drk Z dk s O;fDrxr :i esa ;k fdlh
fof/k O;olk;h }kjk lqu s tku s dk volj nxs k vkSj ,sl s lHkh vk{kis k sa dh lquokbZ dju s d s i”pkr~ rFkk ,slh vkSj tk¡p dju s
d s i”pkr~] ;fn dkbs Z gk]s ftl s l{ke izkf/kdkjh vko’;d le>]s vkn”s k }kjk ;k rk s vk{kis k sa dk s vuqKkr dj ldxs k ;k
vuuqKkr dj ldxs k (
mDr vf/kfu;e dh /kkjk 3x dh mi/kkjk ¼2½ d s v/khu l{ke izkf/kdkjh }kjk fd;k x;k dkbs Z vkn”s k vfare gkxs k (
bl vf/klpw uk d s varxZr vku s okyh Hkfwe d s Hkwj[s kkda vkSj vU; C;kSj s l{ke izkf/kdkjh d s mDr dk;kZy; e sa miyC/k gS a
vkSj mudk fgrc) O;fDr;k sa }kjk fujh{k.k fd;k tk ldrk gS A
2752 GI/2015 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
अअअअननननससुुससुु चचूूचचूू ीीीी
vk/a kz izn”s k jkT; d s dqjuyw fty s e sa jk"Vªh; jktekxZ l[a ;k 18 d s 224@360 fd-eh- l s 350@450 fd-eh- rd ¼dMkik&dqjuyw
lDs ”ku½ d s fy, vtZu dh tku s okyh lajpuk lfgr vFkok lajpuk jfgr Hkfwedk lfa{kIr fooj.k A
(cid:1)म िजले का तालूक/ गाँव का नाम भूिम का भूिम क(cid:24)
सव(cid:14)(cid:15)ण/ (cid:15)े(cid:28)फल
सं(cid:6)या नाम म(cid:9)डल का (cid:19)कार (cid:19)कृित
(cid:17)लांट सं(cid:6)या (एकर म(cid:29))
नाम
1 2 3 4 5 6 7 8
1 कुनू ल 1.चगलामर# प$े ाबोदनम 519िब/2ए2 िनजी शु&क
0.01
520िब/2 िनजी शु&क 0.03
2. पनयाम पनयाम 1230/1िब िनजी शु&क 0.36
1230/2िब िनजी शु&क 0.16
1238/2 िनजी शु&क 0.49
[Qk- l-a Hkk-jk-jk-izk-@chvkVs h@11012@58@07@2006+ @,y-,-]
Ekk;k izdk’k] fun’skd
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
NOTIFICATION
New Delhi, 22nd June, 2015
S.O. 1656(E).— In exercise of the powers conferred by sub – section (1) of section 3A of the National
Highways Act, 1956 (48 of 1956) (hereinafter referred to as the said Act), the Central Government, after being satisfied
that for the public purpose, the land, the brief description of which is given in the Schedule below, is required for
building (widening / four laning, etc), maintenance, management and operation of National Highway No. 18 on the
stretch of land from Km. 224/360 to Km. 350/450 (Kadapa – Kurnool Section) in Kurnool District, in the State of
Andhra Pradesh, hereby declares its intention to acquire such land ;
Any person interested in the said land may within twenty-one days from the date of publication of this
notification in the Official Gazette, object to the use of such land for the aforesaid purpose, under sub-section (i) of
section 3C of the said Act ;
Every such objection shall be made to the competent authority, namely, the Joint Collector, Kurnool, Kurnool
District, Andhra Pradesh, in writing and shall set out the grounds thereof and the Competent authority shall give the
objector an opportunity of being heard, either in person or by a legal practitioner, and may after hearing all such
objections and after making such further enquiry, if any, as the competent authority thinks necessary, by order, either
allow or disallow the objections ;
Any order made by the competent authority under sub-section (2) of section 3C the said Act shall be final ;
The land plans and other details of land covered under this notification are available and can be inspected by
the interested persons at the office of the competent authority.¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 3
SCHEDULE
Brief description of the land with or without structure, falling within the stretch of land from Km. 224.360 to
Km. 350.450 (Kadapa - Kurnool Section) of the National Highway No. 18 in the State of Andhra Pradesh.
Area
Serial Name of Name of the Name of the Survey Type of Nature
(in
number the district Taluk/Mandal Village number Land of Land
Acres)
1 2 3 4 5 6 7 8
1 Kurnool 1. Chagalamarri Peddabodnam 519B/ 2A2 Private Dry 0.01
520B/2 Private Dry 0.03
2. Panyam Panyam 1230/ 1B Private Dry 0.36
1230/ 2B Private Dry 0.16
1238/ 2 Private Dry 0.49
[F. No. NHAI/BOT/11012/58/07/2006/LA).]
MAYA PRAKASH, Director
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.